Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 146127<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Mzkellyl Christopher L. Beach<br />

E I I by, August 18, 2009<br />

D3ISTRBUIO<br />

C. L. Beach X3-16 E. L. Adamson X3-40<br />

R. D. Belden (DDI) S. C. Bentti X3-16<br />

M. R. Coy (DDI) S. D. Bigham N3-30<br />

T. M. Greager X3-40 R. D. Cantwell N3-30<br />

L. W. Grossarth X9-08 Q. L. Crist X3-16<br />

S. E. Parnell X3-16 R. A. Dodd H4-24<br />

D. B. Teachout X9-10 T. A. Foster N3-30<br />

H. Williams III N3-30 R. Ganapathy X3-40<br />

S. A. Strope (DDI) R. M. Harrison N3-30<br />

J. A. Heard H4-17 S. J. Henneman X9-08<br />

A. E. Zacharias X9-08 M. F. Imhoff X9-08<br />

L. R. Miller (DDI)<br />

D. L. Schulperoort T2-10<br />

R. C. Voeks L6-06<br />

J. A. Ware N3-30<br />

Project File, X3-16<br />

Records and Document Control H4- 11<br />

A meeting on the above subject was held on August 18, 2009 at 11I8-K, MO-75 5.<br />

1. SAFETY<br />

* Safety topic:<br />

* WCH will perform HASP training for DDI raft on Monday 8/24/09.<br />

* WCH has Fall Protection Plan for review. The plan must be approved prior to perform-ing any<br />

elevated work. (Tie-off points will be installed at PacMobile before delivery.)<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

" Drawings not complete; site layout is a post-start item and a status will be given at the Thursday<br />

meeting.<br />

" Equipment List is still not complete<br />

" DDI to verify if they have spill kits. List of items included in a kit to be provided at next week's<br />

meeting.<br />

" WCH needs training records for those on site during mobilization (HGET, FR H&S Plan)<br />

* Communication Plan is a WCH responsibility.<br />

X:\Adimiistrative Assistant\Prject Progress Review Weekly Mleetings\2009.OS-18-09 Weekly Piogess.doc


Progress Review Meeting<br />

Page 2<br />

111. PROJECT DESIGN DRAWINGS<br />

* None.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached 3-week look ahead schedule provided by DDI. Training is going well.<br />

V. WEEKLY PRODUCTION TABLE<br />

" Additional discussion of upcoming submittals due. DDI provided schedule update.<br />

" Mobilization:<br />

*RCT and Change Trailer to arrive on Monday, 8/24. Balance of trailers to arrive by the end<br />

of that week.<br />

* Training requirements for mobilization are HIM, HASP, IWCP and HGET<br />

VI.<br />

VII.<br />

VIII.<br />

IX.<br />

MANPOWER<br />

*DDI needs to schedule necessary AMH appointment and Hammer Training for crews. Update<br />

- this is not expected to be an issue, anticipate completion around September 9, 2009.<br />

EQUIPMENT<br />

* Heavy equipment inspections scheduled for the week of September 1 at Watts' yard in<br />

Kennewick.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* Work packages (USQ screening) to be performed prior to 8/24/09.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

0 None.<br />

XI.<br />

XII.<br />

XIII.<br />

XIV.<br />

REQUESTS FOR INFORMATION<br />

" CNOO1I to be transmitted this week.<br />

* CN002 relating to the tent will be transmitted next week.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

" DDI submitted copy of their internal submission log. See attached.<br />

* Discussion held about timing of Lead Handling Plan, Drum Handling Plan, etc. submittals.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

" A change notice has been developed to replace the skin on the tent. DDI to be sent specs for tent<br />

fabric.<br />

" A change notice to revise electrical drawings will be submitted from WCH to DDI this week<br />

(8/19)<br />

CORRESPONDENCE<br />

*None.


Progress Review Meeting<br />

Page 3<br />

XV.<br />

XVI.<br />

INVOICE AND PAYMENT STATUS<br />

* DDI to submit July billing the week of 8/24.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* John Ware to be contacted for 1H Equipment needs/recommendations for DDI.<br />

* A signing party will be scheduled for next week.<br />

* JHA meeting scheduled for Tuesday afternoon, 8/18/09.<br />

* Have first DDI laborer walkdown and re-work air monitor 480V on ground cable signs or ope.<br />

* Checklist of items discussed relating to project:<br />

* Road Maintenance<br />

" Electrical Maintenance<br />

* Tent Skin Replacement<br />

" Chance Notice 003 will be issued to purchase/lease 30-Kenwood radios and charge banks.<br />

" Are there additional equipment needs that need to be identified i.e. generators, etc.<br />

Attachment(s): As noted above.


uance uestgns Inc.<br />

118-K-I Burial Ground Remediation Project<br />

Submittal Log<br />

_______________ _______Date: 8117/09 3:36 PM<br />

Legend: Submitted Returned wcomnments Required Returned wiStatus T<br />

Submittal NoIJDescription Rev. Send To Required ISubmitted I_____ Returned IStatus 1 Comments<br />

1-00 FIELD SUPPORT ___<br />

1-01 Subcontract intrepretation SA As Rq'd __ ---<br />

1-02 Differing <strong>Site</strong> Conditions SA As Rq'd _____________<br />

1-03 Subcontract Key Personnel SA As Rct'd ______<br />

1-04 Subcontract Milestones SA As Rq'd ______See 1-05 Subcontract Schedule<br />

1-05 Subcontrect Schedule SA 15 Due July 23, 2009<br />

0118K-SS-SO001-1-5<br />

1-06 Plant, Equipment end Facilities SA, SC Before Mob<br />

1-07 Temporary Access and Hael Reeds SC Before Work See_9-13 Traffic Access Control Plan<br />

1-0o8 work and Operations et <strong>Site</strong> Requiring SC As Rq'd<br />

Specific Approval<br />

1-08a Overtime Notice SC 4 hra Before<br />

Work<br />

1 -08b Heavy Equipment Mone SC 2 days<br />

Before Work<br />

1-08c Eleictricel System Tie-tn SC 3 days<br />

Before Work<br />

1-09 NEC Inspection SC As Rq'd<br />

1-1 Energized Systems As-Sults SC Before Use<br />

1-11 Enetgized Electrical Work Procedure SIC As Rq'd --- -<br />

1- 12 Energized Electrical Work Permit SC Before Mob<br />

& AsRq'd __ ___ __<br />

1- 13 Notice of Pronisional Acceptence SA As Rq'd __<br />

1- 14 Notice ot Fleat Acceptance SA As Rq'd<br />

2-00 SAFETY & HEALTH ___ __ ___ ___ ___ __ ____________<br />

2-01 ISMS Declaration IForm-0tI SC Before Mob<br />

Sit gK-SS-SO051-2-01 n/<br />

2-02 Subcontrect Safety & Health Program SIC 30 days<br />

Before Work<br />

51 lgK-SS-Ssegl-2-02 8/20/2009<br />

2-02a Hazard Communication Plun SC 30 days See 2-02 Sub S&H Program<br />

Before Work<br />

5ll 8K-SS-sSg0012-02a 8 /20/2009<br />

2-02b Eporlosine Safety Program SC 30 days N/A<br />

Before Work<br />

2-02c Reporting Accident & Injury Program SC 30 days See 2-02 Sub S&H Program<br />

Before Work______________<br />

0118K-SS-Sttdt -2-02c 8/20/2009 --- -<br />

2-02d Fire Prntectiorr/Prenention Program SC 30 days<br />

Before Work<br />

0118K-SS-Segdt -2-02d 0-- 11012009<br />

2-02e Cosuction & Industral Safety Program SIC 30 days Separate Submittal<br />

Before Work<br />

St ttK-SS-S5551-2-02e<br />

2-021 Electrical Safety Program SC 301 days Se )-2 Sub S&H Program<br />

Before Work - L I____ d__


u~ance uestgns Inc.<br />

118-K-i Burial Ground Remediation Project<br />

Submittal Log<br />

_________________Date:<br />

8/17109 3:36 PM<br />

Lgn: Submitted Returned wlcomments Required Returned wlStatus "I<br />

Draft or Date Date Dt<br />

Submittal No./Description Rev. Send To Required Submitted Returned Status Comments<br />

O18K-SS-StO01-2-02f<br />

812012009 _<br />

2-02g Industrial Hygiene Program SC 30 days See 2-14 SSHASP<br />

Before Work<br />

_____<br />

2-02h Chronic Berylliurm Disease Prevention SC 30 days Not required until Be controls are required<br />

Program ____Before Work ___________for Trench I silos.<br />

2-0]i<br />

Fall Protection Program SC 30 days See 2-02 Sub S&H Program<br />

Before Work<br />

OlltK-SS-S051-2-02i 8/2i~61669-- -<br />

2-02i Respiratory Protection Pian 5t 30 days See 2-02 Sub S&H Program<br />

Before Work<br />

5t11K-SS-S0001-2-02i<br />

^8/20/2009--------------_______________<br />

2-02k Occapation Health Program SC 30 days See 2-14 SSHASP<br />

Before Work<br />

2-03 F~orm G06 "Subcontractor Worker Safety SC 30 days<br />

and Heaith Program Plan" (851 Mdatix)<br />

Before Work<br />

tll5K-SS-SOOO1-2-03 n/a -- -- 8/18/2009<br />

2-04 PS0-8, "Washington Closure <strong>Hanford</strong><br />

1IOCFR851 Compliance Matixe"<br />

SC 30 days<br />

Before Work<br />

St 18K-SSS01-2-04 n/a - 8/18/2009 -_____________<br />

2-05 Emergency Response Orientation<br />

Verification<br />

SC Before Work<br />

2-06 Subcontractor Monithly Accident and SC As Rq'd<br />

Injurytitlness Report<br />

2-07 Accidentjincident investigation Report SC As Rq'd<br />

Within 24 Hrs.<br />

2-08 List of Key Sapervisory and S&H SC Before Work<br />

Personnel<br />

5118K-SS-850t-2-08 n/a<br />

2-09 Job Specific Hazards Analysis SC As Rq'd<br />

2-10 Fire Protection-Pield SC Before Work<br />

2-1lOa<br />

Hot Work Control Plan SC Before Work We Need This Added Somewhere<br />

2-1 Ob PAt Designation SC Before Work<br />

011SK-SS-SOttO-2-10b n/a -8/20/2009 - -<br />

2-1 1 Hoisting and Rigging<br />

SC<br />

2-11a - Piano for Medium Lift. Heavy Lift and SIC Before Mob<br />

Other Lifts Designated as Critical<br />

2-11 b Crane Operator Qualifications SIC Before Mob ___ ____________________<br />

2-1 1 C Lift Suminaries for Lifts Performed by SC Before Mob<br />

Equipment Other Than Cranes<br />

2-12,Eacavation Permit SC Before Work ___ ------<br />

2-13 Industrial Hygiene S sR'<br />

2-13a Subcontractor Personnel Industnial SC Monthly<br />

Hygiene Monitoring Data<br />

2-13b Contractor Personnel Indastrial Hygiene SC Monthly<br />

monitoring Oata<br />

2-13c Berytliom Registry Informationj SC Semiannually


uiance IUstgns Inc.<br />

118-K-I Burial Ground Remediation Project<br />

Submittal Log<br />

_____________Date: 8117109 3:38 PM<br />

Lgn: Submitted Returned wlcommenta Required Returned wlStatus "1"<br />

___nd:Date from_-_ _ _ _<br />

Draft or Date Date Dt<br />

Submittal NoJ~escriptlon Rev. Send To Required Submitted Returned- Status Comments<br />

2-14 <strong>Site</strong> Specific Health and Safety Plan SC Before Mob __________<br />

2-1 4a IH Equipment & Calibration Plan SC Before Mob<br />

2-14b Analysis Hazards Assessment and PPE SC As Rq'd<br />

Requirements<br />

2-15 Decontaminatin Material Control SC Before Work<br />

Plan/Procedure<br />

2-16 Request for Authorizatin to Possess<br />

Radioactive Material or Radiation<br />

SC 7 days<br />

Before Work<br />

Generation Instrumentation<br />

2-17 Nnn-RCCC Radiation Exposure Dato (by __ SC Before Work<br />

2-18 Empyloyee Job Task Analysis SC Before Work______<br />

2-18a Forn, G-04, Training and Medical SC Before Work<br />

Surveillance<br />

2-21 Hanfond Fire Marshall Permit SC As Rq'd<br />

3-00 ENVIRCINMENTALICHEMICALIWASTE MANAGEMENT ____ ___<br />

3-01 1Subcontract Enviomental compliance SC Before Work<br />

Plan<br />

0118K-S-S0001-3-O1 - 0 8126/2009<br />

3-02 Eingineeing Report (including design SC Before Use<br />

drawings), O&M Manual, and Certification<br />

ot Completion ton Septic Holding Tanks o<br />

Septic Systems (portable toilets are<br />

excluded)<br />

3-03 Septic System Pumping Records and SC As Rq'd<br />

Inspection and Maintenance Logs<br />

3-04 Written Ontermninatin of 40 CFR 112 SC Before Work<br />

3-05 Spill Prevention, Control, and SC Before Mob<br />

Countermoeasumes Plan or Oil<br />

Management Plan, as appropriate<br />

01181K-S-SlO0l-3-05 0 - -8/26/2009 --- - .--<br />

3-06 Stormmater Poliation Prevention Plan SC Before Work<br />

3-07 Certifications of Efficiency Testing of SC As Rq'd<br />

HEPA Filters from Manufacturers<br />

3-08,Make and Models of HVI-s and PTRAEUS SC As Rq'd<br />

3-09 Monthly Air Quality Onto Summary SC As Rq'd<br />

Report<br />

3-10 Mobilization and Demobilizatiun SC As Rq'd<br />

Hazardous material inventory<br />

3-11j Notification of or Qaarterly tnventory<br />

Updates of Chemical Materials/Products<br />

SC As Rq'd<br />

Inventory<br />

3-12 Chemical Inventory Quantities of Toxic SC As Rq'd<br />

Chemicals Used Thlroughut the Year


uance uiestgns Inc.<br />

118-K-1 Burial Ground Remediation Project<br />

Submittal Log<br />

_____________Date:<br />

Lgn: Submitted Returned wicommenta Required Returned wlStatus '.1"<br />

al ~ Date<br />

Draft or Date Date Dt<br />

Submittal No./Descriptiofl Rev. Send To Required Submitted Returned. Status C~omments<br />

3-13 information necessary to complete an<br />

annual PCB Report (i.e., out-nt-service<br />

s sR'<br />

daterwaste stream. waste codes, net<br />

weight, container number, and shipment<br />

number) for Subcontractor generated<br />

waste that contains PCBO.<br />

8/17/09 3:36 PM<br />

3-14 informtation necensary to cnmplete an<br />

annual Dangerous Waste Report (i.e..<br />

SC As Rq'd<br />

waste stream, waste codes, net weight,<br />

coetainer number, and shipment somber)<br />

for Subcontractor generated waste.<br />

3-15 Qoatrenly Summary of Recycling SC As Rq'd<br />

Actividies<br />

3-16 Formal Written Designations of All Waste SC Before Work<br />

Streams Generated<br />

3-17 Requests for Approval for Use of SC Before Work<br />

Oils/Greases<br />

OttO-SS-Sby01-3-tl<br />

3-18 Transportation Security Plan SC Before Work ____<br />

n/a<br />

4.00 PROCUREMENT ___ ___ ____ ____ ____<br />

4-01 IDefect under Warranty PR As Rci'd_________________<br />

4-02 Claim for Equitable Adjustment PR As Rq'd __ ____<br />

4-03 Insurance Certificates SA 10 fDue July 18, 2009<br />

011tBK-SS-50001 -4-03<br />

n/a<br />

4-04 Insurance Cancellation. Termination, or SA As Rq'd<br />

Alteration<br />

4-05 Amendment of Limits of Insurance SA As Rq'd<br />

4-06 Aathorized Representative Before Work<br />

01 18K-88-80001-4-06 n/la<br />

4-07 Charge Notlces PR As Rq'd______ ______________<br />

(Changes)<br />

4-09 Backcharge Notice Approval PR As Rq'd _____<br />

4-10,Proposal for Adjustment (Trermination) PR As Rcj d _ __<br />

4-12 Purchase and Subcontract Agreements SA As Rq'd<br />

4-13 Dispute Notification SA As Rq'd<br />

4-141 Workplace Substance Abase Program SA 30 _____ _____ _____Due Aug 7, 2009<br />

0llaK-SS-SOOOI-4-14 0-8/21/2009<br />

4-15 SFl4t3-Daois Bacon Compliance SA As Rq'd<br />

(Statement ot Acknowledgement)<br />

4-16 Letter of Credit SA 10 Due July 18, 2009<br />

0t 18K-SS-SSOt-4-1O<br />

n/a<br />

4-17 Performance and Paymert Bonds SA 7 - Due July 15, 2009 Does Not Apply<br />

4-8Masurement and Schedute for Progress SA 15 Due July 23, 2009<br />

Pament<br />

01 tgK-SS-SO00l-4-18


Dance Designs Inc.<br />

118-K-1 Burial Ground Remnediatian Project<br />

Submittal Log<br />

_______________Date:<br />

8117/09 3:36 PM<br />

Lgn: Submitted Returned w/comments Required Returned wlStatus '"V<br />

- Date_________ __<br />

Draft or Date Date Dt<br />

Siubmittal No./Description Rev. Send To Required Submitted Returned Statua Comments<br />

4-19 Monthly Estimate of Work Complete SA Before<br />

Payment __ ___ ___<br />

4-20 Invoice for Monthly Progress Payment SA As Rq'd ___ ______________________<br />

4-21 eond for Lien SA As Rq'd<br />

4-22 Expenditure Notification SA As Rq'd ___ __________________<br />

4-23 75% of Contract SA As Rq'd<br />

4-24 Progress Reports SA As Rq'd _ _________________ _____<br />

4-25 85% of Total Awounts Allocated SA As Rq'd<br />

4-26 Safety Incentive Pay SA As Rq'd____________________<br />

5-00 ENGINEERING________<br />

5-01 Drawings, Dat and Samples SIC As Rq'd<br />

5-01ia Drawings S C 14 days<br />

Before Work<br />

5-01b Samples SC 30 days<br />

Before Work_____<br />

5-1cData and Certificates SC 30 days<br />

Before Work _____<br />

5-Old<br />

Workrieg Drawings and Design Changes SC As Rq'd<br />

5-01le<br />

As-Bout Drawings SC 30 Days<br />

Before<br />

Balance<br />

5-011 As-Built Specifications SC As Rq'd ___<br />

5-Di g<br />

Energized Systems SC 30 days<br />

Before Work<br />

5-02 letrical Design<br />

SC<br />

Before Work<br />

8-00 QUALITY ASSURANCE PROGRAM ______ ___<br />

6-01 1 Quaity Assurance<br />

_______ OttK-SS-S55a1-6-010<br />

j<br />

Program SA rAs Rq'd J-<br />

7-00 OPER4ATIONS PROGRAMS __ _____ _______<br />

7-O1 WCH-DE-0t23,' CONDPS Subontractor SC Before Work<br />

Applicability and Plow-down Worsheet<br />

5118K-SS-Sgtt0l-7-Ol<br />

n/a<br />

7-02 Subcontractor Controlled or Generated SC Before<br />

Work Packages<br />

Balance<br />

7-03 Poteatially Distractive Written Material SC 10 days See 2-02 Chapter 1, Sect. 13, Bullet 3<br />

and Devices<br />

Before Work<br />

8-00 OTHER ADMINISTRATIVE SUBMITTALS ________ _________ ______ _________________<br />

8-01 Security Pmognam SC 30 __ Due Aug 7, 2009<br />

St ItK-SS-SOSS1 -8-0t<br />

8-02ljSecurty Incidents SC -As Rq'd _____<br />

9-00 OTHER TECHNICAL SUBMITTALS<br />

q-nlIAsbestos Abatement/Handlina Plan I I S(' I As Ron I I ISee 9-12 Earthwork Plan


Dance Designs Inc.<br />

118-K-i Burial Ground Remediation Project<br />

Submittal Log<br />

________________ ________Date: 8/17109 3:36 PM<br />

Lgn: Submitted Returned wlcomments Required Returned w/Status 'Il<br />

Draft or Date Date Dt<br />

Submittal No./Description Rev. Send To Required Submitte ______ Returned Status Comments<br />

0llaK-SS-SOO1-9-O1 0 8/20/2009<br />

9-02 Lead Plan SIC As Rq'd See 9-12 Earthwork Plan<br />

0118K-SS-SO0O1-9-12 0 8/20/2009i<br />

9-03 Soil Fixative Information SC Before<br />

Shipment<br />

_______<br />

9-04 Eq iprnent Inspection and Preventative SIC Before Mob<br />

Maintenance Protram<br />

oliuK-SS-sSO01-a-12 08/21/2009<br />

9-05 Equoipment Inspection Certificates SC Before Mob<br />

or Use<br />

_____________<br />

9-06 Grass Veicle Weight Rating Certification SIC Before Use<br />

9-07 Container Inspection Recnrds N/A Ax Rq'd<br />

9-08 Scale Test Data/Certficafion SIC Before Use- ____ _____-<br />

9-09 Backflow Prenentor Certificatinn SIC As Rca'd<br />

9-10 Equipiment Maintenanceiinsprection N/A As Rq'd<br />

Records<br />

9-1 11 Manufacturer's Approval for Equoipment STR As Rq'd<br />

Modification<br />

9-12 Earthworkr and Excavated Material SC Before Work<br />

Handling Plan<br />

0llaK-SS-Soool-a-12 0 wa820/00<br />

9-13 Traffic Access Control Plan SC Before Work<br />

9-14 Verificafion that Structures Cvpmply with SIC As Rq'd<br />

WAC, NFPA, and Design Critenia<br />

9-15 Excavation Design Greaterfthan 20 feet SC As Rq'd<br />

Deep<br />

9- 160Drm and Sealed Container SC Before Work See 9-12 Earthwork Plan<br />

Inspection/Handling Plan<br />

01I8K-SS-SO001-9-12 b - 8/20/2009<br />

9-17 Cold Weather Protection Plan SC Before Work<br />

9- 18 Excavation Competent Person (OSHA) STR Before Work<br />

Before Mob


118-K-1 Mobailiztion Schedule E-Tarel Due Date F-Irndicates Informaution Availble F-sublrtl or Re-submrittal * S.Ibmittal Returned w/uCommeets C-Sublcittl Returned as Status "1"<br />

Julv Au st Se tember October<br />

Acroat Data. 1-4 S-11 12-18 19-25 26-1 2-8 9.15 16-22 23-29 30-5 6-12 13-19 20-6 273 40<br />

_____ CrrirDayt,A-1r _ 1-3 4-10 11-17 18-24 25-31 32-38 39-46 46-52 53-59 60-46 67-73 74-80 81-87 88-94<br />

Ad. T, Aclnitv No500 1 2 3 4 0 6 7 8 9 10 11 12 13<br />

Sbl-.-o "-3-n.r...cenc~rlatooq..<br />

______- bn.t 7a2 2 k<br />

Suc/o-l 4-r Ctter uF Creavd -- 1j ~ --. ~<br />

Suuerlrl-02 1-05S,Slbuntro u/oce .T<br />

0,.H7<br />

fr DDI,<br />

C- dI .<br />

Submttls-03 2-14<br />

ill.dte 7a2 1 -K - z<br />

Pln- - 7F 7 -T<br />

7<br />

~ j 7~-<br />

7EuecO<br />

LL 1<br />

Subrntrs-03 -5 sc lu eo<br />

Subrrrrls-0 2-02 F- G-0 851/s Mralr 1 . -<br />

Sutnrttb-t Dsuaru<br />

2-l0b PA!un<br />

Submrt/sn-05-r Mu794 rru 0 Matlr/nur : 1 T<br />

Co i<br />

- -----<br />

S~r/tlFT0 T-0 -7taou 777Se TM0-L I<br />

La/<br />

Subnrrtls-052 9LOat lt Pces Cur Prnel<br />

S~ulrts03 2-l. 14 t 0<br />

P Cubtratt Plan - 4 P : T =7<br />

2/tt-05301 ESMu CocrtSrc Floer.1<br />

SurtFs0 or.,a 3-05t M7tO<br />

3-0 IO-1<br />

!_0ts0 7eocrnlro<br />

FT<br />

{ f 7 ]T- I~. 1 7<br />

1P0A/<br />

7MI<br />

-T7 '7<br />

7u7 -7


118-K-11 Mobilivation Schedule I -T.,r~ eD.. Date F -indicates Informaotion aoilable R-SubmittalorRe-submilttal f--Sub~tt.1 Retol~ned Cfl tfl Q -Sobelital Returned as Status I"<br />

Julycac September October<br />

cActl Dlc 1-4 51 12-19 12-25 26-1 2 915 6-2 23-29 30-8 6-12 13-19 20.26 27-3 41<br />

OCleederalletrA-ad 1-3 4-10 'l -17 18-24 25-31 32-38 139-45 14642 5349 60-66 67-73 74.6 61487 8-9<br />

..!L. TypcActt .. 1 2 3 4 5 1 6 7 8 9 10 11 12 1<br />

Submttjc -O 3-08 tcccr Pell trev Plan 77 LI17 7 7 F 71 7<br />

S-HeIs-CG 9-03 ScOi Fxat08illt c -<br />

srfUl-0 9-12 Slu ecdt e Plan 77 77: 1 777<br />

Saceat<br />

8-5Ecwe.,<br />

_________ UnaT<br />

777 t.<br />

T ~ -7~17L<br />

SueO.-t2 2-141 AcHelo Pl wan 1 II<br />

Submtc-12 8-01 A nLead Plan<br />

Sctet-3 -1 1 O la Plaz n<br />

ce~


lE<br />

118-K-1 Mobilization Schedule<br />

3 Week Look Ahead 8-5-09 _____ August ______September October<br />

Actual Dates 2-8 9:15 16-22 23-29 30-5 6-12 13-19 20-26 27-3 4-10<br />

_____ Calender Days after Award 25-31 32-38 39-45 46-52 53-59 60-66 67-73 74-80 81-87 88-94<br />

Activity Week No. 4 5 6 7 8 9 1 01 11 12 13<br />

___<br />

40 hr OSHA (HIZOE~--~I,-<br />

Badges '!~--s ___I<br />

HGET<br />

Physicals - . 1 - - i<br />

I lst,-idICPR _ _ _7 _ I, -<br />

_ -7'<br />

4_____<br />

Mask Fits<br />

-,--AK<br />

IRW II I 7 T IiI __<br />

DelpMbWokPcae Au 121 II-- ,l<br />

Deliver Trailers to <strong>Site</strong><br />

A-9~, 24 -<br />

Set ap Trailers Sept. -m m -L -<br />

Mobilization Watkdown Aug. 11 H<br />

Trailers-Watts -- T- -I'~<br />

_______ Electrical-Northpoint<br />

Air Monitors<br />

Tent/Exhaust<br />

Roads-watts<br />

Lay Down ar<br />

Parking Lot<br />

jGPR Surveys-WCH<br />

__ _ Calcium _ Chloride _ _ __ Set 3 Ii<br />

_____<br />

__ __ _ Trailer Training Aug .241 1 . . .<br />

______Mob. Worlrpackage<br />

WCH SSas<br />

___<br />

FCITI Emergency Response<br />

______<br />

______<br />

_Fire Precautions<br />

______Staging Area<br />

General <strong>Site</strong> Training _ Ag1 . 1 7 1 7 :<br />

____Rod 11 L -IL .L[<br />

40-hr. Haoopr __ - -__ ____ ____<br />

ISMS/IWCP<br />

____ -GETIBadging_<br />

_<br />

_______Physicals _______ _______ _______<br />

-Spill Kits (2) ___Aug. 20 IIUI 1F'.<br />

_ _ Electia<br />

______Trailers e<br />

7 T7___<br />

Lighting Sept. 1 - _ _ _ _ _ _ _<br />

Tent~ahaust Set.I - - --<br />

Air Monitors Sept. 1<br />

GPR SurveysWC Aug. 17, -<br />

7 -<br />

Watts Yard Etquip. Inspection Sct 1____ -7 7 1-- -<br />

MobillIo PSR Complete Aug. 11 I<br />

site Laysa Map__________ - !<br />

Restrooms Ffunctional<br />

Adelquate PPE<br />

Cell Phones<br />

__ -- Equip. Inspection Plan status 2<br />

Rust contrel Fixative for Mob<br />

Spill Conrol Kits<br />

AB Training for Mob-<br />

LL database review and sham<br />

IWCP Training<br />

____<br />

FIR HASP Training


118-K-I Mobilization Schedule<br />

3 Week Look Ahead 8-5-09 Agust ______September October<br />

Actua ates 2-8 9-15 16-22 23-29 30-5 6-12 13-19 20-26 27-3 4-10<br />

_____Calendar Days after Award 25-31 32-38 39-45 46-52 53-59 60-66 67-73 74-80 81-87 88-94<br />

Activity Week No. 4 5 6 7 8 9 10 11 12 13<br />

EmergencyResponse for mob_____<br />

Communications Plan -shared ___ __ __<br />

Applicable Exh. I submittals status 2<br />

____<br />

Excavation Permit<br />

IWCP Mob package<br />

CONOPS applic. Wrk sht. Scomplet ____________________________ ______ ______ ______ ______<br />

Standing Orders reviewed log book<br />

GPR of utilities<br />

F<br />

7 !T 4-, '<br />

7- -<br />

- __ Z7§I~ji-7-j Lt L-4 -~__ _ _----*. --


MEETING ATTENDANCE ROSTER<br />

SUBJ ECT: 7Ra-oPu-40o-P ~- S"') DATE: ~I<br />

First MiddleMalSo<br />

Name Name Last name (MlStop Signature Company<br />

(initial) (InitialMSN<br />

6- &e~cA ___ 7


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 146128<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach~,~ ~'~ 2<br />

August 25, 2009<br />

ATENS<br />

DSTRBUIO<br />

E. L. Adamson X3-40 S. D. Bighamn N3-30<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

R. D. Belden (DDI) Q. L. Grist X3-16<br />

S. C. Bentti X3-16 R. A. Dodd H4-24<br />

M. R. Coy (DDI) T. A. Foster N3-30<br />

T. M. Greager X3-40 R. Ganapathy X3-40<br />

L. W. Grossarth X9-08 R. M. Harrison N3-30<br />

W. R. Junkins X3-16 S. J. Henneman X9-08<br />

L. R. Miller (DDI) M. F. Imhioff X9-08<br />

S. E. Parnell X3-16 D. L. Schilperoort T2- 10<br />

H. Williams III N3-30 D. B. Teachout X9- 10<br />

S. A. Strope (DDI) R. C. Voeks L6-06<br />

J. A. Heard H14-17 J. A. Ware N3-30<br />

D. J. Wonders (DDI) Project File, X3-16<br />

A. E. Zacharias X9-08 Records and Document Control H4-1 1<br />

A meeting on the above subject was held on August 25, at I118-K, MO-755.<br />

1. SAFETY<br />

*Safety topic: See the blacken hills; the cool spell will not last long. Need to be aware of the fire<br />

dangers. School will be starting next week; more people and busses will be out and about, need<br />

to pay attention while driving.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* Drawings not complete; site layout is a post-start item and a status will be given at the Thursday<br />

meeting. DDI has initiated drawing designs.<br />

" Equipment List is in process, still on schedule to begin equipment inspections September I".<br />

* WCH needs training records for those on site during mobilization (HGET, FR H&S Plan)<br />

* Have first DDI laborer walkdown and re-work air monitor 480V on ground cable signs and rope.<br />

* Chance Notice 003 will be issued to purchase/lease JO-Kenwood radios and charge banks.<br />

* Sub-tier contractor training prior to beginning work (IWCP work responsibility, HASP, EP,<br />

THAs, Fall Protection Plan)<br />

C:\Docunents and Settings\cibeachTLecal Setfings\fernporary Internet Files\OLK908-25-09 Weekly Progre~S (2).tloc.


