×
However, the changes that were pushed onto West should also be backed off while the district has a long overdue, community-wide conversation about what it desires its high schools to provide all students. And this time, let's have that discussion backed with empirical studies.
Marc Eisen: The good news is that the feds refused to fund the school district's proposal to revamp the high schools. The plan was wrongheaded in many respects, ...
MMSD High School Redesign Committee Selected. According to a report from a recent East High United meeting, where MMSD Assistant Superintendent for Secondary ...
work in high school reform to date has focused on organizational aspects of high school, particularly creating a wide variety of smaller schools, smaller ... A district attempting to redesign standards and assessment to support high school instruction could address these challenges by developing “anchor ...
should not be limited only to those students who have traditionally been considered most able to benefit from them. The results of this study provide ample evidence that we must move the agenda for high school redesign in a direction that will prepare all students for success, no matter which path they choose after ...
The Madison School Board will discuss the Administration's High School Redesign plans on Monday evening, November 27, 2006, according to their calendar [ ...
Nov 22, 2006 · The uproar over proposed changes in East High School's curriculum has apparently prompted Madison School Superintendent Art Rainwater to announce a halt to any plans to change programming at Madison's four major high schools. Here's Rainwater's message to his principals:.
PROJECT GOALS. 1. All high schools will elevate the academic performance and graduation and post-secondary enrollment rates of all students, especially Black, Hispanic, and low-income students. 2. All high school staff will effectively deliver academically rigorous curriculum and instruction, and.
Allows for the construction of ten new classrooms to mitigate overcrowding in the district's middle school/high school building. Source: The Rye Sound ... ❖ Renovation of high school boys and girls locker rooms. ❖ Renovation of the high school guidance suite. ❖ Renovation of the middle school nursing office.
Missing: Redesign | Show results with:Redesign
Jan 12, 2017 · Kitchen: Grade based upon completion of kitchen renovation as part of 2016-2017 renovation. After School Program: Takes place in the cafeteria ... staff parking area between middle school and high school areas as waiting area. Fire Truck Access: Road access on 2 sides open areas on other sides ...
Missing: Redesign | Show results with:Redesign