Progress Review Meeting<br />

Page 2<br />

111. PROJECT DESIGN DRAWINGS<br />

* None.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached 3-week look ahead schedule provided by DDI. Training is going well.<br />

V. WEEKLY PRODUCTION TABLE<br />

* Additional discussion of upcoming submittals due. DDI provided schedule update.<br />

* Mobilization:<br />

RCT and Change Trailer to arrive on Monday, 8/3 1. Balance of trailers to arrive by the end<br />

of that week.<br />

*Training requirements for mobilization are HIM, HASP, IWCP and HGET and site<br />

specific emergency preparedness.<br />

" EJTAs are needed on all personnel to complete PNF process.<br />

" DDI to submit an SPCC in place of the OMP.<br />

* DDI requests clarification to "transportation of hazardous material" that needs to be incorporated<br />

into the Environmental Compliance Plan.<br />

VI.<br />

VII.<br />

VIII.<br />

IX.<br />

MANPOWER<br />

*DDI needs to schedule necessary AMH appointment and Hammer Training for crews. Update<br />

- this is not expected to be an issue, anticipate completion around September 9, 2009.<br />

EQUIPMENT<br />

" Heavy equipment inspections scheduled for the week of September 1 at Watts' yard in<br />

Kennewick.<br />

" Ken Jenkins needs to be scheduled to come and discuss fall protection plan with Pac-Mobile.<br />

Elevated work will not begin until the week of September 8, just the delivery of the trailers will<br />

begin next week. JLG to show up on the last day to put all the buildings together.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

*Work packages (USQ screening) to be performed prior to 8/24/09.<br />

*CHRPC should vacate the CTA by first week of September.<br />

*DDI needs to know if they should be using any specific channel on the radio. Need to<br />

coordinate with other <strong>Hanford</strong> contractors to see which channels, bands and frequencies they<br />

are using.<br />

0 DDI to go ahead and order radios.<br />

MATERIAL<br />

*Drums from 6 18-1 to be delivered to 118-K prior to remediation activities. In addition, twentyfour<br />

(24) wooden drum pallets were ordered on 8/24/09.<br />

X. QUALITY<br />

0 None.<br />

XI.<br />

REQUESTS FOR INFORMATION<br />

* Change Notice to be issued stating the number of additional radios needed.


Progress Review Meeting<br />

Page 3<br />

* DDI requests input assistance with the development of the IH- equipment program that they are in<br />

the process of developing.<br />

" SEC is currently pursuing acquisition of CIE and an IIH lead. Approval request for these<br />

positions will be submitted soon.<br />

XII.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* DDI submitted copy of their internal submission log. See attached.<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

*A change notice to revise electrical drawings will be submitted from WCH to DDI this week<br />

(8/19)<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE<br />

*None.<br />

INVOICE AND PAYMENT STATUS<br />

0 DDI to submit July billing this week.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* NPT for mobilization will be given to DDI today.<br />

* Excavation Permit is being revised to include CTA and tent approach. Started 8/24/09 and is being<br />

expedited, expect completion in two to three weeks.<br />

" Waste Observer training will be given to all craft. To be provided by WCH.<br />

" The entire burial ground site and each trench have the potential for IH exposure. WCH to provide an<br />

Industrial Hygiene Exposure Assessment.<br />

* DDI stated they will be using calcium chloride instead of magnesium chloride.<br />

* Technical procedures for the CTA have been developed, four procedures in all. WCH to provide<br />

copies.<br />

* Plan to start DDIIWatts Construction craft on-site the week of 9/8/09.<br />

0<br />

Attachment(s): As noted above.


Page 1 of 1<br />

Ronald Belden<br />

From: Scott Strope [strope-scott~yahoo.com] Sent: Tue 8/25/2009 7:29 AM<br />

To:<br />

Ronald Belden; Rex Miller<br />

Cc:<br />

layton~pacificmobile.com<br />

Subject: Next weeks Trailer Schedule<br />

Attachments:<br />

Next weeks schedule:<br />

Monday 8/31 PacMobileNorthpoint Wring out (Continuity/Meggar/Conduit Cleaning) existing<br />

electrical installations and delivery of DW and SW. Begin block and set activities.<br />

Tuesday 9/1 PacMobile/Watts/Northpoint Trailer delivery Triple wide (TW) safety anchor<br />

only and any needed excavation work in support of Northpoint on the triple and shower locations.<br />

Wednesday 9/2 PacMobile/Northpoint Continue block and set of Triple Wide (TW) and begin<br />

power to DW and SW.<br />

Thursday 9/3 PacMobile/Northpoint Deliver SW and continue block set and power<br />

Friday??<br />

Currently not in PacMobile's bid??<br />

Then the Holiday weekend and we will see what remains. In that time period we need to walkdown<br />

and plan for the road build in. We all can take a look and see when/where without impacting trailers.<br />

Doubful that mob activities will complete, after the delay PacMobile's resources unknown for the<br />

following week as we compete with PRC the following week.<br />

httns://mailI.babcockservices.com/exchange/rbel den/Tnbox/Next%20week-,%2OTrai ler%20... 9/25/2009


F<br />

118-K-I Mobilization Schedule<br />

3 Week Look Ahead 8-5-09 August _ ______ September ______October<br />

Actual Dates 2- 5 1 9 2<br />

35 61 13-19 20-26 27-3 [41<br />

______ Calender Days after Award 25-31 3238 39-45 46-52 53-59 60.66 67-73 74-80 81-87 88-94<br />

Actiity Week No. 4 5 6 7 8 9 10 11 12 I 13<br />

- 140 hr OSHA (HA7WOPER) r"<br />

*<br />

7<br />

____Physicals______~ 1<br />

RW 11--~' - 1 ---- _____<br />

Original Schedule<br />

Revised Schedule<br />

Corn eate<br />

Develop Mob. Work Package Aug. 12 ______ ___<br />

___Deliver _ Trailers to <strong>Site</strong><br />

Aug.,<br />

Northpoivl pre electrical 8-31<br />

Pac Mobile deliver DW ISW 9- 1___ _ _____ _____ .<br />

Pac Mobile deliver TW 9-2_______-<br />

Pac Mobile deliver SW 9-3_______<br />

_______-<br />

SetupTrailers 8-31 9-3 _ _ Sept. 1 -1-7<br />

_______ ___.~7 iT77 .I~I -<br />

Mobilization Waikdown Aug.11 77~TI<br />

-Trailers-Wafs__ -J<br />

Electrdcal-Northpoint<br />

Air Monitors<br />

Tent/Exhaust<br />

Roads-Wafts<br />

1 L.<br />

__Lay Down Yard<br />

Parking Lot ___ __ ~ 7<br />

_____GPR Surveys-WCH<br />

_<br />

III --.--.-<br />

Cacu hoieSet 3 1 -7_<br />

____Trailer Training - Aug 241 1 11771 __ -7<br />

1717<br />

Mob. Wnrkpackage --<br />

WCH SS Hasp<br />

PEITI Emergency Response<br />

Fire Precautions-<br />

Staging Area-<br />

General <strong>Site</strong> Training Aug. 101 7, +... 777<br />

______40-hr. Hazwopper<br />

iSMSIiWCP<br />

HGSTIWadging_<br />

SpitllKits (2) - Aug20: 11-~ ..777i7-<br />

_______Physicals _______ _______________<br />

Electrical<br />

______Trailers<br />

Aug24,<br />

___ Lighting Sept.1<br />

Tentffxhaust Sept. 1I _____<br />

______Air Monitors Sept. 1 P -<br />

_____GPR Surveys WCH Au 171<br />

Wats Yard Equip. Inspection Set .1 ~7 7~<br />

Mobilization PSR Complete<br />

Aug. 11j<br />

f<strong>Site</strong> Layout Map<br />

-<br />

Restroomnsfuinclinnal-<br />

Cell Phones


118-K-1 Mobilization Schedule F<br />

3 Week Look Ahead 8-5-09 Agust September I ________<br />

Actuaoates 2.8 915 16-22 23-29 30-5 6-12 13-19 20-26 27-3 4-10<br />

Calender Days after Award 25-31 32-38 39-45 46-52 53569 60-66 67-73 74-80 81-87 88-94<br />

Activity Week No. 4 5 6 7 8 9 10 11 12 13<br />

Equip. Inspection Plan status 2<br />

______Dust control Fixative for Mob<br />

Spill Control Kits<br />

Subs Training Records<br />

AS Training for Mob.<br />

LL database review and share<br />

IWCP Training ________ _______<br />

FR HASP Training<br />

-Emergency Response for mob<br />

Communications Plus shared<br />

Applicable Exh. I submittals slatu2<br />

__Excavation Permit<br />

______IWCP Mob packtage<br />

______CONOPS applic. Wrkt nsh. Complete_____<br />

standing orders reviewed log byo<br />

GPR of utilities<br />

*1~~ J____<br />

- ~i,-~ L<br />

_L


118-K-1 Mobilisation Schnedae I-Target Due Dote n Indicafoo Information auilable F-Subnbttol or Re-submittl -Submritfl Returned t/Commoents f2*Submittl0 Returned as Status "1<br />

Jly A dust September October<br />

lafm Dtle 1-4 54 12-18 1 19.25 1 26-I 2-8 9-15 16-22 23-29 30-6 6-12 13-19 20-26 27.3 4-10<br />

C~m~r~ale 0,A 1-3 440O 11-17 18-24 25"1 32-38 39-45 48-S2 53-59 60466 t67.73 74680 81-87 88-4<br />

Aot 0~i/ 0080060 1- 2. 3 4 5 6 7 8 9 10 11 12 13<br />

I ..b tt 7M7i .<br />

=__<br />

77lm071O2 H~X7<br />

nzZIZzV77T-7-<br />

0<br />

77 1 7 71<br />

or~~fj I- DI<br />

_ 4-0 _ _<br />

-~. -~ortr<br />

Subrrrlll.0 4-18 Schedule tor Progre Payr-~ t 0 I + -~- ~-<br />

'7.LI-ILI<br />

:- -<br />

Drft 100 S~flr-e M/<br />

SlOoll - - -.-<br />

8orpino1r - CI c3 0 551 S<br />

SratOls3 2.08 UMf o Key 564<br />

ft.,0 Drafts% Submdfe 8/<br />

7e71oor1<br />

SUbmml-03 2-14 <strong>Site</strong> S-e HOS Pl.. ___<br />

S. .rlls-4 2-01 ISMS Do~aOon For-Of<br />

S~berfD Abuse611<br />

4-14I 1004<br />

N290ee~blo<br />

Suomf~~ls-OS f()O Draft W%1010 Saub-o W<br />

Suomrfla-S 181,HIteII<br />

-L Moe -<br />

S~~----<br />

tI1ii -± -<br />

---<br />

12M---*--1-.<br />

U-11<br />

LLe9<br />

---- 7<br />

= 7-<br />

_- ys II I Il I1 IIiIL i7L7Vm-t --<br />

__~ ~ t1,F 71 1T '1 I -<br />

Sub:mnkC '-17 Req 101 OrIs/G-ese,-<br />

I'<br />

- 7-<br />

-7 7I<br />

Draft 00% Cneneo S ubreed 7/29<br />

u0r1111-OS 7-O CONPS ,,n a r kfrs.F f'- --<br />

Submlfls-SOE Oecg S 703 Osrobo<br />

- - H± - =-- =±-t ±i ~<br />

SulrfIf 7-l3TfDWI<br />

__1_ ___________ te 1 00% S-W7 -<br />

WMoe.. 00,0/Pla I-f Ii<br />

I7 F<br />

1-04104-07~1 __ _<br />

ESfttI,,n<br />

2-12<br />

Su<br />

Erb0 q- Mat T.7fto -f1-<br />

Atrn1n 0-0<br />

Draonls<br />

816 St 2-l<br />

7<br />

x<br />

......<br />

- v :z<br />

Sub~fm582StCPrOMmfn __E y !7_____


18-K-1 Mobilization oEldue. @-Tat Ct Due Date n-Indicates Information Aale -bmtaatRe-submittal []Submtittal Returned usfcommnents - -Submittal Returnedl as Stats.'1<br />

I<br />

As o.6 Septemtber Ontbor<br />

5<br />

A-1ua O... 14 9 12-13 19-26 26-1 2-8 9.16 16-22 23-29 3046 6-12 13-19 20-26 27.3 4-10<br />

Calende, Datte, l ad 1-3 4-10 11-17 1 61-24 25-31 32-38 39-45 46.52 62.59 60-66 67-73 74-90 81-67 88-94<br />

AltTvm Adta Waa No. F; I 1 2 3 _4 5 6 7 8 9 10 11 12 13<br />

S~Jni-SS 3-05Store-aIrPsi<br />

Oral 10% -m-,,ae 81lt Status 2-aDS<br />

P1 fF ln T- 7 ---<br />

Sts-d -0 S1ot }- 11ets dftlttf<br />

~....<br />

Subms.trtt0 2-12 Etntwok Pan- - - - -<br />

_______0 1916_DrumHandlingman Stat 1M5% SttOWelt S.uUMtaa 015 ___<br />

Subrnts-l<br />

St~~~mflh-55ig<br />

St7 aarn ts-<br />

L-t<br />

___~S~-- M 3 ~ 1J7<br />

uaos a.Vet W M. os-- - - - - - - - - -<br />

Subattt-10 9-15 Ero Se., .20ft. t-<br />

i I- ----------------- 7, d - 1 - -<br />

PP Raumnm.<br />

30-1 2-1b AA<br />

-I T--i -- ::<br />

Subm1,t12 -1a Fr G Trg<br />

& Ma Sun I,7 77 -<br />

____ UN r r H ~-4 -I-- I -<br />

E 7.-<br />

Subttrt-12 Se oedtPani<br />

r<br />

2 fl7ZJ _~~t rr TT~T1L<br />

1 FF--- -r -<br />

Submelt-I3 SeS Hw , - tr I.. T-M-aual- r 11 1 N 2<br />

- -<br />

----- t-~ ~~~<br />

I rwaI', j] uooess X-r


uance uesigns Inc.<br />

118-K-I Burial Ground Remedlatlon Project<br />

Submittal Log<br />

Submitted Returned w/comments Required Returned w/Status "1"<br />

Date: 8/25109 7:23 AM<br />

_____________ Legend:en o eule Sbite from WCH<br />

Draft r ~ Data Date Date<br />

Submfttl No./Descriptiofl Rev. Sen To Reqire_____t Returned Status Comments<br />

1-00 FIELD SUPPORT_______ ____ ____ ____<br />

1 - 1 Subcontract lotrePretation SA As Rn'd ____________Before Mob Submittals]<br />

1 -02 Differirng <strong>Site</strong> Conditions-- SA As Rcld<br />

1-03 Subcontract Key Persnnttel SA As Rq'd<br />

1-04 Subcontract Miestones SA As Rqed See 1-05 Subcontract Schledule<br />

1-_5 Sucontract Schedule SA 15 _____ ____ Due July 23, 2009<br />

S1 18K-S-50--5_ t86/2009 8/17/2009 2<br />

1-()6 Plant. Equiptment artd Facilities SA, SC Before Mob______________________<br />

1 -07 Temoporary Access and Haul Roads SC Before Work _____See 9-13 Traffic Access Control Plan<br />

1 -08 Work and Operations at <strong>Site</strong> Requringa SC As Rq'd<br />

Speciftc Approval<br />

1-08a Overtme Notice SC 4 hrs Before<br />

Work<br />

1-08b Heavy Equipmoent Move SC 2 days<br />

Before Work ____ ______ _____<br />

1 -08c Electral Sytemt Tie-in SC 3 days<br />

Before Work<br />

1-09 NEC inspctionl SC As Rn'd_______________________<br />

1-10 Energized Sstems Ao-8orlts SC Before Use<br />

1-11 Energized Electrical Wotk Procedure SC As Rq'd<br />

1-12 Energized Electrical Work Permirt SC Before Mob<br />

& As Rq'd<br />

1-13 Notice of Provisioal Acceptance SA As Re'd<br />

1 -14 Ndotceof Final Acceptance SA IAs Re'd<br />

2-00 SAFETY &. HEALTH___ ___<br />

2-01 tSMS Oociaratioe IForto-0il SC Before Mob<br />

01l8K-SS-60001-2-OI n/a 8/13/20019_ 8/19i2009<br />

2-02 Subconttact Safety & Health Programt SC 30 days<br />

Before Work<br />

St1SK-SS-SOOI-2-02<br />

2-02a Hazard Communcation Plan SC 30 days See 2-02 Sub S&H Program<br />

Before Work<br />

SI15K-SS-S5501-2-02a -- _____<br />

2-02b Explosive Safety Progratm SC 30 days N/A<br />

Before Work<br />

2-02c Reporting Accident & Injury Progaam SC 30 days See 2-02 Sub S&H Program<br />

0111K-SS80011<br />

2020Before<br />

Work<br />

2-02d Fire Protection/Prevention Proaramt SC 30 days<br />

0118-SS-O0012-020 -Before Work<br />

2-02e Construction & Industrial Safety Program SC 30 days Separate Submittal<br />

Before Work<br />

S1I1BIK-SE-S0O0l-2-02e<br />

2-02f Electrical Safety Programr SC 30 days See 2-02 Sub S&H Program<br />

018-SS0120fBefore Work __________________<br />

2 2g q C<br />

l Idustrial Hygiene Program SC 30 days rkSee 2-14 SSHASP<br />

S Before Wor-


uance uesigns Inc.<br />

118-K-I Burial Ground Remediation Project<br />

Submittal Log<br />

______________Date:<br />

Submitted Returned w/comments, Required Returned w/Status 1T<br />

Legend:<br />

from WCH<br />

_ t -<br />

_ __<br />

Draft or Date Date Date<br />

Submittal No./Description Rev. Send To Required Submitted Returned Status Comments<br />

8/26/09 7:23 AM<br />

2-02h Chronic Berylliumn Disease Prevein SC 30 days Not required until Be controls ame required<br />

P''mBefore Work for Trench I silos.-<br />

2-02i Fall Protection Pogram SC 30 days See 2-02 Sub S&H Program<br />

Before Work<br />

0118K-SS-SO0-2-02,<br />

2-02j Respiratory Protection Plan SC 30 days See 2-02 Sub S&H Program<br />

Before Work<br />

01 18K-SS-S0001-2-02j<br />

-<br />

2-02k Occupaion Health Program SC 30 days t~e 2-14 SSHASP<br />

Before Work<br />

2-03 Fernm G0n "Subcontractor Workler Safety SC 30 days<br />

and Health Progranm Plan" (851 Matrel<br />

01 18K-SS-SOttOl-2-03 n/<br />

Before Work<br />

2-04 Pso-8, -Washington Ciosure <strong>Hanford</strong> SC 30 days<br />

IOCFR851 Comrpliance Matria'<br />

Before Work<br />

01181K-SS-S(300l-2-04 n/a<br />

2-05 Emoergency Response Orientaioen SC Before Work<br />

Verification<br />

2-06 Subcontractor Monthiy Accident and SC As Rq'd<br />

Injuryfillns Reort<br />

2-07 Accidentllncident Investiation Report SC As Rq'd<br />

Within 24 Hms<br />

2-CS List of Key Supervisory and SH SIC Before Work<br />

Personneli<br />

01 18K-SS-SG001-2-08 n/a<br />

2-09 lob Specific Hazards Analysis SIC As Rq'd ____<br />

2-10 Fire Pretectire-Field SC Before Work<br />

2-1lOa Hot Work Control Plan __SC Before Work Wl~e Need This Added Somewhere_<br />

2-10b PAl Designation SC Before Work____<br />

SI1OK-SS-SOO01-2- Ob n/a - 81/209 820/2009 ;V<br />

2-11 Hoisting and Rigging SC 9520 /120<br />

2-lie<br />

Plans for Mediunm Lift, Heavy Liht and SC Before Mob<br />

Other Lifts Designated as Critical<br />

2-11 b Crane Operator Qualifications SC Before Mob9/209 81209_<br />

2-1 1C Lift Sumnrires for Lifts Perormed by SC Before Mob<br />

Equipmtent Other Thee Cranes<br />

2-12 Excavation Permit ___ SIC Before Work ____ ____<br />

2-13 Industrial Hygiene Sc As Rq'd<br />

2-13a Subcontractor Personnel Inidustrial SC Monthly<br />

Hygiene Monioring Data<br />

2-1 3b Contractor Persoonel Industrial Hygiene SC Monthly<br />

Monitoring Data<br />

2-13C Beryllicrm Registry Informnation SC Semiannually______<br />

______<br />

2-14 site Specihic Health anid Safety Pla SC Before Mob<br />

2-14a IH Equipmnt & Calibration Plan SC Before Mob<br />

2-4~Aalysis Hazarus Assensmnt end PPE SC As Rq'd<br />

Requirements -


Legend:<br />

iwance Uesigns Inc.<br />

118-K-I Burial Ground Remediation Project<br />

Submittal Log<br />

________________Date:<br />

Submitted Returned w/comments Required Returned wlStatus "'I"<br />

from WCH<br />

8/25/09 7:23 AM<br />

_____________________________ ________Date ___ ______________<br />

Draft or Date Date Date om et<br />

Submittal NoJ~oscriptton Rev. Send To Required Submitted Returned Status Comments ___________<br />

2-15 Decontamination Material Control SC Before Workt<br />

Plan/Procedure<br />

2-16 Requesit for Authorization to Possess SC 7 days<br />

Radioactive Material or Radiation<br />

Before Work<br />

Generation Instrumnentation<br />

2-17 Non-RCCC Radiation Exposure Data (by SC Before Work<br />

2-18 LEmptoyee Job Task Analysis SC Before Work______ __________________<br />

2-18a Foint G-04. Training and Medical SC Before Work<br />

Surveillance<br />

2-21 IHantord Fite Marsthall Permrit SC As Rq'd - - ---<br />

3-00 ENV 'I~N TLCHEMICAIJWA8 TI MANAGEiiMENT ____ ____ _________________<br />

3-01 ISubcontract Environmtental Comrpliance SC Before Work<br />

Plan<br />

0118K-SS-SSOS1-3-01 k 16120059 8&2/2009 __2 _ ____________<br />

3-02 Eingineering Report (inclurding design SC Before Use<br />

drawings). O&M Manual. and<br />

Cettitication of Completion tot Seph0<br />

Holdieg Tanks or Septic Systems<br />

(portable totlers are excluded)<br />

3.03 Septi0 System Pomping Records and SC As Rq'd<br />

Inspection and Mantenance Logs<br />

3-04 WrttnDetermination oft40CFR 112 -SC Before Work-<br />

3-05 Spill Prevention. Control, and SC Before Mob<br />

Countermeasures Plansr Ott<br />

Management Plan. as appropriate<br />

5118K-SS-S0001-3-05 6 /620 8/20/2009 2<br />

3-06 Stormocater Pollution Prevention Plan SC Before Work<br />

3-07 Certirtcations of Efficiency Testing of SC As Rq'd<br />

HERA Filters from Manutacturers<br />

3-08 Make and Models of -IVUs and SC As Rq'd<br />

PTRAEUs<br />

3-09 Monthly Air Qualdty Data Summary SC As Rq'd<br />

Report<br />

3-10 Mobilization and Demobilization SC As Rq'd<br />

Hazardous Material inventory<br />

3-11 Notification of or Quarterly Inventory SC As Rqd<br />

Updates 0f Chenical MaterellProducts<br />

Inventory<br />

3-12 Chemicoat Inventory Quantities of Toxic sc As Rq'd<br />

Chemicals Used Throughout the Year<br />

3-13 information necessary to complet an<br />

annual RCB Report (ine.. out-ot-semion<br />

5(C As Rq'd<br />

daterwaste stream. waste codes, net<br />

weight, container number, and shipment<br />

number) for Sbcontraor generated<br />

waste that contains PCOs.<br />

3-14 tnformation neoessary to complete an SC As Rq'd<br />

annual Dangerous Waste Repont (re,<br />

waste stream. waste codes, net weight.<br />

container number, and shtipment number)<br />

tot Subcontractor generated waste,<br />

3-15 Quarterly Summary of Recynling SC AS Rq'd<br />

Activities


Legend:<br />

Dance Designs Inc.<br />

118-K-I Burial Ground Remediation Project<br />

Submittal Log<br />

________________Date:<br />

Submitted Returned re/comments Required Returned wlStatus '.1,<br />

from WCH<br />

Draft or Date Date Date<br />

Submittal NoJlDeacripton Rev. Send To Required, Submitted Returned Status Comments<br />

3-16 Formral Written Designations of All Waste SC Before Work<br />

Streams Generated<br />

8/25/09 7:23 AM<br />

3-17 Requests for Approval for Use of SC Before Work<br />

OilslGreases<br />

01 1 K-SS-SO0O1-3-17 a<br />

3-18 Transportation Security Plan SC Before Work<br />

4-O0 PROCUREMENT ___<br />

4-01 Defeet Under Warranty PR As Rqod<br />

4-02 clan, for Eqitable Adjustment PR As Ro'd<br />

4-03 Insurance Certicates SA 10 _ ___ Due July 18, 2009<br />

01 lgK-55-SO0l -4.03 nue<br />

4-04 Insuirance Cancellation, Termination, or SA As Rq'd<br />

Alteration<br />

4-05 Amrendmrent of Limits of Insurance SA As Ro'd<br />

4-06 Auitherized Representative Before Work<br />

01 18K-SS-SOO0l-4-086 n/a<br />

4-07 Charge Notices PR As Ro'd ______ _____<br />

4-08 Clain, for Eiquitable Adjustement PR As Rq'd<br />

(Changes)<br />

4-09 Backoharge Notice Approval PR As Rqod<br />

4-10 Proposal for Adjustnment (Ternmination) __ _ PR As Rq'd<br />

4-12 Purchase and Subcontract Agreenments SA As Rq'd<br />

4-13 Dispute Notification SA As Ro'd ______<br />

4-14 Workplace Substance Abuse Programr S_ A<br />

0118K-SS-SDtOIl-4-14 0<br />

30DuAg7,20<br />

4-15, SF1413-Davis Bacon Comrpliance SA As Rq'd<br />

(Statement 0f Acknoadedgeroent)<br />

4-16 Letter of Credit SA 10 Due July 18, 2009<br />

01 ftK-SS-5W001-.16 /<br />

4-17 Pertorm~ance and Payment Bnds SA 7 ___ ___ _____Due July 15, 2009 DoesPNot Apply<br />

4-18 Measurement and Schedule for Progress BA 15 Due July 23, 2009<br />

pyet01 1 8K-SS-S14--18<br />

4-19 Monthly Estimate at Work Comrplete SA Before<br />

Payment<br />

4-20 invoice tor Monthly Progress Payrment SA As Ro'd<br />

4-21 Bond for Lien BA As Rqod<br />

4-22 Experditore Notification BA As Rqod<br />

4-23 75% of Contrac *BA As Ro'd ______________<br />

4-24 Progress Reports SA As Ro'd<br />

4-25 85% of Total Amounts Allocated SA As Rq'd ______ ____<br />

4-6Sfty Incent ive Pay BA As Ro'd _______________________


Dance Designs Inc.<br />

118-K-1 Burial Ground Remediatlon Project<br />

Submittal Log<br />

________________Date:<br />

[Submitted 1 Returned w/comments I Required Returned wlStatus "1'<br />

Legend:<br />

Ifrom WCH<br />

Dator Date Date fDate<br />

Submittal No./Description Rev SnTo1 Reuired Submitted j ____ Returned IStatus lComments<br />

"5-0<br />

5-01 Drawings. Data anid .amples SC As Rod ___<br />

8/25/09 7:23 AM<br />

ENGINEERING_______ ______________ ________<br />

5-01 a Oracnings SC 14 days<br />

Before Work<br />

5-01 b Samples SC 30 days<br />

Before Work<br />

5-01 C Data and Certificate. SC 30 days<br />

Before Work<br />

5-01d Working Drawings and Design Changes SC As Rq~d<br />

5-Olea<br />

As-Built Drawngns SC 30 Days<br />

Before<br />

Balance<br />

6-Gif An-Built Speiications sc As Rqd<br />

5-0ig<br />

Energized Systems sc 30 days<br />

Before Work<br />

6-02 Hlectroall Design SO Before Work<br />

6-00 QUAIT ASUANEPOGRAM ___ ___ ________ _ _____________<br />

6_o1TD~alty Assanne Progrars SA I As Rq'd fE________________<br />

j 118K-SS-SS5O1-6-0<br />

/3209j81920 J<br />

7-00 OPERATIONS PROGRAMS ___ _______ ______ ___________<br />

7-01 W~CH-DC-023. CONOPS Subnontractor sc Before Work<br />

Appicnability and Flow-down Worksheet<br />

0118K-S-S5001-7-O1 n/a8/14/2009 8/19/2009 *.1<br />

7-02 Subcotractor Controlled or Generated SC Before<br />

Work Pankages<br />

Balance<br />

L<br />

-7 otniall, Distractive Written Material SC 10 days Se20 hpe ,Sc.1,Ble<br />

and Devines<br />

Before Work<br />

89-00 OTHEIR ADMINISTRATIVE SUBM ITAS ___ __<br />

8-01 Senanity Prngram SC 30 2009_______<br />

0118K-S-5501-"-O<br />

w6 87/009 8/24/2009 77T, ____________<br />

8-02 Securit Incidents SC As Rq'd _____ __________ _____________________<br />

9.00 OTHER TECHNICAL SUBMITTALS ___<br />

9-01 Asbestos Abatemsettlandling Plan ___ Sc As Rq'd§e 12ErhokPa<br />

S018K-SS-S5001--01 0<br />

9-02 Lead Plan SC As lqadSe -2ErhokPa<br />

0118K-SS-SO001-9-12 0<br />

9-03 Saoil Finatioe Infonrmation sc Before<br />

Shipment ____ __________________<br />

9-04 Equipnment lnopeotinn and Preventative SC Before Mob<br />

Maintenance Program<br />

0118K-SS-30001-9-12 0 8/21/2009 8/19/2009 - 2<br />

9-05 Eqipmnent inspectin Cemtiioatea, sc Before Mob<br />

or Use<br />

9-06 Gross Vehinle Weight Rating Certifcatin 5c Before Use<br />

9-07 Container inspection Records N/A As Rqod<br />

9-08 Scale Test Data/Certification SC Before Use<br />

9-09 riacriloW, Preventnr Certification SC As Rg'd -<br />

9-113 Squ~pmnent Maiotonance/Inspection N/A As Rq'd _____I__I


uarrce ueslgns Inc.<br />

118-K-1 Burial Ground Remediation Project<br />

Submittal Log<br />

________________________Date:<br />

Submitted Returned wlcommenta Required Returned wlStatus "'<br />

Legend:<br />

tfrom WCH<br />

_________________________Date<br />

i<br />

Draft or Date- Date Date<br />

[ubmittal No./Description Rev. Send To Required Submitted _____ Returned Status, C~omments<br />

8/25109 7:23 AM<br />

9-11 Manufacturer's Approval for Equipmnrt STR As Rq'd<br />

Modificationsa<br />

9-12 Earth~voro and Excavated Material Sc Before Work<br />

Handling Plan<br />

01 ltK-SS-S0001-9-12 1<br />

B-1 3 Trafftic Access Control Plan SC Before Work _____________<br />

9-14 Veritication that Structures Copoply vath SIC As Rq'd<br />

WAG, NFPA. and Design Criteria____________<br />

9-15 Excavation Desian Greater Bran 20 teet SC As Rq d<br />

Deep<br />

9-16 Drum and Sealed Container SIC Before Work See 9-12 Eart hwor-k Plan<br />

Inspection/Handling Plan<br />

01 nSK-SS-SO0O1-5-12 0<br />

9-17,Cold Weather Protecti-nPlan SC Before Work ______ -------------<br />

9-18 ocvarion Comrpetent Person (OSHA) STR Before Work<br />

Before Mob ___ _________ ____


W cHWashington<br />

CCN: WA1<br />

144<br />

closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

September 0 1, 2009<br />

ATEDE<br />

ISTRBUIO<br />

E. L. Adamson X3-40 S. C. Bentti X3-16<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

R. D. Belden (DDI) Q. L. Crist X3-16<br />

S. D. Bigham N3-30 R. A. Dodd H4-24<br />

M. R. Coy (DDI) T. A. Foster N3-30<br />

T. M. Greager X3-40 R. Ganapathy X3-40<br />

L. W. Grossarth X9-08 S. J. Henneman X9-08<br />

R. M. Harrison N3-30 M. F. Imhoff X9-08<br />

J. A. Heard H4-17 L. R. Miller (DD1)<br />

W. R. Junkins X3-16 D. L. Schilperoort T2-10<br />

S. E. Parnell X3-16 S. A. Strope (DDI)<br />

H. Williams HII N3-30 R. C. Voeks L6-06<br />

D. B. Teachout X9-l10 J. A. Ware N3-30<br />

A. S. White (DDI) Project File, X3-16<br />

D. J. Wonders (DDI) Records and Document Control 114-1 1<br />

A. E. Zacharias X9-08<br />

A meeting on the above subject was held on September 1, at I118-K, MO-7 55.<br />

1. SAFETY<br />

*Safety topic: Reminder that school has started and to watch out for kids' be careful if you are<br />

driving during the upcoming long weekend.<br />

11. ACTION ITEMS FROM LAST MEETING/STATUS<br />

" Drawings not complete; site layout is a post-start item and a status will be given at the Thursday<br />

meeting. DDI has initiated drawing designs. UPDATE: Contracts to be in place on 9/1/09.<br />

" Equipment List is in process, still on schedule to begin equipment inspections September 14th.<br />

" Have first DDI laborer walkdown and re-work air monitor 480V on ground cable signs and rope.<br />

" Sub-tier contractor training prior to beginning work (1WCP work responsibility, HASP, EP,<br />

IHAs, Fall Protection Plan)<br />

" Excavation Permit is being revised to include CTA and tent approach. Started 8/24/09 and is<br />

being expedited, expect completion in two to three weeks.<br />

" Waste Observer, Haz Mat and DOT training will be given to all craft. To be provided by WCH.<br />

V:\Administrative AssistarnAProject Progress Review Weekly Meefingsv2009\09-01-09 Weekly Propecss.doc


Progress Review Meeting<br />

Page 2<br />

* Plan to start DDlIWatts Construction craft on-site the week of 9/14/09<br />

I11. PROJECT DESIGN DRAWINGS<br />

0 None<br />

IV.<br />

UPDATED ROLLIN~G 3-4 WEEK LOOK AHEAD SCHEDULE<br />

" See attached 3-week look ahead schedule provided by DDI. Training is going well.<br />

" Mobilization of trailers has been pushed to the week of 9/8/09.<br />

V. WEEKLY PRODUCTION TABLE<br />

* None<br />

VI.<br />

VII.<br />

VIII.<br />

IX.<br />

MANPOWER<br />

*DDI to schedule AMH appointments and HAZWPR Training for crews. Update - this is not<br />

expected to be an issue, anticipate completion around September 9, 2009. Darlene McClure<br />

to provide DDI with AMH physicals schedules.<br />

EQUIPMENT<br />

* Heavy equipment inspections scheduled for the week of September 14th at Watts' yard in<br />

Kennewick.<br />

* Ken Jenkins needs to be scheduled to come and discuss fall protection plan with Pac-Mobile.<br />

Elevated work will not begin until the week of September 15th, just the delivery of the trailers<br />

will begin next week. JLG to show up on the last day to put all the buildings together. All ridge<br />

caps will be completed on the last day.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

o Work packages (USQ screening) required to be performed.<br />

* DDI to determine if they should be using any specific channel on the radio. Need to<br />

coordinate with other <strong>Hanford</strong> contractors to see which channels, bands and frequencies they<br />

are using. DDI will perform a test with the radios they plan to use to verify any specific<br />

channel needs.<br />

MATERIAL<br />

*DDI to schedule forklift to be on site before WCH schedules Teamsters to deliver drums and<br />

pallets from 618-1. The fork lift operator will be working to the site mobilization work package.<br />

X. QUALITY<br />

a None.<br />

XI.<br />

XII.<br />

XIII.<br />

REQUESTS FOR INFORMATION<br />

0 None<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* DDI provided a copy of their internal submittal log. See attached.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

*WCH to provide Change notice to incorporate Heavy shuttle trucks specification Rev. 4<br />

*Chance Notice 003 will be issued to purchase/lease 30-Kenwood radios and charge banks


Progress Review Meeting<br />

Page 3<br />

*WCH to provide Change notice to incorporate IWCP Rev. 5<br />

*WCH to provide Change notice for packaging tent additions<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE<br />

* None.<br />

INVOICE AND PAYMENT STATUS<br />

* Discussed July billing, payment cut-off dates and percent completions for payment.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

" Trailer mobilization has been pushed back to 9/8/09. DDI does not yet have their subcontract<br />

procurements in place. Expect that they should be completed by close of business on 9/1/09. Once<br />

in place, drawing can begin.<br />

" Training requirements for mobilization are HIM, HASP, LWCP and HGET and site specific<br />

emergency preparedness.<br />

" WCH to accompany DDI in review of Oiland's shop operations and quality program.<br />

" DDI requests a copy of the draft lHEA for I-I sampling, they would like to review prior to procuring<br />

any IH equipment.<br />

" Discuss dry-run requirements for PSR to begin remediation activities.<br />

" Discuss requirements of 2-week baseline for air monitoring with site perimeter monitors prior to<br />

burial ground excavation activities.<br />

" Discuss signage for electrical buried cable, road crossing, etc.<br />

* Additional discussion of upcoming submittals due. DDI provided schedule update.<br />

* EJTAs are needed on all personnel to complete PNF process.<br />

* DDI to submit an SPCC in place of the OMP.<br />

" DDI requests clarification to "transportation of hazardous material" that needs to be incorporated into<br />

the Environmental Compliance Plan.<br />

" DDI to provide schedule date to begin use of the CTA (tentatively 9/18).<br />

* Discussion of WCH HGET gap training for personnel badged through OHCs.<br />

" Drew White was introduced as the DDI Sampler.<br />

* SEC is currently pursuing acquisition of CLH and an lH- lead. Approval request for these positions<br />

will be submitted soon. DDI planning to use CIH- from ERDF for the weekly site oversight and<br />

operations support.<br />

Attachment(s): As noted above.


118-K-1 Mobilix.flon Schedule M-Target Due Date Fl-Inclicateminilmmatim afl.bl. E-Submittal or Re-submittal Fl-Submiftal Retwined wiComments f4l-Submittal Retwired as Slatw"I*<br />

July A ust Septainber October<br />

A.ZZW. 1-4 5-11 12-18 19-25 26.1 2-8 9-16 16-22 23-29 304 6m12 13-12 20-28 27.3 4.10<br />

C.I- D_ 4-10 11-17 18-24 26-31 32-38 39-45 46-52 63-69 6046 67-73 74-80 81-87 all-S'll<br />

T Wity 1 2 3 4 5<br />

1 =<br />

6 7 a 9 10 11 12 13<br />

7 L<br />

S-7<br />

S-42 1 05 su..I-<br />

5- 7M<br />

I +<br />

I L<br />

J-<br />

7 51-2 .11<br />

"06<br />

+<br />

_-M21<br />

----------- 111 17 EL<br />

aft 107%,<br />

S- 2-WR- G M as' M.&C I i<br />

_SLb.WM 2<br />

851 C--<br />

2.104 ftW Cov<br />

In"<br />

IF :E7T L<br />

iiiii I D,.R 1(M<br />

--LLLL±<br />

D'.ft W% 1-825<br />

7 L ni i 1, - THET<br />

D ft I" su wm<br />

:ELL L2 I T 77i7 _111<br />

T<br />

_7 -7- -77TTT T[T7T7<br />

41<br />

4<br />

- JU! i<br />

7 __7 -T- _ 7,FT<br />

At- 7 ± _1F=77Fi7T7T<br />

Ll _H 1 _<br />

H7<br />

-l'<br />

=±1 -- f _-JiL 1:Hr hffi<br />

pl: " F 71 7F. F FE T, 17 FT 77<br />

- ----- 4)5 146 - E.0, F.,." 1<br />

_- L<br />

74 FI T I<br />

_-H J<br />

C-.W.<br />

il L<br />

_Sussaft-05 3 F-_P Mm PW I<br />

k-T7 7_---<br />

T-7 T 7 T7FP 77 TT7TTTFTF TH-11<br />

L-4 ±LH_<br />

ELF71- ILI<br />

T7 = 777-7-7 1- 7 P -71707<br />

s. :F-4, -H I<br />

CA Powe'<br />

S. -05 I<br />

-I S W 7418 1<br />

L<br />

i I T 741 , 77 TTH 77<br />

-olm _e. M<br />

ixuft'm a- 7m s-, Is<br />

sq 7-oa l i<br />

T<br />

_Sttb<br />

""MI<br />

s-os Fop h__<br />

A l ._Ppwst sAsd*,l INS s- I Aqo<br />

U-sd Sts. 2-8019<br />

S 9-13 TIffil C I<br />

R..i' 1. E.<br />

L -<br />

1 Li L<br />

$..1" 7 - --T-<br />

S.1-06 5 1.<br />

TT L! tit &I<br />

____ _ - - T_<br />

ftI.AR a<br />

__ _ _ I LLIL L -1 +-I<br />

a.1-07<br />

LM<br />

774-<br />

tt L LT--- T T<br />

Tt4<br />

H<br />

su l E. C-01- -7T--<br />

7<br />

7 _<br />

A - 11 S- 2-"<br />

7-<br />

Ti<br />

Tt<br />

L


118-K-1 Mobilixatio., Schedule M-Target Due Date F-Indicat5 Information Available E-Sdunlitl or Re-subttOI F-Subreittal Retonred wCoflrdsnt D-Subnitol Returned as Status Y<br />

JSh Auqust Se tenmber 0010.r<br />

o Nto D 1-4 5-11 12.16 19-25 264I 248 9-16 16-22 23-29 30-4 6-12 13-19 20-26 27-3 Z7.10<br />

__.1-_ o N.t mr.Oe5.A-m 1-3 4-10 11.17 18-24 25-31 32-35 3945 411-52 53-59 110-66 67.72 74-80 81-67 8ea54<br />

Act. T- Aivty W-~n N, 2 3 4 5 6 7 a 9 10 11 12 13<br />

3-09OC-H0177n7<br />

___~~~~~~ 41%~-L1<br />

.liLf ~~~<br />

007771396 771090<br />

Ej7EF _7 ]TTIT77[117,<br />

7 77 - T Ti 7<br />

So.0-Oe 9-0 00 4 gtl p"'00- - -- - - - - II - - - -- - TF T~ ~T<br />

-,I 77<br />

7_____<br />

LL1<br />

1IT~L I<br />

0090-. -12 W IPE Plod<br />

58-12 2-4L80 uure<br />

LP<br />

sooeo.-,<br />

I-oooo~o~ -L-;-- -L-<br />

F<br />

-1HV<br />

-<br />

3,eO e12<br />

0500405 PH±<br />

L-,<br />

-<br />

S-as.i2 S.02Ce9Tic"<br />

S~~I-i 3-0 UAIDGR 1. I I;<br />

009,030-13TITT 0-l_1000 010<br />

F~


118-K-1 Mobillution Schedule P F n<br />

3 Week Look Ahead B-5-09 August September I October<br />

Aoisal Dates 2-8 915. 16-22 2 49 1 30-5 6-12 1 13-19 20-26 1 27-3 4-10<br />

C.1-der Days 39-45 46-62 1 53-59 60-66 67-73 74-80 81-87 88-94<br />

Afivity - Weak No. 4 5 7 9 10 11 12 13<br />

40 hr 013. (HAZWOPER)<br />

I H<br />

7 77, -7 F -77 L<br />

HGET<br />

1 1 1 H I i I<br />

I H I<br />

t<br />

Physiomis<br />

TT --J-<br />

TF71<br />

Ist AjdfCPR<br />

Mask F-ft<br />

RW 11<br />

L1 1. 1-j-<br />

H 1111 H IM +i+F --T R -T I I<br />

009iral-Shdi<br />

Revised Sdi<br />

Comiets<br />

Develop Mob. Work ismotage Au 12 1<br />

DeffearTrallersto Sft Au .2# 1<br />

Norft-tip-t-trical<br />

P. Wed. didivier DVV ISW<br />

PooMobdo deeverr __<br />

Pac M.oi. deliver SW<br />

T7<br />

Setup Trailers 8-31 9-3 Sept. 6 7 77T -7 7 1 1<br />

MottiftrationWalltd-- -<br />

Trafts-W.1the<br />

" ,'Northpmt<br />

Air W.-<br />

T.<br />

T<br />

E-717<br />

UY DovSY"_____<br />

Parkirg Lot<br />

GPR Surveysi<br />

-calclum Chloride Sept.<br />

TrOar Training Aug 241 T<br />

IWCP AIJ 1 !<br />

Mob. Wor<br />

WCH SS Hesip<br />

FElTJ E-gi<br />

IL F 7 1 i<br />

G-ral SIM Trali<br />

Red 11<br />

40-11s.Harwopow -11LUL --1 L<br />

-------- 1SMS11VVCP<br />

---- --------- -<br />

HGET/Bi<br />

Physicade<br />

-- SpiBVJt.(2)<br />

±L<br />

Loose epqt 7<br />

Sept. 7<br />

ArMord- Sept. 7<br />

GPR Si<br />

WCH<br />

Wallis Y.,d Equip. h.pd..<br />

110101tiffizallm PSR Co plate Aug. 11<br />

7-7<br />

'F<br />

Ratio-<br />

fL-<br />

±±H-iii T I-'TH THE 7<br />

Sept. I<br />

TTIRETTEATE TFIFTL 7TEFT . .<br />

Lay.l Map +t+ 11"i T L<br />

Call Phones<br />

EWO1i Plan bft. 2<br />

D-t coai Fosawe for Mob<br />

SubsTrami Records<br />

Li.d.t.basairew-amaimire--<br />

rWCP Tinirg<br />

E..,g..y Resi for<br />

simmed<br />

APIPtoeble Fail. I sUbmittals stafte, 2<br />

Excawitai Parmit<br />

li Mob Package<br />

CONOPS took. Wk W. Corri'lt.<br />

StmdiV Orders reviewed log book<br />

GPR of uftes<br />

- -----


WC A<br />

Washington<br />

closure<br />

WCII <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 146t2<br />

jL,5<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

1111=4kM Christopher L. Beach ~ 9<br />

September 08, 2009<br />

DI3STRIBTIO<br />

C. L. Beach X3-16 E. L. Adamson X3-40<br />

R. D. Belden (DDI) S. C. Bentti X3-16<br />

M. R. Coy (DDI) S. D. Bighamn N3-30<br />

D. E. Faulk L6-06 R. D. Cantwell N3-30<br />

T. M. Greager X3-40 Q. L. Crist X3-16<br />

L. W. Grossarth X9-08 R. A. Dodd H4-24<br />

S. J. Henneman X9-08 T. A. Foster N3-30<br />

D. E. Herman (Watts) R. Ganapathy X3-40<br />

W. R. Junkins. X3-16 R. M. Harrison N3-30<br />

S. E. Parnell X3-16 J. A. Heard H14-17<br />

S. A. Strope (DDI) M. F. Imhoff X9-08<br />

D. B. Teachout X9- 10 D. L. Schilperoort T2-10<br />

H. Williams III N3-30 R. C. Voeks L6-06<br />

A. S. White (DDI) J. A. Ware N3-30<br />

D. J. Wonders (DDI) Project File, X3-16<br />

A. E. Zacharias X9-08 Records and Document Control H4- 11<br />

A meeting on the above subject was held on September 8, at 1 I18-K, MO-755.<br />

I. SAFETY<br />

* Safety topic: Reminder to take care of yourself and your personal health and wellness.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

*DDI to use ARES Corp. for design work and Rogers for surveying work.<br />

*Equipment List is in process, still on schedule to begin equipment inspections September 14th.<br />

*Have first DDI laborer walkdown and re-work air monitor 480V on ground cable signs and rope.<br />

*Sub-tier contractor training prior to beginning work (IWCP work responsibility, HASP, EP,<br />

JHAs, Fall Protection Plan)<br />

*Excavation Permit is being revised to include CTA and tent approach. Started 8/24/09 and is<br />

being expedited, expect completion in two to three weeks.<br />

*Waste Observer, Haz Mat and DOT training will be given to all craft. To be provided by WCH.<br />

*Plan to start DDIIWatts Construction craft on-site the week of 9/14/09<br />

*Trailer mobilization has been pushed back to week of 9/8/09. DDI does not yet have their<br />

C:\Documnents and Selinpa..clheach.ocal SettngsTenpory Internet Files\Ot.K9")-O8-09 Weekly Pragrtss.doc


Progress Review Meeting<br />

Page 2<br />

subcontract procurements in place. Expect that they should be completed by close of business on<br />

9/1/09. Once in place, drawing can begin. Trailers arrive on-site 9/08/2009.<br />

" Discuss dry-run requirements for PSR to begin remediation activities.<br />

" Discuss requirements of 2-week baseline for air monitoring with site perimeter monitors prior to<br />

burial ground excavation activities.<br />

o Electricians walkdown prior to energizing is necessary.<br />

" Discuss signage for electrical buried cable, road crossing, etc.<br />

" Additional discussion of upcoming submittals due. DDI provided schedule update.<br />

" EJTAs are needed on all personnel to complete PNF process.<br />

* DDI to submit an SPCC in place of the OMP.<br />

" DDI to provide schedule date to begin use of the CTA (tentatively 9/18).<br />

" Discussion of WCH HGET gap training for personnel badged through OHCs.<br />

" SEC is currently pursuing acquisition of CIII and an 1H lead. Approval request for these<br />

positions will be submitted soon. DDI planning to use CIII from ERDF for the weekly site<br />

oversight and operations support.<br />

III.<br />

IV.<br />

PROJECT DESIGN DRAWINGS<br />

* None<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

*See attached 3-week look ahead schedule provided by DDI. Training is going well.<br />

V. WEEKLY PRODUCTION TABLE<br />

*None<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

" Heavy equipment inspections scheduled for the week of September 14th at Watts' yard in<br />

Kennewick.<br />

" Ken Jenkins needs to be scheduled to come and discuss fall protection plan with Pac-Mobile.<br />

Elevated work will not begin until the week of September 15th, just the delivery of the trailers<br />

will begin next week. JLG to show up on the last day to put all the buildings together. All ridge<br />

caps will be completed on the last day.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

" Work packages (USQ screening) required to be performned.<br />

" DDI to determine if they should be using any specific channel on the radio. Need to<br />

coordinate with other <strong>Hanford</strong> contractors to see which channels, bands and frequencies they<br />

are using. DDI will perform a test with the radios they plan to use to verify any specific<br />

channel needs.<br />

IX.<br />

MATERIAL<br />

*DDI to schedule forklift to be on site before WCH schedules Teamsters to deliver drums and<br />

pallets from 618-1. The fork lift operator will be working to the site mobilization work package.


Progress Review Meeting<br />

Page 3<br />

X. QUALITY<br />

* None.<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

* None<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* DDI provided a copy of their internal submittal log. See attached.<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

*Chance Notice 003 will be issued to purchase/lease 30-Kenwood radios and charge banks<br />

*WCH to provide Change notice to incorporate IWCP Rev. 5<br />

*WCH to provide Change notice for packaging tent additions<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE<br />

* None.<br />

INVOICE AND PAYMENT STATUS<br />

e DDI to submit August billing.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

*A proposal for the new IH lead, Joe Price, is to be submitted by DDI.<br />

*DDI will be using Oxarc as a vendor for supplied breathing air systems.<br />

*Discussion of Pac-Mobile fall protection plan and work requirements for all elevated work.<br />

*Doug Herman, a Watts employee, was introduced as the new Assistant Superintendent and Labor<br />

Foreman.<br />

*Discuss Exhibit F drawings, design and civil surveys. etc.<br />

Attachment(s): As noted above.


118-K-I Mobilization Schedule<br />

3 Week Look Ahead 8-5-09 ______ AugustSetmrOcor<br />

Actual Dates 2-8 9-15 16-22 23-29 3056 6-12 13-19 20-26 27-3 4-10<br />

____Calender Days after Award 25-31 32-38 39-46 46562 53-59 60-66 67-73 74-80 81-87 88-94<br />

Activity We sesses 4 5 6 7 8 9 10 11 12 13<br />

40 hr OSHA (H-AZWOPER)_____ ____ ______ _____<br />

Badges I-ILL ILLL<br />

Physicals _ _ _ _ _ __TT<br />

1 st AIW/CPR<br />

1_____ ____________J._I_1___1<br />

Mask__ Fits<br />

Lu Ls-C<br />

Develop_ Mob. Wo r Pa cae A .1<br />

__T17__<br />

SS lac I~-<br />

1<br />

DelivTil ers Sie 7 7- 77<br />

Pa<br />

retions oir e


118-K-1 Mobilization Schedule<br />

3 Week Look Ahead 8-5-09 Agust ______September ______October<br />

Actual Bates 2-8 9.15 16-22 23-29 3056 6-12 13-19 20-26 27-3 4-10<br />

_____calender Days after Award 25-31 32-38 39-45 46-52 53-69 60-66 67-73 74-80 81-87 88-94<br />

Activity Weak No. 4 5 6 7 8 9 10 11 12 13<br />

Equip. Inspection Plan status 2<br />

______Duet control Fixative for Mob<br />

_____Spill Control Kits<br />

Subs Training Records<br />

ABt Training tsr Mob,<br />

Li database review and share<br />

IWCP -Tiing _____<br />

FR HASP Training___-__ _ _____<br />

_____Emergenicy Response for mob<br />

Comtmunications Plan shared<br />

Ap______&plicable Exb. t submittal status 2<br />

______Excavation<br />

Pertd<br />

IINCP Mob package<br />

CONOPS appie. Wtk 5111. Complete<br />

Standing orders reviewred log book<br />

GPR of utilities<br />

_<br />

._____ ........<br />

_ _ _L± L± .II -]TTT<br />

_ _ _ _ _ _-F M~ _ _ _ _M


1184(4 Mobill=tim SchedLde WTarget Dm Date n4d t.hf...fi- "I.M. M-Submittal ., R.-ubftl Fl-S.bitt.1 Rtm.d WComments M-Submktal Retumed as Status *1'<br />

ANY I q-t SePtember I Otob.<br />

1 4 5-117 12,18 1 19-25 26-1 2-8 9-15 1 1r,22 23-29 30-5 6-12 1349 1 20-26 274 1 4-10<br />

F7FF7W- 4 io 11-17 60-66 67-73 74-80 81-87 88-94<br />

iT 18-24 25-31 32-M 3945 4642 53-59<br />

1 2 3 4 5 6 7 8 9 10 11 12 13<br />

0 77 , I= I i I I M ill "<br />

111 111111 11111" iiiiii<br />

I I 1 1 1 i I L 1 1 1 iLLLLLL IL 11<br />

Su , 31_ 1 1 1 1 1 1 1 T" "L - -iJ I i _L<br />

5. 7m<br />

Slbltg, 2 j i -1 1<br />

1 1 1 1 LL<br />

suww w<br />

2.03 F- Q W M C -<br />

S. M3<br />

R",,-UM I I i t, __ fl± ±±H-±<br />

111 14+ . : F = i EEE TTPT Td<br />

S_ 7/22<br />

_LL1 IA I<br />

I i7<br />

,-.7- 100%.<br />

+H* ++ ++1 ±4, +I-r1 1 7 7<br />

_LL I I I LLL _1111LL<br />

Draft W% S.- 1<br />

-H" +fl-H+ ±±H - ffl+<br />

.ft 95%<br />

I -Li-Li.L. 77= T-7fT 777T<br />

111M -lo ll] H IM 111111 H IM [filil<br />

00% 7*0 S_ 1<br />

S. 2.14 SU S- MS<br />

F +f+H+ +H-Iff -±ffH± _LLLI_.LL<br />

=H S WO - d<br />

me 1<br />

L ET-7 +H+ + f+ ±±L t +E ±<br />

ft Im suh Mo 1.wlg<br />

su 2.1 ww - I I I I I I I I I x I_ R ,<br />

11<br />

fillil +1++<br />

SuWM.04 4.14 WakpWw 77777 7=<br />

I I I I I I I I 1 "91 1 1 1 1 __[ LLMj I I I I I I I I I I I I -LI-L! H _L 0 1 1 1 ± ±d± ±ffi i± I I F! TI I I I I , i<br />

W_<br />

D W%__ omft W% 1 1<br />

S "I S-W P_ I I<br />

+H* +H+ -*-fl+ 4+4 +H-H+ +f+ -fl+-H -±±t<br />

Subffdft 5 146 PW& Eq*. F<br />

O.ft T 7=1 S.-I.M4<br />

-we,.<br />

+Hi*<br />

TF 17 1 1<br />

I I ( I I I I I i 447 4 +i+ "I i I I H IM H IM 111111 111111 _111111<br />

S 2 Fft<br />

H4* Hill I i TM7 Tffi* TW7<br />

- 121 S_ 2-W,<br />

S, 2.1MPAIDm4 I<br />

I I I i I--H++* +fl4 H Iffl*<br />

TTTFT TRT -,*ff + H*<br />

I LIM illill<br />

TP 17 TFMT TM7<br />

Wfl+ ±L±.± +Hd+<br />

I m I I 111111<br />

-<br />

111111<br />

J±IJ<br />

f<br />

S Me<br />

S .1-MA +Hi<br />

4111111 L<br />

m I IIIII I TFTFTFFPT*fl<br />

Su .05 7 3 D<br />

IF 11 ill I I TF7TFP7TFRTUEHET7T7<br />

.1. -C 1. S_ 1 19<br />

741 M w -H -fl ±ffl±L+H4<br />

Su E .. M- P-<br />

OM<br />

+m4= " " _111111 1111I.L111111<br />

2 19<br />

Subnl."45 F...Up, Cwffl i L LJ -1. 1 1<br />

I I I I I I I I I I I<br />

T- 1<br />

su<br />

-*tOS 18E=C P E 1 H i<br />

7 E Dp<br />

TTF F TFFFF _1_11111T - R:T'IT<br />

-H±ff<br />

TR7 TR?7FT7 T 77 EEETI=TH<br />

T7T7<br />

_TFTFFFFFTFTTTF7 T_7±T 77ffiT 7T<br />

77 ±±H H"<br />

11! H I I 1! 1! ii HL M il-_ 1, TFTT-, TLF7T<br />

Dft 0% S.W.WW11 SW.2-80<br />

FFF,<br />

Suh-rft W M1 Em CwV PW<br />

i Tt7[JE<br />

i i 1 77-77


Jul IIWSaeme Ot<br />

1-SC-1U21-115231 2 -1 2 3-9 3- 6-12 13M19 2 - 2- 4<br />

2 3 5 a 7 9 1 1


MEETING ATTENDANCE ROSTER<br />

SUBJECT: 14--C}O-cLPr VDATE:<br />

o- /'<br />

First Middle----<br />

Name Name<br />

- -- --<br />

Last name Mail<br />

-(Initial)<br />

Stop<br />

(Initial) SignatureCopn<br />

(MSIN)<br />

61<br />

coWe<br />

AA


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 146141<br />

OWWRIMWEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach 7 ~~<br />

September 22, 2009<br />

ATEDE<br />

ISTRIUTIO<br />

C. L. Beach X3-16 E. L. Adamson X3-40<br />

R. D. Belden (DDI) S. D. Bigham N3-30<br />

S. C. Bentti X3-16 R. D. Cantwell N3-30<br />

D. E. Faulk L6-06 Q. L. Crist X3-16<br />

T. M. Greager X3-40 R. A. Dodd 114-24<br />

L. W. Grossarth X9-08 T. A. Foster N3-30<br />

J. A. Heard 1-4-17 R. Ganapathy X3-40<br />

S. E. Parnell X3-16 R. M. Harrison N3-30<br />

A. S. White (DDI) S. J. Henneman X9-08<br />

R. C. Voeks L6-06 D. E. Herman (Watts)<br />

D. J. Wonders (DDI) M. F. Imhoff X9-08<br />

W. R. Junkins X3-16<br />

D. L. Schilperoort T2-10<br />

S. A. Strope (DDI)<br />

D. B. Teachout X9- 10<br />

J. A. Ware N3-30<br />

H. Williams III N3-30<br />

A. E. Zacharias X9-08<br />

Project File, X3-16<br />

Records and Document Control 114-11<br />

A meeting on the above subject was held on September 22, at 118-K, MO-755.<br />

1. SAFETY<br />

*Safety topic: Watch driving conditions. Time to start thinking about vehicle winterization<br />

preparations.<br />

11. ACTION ITEMS FROM LAST MEETING/STATUS<br />

" DDI to use ARES Corp. for design work and Rogers for surveying work. May also use White<br />

Shield. DDI contracts not yet in place with surveyors.<br />

" Equipment List is in process, still on schedule to begin equipment inspections. DDI to provide<br />

updated equipment list this week, waiting for serial numbers for shuttle trucks.<br />

* Have first DDI laborer walkdown and re-work air monitor 480V on ground cable signs and rope<br />

to be completed today. Lines have been energized, ropes and postings to be complete this week.<br />

Z:\Administrative Assistant\Project Progress Review Weekly Meefings\2009\O9-22-O9 Weekly Progressedoc


Progress Review Meeting<br />

Page 2<br />

" Trailer mobilization has been pushed back to week of 9/8/09. DDI does not yet have their<br />

subcontract procurements in place. Expect that they should be completed by close of business on<br />

9/1/09. Once in place, drawing can begin. Trailers arrive on-site 9/08/2009. Trailers to be<br />

complete by 9/24.<br />

" DDI will be using Oxarc as a vendor for supplied breathing air systems. Equipment will start<br />

being delivered to the site during the first week of October.<br />

" Remediation PSR Checklist draft in process of review.<br />

" Discussed gasoline fueling requirements in Burial Ground.<br />

" Discuss diesel fuel storage tank requirements, potential location, power needs and documentation<br />

requirements. Tank to be delivered 9/24. DDI to submit tank rigging plan and details, WCH to<br />

verify plan requirements for 8,000 gallon tank.<br />

" Discuss training and Work Package development schedule. To be completed this week, ready for<br />

JHAs on 9/29.<br />

" Daily reports need to be provided daily.<br />

111. PROJECT DESIGN DRAWINGS<br />

* None<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached 3-week look ahead schedule provided by DDI. Training is going well.<br />

V. WEEKLY PRODUCTION TABLE<br />

0 None<br />

VI.<br />

VII.<br />

MANPOWER<br />

0 See attached.<br />

EQUIPMENT<br />

* Mobilization is in process.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* Work packages (USQ screening) required to be performed.<br />

IX.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

0 None.<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

* None<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

*DDI provided a copy of their internal submittal log. See attached.


Progress Review Meeting<br />

Page 3<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

0 See attached Change Notice Log.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE<br />

0 None.<br />

IN VOICE AND PAYMENT STATUS<br />

*September billing cut-off date is 9/30/2009.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* WCH to revise Exhibit E for CRATER bucket dimensions.<br />

* 1H equipment to begin showing up in the next two weeks. 1H program to be submitted this week.<br />

" WCH to clarify tritium downwind monitoring requirements.<br />

" Joe Price (IH Lead) and Michael Lighty (Project Controls) were introduced as new DDI<br />

employees.<br />

" WCH to verify hydrant pressure, tie-in permit, etc. WCH needs a sketch locating underground<br />

road crossings and planned location for underground waterline.<br />

" Discussed site lighting in new walking and working areas, all of these areas to be verified for<br />

proper lighting.<br />

* WCH to have CTA ready for use this week. They are coordinating with CHPRC to discontinue<br />

their use of CTA (DDI currently has Cal. Chor. delivery and application scheduled for Tuesday,<br />

9/29/09.<br />

Attachment(s): As noted above.


-- 44<br />

I<br />

J


M1W MobUt&Omli tUdwAWe m4m"tik Roff m~d6<br />

C 04F AN 5O<br />

1 114 31- 1a<br />

444 0<br />

W-1 M-I Ite 6<br />

___o<br />

--- ---<br />

___0 .04 I.I~<br />

&*o~. U<br />

'4141.1B44<br />

4 _<br />

&M.o-04 2-ta 15<br />

3.17op<br />

IEE.:<br />

-"b~~~t K.<br />

I -=H<br />

241wC.<br />

5W.M.W 77<br />

- ~ HWL Al<br />

I - - :-<br />

$WosoWW 12-10b M 00-<br />

&l0 3410 mw "mtm<br />

Arx<br />

60.411.04 0P12<br />

7-i ct<br />

1<br />

___± AfF IE


laS-A* Out.<br />

I I<br />

A Iza~,Swi<br />

AfW0 1-4 1 -11 *"U43 6-1 1319 U4 0<br />

4 4-10 11-17 1" 2w4 36-45o- 73 1 74<br />

1 _<br />

0 10 1 1 1<br />

SI.L<br />

~ ~~-'- ~-~---- A u_________ t * - -- -- -- -- ------ - - -<br />

____T<br />

Im I~T<br />

Iwb -t - A


Dance Ofst"n wm<br />

11".1- BuiWa Grund Rweedlado Project<br />

Stubnw Lao<br />

Lgn: Submitte Returnd wtMMnta Returned wltmus<br />

Date:<br />

Sf221 7:16 AM<br />

/ 1-1 sv 5~em ~SA As Rq~d--<br />

1.02 Dfffti 84. CO.dre __ SA As Rqfd<br />

1-03 SubeC*SdfKW~PWS~sol SA As Rld<br />

1-04 J cooflr$5 MfeOSMOe SA As Rcrd See 1-05 Subconr~act S~dulsje __<br />

1.0 SbooWao udwd. SA 15 ____DO 320<br />

0118-S- t1 1.0 81/2009_ WMiM720 2<br />

G009753A-01.O"ttIA<br />

9/25f20M0g<br />

1.0 Plate$ EV~eow so Fvd~se<br />

S__ A. SC<br />

1.7 Tv"pWay Acos.. and FlW R0840 SC Bfr oi ___ See 9-13 Traffic Aces Control Plan<br />

18Work WO Opatimm N Oft RacWftl SC As Rq'd<br />

106Ooe5.o Nobmo SC 4 Its Before<br />

Work<br />

I Ie v E"M- M-oe SC 2 days<br />

Before Workt<br />

1)tEkW~bicM Sye-IF*4 SC 3 days<br />

Before Work<br />

1-09 NE wepoction SC As Rcrd ______<br />

1 -10 &-90Wa &Otw- A.M SC Before use<br />

1-11 Ecwra emd-&l W~rkP--cdw- _ SC As Rqrd<br />

1-13 Mcbmr of Prnoo lAmOeOPCO SA sRd<br />

1-14 "ooe Of FOulAci.n. A As Rq'Od<br />

2.1 Hs0dmld (FIO')lal SC Beor Moys<br />

01 18MM4-600O1--02e<br />

2-M2 stbwnftd SO & O&" Penk SC 30 days<br />

01ISK484MM00-202<br />

F-0 e H$erad reoermio Man~ SC 30e 2.2 u SHsW<br />

2 cooRdb cdn & Sft " Plogel SC 30 days Se20 u rga<br />

Oll8t-SS0Ot-202<br />

COSIMA-54-002-OMA I Af20


Dance DaIgna tm.<br />

I18&X-I Surtal Ground Remudla<br />

Subn" Log<br />

Projact<br />

Subrettted Returned wknwt Retred WM-u I<br />

Date<br />

Date:<br />

O2M 07:16 AM<br />

2- Chraf 8sqawn DI,.m P(OW40um Sc Not reoqed d Be 8 cnottos ame reqired<br />

Pfau-<br />

fr Trancch I altos.<br />

O118K-S4OO1 2-M2<br />

2-W PMW og POACO sc 0 d5 Se 2-02 Sub S&tl Program<br />

201 Rntwry Pftcn~ Plan SC 30 days See 2-02 Sub S&H Program<br />

011SKA-SOOO1-2,02i<br />

2-02l "n Om"*o SCSee Wo<br />

2-14 SSHASP<br />

2.0 Fa G45 -bwmuctm wrn W" SC 30 days<br />

&Wd Hwelh Program Phet (851 USO<br />

BfreWr<br />

24 PS04. -we**00, c~4w. He01w4 SC 30 days<br />

IOCFRO61 Cw phance MaWBeor<br />

wr<br />

20 watewMar"~ Acdu Ow sc As Rcrd<br />

2.7 n0e waIqRpotSC As Rld<br />

M~AM 24 t<br />

2.0 o 01 K"y SuPw~iftrV Ord s&L4 sc safte work<br />

2-O0t Jo Spcf Has f*SSC<br />

As Rq'd<br />

2-1 O HCOO i wokdWPi.___ SC Before WorkSe202 ielil~~oerbnPa<br />

2-10a HMWokoarl onS Bg Wrc es2M is rhcwalaw Pa<br />

2-10b PPat totww M.u.I ~~ 1SC Before Work<br />

2-1a ic<br />

O 1M rwla s* Ulta Pottoe Lift amSC<br />

Before Moab<br />

2-I.. b<br />

~~ il r>d~ C Before Mob _________ ____


Dance Dss<br />

11-K-1 Builal Ground Rsmedatoq Project<br />

&&bnwt Log<br />

Date:<br />

Legend Subn~ed Retw'nad wlcoMmat RW- Retwned wi~Mtua -i<br />

9122M9 716AM<br />

4l Drf<br />

os0toDt ae<br />

2-labl<br />

~ SSO IPE P<br />

Sc As Rcrd<br />

2-15 Oaowoi~too Uawu4 car" SC Soft"e Worl<br />

2-1 W-W- ROLMMW t P~""SC 7 days<br />

RadbaWtiv MoteM of RedMOn<br />

Befor Wr<br />

2-17 NwAi-RccC R.~5Oo Exoae Dt (by____ SC Before Work~<br />

2-18 EMOWYeeJob TkMWYI*f0 SC Before work<br />

2-18a FOMw G-04. TMOWktowl Mi odko SC Before Wok<br />

2-21 Hw~ Fim dMfe Po<br />

SC A Rcfd ________<br />

3-01~ ULf b c ErwfQ m C~POIw SC Before Use<br />

*~WA*91. O&to mwm* aM<br />

Corecosfion of C&"pm w o 80<br />

HOiM9 Tank or Septi symdmf<br />

(po~elol WaftW *%*Xd)<br />

3-03 8.00 Ord-a R-~019 R-odaa Sc Aa R~d<br />

-rpcMw MnW Usoowdsig O<br />

3.04 WrfW~ D08..,dhti of 40 CPIR 112 _ SC Before Work SO - - -- ---<br />

CowbmweairWJM P8.oa 04<br />

Maraemert Phm . -m appropoe<br />

coceSMA.34Mo=0 (SPOC)<br />

3-M M WAO POAAdOf PfMdSMOO PtM SC Before Work<br />

$.7 CatacasOn Of Efttiu Taitig Of SC AS RCd<br />

HEPA Fear. "Mn MaOucadwwu<br />

348 d*. ok a id t of HAA and SC As Rced<br />

PTRAEUs<br />

3-W9 tow** AW OUR*d Dabe Suoniy SC As Rqfd<br />

3-10 VtOOMZUOOM a-4 0(oiotbOn SC As Rctd<br />

3-11 N40Of - t6wity W-l SC As RCd<br />

Upda f tCtiaikw MdeiM8.rmdcfs<br />

3-12 Chafffto ttw~dlm Quota. of T08C SC As Rrtd<br />

Chtdrk sedM TO ought Sm Yew<br />

3-13 tWOOd'W...e "0 W o Offptk" On<br />

aioni PCs ROWe (ile * OedAm<br />

SC AS Rqd<br />

daterAWe MIem Waft COdas 0e9<br />

-s~o o8ok Qrftef. wdsd<br />

SlatS ow wtem PCs&<br />

3-14trONIVOOMM~OMinYt f.0s Sc As Reqd<br />

tw si *aoraed omg


Dan" oesignsn<br />

11".1- BuM Grwind RemAdlako Proec<br />

&""LgDate:<br />

Submi~e Returned wlcoMmts tquied Returned WltStUS 1<br />

W221087:1SAM<br />

3-15 ai.V fR-oC '~w<br />

SC As Rc'd<br />

3.1 omal VWdt.n O064MOMM df AMVW SC Bealm Work<br />

37.q~uJorApp txu of SC Before Won(<br />

3-18 Trawtb aOuOy Pfun__ SC Beor SWofk<br />

10'Eqo~l AFI R As Rq i<br />

4.2IWm f<br />

E*Mab* U50f A*. 'D PR As RO~<br />

4-04 woumPm CamoI Itim T04 m~ w0uU SA As Rq~d<br />

4-07 OOf NQO5 __ PR As Rrfd<br />

4-08 Clm W0 0 EWohE30 $55055 PR As Rqfd<br />

4439 Socktm"g P4050 AW~ol PR As Rqrd ....... ....... ...<br />

4-10 Pmpossl W A4u5W5o (T-*M3I0') PR As Rcfd<br />

4-12 A0'chS6 wwd Stt ~wrf SA As Rqfd<br />

4-13 O~f Nowk"- ~ SA As Rq~d<br />

__ ~~~2 ___ 0_ uA720<br />

4-15 SF1413-4)*3wwS0'~CWP*f SA As R(rd<br />

4-17 Lwfmof%. __PYwg&f SA 10 ---<br />

4-8fddtf l SA 15DuJly2,0D<br />

4.9MO mt Of oWOW' CwOkft5 SA Before<br />

,4-201mk f<br />

MOM ~PMO Peyl0w _ SA As R~rd<br />

4.21 lbn ~ l<br />

SA As Rqfd<br />

4-22 ~~'0' ~SA As R~ced ___<br />

4-23 75 f ~" SA As Rld ___ __<br />

4-24 RepI.S~to*t SA As Rq'd<br />

4_1 W5% of 1045 knowet AO54sd SA IAs Rld


Oance Deeps kv-<br />

11"-1 Burial Ground flreedlalion Project<br />

SubiwUa Log Df: SM7 6A<br />

Daeate09116A<br />

Subrl N.1OSI~io Rv.Sw T Retred SoMente Rturnd wtkuz5 ~ a<br />

4-Sefte<br />

ft5N#P"<br />

A As R O ----<br />

5 -mogm rin W'd 6ai0 Sc As Rod<br />

5-01bcs"f S ly<br />

Before Work<br />

5 o-01C DAB~ Md e1ificiW'9. SC A0 Up<br />

Before<br />

Before Wr<br />

Baler"e<br />

"if<br />

D A~W~ palfecall SC As days<br />

9011 Enballd SWW SC As (3111"<br />

Uroi RengC~af~1C VNIS W5<br />

SC Before work<br />

" 9 - 11 A ln -dlrO P 109 R0o~~ -<br />

SA A s Rqd a l3<br />

T-.1 013 Oi~ 18SSS.<br />

8119ce2W9


Dance De.In W.<br />

11".1- Sial Ground Reilcation Reject<br />

Submitta Log<br />

Loed: fro W1"<br />

Date<br />

oat*:<br />

V2IM 7:16 AM<br />

gckoPoer<br />

egt<br />

Se<br />

A Rqd<br />

90 ftmr maldawwmcb m~ NIA As Rqrd<br />

dtmt11 M u~ AprW~n4.Epow* STR As Rqrd<br />

9.12 o~.nnlnd Ezsnubed UMWW SC Before Work<br />

9.43 Tf15nAnn..Cort~olPlan _ SC Before Work- - _<br />

9-14 VarOied- are smnndl Cop"npr with SC As Rcrd<br />

WAC. WPA anm Designt Craf<br />

9.15 Ein c O*aW Gete Ma 2 la SC As Rqd<br />

9-i Sald Lwnan thsieSC Before Work See 9-12 Esfthworic Plan<br />

Ptan<br />

9-17 Cold Weathe PnmtnlOw Plan SC Before work<br />

.xn.aldln Cornpet<br />

Person IOSlIAI<br />

STR


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 146143<br />

JQ~aMWEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

w2:141kh Christopher L. Beach<br />

JllllllSeptember 29, 2009<br />

DISTRBU:IO<br />

E. L. Adamson X3-40 R. D. Cantwell N3-30<br />

C. L. Beach X3-16 Q. L. Crist X3-16<br />

R. D. Belden (DDI) R. A. Dodd H-4-24<br />

S. C. Bentti X3-16 T. A. Foster N3-30<br />

M. Coy (DDI) R. Ganapathy X3-40<br />

D. E. Faulk 1-6-06 R. M. Harrison N3-30<br />

T. M. Greager X3-40 S. J. Henneman X9-08<br />

L. W. Grossarth X9-08 D. E. Herman (Watts)<br />

J. A. Heard H-4-17 M. F. Imhoff X9-08<br />

R. A. Nunamaker X3-16 W. R. Junkins X3-16<br />

S. E. Parnell X3-16 D. L. Schilperoort T2- 10<br />

D. G. Saueressig N3-30 S. A. Strope (DDI)<br />

R. C. Voeks 1-6-06 D. B. Teachout X9-10<br />

L. Watts (WC) J. A. Ware N3-30<br />

H. Williams III N3-30 A. S. White (DDI)<br />

A. E. Zacharias X9-08 D. J. Wonders (DDI)<br />

Project File, X3-16<br />

Records and Document Control H-4- 11<br />

A meeting on the above subject was held on September 29, at I118-K, MO-755.<br />

1. SAFETY<br />

0 Safety topic: Weather conditions are changing, be aware of surrounding conditions. Day light<br />

hours are getting shorter.<br />

Ii.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* DDI to use ARES Corp. for design work and Rogers for surveying work. May also use White<br />

Shield. DDI contracts not yet in place with surveyors. Contract with White Shield to be in place<br />

today, surveyors to be scheduled tomorrow.<br />

" Equipment List is in process, still on schedule to begin equipment inspections. DDI to provide<br />

updated equipment list this week, waiting for serial numbers for shuttle trucks and waiting for<br />

water trucks, then DDI will submit this week.<br />

Z:\Admnistrative Assistaifl~roject Progress Review Weekly Meetitigs\2009\09-29-09 Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

* Trailer mobilization has been pushed back to week of 9/8/09. DDI does not yet have their<br />

subcontract procurements in place. Expect that they should be completed by close of business on<br />

9/1/09. Once in place, drawing can begin. Trailers arrive on-site 9/08/2009. Trailers to be<br />

complete by 9/24. Occupancy permits received for POD, RCT and change trailers. Shower<br />

trailers yet to be complete.<br />

" DDI will be using Oxarc as a vendor for supplied breathing air systems. Equipment will start<br />

being delivered to the site during the first week of October.<br />

" Remediation PSR Checklist draft in process of review. Completion of items in process. Scheduled<br />

completion 10/5.<br />

" Discussed gasoline fueling requirements in Burial Ground and how this will be addressed by<br />

Watts Construction.<br />

* Discuss diesel fuel storage tank requirements, potential location, power needs and documentation<br />

requirements. Tank to be delivered 9/24. DDI to submit tank rigging plan and details, WCH to<br />

verify plan requirements for 8,000 gallon tank. DDI to submit tank details and design.<br />

* Discuss tank ladder fall protection requirements.<br />

" Discuss training and Work Package development schedule. To be completed this week, ready for<br />

JHAs on 9/29. JHA's scheduled to be complete today.<br />

* Daily reports need to be provided daily.<br />

" WCH to revise Exhibit E for CRATER bucket dimensions.<br />

* IH equipment to begin showing up in the next two weeks. IH program to be submitted this week.<br />

* WCH to clarify tritium downwind monitoring requirements.<br />

* Joe Price (IH Lead) and Michael Lighty (Project Controls) were introduced as new DDI<br />

employees.<br />

* WCH to verify hydrant pressure, tie-in permit, etc. WCH needs a sketch locating underground<br />

road crossings and planned location for underground waterline. DDI to provide details.<br />

* Discussed site lighting in new walking and working areas, all of these areas to be verified for<br />

proper lighting.<br />

" WCH to have CTA ready for use this week. They are coordinating with CHPRC to discontinue<br />

their use of CTA (DDI currently has Cal. Chor. delivery and application scheduled for Tuesday,<br />

9/29/09. Has been pushed out till Thursday, 10/1/09.<br />

" Subcontractor onsite offices to be in place next week.<br />

II1.<br />

IV.<br />

PROJECT DESIGN DRAWINGS<br />

0 Need Pre excavation TOPO performed, Electrical drawings and traffic control plan.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached 3-week look ahead schedule provided by DDI.<br />

V. WEEKLY PRODUCTION TABLE<br />

* None<br />

VI.<br />

VII.<br />

MANPOWER<br />

0 See attached.<br />

EQUIPMENT<br />

0 Mobilization is in process.


Progress Review Meeting<br />

Page 3<br />

VIII.<br />

IX.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* Work packages (USQ screening) required to be performed.<br />

MATERIAL<br />

0 None.<br />

X. QUALITY<br />

* None.<br />

XI.<br />

REQUESTS FOR INFORMATION<br />

* None<br />

XII.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

*DDI provided a copy of their internal submittal 1og. See attached.<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

0 See attached Change Notice Log.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE<br />

" CN 005 Exhibit G Fall Protection and Elevated Work<br />

" CN 006: Exhibit I and Exhibit E<br />

* CN 007: CTA Exit Building<br />

" CN 008: Survey Tent Miscellaneous Items<br />

" Letter to DDI: Remediation of the 118-K-i Burial Ground Key Personnel Position<br />

" Weekly Progress Review Meeting Minutes 9/22/2009<br />

INVOICE AND PAYMENT STATUS<br />

*September billing cut-off date is 9/30/2009. DDI to submit August and September invoices this<br />

week.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

" Prep scales Wednesday and scale calibration is scheduled for Thursday, 10/1/09.<br />

" WCH to provide a vendor list for rad rope to DDI for partial suppliers.<br />

" Discussed Project Manager and Health & Safety Rep. key personnel positions, no replacement<br />

approvals are currently in place.<br />

" Discussed WCH Tobacco use policy, designated smoke areas, etc., WCH will enforce this policy.<br />

" Discussed implementation of DDI QA program, for the category 3 facility and regular<br />

assessments that will be conducted.<br />

" Tritium scheduled monitor to be installed 10/15/09.<br />

Attachment(s): As noted above.


Change Notice Log<br />

Chang Noic<br />

Change notice Effective date DESCRIPTION I Date sent to SC CCN RR Rev No. MOD. No. Related CCNslComments<br />

no. [- Date accepted CCN Date rejected CCN o. Date received CCN Date rejected CCN<br />

S001 18-Aug-09 Drawing Revisions 19-Aug-09 146130 24-Aug-09<br />

Nn<br />

002 2-,Sep-09 Exhibit E Technical Specification No. OOOOX-SP- 1 -Sep-09 146131 Awaiting DDI Proposal<br />

C0009, Heavy Shuttle Trucks, Rev. 4 ______<br />

003 10O-Sep-09 18 additional radios 14-Sep-09 146132 16-Sep-09 Awaiting DDt Proposal<br />

004 10-Sep-09 IWGCP REV 5 15-ei-9 46133 16-Sep-09 _ _____Awaiting Dot Proposal<br />

005 17-Sep-09 Exhibit G Fall Protection and Elevated Work 17-Sep-09 146137 22-Sep-09 ____Awaiting DOI Proposal<br />

006 17-Sep-09 Exhibit l and Exhibit E 17-Sep-09 146138 22-Sep-09 ________ ______Awaiting 001 Proposal<br />

007 22-Sep-09 CTA Exit Building 22-Sep-09 146139 22-Sep-09 ___ _____Awaiting 001 Proposal<br />

008 23-Sep-09 Survey Tent Miscellaneous Items 23-Sep-09 146140 23-Sep-09 Awaiting 001 Proposal<br />

Awaiting DDI Proposal<br />

Prpoa<br />

Issued 9/29/2009 8:19 AM Page 1 of 1


III4,<br />

Ii<br />

.I L


1 U 42S I S" & S 4 d4d .<br />

1 0 T M1 - 0 20 2 4<br />

1.3laslio 1 14723 --<br />

S. w 13-41 41-73<br />

LEH<br />

[M M$~ i<br />

HE<br />

DN t O. L Ph I E _1_E<br />

I4 ulJL1<br />

Ili<br />

341M<br />

I&ANOW411<br />

1WO.01 Wo<br />

00MRO<br />

-w&4 14 voo" so<br />

&4..Nbm~~W<br />

tNImbI~b<br />

41"741 rm<br />

Uodl *$ 2,40M.<br />

t'It 110,10"<br />

__,4_+___E<br />

JIE3 7+<br />

&.O<br />

0IvoAV036ov<br />

00-08M 11 !1 l ;,I1<br />

?,10M 10F.* Wo<br />

0~01T +F


Stunlob<br />

JUN-<br />

Aa- I I1 1 013 -0 1-7 1 W 1M 28 34 306.s 74<br />

A,~m<br />

Ra<br />

10 fl'_r<br />

I fi<br />

t<br />

-4WA<br />

asa<br />

S~a~iIT =<br />

has-ilok a<br />

Ma


&14C-1 i~udKuude~n Loa rjc<br />

SubaiDow<br />

& uMeNd RM.Ind koa.Wf RetuNed mw. 1<br />

~IW7*16AM<br />

1-01 bubo m' SA As Rqfd____ _________<br />

1-0 Ownfiv see 0nbwSA As R~fd<br />

1.04 bcAMMwOrw SA As Rcfd Se10 uorWSh<br />

I-' LSefed Mikkt"J 220<br />

Oii(8S4-8=l0-1-05 $ MO<br />

C00675&441-00,COIA<br />

01<br />

~, P .~I~iR~eSC y<br />

Be oiuWct<br />

1-06 Wer W Opeu 0 Me. Rapokin SC As R4(d<br />

I'm K8S O.o m I SC.4<br />

S CT N~md ,Ik~wlP~. C 30day<br />

2.02c Acc~wd Op~l~ a ~sc 30 days<br />

011M45-BOOM1-202<br />

e202Sb8)Prga<br />

we2. oecJ"om Y ~ Sc A0 Rday aiaeSb<br />

E 101~.0 A -LOIS .<br />

1-12 2-4SStS


Damce Designs Inc.<br />

118-K-i Bwwa Ground Roint~on ProJec<br />

Leed: Sbltod Rturned WIfwft Rnw RokWnW~ WISMAN V<br />

9129M 7:18 AIA<br />

2,2 cu WOW.t~ F1.. romm"ia SC Not mqL*m un Be cotrl am rmqike<br />

frT, v KI I ss<br />

221FaNPbA l'to UIo Srgo C 30 Gays See 2-02 Sub S&H PrOgram<br />

24)211 RmpvlPMWWW Plo~n SC 30 days Se2-02 Sub S&H Program<br />

O11WS8000i1.-081109 92320 2.<br />

2-M2 OPouSUHam progrorn Sc See 2-14 SSHASP<br />

2- i , wcdw mkM s **y SC 30 days<br />

an HsIGO pmronm pwr w82 mw eibo Work<br />

O11SK-S$40001-M4 / /720 1520<br />

24 PO". '#AUIfosln Clit HorMuU SC 30 days<br />

20 i RSIIWWWO Of* 1800'o SC Bew, Work<br />

2- u~w"M"Ad ww Sc As mRO4<br />

Ir*XW1Ieu RuOWr<br />

y) 24 Fo<br />

208LgOf "e QucWWVI wm sw1 SC Before Work<br />

2-105300-10 cis Of82$l.<br />

2- ob N*AwroS AsR'<br />

2-1 Halt Wor CodolP SC So"___I _e_20___ RPW~ooit Pa<br />

2-10b Pawfi e~ AI 0ov~Uan SC Bolos Wobt<br />

2-1 lb Crms0pcurG" t~ SC $.,Mo<br />

2-ilc<br />

USn Sw cutwffoE fopqL frnad SC 9.10 Mob<br />

Otwi o~i CrftM<br />

9/5200 812112009<br />

2-12 A~~r~Pn SC Solo. Work<br />

2-13 "I&ANI W SC As ftC~d<br />

2-13a SchrUi C Murvle por"~J<br />

"hm MWOWIdfG Oats<br />

2-13b ~ .,nl ! ~S-so Mon"l<br />

2-'.bSuGC~Ud~y~WSC Befoe Mob _______~l _______-


Cane Desgn Inc.<br />

118-K1 wwI Groomd Aemadon ProJed<br />

Lagnt thettd ftsWamd wftoainl* M"Ok Rftzw wMltb -I<br />

2-14b Ar ~ Purt~SC As aR<br />

2-15..~M W @~ SC 880019 Work<br />

2-18IOW fiq.eut AJMFtdnWsm Is Paa SC 1 days<br />

Rtado Moal~ w~adbrw Set"r Work<br />

2.17'O%<br />

iic-fCC Adw EOsdon IO wb SC BefOre WOWk___<br />

2-18 EM;;piase4*TeikMOgISM Sc Beobe Work<br />

2-180 vivi "0. TItar womeoe e<br />

SC Before Work<br />

2-21 lim P-SMwSEUMPsm* Sc A~ ___ ___<br />

30 Eronow" RepsE (rolo do SC Before Use<br />

Cartrkma oCwo~seo<br />

for oome<br />

%4S Sepik 0 tg* s vraf e WSC A<br />

Ir-ak ard Molencerf LOP<br />

3404 WON ~UON P' lot 40 CFR 112 Sc Befors Work ___0______<br />

see___<br />

M sa ripanSC<br />

cowrderrywe"PSJa 00<br />

Ueneemeflr PEt ft "WopoU<br />

Beftr Mob<br />

C0P534MO40 (PCC) 220 V&<br />

34 ometm r EfiaUmc raft of SC As R~t<br />

HPAFUUS "Whturitahrov<br />

349 aSE Model OF HU o SC As Rq~d<br />

39 ManM" A MW tSE B4JW SC As RQ'd<br />

3-0Mora 1. wo wAb~n Sc At A4'<br />

3-11il ~ ~ ryw~ A* ARId<br />

3-12. khwfw ;r, 04ooWi Of Tedse - SFtd<br />

OritetVd Tfho Ow Yaw<br />

3-13 1~rUM~ nsOwSIY OWPW Ssml<br />

-s Sc<br />

R __


Dane. Desgns ha.<br />

li1l-K-l Buril Ground Remenufon Rv~eto<br />

Subifll Log<br />

Dt, W9 :8A<br />

Logen: Bullte ROWMntd wtOmhhn Re***" Roluuld wI8aho -11<br />

~ W Pp~w~ fr<br />

SC Before Work<br />

S7 oqwwht ar APO w .Bfoe1or<br />

"<br />

a k1otoom"iAdars - PR A-q-<br />

PR<br />

As R(Pd<br />

-4 - CaW-1 a~~ol AdA - PR AS Rcqd<br />

4-13 forw Tmwnpn SA 10Du JlyIS2<br />

4w4-V<br />

wXi R6 cc.*.<br />

AqOnwm t SA As Rcd<br />

4-1/ 0.fe P for esr ~ (TWWM -*b4 P sR<br />

01lISK-6-SO0O1-4-18<br />

4.1 *WoI0.ManWwvW BMWPU) TSvt SA As Rcd<br />

4-16L2KO Eo<br />

dQ NSAE50<br />

4-14 Perim RPomm$ a<br />

u 1lr1&20 o o P<br />

4- mo-ww 0TM0ND18<br />

BwroA As Due July 2__ ,2__9


Done* Doolem kic.<br />

118-K-1 OmW Wourid Rovisifidlon Project<br />

ssam" Log<br />

Sub R*wn*d WMMW*nb ft**od Roxned wMatus -V<br />

Lociond: Date H<br />

Ddo:<br />

W2*M?:ISAM<br />

P" tit DM<br />

Row. tWOU gKufmw *OA comm"<br />

4-26 Weir W-*- Per SA As R(td<br />

S.M OnwArKw Oft *no Sim"Oss Sc As R4yd<br />

5-010 orswvw Sc 14 dap<br />

Before VVo&<br />

Sc<br />

30 day*<br />

Before Work<br />

Ds% OW Cartillasim SC 30 di"<br />

Before Work<br />

5-Old wCe4v onwwv Orm Olown chwv- Sc As Rcrd<br />

----------<br />

Pw Sc 30 D&A<br />

Before<br />

sallivice<br />

"if Mao spwmmftm Sc As Rq;d<br />

- - - -- - --------<br />

5-Ma Sc 30 den<br />

Bofors VVM<br />

5-02 EMCIVICSIONIOP Sc Was Vft*<br />

+<br />

A, Rq'd<br />

SA<br />

7-01 COMOPS P oW&I sulwc Sc Bowe work<br />

AnWorm Wid P4004MIn W*eo~<br />

mom::<br />

-- -77----w-<br />

01 ISK-116-80001-7-01<br />

7.02 Subcorkschu C4r&oM or Gwwww Sc Bolors<br />

Work PudWn<br />

Baliffice<br />

7-03 Pawfilmy Disswalift V-16'" MAwW Sc 10 dop See 24)2 Ch#PW 1. Sea 13. &M 3<br />

wd DrAcm<br />

B10" Work<br />

I I I<br />

_--77-7<br />

SC 30 20M<br />

011SK4914MM."i NONNI &712009 &24rdM<br />

8-M Sc As ftd<br />

MAMM"ALN<br />

941 Absommmoilkimmilk Plan Sc As RC(d See a-12 Earthwork Plan<br />

; 01191(41& 4W CAI f<br />

9-02 Uw Pmm Sc AS Rld Puss cLil ic-*<br />

011SK4M.8000140-12<br />

9.M so 90; wavoom Sc Before<br />

ShOM9M<br />

9-04 6**nwt UM*c*m &id ftwetaelve<br />

prow"<br />

Sc<br />

94)5 SquO-t k*Pmd- CON"Oft" Sc<br />

-q7<br />

9-M am" v0saft Woo W; c Sc Before Uso<br />

9.07 Canubmw bwomalm Recono, WA As Rld<br />

9.M oasis M DAOC*Wcom SC Boom Use


Danceo Designs Inc,<br />

1111-1- urls Ground ftemedlam Project<br />

S&*mNM LogDo<br />

eend: Uubalmotd Returned wlcommno fo~m tshued Wtatstus "I<br />

M<br />

7:1AM<br />

ggb Pvre CU*YI j SC As RV ~ ___________________<br />

0 k~psi MkwameI,.pelri WA As Rcqd<br />

9-11 Mu~nt AppfvWw Eqow SIR As Rqd<br />

0.12 Edmwk W Ew- SC Before Work<br />

O1 ff(4M-SWnl-5-l2<br />

=q<br />

.1 Trafle MceM cma lu m SC Before Work_____________________<br />

9.14 VOAinV ~M W ~hSC As Rqd<br />

WAC. NFPA. and Deepn Cl*srt<br />

9,5 maaa O~n Wre". Von 20 0 Sc As Rq'd<br />

0.18 enmws eledc~nw SC seft"e Workr See 9-12 Esrtmmxk Pion<br />

OjWlM4W4-12<br />

9A7 -; " Wo


MEETING ATTENDANCE ROSTER<br />

SUBJECT: i ~ Off Dy DATE: CS lAc/ '-"<br />

First MiddleMalSo<br />

Name Name Last name (SN intr opn<br />

(Initial) (Initil)(MN<br />

J ___<br />

Pgi<br />

xsjj1 kw&GL( "i<br />

±L __H<br />

In_ 6W_ e s 4-~<br />

A ~ ~ ~ c ~ ,<br />

~~74Z~____30<br />

________ 46_<br />

___~~


WCH<br />

Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 146149<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

E October 13, 2009<br />

E. L. Adamson X3-40 R. D. Cantwell N3-30<br />

C. L. Beach X3-16 R. A. Dodd H-4-24<br />

S. C. Bentti X3-16 D. E. Faulk L6-06<br />

Q. L. Grist X3-16 T. A. Foster N3-30<br />

W. R. Junkins X3-16 R. Ganapathy X3-40<br />

M. Lighty (DDI) T. M. Greager X3-16<br />

S. McQueary (DDI) L. W. Grossartli X9-08<br />

S. E. Parnell X3-16 R. M. Harrison N3-30<br />

J. Price (DDI) J. A. Heard H4-17<br />

P. Sawyer (DDI) S. J. Henneman X3-16<br />

S. A. Strope (DDI) R. A. Nunamaker X3-16<br />

A. S. White (DDI) D. G. Saueressig N3-30<br />

H. Williams III X3-16 D. B. Teachout X3-16<br />

R. C. Voeks L6-06<br />

J. A. Ware N3-30<br />

A. E. Zacharias X3-16<br />

Project File, X3-16<br />

Records and Document Control H-4- 11<br />

A meeting on the above subject was held on October 13, at 118-K, MO-755.<br />

1. SAFETY<br />

0 Safety topic: Discussed texting during driving and how much of a distraction it is.<br />

11. ACTION ITEMS FROM LAST MEETING/STATUS<br />

* Still need steps for shower and hygiene trailers to get occupancy permits. Will proceed with work<br />

on the hygiene shower trailer at this time. Work on the Decon trailer is being put on hold.<br />

* DDI will be using Oxarc as a vendor for supplied breathing air systems. Equipment has been<br />

ordered and status update will be provided by DDI before 10/19.<br />

* Remediation PSR Checklist draft in process of review. Completion of items in process. Scheduled<br />

completion 10/22. All items should be submitted relating to the PSR no later than 10/22. PSR<br />

Management review for sign off will be 10/28/2009. DDI requested to follow up on QA and<br />

Training plans before then.<br />

Z:\Administritive Assistant'Project Progress Review Weekly Meetiings\2009\ 10-I 3-09 Weekly Progressedoc


Progress Review Meeting<br />

Page 2<br />

* Discussed gasoline fueling requirements in Burial Ground and how this will be addressed by<br />

Watts Construction. DDI to set some sort of control in place on the fuel tank and provide to<br />

WCH.<br />

* Discussed diesel fuel storage tank requirements, potential location, power needs and<br />

documentation requirements. Tank to be delivered 9/24. DDI to submit tank rigging plan and<br />

details, WCH to verify plan requirements for 8,000 gallon tank. DDI to submit tank details for<br />

hose and reel design. DDI to provide appropriate submittals<br />

* DDI and WCH to discuss tank ladder fall protection requirements.<br />

* Discussed Training and Work Package development schedule. JHA's and Tech Procedures<br />

scheduled to be completed this week.<br />

0 11H equipment to begin showing up in the next two weeks. 1H program submitted to and being<br />

returned with comments (WCH) this week.<br />

* WCH to clarify tritium downwind monitoring requirements. WCH checking on RadCon and<br />

Environmental requirements<br />

* Discussed site lighting in new walking, working areas and tent areas, all of which are to be<br />

verified for proper lighting.<br />

1I1. PROJECT DESIGN DRAWINGS<br />

*Electrical drawings and traffic control plan drawings are in process. Diesel storage tank electrical<br />

designs and trailer site electrical needs as-built drawings.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* None.<br />

V. WEEKLY PRODUCTION TABLE<br />

* None<br />

VI.<br />

VII.<br />

VIII.<br />

IX.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

0 None.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

*Discussed implementation of DDI QA and Training program, for the category 3 facility and<br />

regular assessments that will be conducted. Schedule of surveillances to be developed.<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

0 None<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* None.


Progress Review Meeting<br />

Page 3<br />

XIII.<br />

XIV.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

*CN009 will be coming from WCH. - this change notice will be a full revision of Exhibit G and<br />

will incorporate the CN005 revisions.<br />

CORRESPONDENCE<br />

" Letter from DDI - Appointment of Steve McQueary as DDI Project Manager<br />

* Weekly Progress Review Meeting Minutes 9/29/2009<br />

" Letter to DDI: Key Personnel Approval (McQueary)<br />

* Letter to DDI: Key Personnel Approval (Sexsmith)<br />

* Letter to DDI: Irrevocable Standby Letter of Credit<br />

* Letter from DDI: Additional Requirement for <strong>Site</strong> Safety Office during Mobilization<br />

" Heavy Equipment Move Notification<br />

" Heavy Equipment Move Notification<br />

* Heavy Equipment Move Notification<br />

XV.<br />

XVI.<br />

IN VOICE AND PAYMENT STATUS<br />

* None.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

" Discussed WCH tobacco use policy, designated smoke areas, etc. WCH will be establishing<br />

designated smoking areas. WCH will enforce this policy.<br />

* Need CADD/Electrical Drawings for electrical tie-ins.<br />

* WCH requested status of Cold Weather Protection plan from DDI.<br />

" DDI needs to abide by the approved bucket truck inspection plan. Per DDI the bucket truck will<br />

be on-site 10/15/2009.<br />

* Schedule for emergency drill preparation was discussed. Table-top drill to be performed 10/15.<br />

Will need some craft involvement, supervisors and one or two key techs, a laborer and operator or<br />

two.<br />

* Modesty clothing/laundry service will be provided and blues as well as towels.<br />

* DDI informed that water supply lines will not all be in place before start up.<br />

* DDI needs to engage a qualified person to inspect scaffolding prior to start-up.<br />

* WCH to provide CTA technical procedures to DDI.<br />

" Should have baseline soil samples back sometime this week for the site area perimeter air monitor<br />

locations.<br />

" Paul Sawyer (IH) and Steve McQueary (PM) were introduced as new DDI employees.<br />

Attachment(s): As noted above.


E<br />

E<br />

a. 0.a..fl0Q-0-(L 1-<br />

0 0000001i 1j<br />

I<br />

I<br />

CL<br />

0C0 0 0 0 0 0<br />

(U a<br />

to,<br />

z<br />

z<br />

c<br />

0-0<br />

0Le.<br />

0)<<br />

U<br />

LL<br />

II<br />

6.-<br />

US<br />

n; I-?<br />

6 w<br />

InIN<br />

1- m I n~ uI 11


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 147301<br />

JJ12MWEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

October 20, 2009<br />

i DISRIBTIO<br />

E. L. Adamson X3-40 S. C. Bentti X3-16<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Crist X3-16 R. A. Dodd H4-24<br />

D. E. Faulk L6-06 T. A. Foster N3-30<br />

L. W. Grossarth X9-08 R. Ganapathy X3-40<br />

J. A. Heard H4-17 T. M. Greager X3-16<br />

S. McQueary (DDI) R. M. Harrison N3-30<br />

S. E. Parnell X3-16 S. J. Henneman X3-16<br />

S. A. Strope (DDI) W. R. Junkins X3-16<br />

H. Williams III X3-16 M. Lighty (DDI)<br />

R. A. Nunamaker X3-16<br />

J. Price (DDI)<br />

D. G. Saueressig N3-30<br />

P. Sawyer (DDI)<br />

D. B. Teachout X3-16<br />

R. C. Voeks L6-06<br />

J. A. Ware N3-30<br />

A. S. White (DDI)<br />

A. E. Zacharias X3-16<br />

Project File, X3-16<br />

Records and Document Control H-4-1 1<br />

A meeting on the above subject was held on October, at 118-K, MO-755.<br />

1. SAFETY<br />

0 Safety topic: Discussion included driving in fog and low visibility. Also discussed tire inflation<br />

and attendees were referred to Lessons Learned from 1 00-D area.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* Still need steps for shower and hygiene trailers to get occupancy permits. Will proceed with work<br />

on the hygiene shower trailer at this time. WCH to issue CN to de-mob the Decon trailer.<br />

* DDI will be using Oxarc as a vendor for supplied breathing air systems. Equipment has been<br />

ordered and status update will be provided by DDI before 10/19. Equipment is on site, set-up on<br />

excavator is in process.<br />

Z:\Admninistrative Assistant\Project Progress Review Weekly Meetings\2009\lO-20-09 Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

* Remediation PSR Checklist draft in process of review. Completion of items in process. Scheduled<br />

completion 10/22. All items should be submitted relating to the PSR no later than 10/22. PSR<br />

Management review for sign off will be 10/28/2009. DDI requested to follow up on QA and<br />

Training plans and then meet with E. Adamson.<br />

* Discussed gasoline fueling requirements in Burial Ground and how this will be addressed by<br />

Watts Construction. DDI to set some sort of control in place on the fuel tank and provide to<br />

WCH. DDI has determined that no vehicle mounted fueling tanks for gasoline will be on site.<br />

* Discussed diesel fuel storage tank requirements, potential location, power needs and<br />

documentation requirements. Tank to be delivered 9/24. DDI to submit tank rigging plan and<br />

details, WCH to verify plan requirements for 8,000 gallon tank. DDI to submit tank details for<br />

hose and reel design. DDI to provide appropriate submittals<br />

" DDI and WCH to discuss tank ladder fall protection requirements. DDI to propose providing<br />

JLG, manlift, etc.<br />

" 1H equipment to begin showing up in the next two weeks. 1H program submitted to and being<br />

returned with comments (WCH) this week. WCH current in review of these. 1H equipment is<br />

on-site, excavators are being set up and personnel are in training.<br />

" WCH to clarify tritium downwind monitoring requirements. WCH checking on RadCon and<br />

Environmental requirements. DOE has agreed with proposal and it has been forwarded to EPA<br />

for review/concurrence.<br />

" Discussed site lighting in new walking, working areas and tent areas, all of which are to be<br />

verified for proper lighting. Discussion continued on alternative light sources such as light plant<br />

at rail crossing into site, additional parking lot and entrance lighting.<br />

* Discussed WCH tobacco use policy, designated smoke areas, etc. WCH will be establishing<br />

designated smoking areas. WCH will enforce this policy.<br />

" Need Electrical Drawings for electrical tie-ins.<br />

" WCH requested status of Cold Weather Protection plan from DDI.<br />

" DDI needs to abide by the approved bucket truck inspection plan. Per DDI the bucket truck will<br />

be on-site 10/15/2009. WCH Safety to follow up on aerial lift and associated fall protection<br />

requirements. DDI to verify/confirm electricians fall protection training.<br />

" Schedule for emergency drill preparation was discussed. Drill was performed 10/15. Field drill<br />

options discussed.<br />

" Modesty clothing/laundry service will be provided and blues as well as towels.<br />

1II.<br />

IV.<br />

PROJECT DESIGN DRAWINGS<br />

*Electrical drawings and traffic control plan drawings are in process. Diesel storage tank electrical<br />

designs and trailer site electrical needs as-built drawings.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

0 None.<br />

V. WEEKLY PRODUCTION TABLE<br />

* None<br />

VI.<br />

MANPOWER<br />

0 None.


Progress Review Meeting<br />

Page 3<br />

VII.<br />

EQUIPMENT<br />

* None.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

IX.<br />

MATERIAL<br />

*None.<br />

X. QUALITY<br />

*Discussed implementation of DDI QA and Training program, for the category 3 facility and<br />

regular assessments that will be conducted. Schedule of surveillances has been developed and<br />

there will be 27 assessments over the next year.<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

* None<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

0 None.<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

" CN009 will be coming from WCH. - this change notice will be a full revision of Exhibit G and<br />

will incorporate the CN005 revisions.<br />

" CN0 10 will be coming from WCH - this change notice will be authorization to de-mob the<br />

Decon Shower Trailer.<br />

XIV.<br />

CORRESPONDENCE<br />

0 None<br />

XV.<br />

XVI.<br />

INVOICE AND PAYMENT STATUS<br />

* Discussed billing and payment status.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

" DDI informed that water supply lines will not all be in place before start up. Discussion of not<br />

tying directly to a hydrant. There will be no filling of trucks until an alternative to hard tie-ins is<br />

in place.<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed.<br />

" Chris Guzzetti is the new EPA site representative, replacing Rob Lobos.<br />

Attachment(s): As noted above.


CM<br />

CN<br />

N<br />

0t 1.<br />

-4<br />

W,<br />

co,<br />

CD0<br />

-0 0t~ 9<br />

(* H H H H<br />

C14<br />

C an C)J In N- C C) CO 0 f 2 -ro<br />

C) C) L) C) c) 0 ) ~ 1- a,0 'O I I iiE c C) C)( C~ )' ~ H o<br />

'<br />

0 a) 0 0, o0 0 0 o<br />

C/, .0a E [ C C C c - ~ .<br />

wL~<br />

a) UaC c< L 0 , C<br />

~~0..C 0a Cm T (2 CX m a -, c2<br />

*CL In 'I - 0 0 0 aLa<br />

0 ( CL 0~<br />

C) E-0.<br />

0 CL -FD 00 '<br />

0 0 a)Cx- I<br />

E 0 0 0 0 EC ,<br />

t5 cc a 5c t- (N (N (N m 3<br />

0U


E<br />

s mo calafi a 70i<br />

0<br />

o 0 0000 0<br />

0 C<br />

ji<br />

iC27l ll 1<<br />

2i<br />

Z<br />

6<br />

C.)<br />

99.C<br />

61<br />

9 999<br />

U3 C/<br />

0W<br />

Mm6RZ )X<br />

0<br />

O2 U x0 - ( 4X.C I I<br />

LU<br />

C<br />

z


W H<br />

CCN: 14730r<br />

Washington -731<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

October 27, 2009<br />

I<br />

DISRIBTIO<br />

E. L. Adamson X3-40 R. A. Dodd H-4-24<br />

C. L. Beach X3-16 T. A. Foster N3-30<br />

S. C. Bentti X3-16 R. Ganapathy X3-40<br />

R. D. Cantwell N3-30 R. M. Harrison N3-30<br />

M. D. Clancy X3-16 D. B. Teachout X3-16<br />

Q. L. Grist X3-16 J. A. Ware N3-30<br />

D. E. Faulk 1-6-06 Project File, X3-16<br />

T. M. Greager X3-16 Records and Document Control H-4-1 1<br />

L. W. Grossarth X9-08<br />

J. A. Heard 1-4-17<br />

S. J. Henneman X3-16<br />

W. R. Junkins X3-16<br />

M. Lighty (DDI)<br />

S. McQueary (DDI)<br />

R. A. Nunamaker X3-16<br />

S. E. Parnell X3-16<br />

J. Price (DDI)<br />

D. G. Saueressig N3-30<br />

S. A. Strope (DDI)<br />

A. S. White (DDI)<br />

H. Williams III X3-16<br />

A. E. Zacharias X3-16<br />

A meeting on the above subject was held on October 27, 2009 at 118-K, MO-755.<br />

1. SAFETY<br />

*Safety topic: Discussion about the wind and watching when opening building and vehicle doors<br />

when the winds are high.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

*Still need steps for shower and hygiene trailers to get occupancy permits. Will proceed with work<br />

C:\Docurnents and Setfings\clbeach\Local Setfiigs\Temnporary Internet Files\OLK9\I 0-27-09 Weekly Pro gress.doc


Progress Review Meeting<br />

Page 2<br />

on the hygiene shower trailer at this time. WCH will revise Exhibit D to de-mob the Decon<br />

trailer.<br />

* DDI will be using Oxarc as a vendor for supplied breathing air systems. Equipment has been<br />

ordered and status update will be provided by DDI before 10/ 19. Equipment is continuously<br />

arriving. WCH to confirm which fittings are being used by the RCTs - Hanson or Schrader?<br />

" Remediation PSR Checklist draft in process of review. Completion of items in process. Scheduled<br />

completion 10/22. All items should be completed relating to the PSR no later than end of this<br />

week. PSR Management review for sign off after all dry runs are completed - on or about<br />

11/4/2009. DDI requested to follow up on QA and Training plans and then meet with E.<br />

Adamson. GO-4 forms have been submitted. Discussed training and tracking program.<br />

* Discussed diesel fuel storage tank requirements, potential location, power needs and<br />

documentation requirements. Tank to be delivered 9/24. DDI to submit tank rigging plan and<br />

details, WCH to verify plan requirements for 8,000 gallon tank. DDI to submit tank details for<br />

hose and reel design. DDI to provide appropriate submittals, which WCH has reviewed and<br />

returned.<br />

" DDI and WCH to discuss tank ladder fall protection requirements. DDI to propose providing<br />

JLG, manlift, etc. in process.<br />

" 1H equipment is on-site, excavators are being set up and personnel are in training. Equipment is<br />

now ready to support mock-ups and dry runs.<br />

" WCH to clarify tritium downwind monitoring requirements. WCH checking on RadCon and<br />

Environmental requirements. DOE has agreed with proposal and it has been forwarded to EPA<br />

for review/concurrence. Tritium monitor is in place.<br />

* Discussed site lighting in new walking, working areas and tent areas, all of which are to be<br />

verified for proper lighting. Discussion continued on alternative light sources such as light plant<br />

at rail crossing into site, additional parking lot and entrance lighting. Light plants to be used for<br />

vehicle parking area. Some additional discussion is needed about fall protection/aerial lift<br />

training.<br />

* Need Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design.<br />

* WCH requested status of Cold Weather Protection plan from DDI. WCH has returned submittal.<br />

" DDI needs to abide by the approved bucket truck inspection plan. WCH Safety to follow up on<br />

aerial lift and associated fall protection requirements. SME needs to take a look at the bucket<br />

truck.<br />

" DDI informed that water supply lines will not all be in place before start up. Discussion of not<br />

tying directly to a hydrant. There will be no filling of trucks until an alternative to hard tie-ins is<br />

in place. WCH will be issuing a CN to use only a water fill station for water trucks.<br />

" PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. PRC may hold up hydrant tie-in and/or permit until configuration and details are<br />

complete.<br />

I11. PROJECT DESIGN DRAWINGS<br />

*Electrical drawings and traffic control plan drawings are in process. Diesel storage tank electrical<br />

designs and trailer site electrical as well as as-built drawings.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.


Progress Review Meeting<br />

Page 3<br />

V. WEEKLY PRODUCTION TABLE<br />

* See attached.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

* There are some hot work items to be completed.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* There are some minor modifications to the Load-out work package.<br />

* Discussion of "Key Personnel" for specific work packages was discussed and tabled to a later<br />

meeting.<br />

IX.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

* WCH is working on the mark-ups for the TDI, QA and Doc Plan for upcoming assessments.<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

* None<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* Copy of submittal Log attached<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE<br />

*Letter from DDI: Transmittal of Change Notice Drawings Nos. I100K-DD-E0027, Rev. 5 and<br />

0O100K-DD-E0042, Rev. 5<br />

*Letter from DDI: Excavation Competent Person<br />

INVOICE AND PAYMENT STATUS<br />

* None.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* Discussed IWCP requirements for dedicated and critical resources.<br />

" Discussed load-out start-up behind excavation and sorting. DDI request to revise PSR to have<br />

container loading and handling as a post-start for the dry runs.<br />

* Discussed the incidental welding procedures that are required per Exhibit E.<br />

* Discussed RCT support for full operation. There will be some challenges, DDI will try and<br />

structure work to help lessen the impact when there is a shortage of RCTs.<br />

* Need to have someone off site train DDI site personnel to inspect scaffolding.<br />

* Discussed dry-runs and schedule for dry-runs: Donning/Doffing for respiratory training, Gross<br />

Sort, Secondary Sort, Load-out, Anomaly Response.


Progress Review Meeting<br />

Page 4<br />

* There will be a work-package revision as a result of the ALARA review.<br />

* WCH will be watching dust control carefully.<br />

* Introduced Tami Dance.<br />

Attachment(s): As noted above.


00<br />

o 0<br />

0<br />

0<br />

0 M I*I L .C<br />

2<br />

0<br />

00 ol 0 CO 0<br />

SE woo r) 0)0<br />

0 ) 0<br />

0<br />

u 0 v 00 0n0 00 )-1V<br />

w w0ww V n 0 0<br />

ahoM0 fn 0. 0oc<br />

0 0a 0<br />

D n 0 0<br />

0A<br />

0. 0.00<br />

>4<br />

.. 2<br />

Ii<br />

2<br />

c~~<br />

f 00C E . 00 0<br />

, 5 ~~~~ ,00 - ~ ~ ~ 2- 0 0,0 !. __ 0.<br />

-. eaa ,. ... . . >2-.0-<br />

.0~~~~ 0 < 1 0,0U<br />

0, m,<br />

8Eo f.- 020 -<br />

z5<br />

- 4 (A<br />

0) . 80<br />

L) 0<br />

Ea , E c ~ a- 8 E I~ L 0, , 0 0,><br />

-U > 0 C ,2'n>s- C<br />

S00 0n ~ 00<br />

0<br />

~ ~ ) 0,~~*,0<br />

o ~ ~ ~ 8 IN coW 0 :2<br />

0~~E .0<br />

-~~~~~~~ 0. 00<br />

< * j% - - 06 - -- , W o ( a a o<br />

(n U200< Lnu )< -o0 zao >0U, L, wI<br />

U) .5 < _ I z D0 Liu U) IJ 0 0~ x; 0 S<br />

99 909000 9 99<br />

0 ;- 08 1.0 S 000 - . . . .


zI 0 )0<br />

U-<br />

U~ 0<br />

..<br />

ua<br />

0<br />

00<br />

0<br />

cl. . .'<br />

0 j 0 TC d d dl(j 0 0 0T<br />

I - u 0 0 L) 0 ) 0 0 0 C)00 0 0)<br />

a 0 l 0~<br />

0 ~0:<br />

IL~~ -2 0<br />

a<br />

00000I<br />

00 00 0 0 -<br />

z<br />

I z0 CL 0 - (<br />

=La 0 -21<br />

S2<br />

.6 .1-<br />

2<br />

8 E E<br />

5-fifi -j6 ng .0 'a,, E -i<br />

02-2<br />

E l,0 0<br />

,<br />

0 0 .6 0 oc<br />

m Eu E. 0 ;c'<br />

0 0 w)EE<br />

.2 0 ix .<br />

I0<br />

x<br />

I II I<br />

0<br />

. O L) C aU)U0<br />

u, 2<br />

(z 0 0L aaT<br />

-~~~~1 U) . U U o I 7 7 ~0O


0<br />

o 0<br />

o -<br />

C.) n-0 LI 0<br />

0.<br />

3: 3: 3 : : rjN N-<br />

* -N N NN<br />

o<br />

l o<br />

0<br />

al 0<br />

in l 1 ci NC i i 11<br />

ON 0<br />

09<br />

0 D 00001 P0<br />

N N N NN N<br />

wd2~ I<br />

0 a.<br />

L<br />

NL7<br />

- 2C 0 o<br />

0n CL c-120<br />

O ~ 00 00 0 000 0 0 00 00<br />

E<br />

m0<br />

C<br />

0<br />

0 >0<br />

Q000~ 2 2 25 .0 . X: a0 E . 0<br />

In~ ~ -- ~ s<br />

8<br />

0 16<br />

0i 0 0<br />

2 E 10<br />

E 0 <<br />

00 ~<br />

t5 iC .LOM. L> L4 o 0! A .-<br />

00 . N 9<br />

0 J00 Cl Z)<br />

00<br />

6 0 E.c<br />

0) 4On -us<br />

0 0 0L c 0-<br />

C55.S?: 0G L E lg 5 .<br />

= . - E E:air -8 9 5 .5<br />

> E 0 0<br />

E<br />

000c<<br />

--.<br />

Z.>0<br />

-10 QC 0.0 z<br />

0-scn( n mmEz s s 00. 0 .<br />

0<br />

U)<br />

,<br />

.. -- O<br />

909-9N .- z,<br />

A1 E100<br />

l<br />

oc<br />

A AA A


z<br />

0<br />

IL 0<br />

5 U.<br />

0<br />

C..<br />

0<br />

I<br />

00<br />

oto<br />

6 000d 001 000100 000<br />

011001'-O 010000 0 0 0101 0 0000 0 0 0l lO 0<br />

3: NN NN N N~- - NNN N N NN N dON O N o<br />

<


U.<br />

U)<br />

0,<br />

u~ *L<br />

.0<br />

0<br />

3.L<br />

aCa<br />

dw<br />

n a) a/ a) a an h al a.)a an Ca<br />

U) V<br />

an Ch -n a)C)<br />

00<br />

o aV)a U) y<br />

a)~~ 4- 47V 5c<br />

ou 07 0u 0j __ 0u _u __ 0 _ 0 0 O<br />

0) D<br />

N<br />

E NS I N<br />

- N f NN ~ n<br />

C)~ ~~~ )C ~~~~~ C) )C C<br />

C ) - C )C<br />

C0. 02,~<br />

CL fx 6<br />

Y X 7 .2 (<br />

<br />

8<br />

0 0 -<br />

0<br />

~CC<br />

a, aCCU<br />

CL. 0.<br />

1 1 2 -<br />

><br />

><br />

.2 2,<br />

X F<br />

a co (n U) wCL L- ujw 0 m c LI C) w L) Vu)V) nW' LU*0 c<br />

9 C 9C 9<br />

Z ~ ~ -<br />

E aC'ZCCMa CCfC


z<br />

0 V<br />

V-)<br />

a7 i<br />

=0<br />

u LL<br />

0<br />

CCO<br />

0~0<br />

LO U -<br />

C 0<br />

0000 ) )<br />

0<br />

)COUCC.u LuEU U<br />

0 CL (o<br />

C6<br />

L> U w .<br />

z z z z<br />

0><br />

>o<br />

E E E E c<br />

o o 0 0 w e<br />

~ () 9D cc -<br />

00<br />

0 0 q g i 0<br />

> m~>0>0 > 2 0


3-Week Lookahead<br />

ACTI'VIT MON-26 TUE-27 WED-28 THU-29<br />

Perform Dry Runs X X<br />

Install (H Equipment on X X X<br />

Excavators<br />

Setup Water Supply System X X<br />

Prepare for PSR<br />

X<br />

Remediation PSR<br />

X<br />

KEY PERSON NEL S.McQueary; S.Strope; S.McQueary; S.McQueary; S.McQueary;<br />

W.Sexsmits; J.Price; 5.Strope; S.Strope; S.Strope;<br />

A.White<br />

W.Sexsmith; i.Price; W.Sexsmith; i.Price; W.Sexsmith;<br />

AWhite A.White i.Price; A.White<br />

CRAFT PERSONNEL Operators (7); Operators (7); Operators (7); Operators (7);<br />

Teamsters (2); Teamsters (2); Teamsters (4); Teamsters (4);<br />

Laborers (6) Laborers (6) Laborers (6) Laborers (6)<br />

COMMENTS<br />

Wee!k 9f<br />

ACTIVITY MON-2 TUE-3 WED-4 THU-S<br />

Begin Loadout Trench i/L X X X X<br />

Setup Water Supply System X X X X<br />

Loadout CTA Dry Runs X X<br />

KEY PERSONNEL S.McQuearv; S.ttrope; S.Mc~ueary; S.McQueary; S.McQueary;<br />

W-Sexsmith; J.Price; 5.Strope; S.Strope; S.Strope;<br />

A-White<br />

W.Sexsmith; i.Price; W.Sexsmith; i.Price; W.Sexsmith;<br />

A.White A.WhIte J.Price; A.White<br />

CRAFT PERSONNEL Operators (7); Operators (7); Operators (7); Operators (7);<br />

Teamsters (4); Teamsters (4); Teamsters (4); Teamsters (4);<br />

Laborers (6) Laborers (6) Laborers (6) Laborers (6)<br />

COMMENTS<br />

COMM ENTS


TO-GO QTY__<br />

Exc Order Trench Ovrbrdn Cantmntd Total<br />

BCM<br />

BCM<br />

1 J 0 7,905 7,905<br />

2 L 0 14,700 14,700<br />

3 DIEIP 0 8,565 8,565<br />

4 G 0 7,910 7,910<br />

5 H 251 3,135 3,387<br />

6 C 0 4,382 4,382<br />

7 F 0 3,713 3,713<br />

8- K 0 18,120 18,120<br />

A/B 0 0 0<br />

______ 714 8,476 9,190<br />

M 0 0 0<br />

N 0 14,665 14,665<br />

0 338 15,646 15,985<br />

TOTAL 1,304 107,216 108,520<br />

____


W Washington<br />

CH<br />

CCN: 1A736i7<br />

Closure-74 \I<br />

Meeting Minutes<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

October 27, 2009<br />

*- - 1 - - -- 0<br />

E. L. Adamson X3-40 R. A. Dodd H-4-24<br />

C. L. Beach X3-16 T. A. Foster N3-30<br />

S. C. Bentti X3- 16 R. Ganapathy X3-40<br />

R. D. Cantwell N3-30 R. M. Harrison N3-30<br />

M. D. Clancy X3-16 D. B. Teachout X3-16<br />

Q. L. Crist X3-16 J. A. Ware N3-30<br />

D. E. Faulk L6-06 Project File, X3-16<br />

T. M. Greager X3- 16 Records and Document Control H4- 11<br />

L. W. Grossarth X9-08<br />

J. A. Heard H-4-17<br />

S. J. Henneman X3-16<br />

W. R. Junkins X3-16<br />

M. Lighty (DDI)<br />

S. McQueary (DDI)<br />

R. A. Nunamaker X3-16<br />

S. E. Parnell X3-16<br />

J. Price (DDI)<br />

D. G. Saueressig N3-30<br />

S. A. Strope (DDI)<br />

A. S. White (DDI)<br />

H. Williams III X3-16<br />

A. E. Zacharias X3-16<br />

A meeting on the above Subject was held on October 27. 2009 at 118-K, MO-755.<br />

1. SAFETY<br />

*Safety topic: DiscuIssion about the wind and watching when opening building and vehicle doors<br />

when the winds are high.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

*Still need steps for shower and hygiene trailers to get occuipancy permits. Will proceed with work<br />

CA:\1cne nt, anzd seft ing'c I heach~i iw: I Stings\ Finpor1r<br />

nlicruc I Ji Ic\( )lK%1\in.27-0 q Wcek IyProgress doc


Progress Review Meeting<br />

Page 2<br />

on the hygiene shower trailer at this time. WCH will revise Exhibit D to de-mob the Decon<br />

trailer.<br />

" DD[ will be using Oxarc as a vendor for supplied breathing air systems. Equipment has been<br />

ordered and status update will be provided by DDI before 10/19. Equipment is continuously<br />

arriving. WCH to confirm which fittings are being used by the RCTs - Hanson or Schrader?<br />

" Remediation PSR Checklist draft in process of review. Completion of items in process. Scheduled<br />

completion 10/22. All items should be completed relating to the PSR no later than end of this<br />

week. PSR Management review for sign off after all dry runs are completed - on or about<br />

11/4/2009. DDI requested to follow up on QA and Training plans and then meet with E.<br />

Adamson. GO-4 forms have been submitted. Discussed training and tracking program.<br />

" Discussed diesel fuel storage tank requirements, potential location, power needs and<br />

documentation requirements. Tank to be delivered 9/24. DDI to submit tank rigging plan and<br />

details, WCH to veify plan requirements for 8,000 gallon tank. DDI to submit tank details for<br />

hose and reel design. DDI to provide appropriate submittals, which WCH has reviewed and<br />

returned.<br />

* DDI and WCH to discuss tank ladder fall protection requirements. DDI to propose providing<br />

JLG, manlift, etc. in process.<br />

* IH equipment is on-site, excavators are being set up and personnel are in training. Equipment is<br />

now ready to support mock-ups and dry runs.<br />

" WCH to clarify tritium downwind monitoring requirements. WCH checking on Rad~on and<br />

Environmental requirements. DOE has agreed with proposal and it has been forwarded to EPA<br />

for review/concurrence. Tritium monitor is in place.<br />

" Discussed site lighting in new walking, working areas and tent areas, all of which are to be<br />

verified for proper lighting. Discussion continued on alternative light sources such as light plant<br />

at rail crossing into site, additional parking lot and entrance lighting. Light plants to be used for<br />

vehicle parking area. Some additional discussion is needed about fall protection/aerial lift<br />

training.<br />

" Need Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design.<br />

* WCH requested status of Cold Weather Protection plan from DDI. WCH has returned submittal.<br />

" DDI needs to abide by the approved bucket truck inspection plan. WCH Safety to follow up on<br />

aerial lift and associated fall protection requirements. SME needs to take a look at the bucket<br />

truck.<br />

" DDI informed that water supply lines will not all be in place before start up. Discussion of not<br />

tying directly to a hydrant. There will be no filling of trucks until an alternative to hard tie-ins is<br />

in place. WCH will be issuing a CN to use only a water fill station for water trucks.<br />

" PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. PRC may hold up hydrant tie-in and/or permnit until configuration and details are<br />

complete.<br />

Ill.<br />

[V.<br />

PROJECT DESIGN DRAWINGS<br />

*Electrical drawings and traffic control plan drawings are in process. Diesel storage tank electrical<br />

designs and trailer site electrical as well as as-built drawings.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

0 See attached.


Progress Review Meeting<br />

Page 3<br />

V. WEEKLY PRODUCTION TABLE<br />

0 See attached.<br />

V1. MANPOWER<br />

* See attached.<br />

VII.<br />

VIII.<br />

IX.<br />

EQUIPMENT<br />

* There are some hot work items to be completed.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

" There are some minor modifications to the Load-out work package.<br />

" Discussion of "Key Personnel" for specific work packages was discussed and tabled to a later<br />

meeting.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

0 WCH is working on the mark-ups for the TDI, QA and Doc Plan for upcoming assessments.<br />

XI.<br />

XII.<br />

XIII.<br />

XIV.<br />

XV.<br />

XVI.<br />

REQUESTS FOR INFORMATION<br />

0 None<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* Copy of submittal Log attached<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

0 See attached.<br />

CORRESPONDENCE<br />

* Letter from DDI: Transmittal of Change Notice Drawings Nos. I OOK-DD-E0027, Rev. 5 and<br />

0O100K-DD-E0042, Rev. 5<br />

" Letter from DDI: Excavation Competent Person<br />

INVOICE AND PAYMENT STATUS<br />

0 None.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

" Discussed IWCP requirements for dedicated and critical resources.<br />

* Discussed load-out start-up behind excavation and sorting. DDI request to revise PSR to have<br />

container loading and handling as a post-start for the dry runs.<br />

" Discussed the incidental welding procedures that are required per Exhibit E.<br />

" Discussed RCT support for full operation. There will be some challenges, DDI will try and<br />

structure work to help lessen the impact when there is a shortage of RCTs.<br />

* Need to have someone off site train DDI site personnel to inspect scaffolding.<br />

" Discussed dry-runs and schedule for dry-runs: Donning/Doffing for respiratory training, Gross<br />

Sort, Secondary Sort, Load-out, Anomaly Response.


Progress Review Meeting<br />

Page 4<br />

" There will be a work-package revision as a result of the ALARA review.<br />

* WCH will be watching dust control carefully.<br />

" Introduced Tami Dance.<br />

Attachment(s): As noted above.


z 0<br />

o<br />

LUN<br />

N N N N NN<br />

-2<br />

QNu -<br />

N~ CN<br />

0 r:I a& o


Lu<br />

00<br />

0. o . .a<br />

6 ;62 , Cl dclI10 C cl0 10CI0 0 1l-<br />

C, a I<br />

00 0 0 0 0 00 0<br />

0 0 0 0 0 0 - 0 0<br />

- M N<br />

~<br />

cci<br />

:9'<br />

T V<br />

n<br />

a- a.<br />

La Cc I! -a L<br />

992 9 99<br />

99 _99<br />

s


ONw<br />

j) N N N-<br />

N N<br />

NO, 9 N N G 3 N<br />

- PN:<br />

m_ a.~ CL (n Ef~ _ _<br />

a . 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0 N ND'0<br />

L,<br />

U)<br />

Lo .9,-<br />

n -wc -,<br />

-,<br />

ox<br />

E 0<br />

> m m<br />

4) C/<br />

1. o<br />

> tE >i<br />

-if 'Do x Ej E ' x<br />

m iNS Ha _ z6<br />

0 's<br />

'D<br />

E<br />

Z4S o~ f. 3,1 - .MNL 6 -0 o- 10 r LU cfC )<br />

_ ; p_ __ U___<br />

6 0) 0 - N 4<br />

NN NN NN -<br />

0 0 0<br />

m<br />

0


- - -<br />

-- -- -<br />

(L aa.1<br />

o o ;6 0000wM o1000 0 0 o0 ;oo0,1<br />

i<br />

II<br />

r, Ze I '<br />

6 od o oooo o )C o 00000CD( ooo )a )c n0w 0 Oo 'n 0 U 00000 )w c )c AV<br />

CD 0 0C<br />

'ED.ED . - L '7.a h3-<br />

0<br />

CO8 o: c: I'Z, ,Z0E U E DmmE ', c<br />

I ~ ~ sr<


INN<br />

- N "<br />

"T<br />

9 1<br />

j<br />

NN<br />

N<br />

N<br />

ra '7 .r7l a.<br />

at<br />

-<br />

U~~~~~ U UI<br />

a.) Gi 41<br />

><br />

1_<br />

N)<br />

Nl<br />

C'<br />

LL<br />

T<br />

z 0 n U<br />

0 =<br />

N, -C Z<br />

E a o3<br />

j<br />

2 0<br />

C. EU g<br />

2 19 - .<br />

L? C. ' I- 0.. .<br />

C'L<br />

U<br />

FL E > '<br />

LL=' I<br />

'<br />

0 .- . .N ~ . ~ ~ ..)<br />

.0 ) co"<br />

- _ _ _ N C 0- '


-J<br />

I<br />

n (n w (w N<br />

a. a a.<br />

CL N<br />

mw 0 &_<br />

0 ci<br />

0.Q 0<br />

I.L.<br />

n (7<br />

2 . -<br />

u~ o<br />

. ac 0<br />

. -, 2 0 2 2<br />

CN m0 N (


3-Week Lookahead<br />

Wft* Of<br />

*o0-0"<br />

ACTIVITY MON-26 TUE-27 WED-28 THU-29<br />

Perform Dry Runs X x<br />

InstallI H Equipment on X X X<br />

Excavators<br />

Setup Water Supply System X X<br />

Prepare for PSR<br />

X<br />

Remediation PSR<br />

X<br />

KEY PERSONNEL S.McQuearV; S.Strope; S.McQueary; S.McQueary; 5.Mcaueary;<br />

W.Sexsmith; i.Price; S.Strope; S.Strope; S.Strope;<br />

A.White<br />

W.Sexsmith; J.Price; W.Sexsmith; i.Price; W.Sexsmith;<br />

A.White A.White ].Price; A.White<br />

CRAFT PERSONNEL Operators (7); Operators (7); Operators)(7); Operators (7);<br />

Teamsters (2); Teamsters (2); Teamsters (4); Teamsters (4);<br />

Laborers (6) Laborers (6) Laborers (6) Laborers (6)<br />

COMMENTS<br />

ACTIVITY MON-2 TUE-3 WED-4 THU-5<br />

Begin Loadout Trench J/I X X X X<br />

Setup Water Supply System X X X X<br />

Loadout CTA Dry Runs X X<br />

KEY PERSONNEL S.McQueary S.Strope; S.McQuearV; S.McQueary; S.McQueary;<br />

W.Sexsmith; J.Price; S.Strope; S.Strope; 5.Strope;<br />

A.White<br />

W.Sexsmith; J.Price; W.Sexsmith; i.PrIce; W.Sexsmitti;<br />

A.White A.White J.Price; A.White<br />

CRAFT PERSONNEL Operators 17); Operators (7); Operators (7); Operators)(7);<br />

Teamsters (4); Teamsters (4); Teamsters (4); Teamsters (4);<br />

Laborers (6) Laborers (6) Laborers (6) Laborers (6)<br />

COMMENTS<br />

COMMENTS


_______TO-GO<br />

QTY<br />

Exc Order Trench Ovrbrdn Contmntd Total<br />

______ BCM BCM<br />

1 J 0 7,905 7,905<br />

2 L 0 14,700 14,700<br />

3 D/EJP 0 8,565 8,565<br />

4 G 0 7,910 7,910<br />

5 H 251 3,135 3,387<br />

6 C 0 4,382 4,382<br />

7 F 0 3,713 3,713<br />

8 K 0 18,120 18,120<br />

A/B 0 0 0<br />

1714 8,478 9,190<br />

M 0 0 0<br />

N 0 14,665 14,665<br />

i0 338 1 15,648 15,985<br />

TOTA 1,304 107,216 108,520


Washington<br />

Closure<br />

WC H <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 147310<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

November 3, 2009<br />

DISTRIBUTIO<br />

E. L. Adamson X3-40 R. D. Cantwell N3-30<br />

C. L. Beach X3-16 S. C. Bentti X3-16<br />

Q. L. Crist X3-16 M. D. Clancy X3 -16<br />

T. M. Greager X3 -16 R. A. Dodd H4-24<br />

L. W. Grossarth X9-08 D. E. Faulk L6-06<br />

J. A. Heard H4-17 T. A. Foster N3-30<br />

S. J. Henneman X3-16 R. Ganapathy X3-40<br />

W. R. Junkins X3-16 R. M. Harrison N3-30<br />

M. Lighty (DDI) S. A. Strope (DDI)<br />

S. McQueary (DDI) J. A. Ware N3-30<br />

R. A. Nunamaker X3-16 Project File, X3-16<br />

S. E. Parnell X3-16 Records and Document Control H4-1 1<br />

J. Price (DDI)<br />

D. G. SaueressigN3-30<br />

D. B. Teachout X3-16<br />

A. S. White (DDI)<br />

H. Williams III X3-16<br />

A. E. Zacharias X3-16<br />

J. Zeisloft A3-04<br />

A meeting on the above subject was held on November 3, 2009 at 11 8-K, MO-755.<br />

1. SAFETY<br />

0 Safety topic: Discussed steps and icy hand rails.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* DDI will be using Oxarc as a vendor for supplied breathing air systems. Equipment has been<br />

ordered and status update will be provided by DDI before 10/19. Equipment is continuously<br />

arriving. WCH uses Schrader, DDI is equipping with Schrader for consistency.<br />

" Remediation PSR Checklist draft in process of review. Completion of items in process. Scheduled<br />

ZAdministrative Assistant\Froject Progress Review Weekly Meetings\2009\l 1-03-09 Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

completion 11/11. All items should be completed relating to the PSR no later than end of this<br />

week.<br />

" Discussed diesel fuel storage tank requirements, potential location, power needs and<br />

documentation requirements.. Tank to be delivered 9/24. DDI to submit tank rigging plan and<br />

details, WCH to verify plan requirements for 8,000 gallon tank. DDI to submit tank details for<br />

hose and reel design. DDI to provide appropriate submittals, which WCH has reviewed and<br />

returned. Will need to go through the same process for the gas storage tank as well.<br />

* DDI and WCH to discuss tank ladder fall protection requirements. DDI to propose providing<br />

JLG, manlift, etc. in process. WCH has this proposal for review.<br />

" Discussed site lighting in new walking, working areas and tent areas, all of which are to be<br />

verified for proper lighting. Discussion continued on alternative light sources such as light plant<br />

at rail crossing into site, additional parking lot and entrance lighting. Light plants to be used for<br />

vehicle parking area. Some additional discussion is needed about fall protection/aerial lift<br />

training. WCH top verify fall protection training for electricians.<br />

" Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH.<br />

* WCH requested status of Cold Weather Protection plan from DDI. WCH has returned submittal.<br />

* DDI informed that water supply lines will not all be in place before start up. Discussion of not<br />

tying directly to a hydrant. There will be no filling of trucks until an alternative to hard tie-ins is<br />

in place. WCH will be issuing a CN to use only a water fill station for water trucks. DDI in<br />

process of building J-Stand.<br />

" PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system.<br />

" Discussed IWCP requirements for dedicated and critical resources. Work packages to be revised<br />

for clarifications.<br />

" Discussed load-out start-up behind excavation and sorting. DDI request to revise PSR to have<br />

container loading and handling as a post-start for the dry runs. Dry-runs to be scheduled.<br />

" Discussed the incidental welding procedures that are required per Exhibit E.<br />

" DDI to have offsite vendor to train site personnel to inspect scaffolding. Currently DDI only has<br />

one (1) competent person.<br />

" Discussed dry-runs and schedule for dry-runs: Donning/Doffing for respiratory training, Gross<br />

Sort, Secondary Sort, Load-out, Anomaly Response. Need to do a feedback discussion on<br />

primary and secondary sorts and on 11/2 set-ups and run-throughs.<br />

* There will be a work-package revision as a result of the ALARA review.<br />

111. PROJECT DESIGN DRAWINGS<br />

*Electrical drawings and traffic control plan drawings are in process. Diesel storage tank electrical<br />

designs and trailer site electrical as well as as-built drawings.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

0 See attached.


Progress Review Meeting<br />

Page 3<br />

VI.<br />

VII.<br />

VIII.<br />

IX.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

*See attached. Need equipment list from DDI.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

MATERIAL<br />

0 None.<br />

X. QUALITY<br />

* WCH is working on the mark-ups for the DDI, QA and Doc Plan for upcoming assessments.<br />

XI.<br />

XII.<br />

XIII.<br />

XIV.<br />

XV.<br />

XVI.<br />

REQUESTS FOR INFORMATION<br />

*DDI is creating an "Indoctrination" training book and requests information from WCH to<br />

complete.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* Copy of submittal Log attached<br />

CHANGE NOT ICES/STATUS/CHANGE ORDERS<br />

0 See attached.<br />

CORRESPONDENCE<br />

* Transmittal from DDI: Acceptance of Change Notice 004 (no proposal to be submitted)<br />

* Letter from DDI: Submittal 9-18, Excavation Competent Person<br />

" Change Notice to DDI: CN 010 De-mob Decon shower Trailer<br />

" Change Notice to DDI: CN 011 IWCP Rev. 6<br />

* Change Notice to DDI: CN 0 12 Descope IFC Drawing Requirements for 11I8-K- I Burial<br />

Ground.<br />

* Weekly Progress Review Meeting Minutes of 10/27/2009<br />

INVOICE AND PAYMENT STATUS<br />

* None. No October billing to be submitted.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

" Introduced DOE Project Manager - Jamie Zeisloft.<br />

" DDI plans to add a third ( 3 rd) water truck and driver the water supply line and system are<br />

constructed.<br />

* Discussed the AB requirement for a drum handling plan. DDI to coordinate with WC-<br />

Engineering to establish this plan.<br />

Attachment(s): As noted above.


3-Week Look October 26 - November 12<br />

Last Week Week of: 26-Oct-09<br />

ACTIVITY MON-26 TUE-27 WED-28 THU-29<br />

Perform Dry Runs<br />

Install IH Equipment on<br />

Excavators<br />

Setup Water Supply SystemWatn<br />

Prepare for PSR<br />

KEY PERSONNEL S.McQueary; S.Strope; S. McQueary; S.McQueary; S.McQueary;<br />

W.Sexsmith; J. Price; S.Strope; S.Strope; S.Strope;<br />

A.White<br />

W.Sexsmith; J.Price; W.Sexsmith; J.Price; W.Sexsmith;<br />

A.White A.White J.Price; A.White<br />

CRAFT PERSONNEL Operators (7); Operators (7); Operators (7); Operators (7);<br />

Teamsters (2); Teamsters (2); Teamsters (4); Teamsters (4);<br />

Laborers (6) Laborers (6) Laborers (6) Laborers (6)<br />

COMMENTS<br />

This Week Week- of: 2-Nov-09<br />

ACTIVITY MON-2 TUE-3 WED-4 THU-5<br />

CRAF PERSONNEL Opcerar (6) oe; Op.~ear 6; Opcerar 6; Opcerar 6)<br />

Teamsters (3+1); Teamsters (3+1); Teamsters (3+1); Teamsters (3+1);<br />

Laborers (8);Mech (1) Laborers (8);Mech Laborers (8);Mech Laborers (8);Mech<br />

COMMENTS


Next Weekt Week of: 9-Nov-09-<br />

ACTIVITY MON-9 TUE-10 WED-li THU-12<br />

Complete Loadout CTA Mockups/<br />

KEY PERSONNEL S.McQueary; S.Strope; S. McQueary; S.McQueary; S.McQueary;<br />

W.Sexsmith; i.Price; S.Strope; S.Strope; S.Strope;<br />

A.White<br />

W.Sexsmith; J.Price; W.Sexsmith; J.Price; W.Sexsmith;<br />

A.White A.White J.Price; A.White<br />

CRAFT PERSONNEL Operators (6); Operators (6); Operators (6); Operators (6);<br />

Teamsters (4); Teamsters (4); Teamsters (4); Teamsters (4);<br />

Laborers (8);Mech (1) Laborers (8);Mech Laborers (8);Mech Laborers (8);Mech<br />

COMMENTS


~ ~ 2 22 22 2<br />

E Ea d.- a.a a .<br />

10o~Q 000 000<br />

0.5 coo coo<br />

3 6<br />

26<br />

CC2<br />

cc<br />

LU (3<br />

Al<br />

9L<br />

25<br />

ou<br />

o<br />

.21<br />

C4 U)<br />

J<br />

Cr0<br />

3-2<br />

a<br />

a<br />

a


0<br />

0


E<br />

7a<br />

0 a 000 76'E' 000<br />

e2 222 2 22 2<br />

z<br />

1~ I<br />

C.)<br />

C.)<br />

~0 00 9 00<br />

U) 0)o<br />

002 c C- (L'<br />

8<br />

cA<br />

E<br />

~ Sco000 PA<br />

(n2<br />

o0 VCC e- B~) NOO<br />

C<br />

~ C cC0) -CC0 0.-C 0 0


00<br />

10<br />

2 C2<br />

0v<br />

0R<br />

0-0 0 0 00 o L11Od id (5al(:<br />

al N<br />

NC, NP<br />

Nz:3:.3<br />

/<br />

- r a- (04C<br />

'.~~~~~.~ O O S9<br />

O 0 0 8 O O O O 9~OO 0 0<br />

j11<br />

0<br />

> ~ 0j oof~l/U<br />

U F-)~ /<br />

><br />

0 J)U<br />

c ><br />

47 E<br />

S) 0 IS<br />

&&<br />

A 7E 2112<br />

21 W5 m ~ C1<br />

0 C, 0 1E<br />

8 cc 8 8 88<br />

88<br />

a8 1U Ta 88w nU La . C<br />

Q) a> 0 0Q. 0 ) -<br />

Cw flC<br />

CmmE<br />

99999<br />

C?? 99 94~00<br />

440<br />

s d J 0490 4


0, 0 0<br />

E<br />

E<br />

0, 00 N) a, Im0<br />

- (N N RN R<br />

0<br />

E<br />

-J) 0 U0 ) 101 0 ,1<br />

Enzi U) lnU n U n cncn tncnIo n I ( ~W U n( n<br />

uJ~co<br />

X0<br />

0 0<br />

0~~~ ( (0U))<br />

0-i 0.<br />

0<br />

4)<br />

E<br />

15 U) - 02<br />

0 22oa1!9 _ j > 0<br />

0L a aE<br />

a s00 2 0a . o o z a Ir"<br />

_a& ~ 0 m Q, U- xO0 0a 0 a awa<br />

00~- . . .0U~~ n<br />

'L~ '.0 0<br />

00 > u >aE C<br />

0 _ _<br />

999 99 09 p B9 "05 9 4)7 -


"A<br />

L<br />

z<br />

01<br />

2<br />

-; co 6C L<br />

- 01N<br />

3: 3 : Z : 2 N: 1 1: 14 N NNN N<br />

00<br />

N3<br />

.90L<br />

0 U C 0<br />

0<br />

0)) 0 000)<br />

U)<br />

8 pu<br />

888V80P 11<br />

0 CL . J= N<br />

E N 0 3 EN<br />

>o Moo io u d &ci c120 6 o<br />

N~~~J 0 N N N EL N3<br />

0- CL<br />

M 4) a4a<br />

-a :e 0 40 aa '<br />

2 m0 L D L<br />

o 2o<br />

Nn NN No NA -<br />

a. 9. 0-0Ii<br />

a~ N 0-a<br />

0 00 0<br />

- .N<br />

Z~~<br />

> C<br />

04) 0<br />

c). c E CL X 7) E<br />

>o B- o) as 0<br />

.U ) E 0 A~4 2)2<br />

M~ ~~<br />

c w ~ 0<br />

c Q ,-) ~4<br />

E~4<br />

! 0 4<br />

- E EE 3<br />

4 ) - 0 .-<br />

0<br />

- C)<br />

- 0 >,w; - - I) ",' I ao M.5 I 4)44<br />

0<br />

'<br />

1<br />

-M 0 o 9! 2 cE<br />

a M4 4 0:<br />

,'~ 3 E<br />

IFu ELIiI<br />

C,!~ M ~E - 0 E8 ~ z D 0<br />

~ O~ E ) N 4)0<br />

Z. . n L w o (nU) 2 Lo U) 00 001c 0 lm - 0 Z 2? Q c 0 ca a.<br />

0-f ?-0 M q C? a04 0 2 :1144<br />

A44 0. MC Z 21A 0<br />

AA l A1; A<br />

%10 ~ ~


0))0<br />

0:0<br />

0<br />

z<br />

UU<br />

o<br />

CD<br />

0<br />

a.-La-a<br />

0001 5d 00000( 1 AzloloIo l.o 0 l 111 o o o<br />

0 J _ a 3<br />

T C?<br />

000 o ( o 00 o(<br />

000 0)b<br />

(L(<br />

0 0<br />

0 0 0<br />

00 '0 T<br />

0<br />

0 00<br />

0;<br />

.5 a<br />

- ~ oc~i ~ o~~ coI<br />

o--<br />

z E a- ) I<br />

~~~~~~~~~ ul~~~4m<br />

< - 0 c- )0 CLC( [(0C N N


z<br />

0<br />

-l<br />

CA<br />

NN<br />

A<br />

NN NN :D N(<br />

U)17 U 0 0 000 0<br />

t:t<br />

c<br />

aa<br />

Q) ( C.D co C/ (5'<br />

H<br />

U)~~~U U)r U)<br />

) U U )U<br />

c<br />

.0 C0<br />

-0 0<br />

c 0<br />

Cc 0 -<br />

~~ w<br />

,<br />

E<br />

(N Zr<br />

aa s- a- )c0 2<br />

0- - ""s ''" E<br />

( U<br />

0 0 03 0)<br />


z<br />

U.<br />

1 0<br />

- U .<br />

0<br />

00<br />

to<br />

z<br />

aC<br />

0iL<br />

i-l<br />

U51<br />

c<br />

(n U) 0. 0<br />

a, a a a,,<br />

o0 0 0<br />

0<br />

I u 0 0<br />

(7 04 1! 0~(<br />

0. a0<br />

0.<br />

.2 5c 2<br />

> W) C) C


WCH Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 147319<br />

102M WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

November 10, 2009<br />

E. L. Adamson X3-40 R. D. Cantwell N3-30<br />

C. L. Beach X3-16 S. C. Bentti X3-16<br />

Q. L. Crist X3-16 M. D. Clancy X3-16<br />

L. W. Grossarth X9-08 R. A. Dodd H4-24<br />

J. A. Heard H4-17 D. E. Faulk L6-06<br />

S. J. Henneman X3-16 T. A. Foster N3-30<br />

W. R. Junkins X3-16 R. Ganapathy X3-40<br />

S. E. Parnell X3-16 T. M. Greager X3-16<br />

J. Price (DDI) M. Lighty (DDI)<br />

S. McQueary (DDI) R. M. Harrison N3-30<br />

D. G. Saueressig N3-30 R. A. Nunamaker X3-16<br />

D. B. Teachout X3-16 S. A. Strope (DDI)<br />

A. S. White (DDI) J. A. Ware N3-30<br />

H. Williams III X3-16 J. Zeisloft A3-04<br />

A. E. Zacharias X3-16 Project File, X3-16<br />

Records and Document Control H14- 11<br />

A meeting on the above subject was held on November 3, 2009 at 11 8-K, MO-755.<br />

1. SAFETY<br />

0 Safety topic: Discussed proper storage of PPE. Be sure to shake out clothing and equipment to<br />

dislodge spiders and other venomous insects that could be in hiding.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

" DDI will be using Oxarc as a vendor for supplied breathing air systems. Equipment is<br />

continuously arriving. WCH uses Schrader, DDI is equipping with Schrader for consistency.<br />

* Remediation PSR Checklist draft in process of review. PSR Management sign-off scheduled for<br />

11/11.<br />

* Discussed diesel fu.el storage tank requirements, potential location, power needs and<br />

documentation requirements. Tank to be delivered 9/24. DDI to submit tank rigging plan and<br />

details, WCH to verify plan requirements for 8,000 gallon tank. DDI to submit tank details for<br />

hose and reel design. DDI to provide appropriate submittals, which WCH has reviewed and<br />

Z:XAdministrative AssistantX~roject Progress Review Weekly Meelings2009\1 1-10-09 Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

returned. Will need to go through the same design review process for the gas storage tank as<br />

well. Will need to have Fire Protection approval as well.<br />

* DDI and WCH to discuss tank ladder fall protection requirements. DDI to propose providing<br />

JLG, manlift, etc. in process. WCH has this proposal for review.<br />

* There will be four (4) light plants onsite, One (1) in the parking area, one (1) in the lay-down yard<br />

and two (2) in the burial ground. WCH to verify fall protection training for electricians. All<br />

work is in process.<br />

* Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. DDI does not plan to resubmit incorporation of the cold weather protection<br />

plan comments until water supply line installation is complete.<br />

* WCH requested status of Cold Weather Protection plan from DDI. WCH has returned submittal.<br />

* DDI informed that water supply lines will not all be in place before start up. Discussion of not<br />

tying directly to a hydrant. There will be no direct filling of trucks until an alternative to hard tieins<br />

is in place. WCH will be issuing a CN revising the specification to use only a water fill<br />

stations for water trucks. DDI in process of building J-Stand. Stand delivered 11/9/2009, will be<br />

assembled today.<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer.<br />

* Discussed LWCP requirements for dedicated and critical resources. Work packages to be revised<br />

for clarifications and will include down-posting language.<br />

" Discussed load-out start-up behind excavation and sorting. DDI request to revise PSR to have<br />

container loading and handling as a post-start for the dry runs. Dry-runs to be scheduled. WCH<br />

concurs.<br />

* Discussed the incidental welding procedures that are required per Exhibit E. WCH has reviewed<br />

and returned.<br />

* DDI to have offsite vendor to train site personnel to inspect scaffolding. Currently DDI only has<br />

one (1) competent person. DDI to schedule this. Currently their scaffolding competent person is<br />

not onsite.<br />

" There will be a work-package revision as a result of the ALARA review. There will be additional<br />

revisions to address exclusion zone postings.<br />

* DDI plans to add a third (3d) water truck and driver the water supply line and system are<br />

constructed.<br />

* Discussed the AB requirement for a drum handling plan. DDI to coordinate with WCH<br />

Engineering to establish this plan.<br />

111. PROJECT DESIGN DRAWINGS<br />

*Electrical drawings and traffic control plan drawings are in process. Diesel storage tank electrical<br />

designs and trailer site electrical as well as as-built drawings.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

* None.


Progress Review Meeting<br />

Page 3<br />

VI.<br />

VII.<br />

VIII.<br />

IX.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

* See attached. Requested updated equipment list from DDI.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

*WCH is working on the mark-ups for the DDI, QA and Doc Plan for upcoming assessments.<br />

This is on-going. DDI plans to have a revision concerning the QA plan previously submitted.<br />

XI.<br />

XII.<br />

XIII.<br />

XIV.<br />

XV.<br />

XVI.<br />

REQUESTS FOR INFORMATION<br />

*DDI is creating an "~Indoctrination" training book and requests information from WCH to<br />

complete. This is in progress.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* Copy of Submittal Log attached.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

0 See attached.<br />

CORRESPONDENCE<br />

* Weekly Progress Review Meeting Minutes of 11/3/2009<br />

* Letter to DDI: Key Personnel Approval<br />

" Letter from DDI: Delay on Start of Remediation<br />

" Letter from DDI: 118-K-i Burial Ground Remediation Project<br />

INVOICE AND PAYMENT STATUS<br />

* None.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* Discussed disposal of cleaning grey water. Should be disposed of down the drain in the shower<br />

trailer.<br />

* Discussed minimum excavation activities to be performed in the burial ground, excavation of<br />

design limits and any additional excavation to be performed.<br />

" Discussed use of an excavator bucket with "teeth" as opposed to a smooth edge for excavation<br />

and sorting operations, and the adverse implications that have been experienced at other projects,<br />

and earthwork requirements.<br />

Attachment(s): As noted above.


0 li<br />

0<br />

0 Ix<br />

E<br />

0<br />

U)<br />

0 0<br />

aL a- aa aCLa<br />

oo 1 1 111DO o 00 lI 0 o 0 00<br />

e<br />

dcl DD N<br />

33<br />

CO<br />

0<br />

N<br />

'C.)!<br />

0DU<br />

oc 0 00<br />

C c vc 0 0 00 0<br />

0 0 E E<br />

2 2<br />

-0 E E E<br />

2 DCC 0~ p~ oDD o? 0 0 0<br />

Q 000<br />

C)m 0 M: aw ><br />

C) 0 a<br />

55 0 -6 *.<br />

-6 C c<br />

9E E<br />

CCa CCC 00 CC C C C<br />

~ci z~C 000<br />

. o o .) .2 oo ~ . . L 0 E ' i l<br />

C)1<br />

wC C'a. L, L<br />

C C C C C C . . ;<br />

E ~ 0U C5 oEE 0 80 0<br />

C CC<br />

>J .CUu<br />

UJ o C' U' zD<br />

o < :<br />

o C)C)CC xC u-i C D - ) (n T CC x C 2 w)<br />

) 5 MI IC)D)c


S<br />

> 0<br />

0 'A0<br />

U.N<br />

o 00<br />

U. a.<br />

0<br />

E<br />

a<br />

00<br />

- CN a- N Na_- N<br />

- N<br />

0<br />

EO<br />

E<br />

o o o m N ~ C, (' C'<br />

N ~<br />

723<br />

a<br />

ww<br />

0'-ft= 00<br />

- - 0 0 0 0 0<br />

1<br />

00. ) l 12 E<br />

ZOO > .0 Cox0)<br />

E<br />

0<br />

0r<br />

. - 5 D0-(<br />

-2 (L<br />

0) 00 0 U)I (<br />

0 E0 E 0)i)<br />

E) 0) L2 0 0)0))3<br />

.. . . C 0 ) U ) 0 ) 0 )00<br />

c z)0<br />

0)0a ~ 0)0 )0 > 0 0 0 I<br />

400)<br />

s ) 8 E AM) C3L X = 3: 2<br />

-. j 7z:)0a.0)<br />

E<br />

CL CL<br />

ma 0 0 2 .~~<br />

)))) 0<br />

2 QU)(<br />

0 ))))<br />

~ 0 a ' ( I<br />

z0 0 0 0 t~ 0 O 0 9 0 o 22!))0<br />

~ ) ~<br />

~<br />

00 0 a-~~0<br />

sE .3 22 E2 2 E)).0. E 00 )I ) 0) 60C Eo T - 2<br />

o0)00 o Z0)- - ' L :0<br />

000 0<br />

><br />

00 00<br />

0 0o00 0 0<br />

a-0 0)0 0' 0)) 0) 0<br />

.o 0) w 0.<br />

30)3, - Lrn<br />

00 9N N N N~N) 8<br />

00 -a - - t 0<br />

______~ ~~ NN ~~~ N N N N N N N NqO N N N N


0<br />

LA.<br />

0:<br />

0<br />

z<br />

0<br />

(a<br />

U)<br />

S: 0 0N<br />

CL CL 0- CL 0- 4<br />

0 00 Jo a1 9 1 1 0 000 0 O 00<br />

0<br />

02<br />

__& 00 1.0 0.0 0 _ _0 Ulu0 00 0 0 o00 0<br />

In(n<br />

00o<br />

In<br />

c<br />

0<br />

0.4 Wa au_<br />

a___ a al al P Pa P a<br />

a a a 00<br />

0<br />

0 0 0N<br />

E- N9 040 04 E400 -<br />

-w~.*:<br />

mE,<br />

9D2m<br />

04 F, 04<br />

0 4 0 U 4 4 0 , 4)0f<br />

w 0<br />

0 0 00 fr~ 0- oo<br />

0 ac 'a<br />

-0 U-.<br />

E 4 ~<br />

t,2J<br />

Z9 0<br />

m 4 11<br />

20 .2<br />

4 0, (L40 iL CL ;<br />

*0<br />

72oo . 0 0 -<br />

0 4 M-, 511 W, 01<br />

-U < )1 >-<br />

- 0-<br />

2 C~c0 0 Z<br />

T a 114 ,.<br />

c .3<br />

Z4 7 0000 0 M 2 20I<br />

OC0 CE<br />

4<br />

*g.2 E 0<br />

-L<br />

>04 0<br />

00 0 00 0 E<br />

0 0) 0 00 z0 0 0<br />

WO ZOO 0 11 04<br />

0 L a<br />

w E4 NO M 0 0 04<br />

0 ON<br />

';.99~~~~~~ 99 9j 99 ~ --<br />

0 C004 ) 0 0)0 04 0) 4 040) 404 ____ _ 04404004 4040 0' 04;


0 N<br />

C.)<br />

o 0'<br />

0<br />

oU.<br />

LuJ<br />

0<br />

N 21<br />

(ICI-<br />

O i oll ooci 1 0110001- a 1oo 001 io 00000 o a.o 00o 060 0000 __ __ 0 0<br />

.N N NN<br />

O1 0<br />

0<br />

oc D 00 0<br />

~ ~ ~ < 0 < < < < < - In w 4Cb22<br />

CL _0 Ir<br />

0 u3<br />

E 1 .2 co 2 ~ E<br />

00 0<br />

Zw<br />

0 C.zo 000 ~ - 0<br />

0= ~ ~ -<br />

E E<br />

:!0 0, LM<br />

I InI 0 w 0<br />

a 5 f 6 0 ~ L 00a<br />

~ ON (003-- ~9~990 9A<br />

0000<br />

000 000 00 0 00 00 t~tf0~)0 (10 (bOL CO O C. N


0<br />

0) U<br />

U.<br />

z<br />

0<br />

U))<br />

C,<br />

Ej E:<br />

0o<br />

C)~~~~ 0)-<br />

0) 0EO0O0O)6600 )) ) - 0 a.. -2<br />

0l 0 i C<br />

0 10 0 0 u<br />

Eo ss<br />

N Ns Ns-v~~<br />

0 & 0 N 0 - 0)<br />

v)' ou J), U) v ) (L) O U) u) V) 0.v U) ) 1<br />

J N J l NJN<br />

6<br />

2 0 o<br />

U) CA<br />

007 0 L<br />

) C) u) CD C) C ) )C c ) - C<br />

Co<br />

ix ci - i0 u<br />

ci C 6<br />

)<br />

6<br />

C ' C.<br />

E<br />

-It am 2 2 < 2J z<br />

L) o<br />

N" TN~~ S 0. a ' 0 o M'*<br />

__u u ~os > *u .9 ,..<br />

C0 a: C<br />

0 z z<br />

o E Ei 2 C)( w zw t0 , m cn 0) W u)t m C<br />

sN<br />

a ~ on l M ~<br />

6 0 U~ 1,;C < U) 0<br />

oL i~2U<br />

t >-<br />

~. ~ >a..0 0- - 2<br />

O-.<br />

C) CCo ~U ~ o5 UE<br />

Q C) C .2 aS ~CC<br />

EC-5 >v C) E oJ)<br />

C~1 C)C<br />

-o<br />

-Lo,0<br />

Z 1 oZ 2 )U C>~ ~<br />

.C C)). 72j,5 .) , .<br />

. 6<br />

C C?


U.&<br />

~ 0<br />

UU<br />

U. N 1 .<br />

0<br />

0<br />

o0 *6C t<br />

CCn<br />

0C CC<br />

.2! a ,2<br />

0 0 0 0 0 0<br />

C) C 0 0 0 0<br />

a-I Q - a- a. a<br />

2~ 2<br />

Ua<br />

2 a.. c<br />

E<br />

z o 0 E ) L) Z ii--<br />

0<br />

< C)<br />

IT6-


a)<br />

0 w E )<br />

= C<br />

0. a0<br />

z) vi < 0 j<br />

00<br />

L<br />

iz 0<br />

CL<br />

0 N)<br />

(N 0<br />

CL)


00.<br />

CU -4 - C<br />

CL<br />

u~ C a E<br />

z<br />

aj<br />

-u LU w<br />

-M 0- W<br />

E<br />

0U<br />

z<br />

0 U -~Cowo<br />

4-,-<br />

ro-<br />

0) Z E I ~<br />

~ _ _ _ _ _ ___


E<br />

o oo o0 o<br />

z ~2 2 22 o2<br />

C a ,o a obcc<br />

, F F, 25 FaF;<br />

oz<br />

o0<br />

90 99<br />

C~ ~ z0 0 z<br />

~ ,~,o -E<br />

cnc<br />

ww2<br />

0<br />

0 o 000000 0 0 O<br />

Q2 <<br />

,t<br />

4, 00 .0 ,Z Z<br />

9 92


WCHClosure<br />

Washington<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 147321<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

M T4 I 01 November 17, 2009<br />

ATENEE<br />

ISTIUTO<br />

E. L. Adamson X3-40 R. D. Cantwell N3-30<br />

C. L. Beach X3-16 S. C. Bentti X3-16<br />

Q. L. Grist X3-16 M. D. Clancy X3-16<br />

S. K. DeMers L6-06 D. E. Faulk L6-06<br />

R. A. Dodd H4-24 T. A. Foster N3-30<br />

L. W. Grossarth X9-08 R. Ganapathy X3-40<br />

J. A. Heard H4-17 T. M. Greager X3-16<br />

W. R. Junkins X3-16 S. J. Henneman X3-16<br />

M. Lapp (DDI) R. M. Harrison N3-30<br />

M. Lighty (DDI) R. A. Nunamaker X3-16<br />

S. E. Parnell X3-16 D. G. Saueressig N3-30<br />

J. Price (DDI) J. A. Ware N3-30<br />

S. McQueary (DDI) Project File, X3-16<br />

S. A. Strope (DDI) Records and Document Control H4-1 1<br />

D. B. Teachout X3-16<br />

A. S. White (DDI)<br />

H. Williams III X3-16<br />

A. E. Zacharias X3-16<br />

J. Zeisloft A3-04<br />

A meeting on the above subject was held on November 17, 2009 at 11I8-K, MO-755.<br />

1. SAFETY<br />

*Safety topic: Discussed Christmas lights and use of ladders. Be sure to follow proper ladder<br />

safety at home as well as on the job.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* Remediation PSR Checklist draft in process of review. PSR Management sign-off scheduled for<br />

11/17. Notice to Proceed was issued to DDI on 11/17.<br />

* Discussed diesel fuel storage tank requirements, potential location, power needs and<br />

documentation requirements. Tank was delivered 9/24. DDI to submit tank rigging plan and<br />

Z:\Administrative Assistant.Project Progress Review Weekly Meetings\2009\l 1-17-09 Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

details, WCH to verify plan requirements for 8,000 gallon tank. DDI to submit tank details for<br />

hose and reel design. DDI to provide appropriate submittals, which WCH has reviewed and<br />

returned. Will need to go through the same design review process for the gas storage tank as<br />

well. Will need to have Fire Protection approval as well. Design is required to show proximity<br />

of the gas storage tank to electrical class and division requirements.<br />

" DDI and WCH to discuss tank ladder fall protection requirements. DDI to propose providing<br />

JLG, manlift, etc. in process. WCH has this proposal for review.<br />

" There will be four (4) light plants onsite, one (1) in the parking area, one (1) in the lay-down yard<br />

and two (2) in the burial ground. WCH to verify fall protection training for electricians. All<br />

work is in process. Lighting has been completed except in the tent where work is in process.<br />

" Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. DDI does not plan to resubmit incorporation of the cold weather protection<br />

plan comments until water supply line installation is complete.<br />

* WCH requested status of Cold Weather Protection plan from DDI. WCH has returned submittal<br />

with comments.<br />

" DDI informed that water supply lines will not all be in place before start up. Discussion of not<br />

tying directly to a hydrant. There will be no direct filling of trucks until an alternative to hard tieins<br />

is in place. WCH will be issuing a CN revising the specification to use only a water fill<br />

stations for water trucks. J-stand is erected and is working on making it functional.<br />

" PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH will develop a CAD drawing from the info that DDI has provided.<br />

* Discussed IWCP requirements for dedicated and critical resources. Work packages have been<br />

revised for clarifications and will include down-posting language. Additional clarification has<br />

been requested on key personnel language. The IWCP Rev. 6 alignment modifications will<br />

address this.<br />

" Discussed load-out start-up behind excavation and sorting. DDI request to revise PSR to have<br />

container loading and handling as a post-start for the dry runs. Dry-runs to be scheduled.<br />

* Discussed the incidental welding procedures that are required per Exhibit E. WCH has reviewed<br />

and returned.<br />

" DDI to have offsite vendor to train site personnel to inspect scaffolding. Currently DDI only has<br />

one (1) competent person. DDI to schedule this.<br />

* DDI plans to add a water truck (third) and driver until the water supply line and system are<br />

constructed and operations ramp up. The second water truck will be on site later this week.<br />

* Discussed the AB requirement for a drum handling plan. DDI to coordinate with WCH<br />

Engineering to establish this plan. Per Doug Teachout, this has been covered in the anomaly<br />

response work package.<br />

* Discussed disposal of grey water from hand washing, etc. Should be disposed of down the drain<br />

in the shower or restroom trailer, or in the field portable toilet facilities.<br />

" Discussed use of an excavator bucket with "teeth" as opposed to a smooth edge for excavation<br />

and sorting operations, and the adverse implications that have been experienced at other projects,<br />

and earthwork requirements. Bucket to be changed out today (11/17).


Progress Review Meeting<br />

Page 3<br />

111. PROJECT DESIGN DRAWINGS<br />

* Electrical drawings and traffic control plan drawings are in process. Diesel storage tank electrical<br />

designs and trailer site electrical as well as as-built drawings. WCH in review, to be returned this<br />

week.<br />

* DDI to resubmit Traffic Control Plans which will incorporate comments from WCH.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

0 See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

* None.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

*See attached. Requested updated equipment list from DDI to be incorporated into the weekly<br />

project status.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

0 None.<br />

IX.<br />

MATERIAL<br />

0 None.<br />

X. QUALITY<br />

" Kudos to Drew White from DDI for all his work supporting DDIs QA Program efforts.<br />

" Everett plans to finish up with first scheduled assessment by the first of December.<br />

XI.<br />

REQUESTS FOR INFORMATION<br />

*DDI is creating an "Indoctrination" training book and requests information from WCH to<br />

complete. This is in progress.<br />

XII.<br />

XIII.<br />

XIV.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

0 Copy of Submittal Log attached.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

0 See attached.<br />

CORRESPONDENCE<br />

" Letter from DDI: 1 18-K-lI submittal of Jerry Istre for position as Project Manager<br />

* Letter from DDI: Request for Information, Soil Bonding Agent<br />

* Transmittal from DDI: Acceptance of Change Notice 005<br />

" Transmittal from DDI: Acceptance of Change Notice 006<br />

* Transmittal from DDI: Acceptance of Change Notice 007<br />

* Letter to DDI: Key Personnel


Progress Review Meeting<br />

Page 4<br />

* Letter to DDI: Key Personnel Approval (Jerry Istre as Project Manager)<br />

* Letter to DDI: Notice to Proceed for the Remedial Action Excavation of 11 8-K-i Burial Ground<br />

" Weekly Progress Review Meeting Minutes of 11/17/2009<br />

XV.<br />

XVI.<br />

IN VOICE AND PAYMENT STATUS<br />

* None.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

*WCH to provide container load out sheets. DDI to include previous day's load counts with daily<br />

report. Daily provision of DDI daily reports continues to need improvement.<br />

Attachment(s): As noted above.


Dance Designs Inc.<br />

11 8-K-1 Burial Ground Remediation Project<br />

EQUIPMENT AND MANPOWER SUMMARY<br />

As of Date: Thursday, November 12, 2009<br />

EQUipment Summary<br />

Manpower summary<br />

Komastu 600 Classification No.<br />

Komastu 400 Operators 5<br />

Komastu 300 Laborers 8<br />

Hitachi 330 Teamsters 3<br />

Hitachi 225 Mechanic 1<br />

John Deere 225 Total 17<br />

Shuttle Truck #1<br />

Rock Truck<br />

Water Truck #1<br />

Road Grader<br />

Front End Loader<br />

2-Week Look November 9 - November 26<br />

Last Week~r WeeIkofi: 9-Nov-09-x<br />

ACTIVITY MON-9 TUE-10 WED-1i TH-U-12<br />

General Mobilization<br />

Awaiting PSR Approval<br />

COMMENTS


This Wek<br />

-Week-of:16Nv0<br />

ACTIVITY MON-16 TUE-17 WED-18 THU-19<br />

PSR Completion<br />

Excavate Trenches i/L<br />

RVA Road<br />

CTA/Loadout Mockup<br />

COMMENTSHihwnwetr


E<br />

- a ,a 22<br />

C.)<br />

N0 000 cc00 00<br />

- z<br />

- 0 0 0<br />

z<br />

0<br />

0<br />

0 -<br />

C.)<br />

I.G'22 810 7<br />

(nn<br />

0<br />

a<br />

> E~<br />

cn 0'<br />

t0<br />

1d<br />

S 'r T- ; t<br />

10 _ .<br />

L) Lfl ~ (r Z<br />

______<br />

O<br />

LU -000( L) ?<br />

O-000


z<br />

0<br />

kL<br />

V))<br />

o 0<br />

0<br />

0-1 ;O 00JO mdJ 1P ic<br />

0<br />

u - q4 C? . . . . ? q<br />

"O M<br />

00oe._O<br />

88NN<br />

(n U) (04.0404 D(D4 U)C . v" 4<br />

04i 04<br />

o 0 0 0 E<br />

00<br />

0 ~~40<br />

N<br />

4 0 - 0<br />

e<br />

uI~~~I<br />

2.00.<br />

90 .94 0-0~ -~ o<br />

Mr 0<br />

oooooE 0- 40 4 . c c00 -a - - -a<br />

i 9 0 00 0 00 0 0' C D _0<br />

1 S;<br />

0. .<br />

. = (2.EE<br />

EE<br />

U) E2 ) 0<br />

u -E) > 0C c' 2P- i -a 0m<br />

=1 00 I 0 -6-<br />

,5 =o =_ w~)~ =c<br />

t:UA. U<br />

U) 1:W V Z U)C/)U) U, l L ) Z U U)SQ FL F- U) r 1<br />

111 1 t C w Of LL L L<br />

0 C, 61M<br />

99<br />

999<br />

040


0 0,<br />

00<br />

0 -L<br />

0<br />

0L<br />

-Dj , 0 1 0 a ,( ) m Do<br />

0<br />

mz1, 0 l a 0 o l o D0 ,C<br />

a<br />

0 80<br />

o<br />

0)L 0)<br />

0) 00 0 c- 0);0 C)<br />

0)0<br />

id 0; 0; 00 00<br />

00 0C<br />

0)0<br />

0<br />

0 0<br />

0) C) ) 0 0 0 0 0 ) 0) ) 0)0u 000<br />

0)0 0)C<br />

~~~ N. N. N. N. N.N .~N<br />

. .<br />

N..<br />

I .0 .0 .. . . . .<br />

o(DN0 0 10<br />

a- 0.<br />

m 1<br />

0 000 00_ 0 000 0 0<br />

2. ,~~ E 0<br />

0 0). )0 1 /<br />

>~ . Q ~ A.~ 000 0 * I*N N. -N.<br />

>D (D .2) m r:<br />

o2 2 U)<br />

0. (: .0<br />

w~ -a -a -a( E<br />

Q-0. > E :2I 729 *0<br />

4 .0. 0<br />

%.1 CLC L0 2 ) o a 02' ~ KI ~ ) (n<br />

-uj-- 0 8 L 0 0 2 A -a -0<br />

N. I N .N<br />

1 ) E0 0 0 -M - u N N. N N5<br />

N. N. 0 -2<br />

0 09 0 99 0<br />

INN.S N. N..10N . N . N .. > >I 9,7,7 NN..N N NN )& -.. N N -


00<br />

0<br />

o<br />

z<br />

LU<br />

0 .<br />

-x<br />

o- o<br />

00<br />

- - 04 N N NO<br />

o o0 0 9C 00 0<br />

C<br />

0 0<br />

- 2?<br />

00)0<br />

z0 Z<br />

-~~ 00 000 45~00<br />

0 00 0 0 0 00 0<br />

0) 00<br />

t:<br />

0 0~4 .0 . c CL0 c<br />

.0 c- 2 E<br />

E4) 0 .2 0<br />

(D IT<br />

4) 4<br />

M 2, U<br />

4) 4) 2U<br />

. . r -0<br />

0) 0<br />

4) oco 0<br />

t:<br />

U L) L'U) I<br />

0 E m..a.<br />

E5 TE22<br />

16 2)0- 0 a) . 11 .) 60<br />

0<br />

C<br />

4T.<br />

4)a5 -=L)U<br />

w m<br />

04) of E<br />

0<br />

o<br />

CL a16 4 2c00 2 E!= 0 .<br />

E 4)<br />

4)<br />

z E<br />

2 0 _<br />

r<br />

m ) .L<br />

0<br />

0 > -"<br />

00 4)~*) ~0a a*0 o o<br />

E) 4E~a0 ~ ~ )0 ~ 24 =4) I~ I400<br />

orJ U :D U < nW( 20 U 0000 U) (n<br />

c<br />

Z Eao ~ -2 F- S E C ~2 0? _o<br />

004)~~~C ~ 404<br />

7)44<br />

a C ~ 0 O 4<br />

6 ~ ~ ~ ~ C


0)0<br />

0<br />

0 L<br />

C'))<br />

.0<br />

U-H<br />

) w C


00<br />

00<br />

z<br />

o<br />

LL<br />

o<br />

0o<br />

CD<br />

m<br />

00m o 98 S 1C<br />

w0 0<br />

U,)<br />

0<br />

430 (0 0 0) 0 ) Q )( 0 0)0 0<br />


-<br />

z<br />

0<br />

LU<br />

U<br />

U-<br />

IL 0<br />

0<br />

0<br />

0<br />

8 W In c n n n (n o C<br />

co U nIn( ) I<br />

Is0 0) C<br />

G 0 0u 0<br />

C. 0)000U<br />

< < < <<br />

- U 0 0<br />

(NO - (N al<br />

(N (<br />

m mOw w (~ U) 10 (n ci . U)<br />

C<br />

U)N )<br />

za<br />

.0<br />

C<br />

o 0 (v p C-<br />

ww9C<br />

w<br />

U ~ jCN~J-~jJ * ( r.- ,


0 ~ C0 2 0 00 '~ 08 1<br />

Z a 2 222 2<br />

'- E CL CL CL 0- (L .<br />

Es 1 a<br />

0<br />

CC )<br />

U<br />

1><br />

C<br />

0 0<br />

0. o<br />

00 0<br />

a: No z<br />

z~<br />

S C i) 0 C;) m<br />

a( 0<br />

CL<br />

on ', 0<br />

a<br />

0 c o f<br />

2L Z~<br />

~> (4 2<br />

UD 02E<br />

M. Lua s<br />

$ 1 ,<br />

z<br />

N-0 O 0-.9 LL<br />

88 a.SSSs;<br />

00 j h:-'


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 148131<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

December 1, 2009<br />

D3ISTRBUIO<br />

E. L. Adamson X3-40 R. D. Cantwell N3-30<br />

C. L. Beach X3-16 S. C. Bentti X3-16<br />

Q. L. Grist X3-16 M. D. Clancy X3-16<br />

T. M. Greager X3 -16 S. K. DeMers L6-06<br />

L. W. Grossarth X9-08 R. A. Dodd H4-24<br />

J. A. Heard H4-17 D. E. Faulk L6-06<br />

W. R. Junkins X3-16 T. A. Foster N3-30<br />

M. Lighty (DDI) R. Ganapathy X3-40<br />

S. E. Parnell X3-16 S. J. Henneman X3-16<br />

S. McQueary (DDI) R. M. Harrison N3-30<br />

R. A. Nunamaker X3-16 M. Lapp (DDI)<br />

D. G. S aueressig N3 -30 J. Price (DDI)<br />

A. S. White (DDI) S. A. Strope (DDI)<br />

H. Williams III X3-16 D. B. Teachout X3-16<br />

A. E. Zacharias X3-16 J. A. Ware N3-30<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4-1 1<br />

A meeting on the above subject was held on November 17, 2009 at 11I8-K, MO-755.<br />

1. SAFETY<br />

*Safety topic: It is a little known fact that the most common reason for a small plane to crash is<br />

lack of fuiel. The second most common is pilot error. The message behind this trivia is to be<br />

prepared. When traveling, you should have a safety kit in the car and in the winter make sure it<br />

included cold weather preparations.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

0 Discussed diesel fuel storage tank requirements, potential location, power needs and<br />

documentation requirements. Tank was delivered 9/24. DDI to submit tank rigging plan and<br />

details, WCH to verify plan requirements for 8,000 gallon tank. DDI to submit tank details for<br />

hose and reel design. DDI to provide appropriate submittals, which WCH has reviewed and<br />

returned. Will need to go through the same design review process for the gas storage tank as<br />

well. Will need to have Fire Protection approval as well. Design is required to show proximity<br />

of the gas storage tank to electrical class and division requirements. DDI will submit shortly.<br />

Z:\Adininistrative Assistant~Project Progress Review Weekly Meetings\2009\12-Ol-09 Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

* DDI and WCH to discuss tank ladder fall protection requirements. DDI to propose providing<br />

JLG, manlift, etc. in process. WCH has this proposal for review. DDI to provide revision to the<br />

plan as part of the change notice proposal.<br />

" Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today.<br />

* WCH requested status of Cold Weather Protection plan from DDI. WCH has returned submittal<br />

with comments. DDI does not plan to resubmit incorporation of the cold weather protection plan<br />

comments until water supply line installation is complete.<br />

" DDI informed that water supply lines will not all be in place before start up. Discussion of not<br />

tying directly to a hydrant. There will be no direct filling of trucks until an alternative to hard tieins<br />

is in place. WCH will be issuing a CN revising the specification to use only a water fill<br />

stations for water trucks. J-stand is erected and is working on making it fuinctional.<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH will develop a CAD drawing from the info that DDI has provided.<br />

Waiting on FPE authorization.<br />

" Discussed load-out start-up behind excavation and sorting. DDI request to revise PSR to have<br />

container loading and handling as a post-start for the dry runs. Dry-runs have been completed<br />

and loadout authorized.<br />

" DDI to have offsite vendor to train site personnel to inspect scaffolding. Currently DDI only has<br />

one (1) competent person. DDI waiting on training resource to get additional persons trained.<br />

" DDI plans to add a water truck (third) and driver as the weather turns drier. The second water<br />

truck will be on site later this week.<br />

* WCII to provide container load out sheets. DDI to include previous day's load counts with daily<br />

report. Daily provision of DDI daily reports continues to need improvement.<br />

I11. PROJECT DESIGN DRAWINGS<br />

* Electrical drawings are in process. Diesel storage tank electrical designs and trailer site electrical<br />

as well as as-built drawings. DDI will be re-submitting drawings which will incorporate WCH<br />

comments.<br />

* DDI to resubmit Traffic Control Plans which will incorporate comments from WCH. DDI to<br />

submit 12/1/09.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

0 None.<br />

VI.<br />

VII.<br />

MANPOWER<br />

" See attached.<br />

" Mr. McQueary plans to be transitioned out by 12/22/09 if possible.<br />

* WCH waiting for the requested DDI site superintendent and project manager transition plans.<br />

EQUIPMENT<br />

* See attached.


Progress Review Meeting<br />

Page 3<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

IX.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

*Everett plans to finish up with first scheduled assessment shortly.<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

0 Use of soil bonding agent for initial sort and end of day requirements.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

0 See attached.<br />

XIII. CHANGE NOTICESISTATUS/CHANGE ORDERS<br />

* See attached.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE<br />

" Letter from DDI: <strong>Site</strong> Superintendent 1(b)(6)<br />

* Letter from DDI: Resumes for Project Manager 1(b)(6)<br />

" Letter to DDI: Key Personnel Approval (<strong>Site</strong> Superintendent)<br />

* Letter to DDI: Key Personnel Approval (Project Manager)<br />

IN VOICE AND PAYMENT STATUS<br />

* DDI plans to submit November invoice this week.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

" New SWAC to be released this week. Discussed specific change with regards to weight of cans<br />

versus sticker weight of truck.<br />

" WCH requests the status of the two small buildings. (CN 007 R. 1)<br />

" Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil.<br />

* Discussed compressed gas cylinder removal options. Currently on hold across FR while WCH<br />

works through a solution.<br />

* Discussed trench scheduled. DDI plans daily to have two primary sorts, one load-out for now.<br />

* WCH requests a site absences coverage plan.<br />

* Discussed safety incentive quarterly payment details.<br />

* Discussed delays/schedule impacts tracking and resolution.<br />

* Discussed working copy requirements for techinical procedures.<br />

Attachment(s): As noted above.


Dance Designs Inc.<br />

1183-K-I Burial Ground Remediation Project<br />

EQUIPMENT AND MANPOWER SUMMARY<br />

As of Date: Thursday, November 26, 2009<br />

E'au-inmaenft Summary<br />

manpower Summary<br />

Komastu 600 Classification No.<br />

Komastu 400 Operators 6<br />

Komastu 300 Laborers 8<br />

Hitachi 330 Teamsters 3<br />

Hitachi 225 Mechanic 1<br />

John Deere 225<br />

Shuttle Truck #1 Total 1<br />

Shuttle Truck #2<br />

Rock Truck<br />

Water Truck #1<br />

Water Truck #2<br />

Light Plants (4)<br />

Water Tank<br />

Front End Loader<br />

2-Week Look November 9 - November 26<br />

Last Week Week of: 23-Nov-09<br />

ACTIVITY MON-23 TUE-24 WED-25 THU-26<br />

Excavate Trenches ilL


This Week Week of:, 30-Nov-09<br />

ACTIVITY MON-30 rUE-1 WED-2 THU-3<br />

AWieA.White A.White .ht<br />

COMMENTS<br />

W. Sexsmith in Fall<br />

Protection Class<br />

C. Flowers in Rad C. Flowers in Rad<br />

Worker 11 Training Worker 11 Training<br />

Next Week Week of: 7-Dec-09<br />

ACTIVITY MON-7 TUE-B WED-9 THU-10<br />

Excavate Trenches i/L<br />

Load out Trenches i/I<br />

Excavate Trenches DIE/P_________________________<br />

COMMENTS<br />

W.Sexsmith; J.Price; W.Sexsmith; J.Price; W.Sexsmith; i.Price; W.Sessmith; J.Price;<br />

A.White A.White A.White A.White


s 04 - a:<br />

a<br />

a. C,<br />

E" 0 0<br />

l<br />

~~a0&& ~ &.. 0<br />

Cl c; 0 Ch C C O ~ C C<br />

0<br />

zI<br />

0<br />

a<br />

Q<br />

22<br />

a:w<br />

2Z 6.<br />

Uz<br />

9 9<br />

Sm~<br />

7EV h C<br />

CE<br />

S2<br />

0 (<br />

0 .9 I<br />

032<br />

S2 8 m' . 0<br />

9s :.j E 2<br />

0<br />

! 0<br />

-LU -~ 8 L x<br />

UJM- c 0 ;4'E-. r ~<br />

____ ~ i I ftt Ew-_ h Ia:w L<br />

a .2<br />

o -- a: oj-c) . aNt ('<br />

0 4 2 O rO L 0 C , - e , 4 C<br />

09<br />

0<br />

00


U<br />

z0<br />

0-0<br />

N<br />

U.<br />

U) I<br />

IL<br />

i<br />

0,0<br />

o~ *a<br />

0, 01<br />

01111 d 0 00000 -oClll 00 1 d) 0j d<br />

0<br />

< j0 0 < 0 00 0 0u 00<br />

44 (n4<br />

p 0. (D0 0<br />

CL<br />

0<br />

)fx 04: >4<br />

0)<br />

E<br />

LL a 8 cc<br />

2<br />

a. m M - - E'0 a)<br />

- 0-<br />

0 00<br />

0:U ) 4<br />

a-, '? w0<br />

0 0 0 0 - - -<br />

04<br />

0 0<br />

040<br />

0<br />

E , -1 't1 . E 00<br />

0404<br />

) 04Z


LL,<br />

w<br />

0-<br />

Uc.<br />

E<br />

0 0)0 0 0 co0o 0 0 a8 0<br />

0) a, m~, 0 ))00<br />

Ca-<br />

0<br />

o Q-1 [L I a-, 1. .1<br />

aJ 0-<br />

Oc d c; 5 c5 d d&<br />

1a 0101 0 a<br />

_i oio ci5 oO 10 of 01<br />

C; 6 d~<br />

C6 6 INN<br />

-0<br />

0<br />

-0 ' ~ ~~~~~ 10 1<br />

C0wwW'<br />

.2 N. C 7 N) IN 040~<br />

a C> 0)0<br />

0<br />

.0 C m m LL ~ .2U E<br />

E o0) oo a - 0 ~~S<br />

cc2<br />

0<br />

0 .<br />

0 C3 C> C<br />

> CC C>


U) a<br />

0<br />

ILL<br />

U.<br />

'0<br />

0 1I<br />

04<br />

N N: N<br />

N<br />

NNi<br />

'siui<br />

0 0l 0)<br />

CA 0<br />

o<br />

Nn O<br />

WILL<br />

0<br />

c n . Nn<br />

c n clU NNCi)<br />

) ( ( ) (i n<br />

Nl mNi imn0- - M l l<br />

0 00<br />

D (.cl<br />

us-j<br />

Na 0 N 0N<br />

u ~ ~ r 4)J 0) L<br />

U~~~~~~~<br />

E0<br />

O) U UU _ _ U O) UU U .0.0)CU<br />

) LU U<br />

) U U ) UU U ) U<br />

814)~ ~~~~~~~~~~~~ .) EOU >iUU<br />

2 . ) U U)<br />

(n- -- 2<br />

a - cr<br />

0<br />

-a<<br />

C) > 0. 9 a w 000<br />

E Nda N<br />

0 O<br />

m 0-<br />

0 0 0<br />

5 EC 0NN4<br />

.) Z<br />

V) 0 '0 E<br />

a, E0-~4<br />

E) E 0) Q,~<br />

4)1 0 a~ a, a >) -<br />

U- g<br />

2.0 ~ '2. 62 0. 05n R m '<br />

U4 a a IZ<br />

0 0 cM0<br />

Eao 0- 0'<br />

- (0 w~ Q) E-o -<br />

2: L&U; (n (n)' Of ( ( : )2 :U<br />

50 -J 4)0 U- ~0 00 0 ' 0<br />

E ~E~<br />

0.~~~ 0..0~~~<br />

0 -ss; V oo9a,<br />

:c


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 148135<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

December 8, 2009<br />

DISRIBTIO<br />

E. L. Adamson X3-40 R. D. Cantwell N3-30<br />

C. L. Beach X3-16 S. C. Bentti X3-16<br />

Q. L. Grist X3-16 M. D. Clancy X3-16<br />

C. Flowers (DDI) S. K. DeMers L6-06<br />

T. M. Greager X3-16 R. A. Dodd H-4-24<br />

L. W. Grossarth X9-08 T. A. Foster N3-30<br />

J. A. Heard H-4-17 R. Ganapathy X3-40<br />

W. R. Junkins X3-16 S. J. Henneman X3-16<br />

S. E. Parnell X3-16 R. M. Harrison N3-30<br />

S. McQueary (DDI) M. Lapp (DDI)<br />

R. A. Nunamaker X3-16 M. Lighty (DDI)<br />

D. G. Saueressig N3-30 J. Price (DDI)<br />

A. S. White (DDI) S. A. Strope (DDI)<br />

H. Williams III X3-16 D. B. Teachout X3-16<br />

A. E. Zacharias X3-16 J. A. Ware N3-30<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control 1-4-1 1<br />

A meeting on the above subject was held on December 8, 2009 at 11 8-K, MO-755.<br />

1. SAFETY<br />

a Safety topic: Cold weather people and vehicles: Be sure to remove frost completely from<br />

windshield before driving. Watch for changing road conditions. Should dress in layers and<br />

watch co-workers for signs of cold stress.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

0 Discussed diesel fuel storage tank requirements, potential location, power needs and<br />

documentation requirements. Tank was delivered 9/24. DDI to submit tank rigging plan and<br />

details, WCH to verify plan requirements for 8,000 gallon tank. DDI to submit tank details for<br />

hose and reel design. DDI to provide appropriate submittals, which WCH has reviewed and<br />

returned. Will need to go through the same design review process for the gas storage tank as<br />

well. Will need to have Fire Protection approval as well. Design is required to show proximity<br />

of the gas storage tank to electrical class and division requirements. DDI has submitted revisions,<br />

WCH in review.<br />

Z:\Administrative Assistant~roject Progress Review Weekly Meetings\2009\l 2-08-09 Weekly Progress. doe


Progress Review Meeting<br />

Page 2<br />

" DDI and WCH to discuss tank ladder fall protection requirements. DDI to propose providing<br />

JLG, manlift, etc. in process. WCH has this proposal for review. DDI to provide revision to the<br />

plan as part of the change notice proposal.<br />

" Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments.<br />

* WCH requested status of Cold Weather Protection plan from DDI. WCH has returned submittal<br />

with comments. DDI does not plan to resubmit incorporation of the cold weather protection plan<br />

comments until water supply line installation is complete. WCH has completed cold weather<br />

protection surveillance. DDI has missed submitting some daily cold weather check lists.<br />

" PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH will develop a CAD drawing from the info that DDI has provided.<br />

Waiting on FPE authorization. WCH will follow up on status.<br />

* Discussed load-out start-up behind excavation and sorting. DDI request to revise PSR to have<br />

container loading and handling as a post-start for the dry runs. Dry-runs have been completed<br />

and loadout authorized.<br />

" DDI to have offsite vendor to train site personnel to inspect scaffolding. Currently DDI only has<br />

one (1) competent person. DDI waiting on training resource to get additional persons trained.<br />

* DDI plans to add a water truck (third) and driver as the weather turns drier. The second water<br />

truck will be on site later this week.<br />

* WCH requests the status of the two small buildings. (CN 007 R. 1) One shack was delivered on<br />

December 8 t<br />

" Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss ffurther with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective.<br />

" Discussed compressed gas cylinder removal options. Currently on hold across FR while WCH<br />

works through a solution. Watts has designed a double bottle cradle to be mounted on machines<br />

that will have a load rated capability. Per Bill Junkins, need engineering approval that design will<br />

hold the weight of the lifting device. Per Everett Adamson, DDI should make sure that the<br />

fabrication is compliant with their QA manual.<br />

* Discussed trench scheduled. DDI plans daily to have two primary sorts, two secondary sorts, and<br />

one load-out for now.<br />

* WCH requests a site absences coverage plan. DDI is working on this.<br />

" Discussed safety incentive quarterly payment details. DDI asked if this applied to mobilization,<br />

WCH to follow up.<br />

" Discussed delays/schedule impacts tracking and resolution.<br />

" Discussed working copy requirements for technical procedures.


Progress Review Meeting<br />

Page 3<br />

111. PROJECT DESIGN DRAWINGS<br />

" Electrical drawings are in process. Diesel storage tank electrical designs and trailer site electrical<br />

as well as as-built drawings. DDI will be re-submitting drawings which will incorporate WCH<br />

comments.<br />

" DDI to resubmit Traffic Control Plans which will incorporate comments from WCH. DDI to<br />

submit 12/1/09. WCH received revision and is in review.<br />

" DDI to submit excavation pre-excavation drawings.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

0 See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

* None.<br />

VI.<br />

VII.<br />

MANPOWER<br />

" See attached.<br />

" New Project Manager, Patrick Kennedy, will be in-site December 2 1 s'. DDI transition plan has<br />

been received.<br />

" December 1 Oth is Scott Strope's last day.<br />

" Steve McQueary plans to transition out around the first of the year.<br />

EQUIPMENT<br />

* See attached.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

" None.<br />

* Mobilization work package is complete.<br />

* Electrical work package needs JHA before it can be worked to.<br />

IX<br />

MATERIAL<br />

0 Discussed Earthbound temperature limitations.<br />

X. QUALITY<br />

* Everett plans to finish up with first scheduled assessment shortly.<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

" Use of soil bonding agent for initial sort and end of day requirements.<br />

" Shuttle truck cable directions have been requested (CNO 16). WCH to share video tutorial with<br />

DDI.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

0 See attached.<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

XIV.<br />

CORRESPONDENCE


Progress Review Meeting<br />

Page 4<br />

* None.<br />

XV.<br />

XVI.<br />

IN VOICE AND PAYMENT STATUS<br />

* November invoice has been received and is in review.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

" New HASP to be effective December 14, 2009. WCH will do gap training of revisions in POD<br />

on December 14 th<br />

* WCH asked DDI for a snow removal plan. DDI plans to designate two operators and 3 laborers<br />

plus a superintendent. If there is an on-site delay, these persons will be instructed to come in<br />

early and clear pathways, ice steps, etc. If no delay, those individuals will clear snow, etc. during<br />

morning POD.<br />

* DDI management needs to be included in the WCH Emergency Notification list. They should<br />

encourage their employees to be included also.<br />

* DDI to respond to SDRs by end of week.<br />

" WCH requests G-02 hours for November.<br />

* Discussed the potential upgrade from 2-watt to 5-watt radios. DDI indicated there should be a<br />

trade-in value from existing radios which will help off-set the cost.<br />

" Discussed schedule of monthly LSIT meetings. In addition, discussed how LSIT entries are<br />

cleared.<br />

Attachment(s): As noted above.


0 -<br />

-<br />

a.u<br />

C-4C<br />

0 %0<br />

000<br />

(U) 0 ><br />

0 = z<br />

CD w .<br />

U 4-i<br />

0~ v<br />

w<br />

E<br />

uC<br />

Q) m<br />

CYC<br />

0 uUu<br />

4-j


Ln4-.<br />

ro<br />

LL<br />

L<br />

-. 0 o<br />

Ln<br />

L'i<br />

E~ aI .<br />

0<br />

E<br />

I oC -<br />

LUi> >< >< x<br />

D<br />

E w<br />

w<br />

Li22 LO<br />

LiL<br />

o 0<br />

V) C.-<br />

z x<br />

-x<br />

a<br />

0i<br />

0<br />

W--0~E<br />

-J w E<br />

-o -= o m<br />

o) L 0<br />

C -W ~ -oLU<br />

0 a- 0 z H<br />

c -0 c 0ZL<br />


( x<br />

E<br />

Ln<br />

(U<br />

u 2)<br />

0 CL<br />

L)LL-<br />

4-j<br />

E<br />

(U<br />

00<br />

ooC<br />

- 4<br />

Q)-<br />

-~L)<br />

CuLf ) U<br />

C<br />

4-J<br />

76 O1 :3-<br />

>0 0) >0L<br />

L<br />

>0 c 0 a ) 0<br />

) a)) o a_<br />

< 0U~ LU" ___


S)<br />

E<br />

F- O <<br />

(o 3<br />

E<br />

(a)<br />

o<br />

CL<br />

E<br />

L,<br />

OV)<br />

0 -I<br />

E<br />

U,<br />

0<br />

CU a)<br />

ojj<br />

0 E 0 z<br />

0 -~zz<br />

> - < -j I~ V)<br />

F~- ~ %+- - ~ -o Lii r,<br />

0U<br />

C (U d J<br />

(Uj<br />

>3 a) Ou >)~ ><br />

M aU ( 0<br />

>U j aF)<br />

mUC<br />

>u<br />

(U CO L. u


0)<br />

0-0<br />

w 0<br />

0N<br />

0<br />

00. SI<br />

00<br />

0IN<br />

E--<br />

2,,<br />

0<br />

00 11111L o oool a lido ii~iIId 6 j<br />

N<br />

'NNDNN<br />

- N.<br />

0000 0 0 0 00L)<br />

0<br />

d0<br />

-<br />

0 00 0l 0<br />

N2 CNN<br />

N. N N CNN(0) NO<br />

o WC o0<br />

U ~~~~~~O . -<br />

0 -'<br />

pr IT 1N91 - 0)a.<br />

000 0 000 U0 0 0000<br />

0 0<br />

0)<br />

U1 , cm ED 0000 co 00 D 0 0o 00<br />

U8<br />

EDT23Z Z D ao C)L t )E ()<br />

0 >0U 20 En.0 E E<br />

0 (0<br />

ix Ex. 0<br />

2<br />

0L<br />

C0 (D C OPM2 %E<br />

EE<br />

M.2 inO<br />

~~00<br />

a.<br />

iL<br />

E<br />

mO) 2OCO 2. t E §<br />

1) C,<br />

ID 00 0<br />

0<br />

2<br />

0 0 0990 09 00<br />

a CO<br />

00<br />

)<br />

0<br />

CO.<br />

9<br />

0<br />

W<br />

N CNN ,: N _( , L (


00<br />

z<br />

U.<br />

0<br />

0:<br />

0<br />

-.<br />

E<br />

E<br />

-E<br />

rU<br />

00C<br />

UC,<br />

0 M- a.~ a. a. M<br />

C; C5 C; - cC<br />

n.0 0. co0 r co .<br />

0.cn 0. .0 CO 0.0 1 nOW1 0<br />

0<br />

-, a<br />

do 6 0<br />

6 b66 bb bbl b<br />

E<br />

E<br />

.2 2<br />

00r<br />

o<br />

> 0<br />

XM 0 c<br />

0<br />

E- E >~ Ir m0 m .0 j 0<br />

A: a-( ' O< i- 0 c a<br />

E0 0.-- z' ~ 00<br />

'1 6 . 5 C . .0 > 00 a<br />

2l a, 'x. .<br />

4) 3 - -<br />

Cl) 016 0)0)<br />

8, 8- 888 b 0 00 a_<br />

-a) %04- -ca0<br />

'<br />

99 0- o9<br />

- - - S.-- -<br />

0 0 9 9 9161 5 "L0U<br />

-<br />

(g C' C')


C. 0) 0<br />

0<br />

U)<br />

o 2,<br />

U)<br />

a:<br />

0,<br />

0a.<br />

00<br />

C,,!<br />

U) aUh 0) ac, P<br />

o) a:<br />

a<br />

ca<br />

a<br />

CL a.<br />

(N -0 - .5 Im<br />

-~ (D N ~ (<br />

3:-<br />

Ca<br />

a<br />

a a a ) a<br />

a<br />

a ~ a.<br />

1. a a<br />

a U) 0.9 Laa a) 8 a<br />

o2<br />

0m<br />

LO E0 aa a0 0, 0 0 00 1_ m<br />

0<br />

.0 .,a<br />

p<br />

2 C, 00 0 0 0 0 00 0 00<br />

0 0<br />

m 0 0 a5 a 0 2 c<br />

00 ;6 0- E. q (L Cy(<br />

M s Wmj4CC)<br />

0 - a - 02N Ew._ _ C<br />

_-5 . 2 I) D a<br />

E E20 2 j E!-<br />

-J 2 < ! OE 'aW0'' w-9 -0 (<br />

4)2 4) a0<br />

CE 0 LW EE 3:<br />

0) CD a. E: o<br />

a% 3<br />

)<br />

E E a E 1,r a 0<br />

o I-80 ch C- 0 ><br />

c)<br />

0f<br />

ID( 0. o 10 m- (L) > ~ ~ 0C<br />

>' C<br />

L) c<br />

1<br />

z<br />

E O' zaa u P: 2 wC~ 0G(SO~ (n m)- COW2L 23 oo000 nC<br />

-LJ )~ a 0--- C<br />

S~~L uw~g** ~<br />

0ECC8CU)8 ~ ~ ~ E,~ o<br />

2<br />

~ ~ 'oE 0~~5~C~ Ca0Ja2)'C o 8oEu C~m<br />

~to a::zw uw ~ __~~5~ ~ C 8 8~~8O<br />

;E 9<br />

2<br />

- - - - -(O a a 99 9 99 90<br />

C4(<br />

(N~1 (N((N N(A A C6 N(


0<br />

U)<br />

>0)<br />

z<br />

0<br />

U)<br />

a. a. a - .0 a L(<br />

0<br />

2i C q7E q' q i C i 4.a<br />

M0eU<br />

C4 0 C40 4"C<br />

O0<br />

"tqU l lc<br />

E<br />

0EE<br />

((D<br />

00<br />

-,6<br />

oa<br />

a) o)00c 0 0<br />

-<br />

a<br />

0.. 1.5<br />

-Z Q00 'n -a, g7<br />

0 M 0<br />

00<br />

E<br />

U) U)m<br />

:o<br />

00 0 .2<br />

< <<br />

0<<br />

0 U ur~N .oa<br />

5ooo~ .0 W ) (h14<br />

cn ~ a ~ ~ n .5! ) -<br />

c<br />

E ) 2<br />

<


010 0 0<br />

0 0 00<br />

0<br />

NU<br />

LL<br />

z<br />

o<br />

o 0<br />

0<br />

U .<br />

o<br />

C,,0,06<br />

0<br />

cic4<br />

0~<br />

8<br />

NL<br />

0<br />

0 0 0 Q 0 0<br />

0<br />

0 0 0<br />

"t 8888888 U 88c888 880 NN<br />

0 E<br />

ccm 0.0<br />

0 S2 0,5 0"<br />

x m L c<br />

CLu l Cl)<br />

-:0 05 0 2 0<br />

ca C<br />

Un .~ aF 2 n z -<br />

Of ml) mfol 0 ax4 w RmI<br />

W ~ of<br />

CD w )mzO a ' F p<br />

_n _) 0* 16 m c o ) U<br />

0 0 . 0 0) <<br />

o 0 2 0<br />

0 C .0 0 0 0- -<br />

CA)(l)0 5 c CL Z O<br />

2 I oz o z C > .0 a -2o0 < -C c 2 *<br />

05 o6<br />

C. oi<br />

0 .0>0><br />

c Z E oE<br />

z<br />

0<br />

ClE<br />

C0<br />

> EE 2 - '6. 2 C,<br />

0 2:1 0O- 0 (D LL L<br />

sc ~ ,, . 0 0 100 = a ~2<br />

0000<br />

CU 8,14 Wo- 2' 'n (n, 'L LU LE' 0E W0 0 o r0 QEA m0 CO (<br />

C.z CL IMI 0(0 U) U) CL V_ A (L0 0 ~<br />

00 000<br />

0 0 0 0 0<br />

0 _ 0<br />

0~~~d 0


z<br />

M<br />

U)<br />

0<br />

0<br />

-<br />

IlI<br />

a0<br />

N 4 2<br />

) S<br />

m m 0<br />

co<br />

0<br />

o<br />

N N N -:31V<br />

o 0- 0 0 0 0<br />

J 0i 0 0 0i<br />

o<br />

0Z0<br />

E Lo 0<br />

-~ -j - - - bO<br />

-<br />

c Q- (a a. ( a<br />

(0 5 _ _ _ s o ci(s<br />

Z5<br />

n<br />

oo o o I<br />

> 2. u ow<br />

oo -'<br />

2~-<br />

' a<br />

> . * 2a'<br />

u *w *w w *<br />

E m < m m m C<br />

El , a: ' Qa C) C) > E<br />

0 6 o o .0 S o<br />

_ < < < a)A


o F -r -r. ca-~C<br />

Z~' -o a ~.-~z o o<br />

8 0 0<br />

o<br />

a) ('<br />

aaa<br />

0<br />

C.)<br />

aa<br />

a<br />

,-n (9 o?-oc' Z??2;o<br />

Ol_ ~ a 20 11 1<br />

tt.


wcHClosure<br />

CCN: 148148<br />

Washington<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach .~<br />

December 16, 2009Z'<br />

DISRIBTIO<br />

C. L. Beach X3-16 E. L. Adamson X3-40<br />

Q. L. Crist X3-16 R. D. Cantwell N3-30<br />

T. M. Greager X3-16 S. C. Bentti X3-16<br />

W. R. Junkins X3-16 M. D. Clancy X3-16<br />

S. E. Parnell X3-16 S. K. DeMers L6-06<br />

S. McQueary (DDI) R. A. Dodd H4-24<br />

R. A. Nunamaker X3-16 C. Flowers (DDI)<br />

A. S. White (DDI) T. A. Foster N3-30<br />

H. Williams III X3-16 R. Ganapathy X3-40<br />

A. E. Zacharias X3-16 L. W. Grossarth X9-08<br />

J. A. Heard H4-17<br />

S. J. Henneman X3-16<br />

R. M. Harrison N3-30<br />

M. Lapp (DDI)<br />

M. Lighty (DDI)<br />

J. Price (DD1)<br />

D. G. Saueressig N3-30<br />

D. B. Teachout X3-16<br />

J. A. Ware N3-30<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4- 11<br />

A meeting on the above subject was held on December 16, 2009 at 11 8-K, MO-755.<br />

1. SAFETY<br />

0 Safety topic: Forecasters are predicting freezing rain again tonight. Stay alert and watch for<br />

changing road conditions.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

" DDI and WCH to discuss tank ladder fall protection requirements. DDI to propose providing<br />

JLG, manlift, etc. in process. WCH has this proposal for review. DDI is revising Fall Protection<br />

Plan. When this is complete, they will draft response and proposal to CNOO5. Whitney Sexmith<br />

is competent person for harness inspections.<br />

" Electrical Drawings for electrical tic-ins, as-builts and diesel tank electrical design have been<br />

Z:V~dministrative AssistnL\roject Progress Review Weekly Meetings\2009\1 2-16-09 Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments.<br />

* WCH requested status of Cold Weather Protection plan from DDI. WCH has returned submittal<br />

with comments. DDI does not plan to resubmit incorporation of the cold weather protection plan<br />

comments until water supply line installation is complete. WCH has completed cold weather<br />

protection surveillance. DDI has missed submitting some daily cold weather check lists.<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and is working to resolve CHPRC concerns<br />

and requests. Discussed 150 lb. restrictor.<br />

" DDI to have offsite vendor to train site personnel to inspect scaffolding. DDI has six (6) peopled<br />

trained.<br />

* DDI plans to add a water truck (third) and driver as the weather turns drier.<br />

" WCH requests the status of the two small buildings. (CN 007 R. 1) One shack was delivered on<br />

December 8 1h . Need to get power in order to obtain occupancy permit. Discussed scheduling<br />

JHA for electrical work.<br />

" Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss fuirther with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH evaluating waste oil for heaters.<br />

* Discussed compressed gas cylinder removal options. Currently on hold across FR while WCH<br />

works through a solution. Watts has designed a double bottle cradle to be mounted on machines<br />

that will have a load rated capability. Per Bill Junkins, need engineering approval that design will<br />

hold the weight of the lifting device. Per Everett Adamson, DDI should make sure that the<br />

fabrication is compliant with their QA manual. Tags on devises, etc. and ready for use.<br />

* Discussed trench scheduled. DDI plans daily to have two primary sorts, two secondary sorts, and<br />

one load-out for now. DDI to begin earthwork in trench DEP. Will perform two (2) loadouts in<br />

the beginning.<br />

" WCH requests a site absences coverage plan. DDI is working on this.<br />

* Discussed safety incentive quarterly payment details. DDI asked if this applied to mobilization,<br />

WCH to follow up. DDI to provide personnel hours.<br />

" Discussed delays/schedule impacts tracking and resolution. Negotiations in progress, DDI<br />

submitting delay forms daily.<br />

" New HASP to be effective December 14, 2009. WCH will do gap training of revisions in POD<br />

on December 14 th . DDI is now working to this revision.<br />

* WCH asked DDI for a snow removal plan. DDI plans to designate two operators and 3 laborers<br />

plus a superintendent. If there is an on-site delay, these persons will be instructed to come in one<br />

(1) hour early and clear pathways, ice steps, etc. If no delay, those individuals will clear snow,<br />

etc. during morning POD.<br />

* DDI to respond to SDRs by end of week. DDI has submitted these as of 12/15/2009.<br />

* WCH requests G-02 hours for November. DDI needs to have these submitted by the 3 rd of each<br />

month.<br />

* Discussed the potential upgrade from 2-watt to 5-watt radios. DDI indicated there should be a<br />

trade-in value from existing radios which will help off-set the cost. DDI to provide possible cost<br />

info to WCH today.<br />

" Discussed schedule of monthly LSIT meetings. In addition, discussed how LSIT entries are<br />

cleared.


Progress Review Meeting<br />

Page 3<br />

III.<br />

IV.<br />

PROJECT DESIGN DRAWINGS<br />

" Electrical drawings are in process. Diesel storage tank electrical designs and trailer site electrical<br />

as well as as-built drawings. DDI will be re-submitting drawings which will incorporate WCH<br />

comments.<br />

* DDI to resubmit Traffic Control Plans which will incorporate comments from WCH. DDI to<br />

submit 12/1/09. WCH received revision and is in review.<br />

* DDI to submit excavation pre-excavation drawings.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

* None.<br />

VI.<br />

VII.<br />

VIII.<br />

IX.<br />

MANPOWER<br />

* See attached.<br />

" New Project Manager, Patrick Kennedy, will be in-site December 2 1 ". DDI transition plan has<br />

been received.<br />

* December I 1 IS Scott Strope's last day.<br />

" Steve McQueary plans to transition out around the first of the year.<br />

EQUIPMENT<br />

* See attached.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

" Mobilization work package is closed.<br />

* Electrical work package needs JHA before it can be worked to.<br />

MATERIAL<br />

* Discussed Earthbound temperature limitations.<br />

X. QUALITY<br />

* None.<br />

XI.<br />

XII.<br />

XIII.<br />

REQUESTS FOR INFORMATION<br />

" Use of soil bonding agent for initial sort and end of day requirements.<br />

" Shuttle truck cable directions have been requested (CNO 16). WCH to share video tutorial with<br />

DDI.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

" See attached.<br />

" DDI submitted proposals today for CNOO2, CNOO8, and CN0l3.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

0 See attached.


Progress Review Meeting<br />

Page 4<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE<br />

* None.<br />

IN VOICE AND PAYMENT STATUS<br />

* November invoice has been received and is in review.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* Discussed DDI working to mobilize two haul trucks from ERDF. There is a total of four (4)<br />

required still.<br />

* Discussed badging requests recovery of badge and TLD upon termination of employees.<br />

* Discussed positive continue improvement in POD work pre-eys.<br />

* Next progress meeting to be after the holidays on January 5, 2010.<br />

" DDO looking at bringing de-icer on site for the scale. WCH need information for environmental<br />

review.<br />

Attachment(s): As noted above.


0)<br />

4)'<br />

00<br />

o-<br />

0<br />

E. wo 0 .<br />

0a 0o (D .0<br />

0~0<br />

0<br />

0<br />

a<br />

&- a 0 nr<br />

(LU<br />

E<br />

4 C 00 C-) r1 --' 0)<br />

CD 0 0 0 Lru ~ U U ~ o)~<br />

'. - L cu .<br />

~ u.C) f ~ C<br />

EE<br />

22m<br />

~~c<br />

0 C) aj-<br />

CU u U ) U +0 - j 1..0<br />

-HL.<br />

SE E E m m : 4- 4- 4- C


o)<br />

C)<br />

;5.2>E<br />

cE~<br />

0<br />

CO 0<br />

C w ~ -<br />

= a.<br />

T- cu ai Oa u 0 Qcu<br />

W w c u c<br />

4- J - ,,<br />

w )L A I - L<br />

mw


a,)U<br />

O~) ) CL<br />

C)0' L ) (<br />

U<br />

0-<br />

0' w) x<br />

0 C<br />

C) C U)<br />

- 0 -<br />

U -<br />

w<br />

I-<br />

CU<br />

r 0<br />

x x<br />

i<br />

m U .-<br />

a))<br />

C u Cu Cu- u<br />

C'4H~0-:<br />

C)C<br />

LL<br />

- 0<br />

u0> Cu cu<br />

Cuj Cu<br />

0<br />

C<br />

U<br />

U J L UJH __ _ _ _


-2 72 -0<br />

01<br />

w) x x x x<br />

0u<br />

0<br />

0<br />

.4-<br />

= Ln 4<br />

-0 C<br />

00 U) u. 0<br />

3: C I'-4<br />

0.5!<br />

m L)<br />

Cu<br />

En<br />

CU<br />

a)) z .<br />

~~-C<br />

_ 0 0d 0L L<br />

CL 0<br />

-C -C -0 C: 0-<br />

1 0 cL<br />

o<br />

c c *Z c L<br />

> (Ii 0 > Cu Uj<br />

Cu U Cu D ) L. U) Cu<br />

z~~ __ ~c _ -0__ _ _


-2 - 0 - -0 _0 -a<br />

M<br />

) L<br />

w- x. x x xx=<br />

-<br />

U - CU<br />

G) 0 un>. 3<br />

cn'<br />

EL C: o<br />

) Cl<br />

x0<br />

U.-<br />

U<br />

-w w00,<br />

0 C4 3 -<br />

-0a<br />

Li<br />

00<br />

c~~C<br />

Z c<br />

.<br />

FL Ln C)<br />

0<br />

>~ 0 c =a<br />

m~ c:<br />

c mm~ _ M U UQ<br />

x~ ~ 0 0 ~ 0<br />

CUJ I j j U - CU z Z


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 148149<br />

WEEKLY PROGRESS REVIEW MEETING C008753A04)<br />

Distribution<br />

Christopher L. Beach<br />

January 5, 2010<br />

DISTRBUTIO<br />

C. L. Beach X3-16 E. L. Adamson X3-40<br />

B. Collyer (DDI) R. D. Cantwell N3-30<br />

Q. L. Crist X3-16 S. C. Bentti X3-16<br />

T. M. Greager X3-16 M. D. Clancy X3 -16<br />

L. W. Grossarth X9-08 S. K. DeMers L6-06<br />

J. A. Heard H4-17 R. A. Dodd H4-24<br />

J. Janosky (Watts) C. Flowers (DDI)<br />

S. E. Parnell X3-16 T. A. Foster N3-30<br />

S. McQueary (DDI) R. Ganapathy X3-40<br />

M. Sherman (DDI) S. J. Henneman X3-16<br />

D. B. Teachout X3-16 W. R. Junkins X3-16<br />

A. S. White (DDI) M. Lapp (DDI)<br />

H. Williams III X3-16 M. Lighty (DDI)<br />

A. E. Zacharias X3-16 R. A. Nunamaker X3-16<br />

J. Price (DDI)<br />

D. G. SaueressigN3-30<br />

J. A. Ware N3-30<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4-11I<br />

A meeting on the above subject was held on January 5, 2010 at 11 8-K, MO-755.<br />

I. SAFETY<br />

* Safety topic: Watch for changing weather conditions which can leave moisture content on the<br />

road.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* DDI and WCH to discuss tank ladder fall protection requirements. DDI to propose providing<br />

JLG, manlift, etc. in process. WCH has this proposal for review. DDI is revising Fall Protection<br />

Plan. When this is complete, they will draft response and proposal to CNOO5. Whitney Sexmith<br />

is competent person for harness inspections. DDI resubmitted CN 005 proposal last week WCH<br />

in review. This is to be completed by 1/28/20 10.<br />

* Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

Z:\Administrative Assistant\Project Progress Review Weekly Meetings\201 0\January\l -5-10 Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

comments and will resubmit.<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank.<br />

" WCH requests the status of the two small buildings. (CN 007 R. 1) Both shacks are on site.<br />

Occupancy permits have been obtained. Upon completion of the work package JHA, DDI will<br />

schedule electricians to perform the electrical installations.<br />

* Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to bumn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence.<br />

" Discussed trench scheduled. DDI plans daily to have two primary sorts, two secondary sorts, and<br />

one load-out for now. DDI has begun work in trench DEP. Will perform two (2) loadouts in the<br />

beginning. After DEP trenches are complete, work will be moved to trench K.<br />

* WCH requests a site absences coverage plan. WCH to give DDI comments.<br />

* Discussed safety incentive quarterly payment details. DDI asked if this applied to mobilization,<br />

WCH to follow up. DDI to provide personnel hours.<br />

* WCH requests G-02 hours for December. DDI needs to have these submitted by the 3 rd day of<br />

each month.<br />

* Discussed the potential upgrade from 2-watt to 4-watt radios. DDI indicated there should be a<br />

trade-in value from existing radios which will help off-set the cost. DDI evaluating quotes<br />

received and licensing potential issues. Also looking into alternatives such as installation of a<br />

repeater versus purchase of new radios.<br />

* Discussed schedule of monthly LSIT meetings. In addition, discussed how LSIT entries are<br />

managed and addressed. Additional discussion relating to LSIT entry for heating options and<br />

costs for the CTA tent.<br />

* Discussed DDI working to mobilize two haul trucks from ERDF. There is a total of four (4)<br />

needed for site operations. Negotiations about contracts, costs and ownership are in progress.<br />

DDI to work on a proposal and WCH Procurement will follow up on request. Discussed details<br />

regarding WCH provision of two 22-ton capable haul truck and contract changes that would need<br />

to be made for the 25-ton minimum requirement.<br />

* Discussed badging requests recovery of badge and TLD upon termination of employees.<br />

Currently there are two individuals that need to return their badge from DDI/ Watts.<br />

" Discussed positive continuous improvement in POD work pre-evs. Continue to have feedback<br />

from DOE that there needs to be more employee interaction during the work package pre-ev<br />

briefing.<br />

" DDI looking at bringing de-icer on site for the scale. WCH need information for environmental<br />

review. DDI will follow-up on details.


Progress Review Meeting<br />

Page 3<br />

111, PROJECT DESIGN DRAWINGS<br />

*Electrical drawings are in process. Diesel storage tank electrical designs and trailer site electrical<br />

as well as as-built drawings. DDT will be re-submitting drawings which will incorporate WCH<br />

comments.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

*See attached.,<br />

V. WEEKLY PRODUCTION TABLE<br />

*None.<br />

VI.<br />

VII.<br />

MANPOWER<br />

" See attached.<br />

" DDIsl(b)(6) -- was injured in a serious car accident over the holidays so Mitch Sherman<br />

will be filling in for him.<br />

" DDIsl(b)(6) s out on medical leave and. until her return Beth Collyer will be<br />

filling in for her.<br />

EQUIPMENT<br />

*See attached.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

*Electrical work. package needs JHA completed before it can be approved. This is should be<br />

complete by the end of today along with Anomaly Response work package revisions.<br />

IX.<br />

MATERIAL<br />

*None.<br />

X. QUALITY<br />

*WCH has a marked up surveillance schedule through the end of March. These changes have been<br />

addressed with DDI.<br />

XL.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

*Shuttle truck cable directions have been requested (CNOI6), WCH to share video tutorial with<br />

DDI. Training using the video will he scheduled by the end of January.<br />

TECHNICAL DATA SUBMITTALSISTATUS<br />

0 See attached.<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

XMV.<br />

CORRESPONDENCE<br />

" Transmittal from DDI: Acceptance and Proposal for Change Notice 014, Exhibit E, Rev. 5<br />

" Transmittal from DDI: Acceptance of Change Notice 006, Exhibit E, Rev. 3 & Exhibit 1, Rev. 3<br />

" Transmittal from DDI: Acceptance and Proposal for Change Notice 0 10, Exhibit D -<br />

Decontamination Shower Requirements<br />

" Transmittal fromi tDI: Acceptance of Change Notice 011, Exhibit K, Rev 6


Progress Review Meeting<br />

Page 4<br />

* Response to RFI, Soil Bonding Agent<br />

* Weekly Progress Review Meeting Minutes of 12/16/2009<br />

XV.<br />

XVI.<br />

IN VOICE AND PAYMENT STATUS<br />

* December invoice has been received and is in review.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

0 None.<br />

Attachment(s): As noted above.


0 N3<br />

W 0<br />

a.~-<br />

00<br />

0--<br />

. u 03<br />

nE<br />

E<br />

-rl<br />

Z 9 C)- 0 Ile -11 03<br />

uU -u 0<br />

q CD00L- E-<br />

u~ ~o ~ E-5 ~ J4-<br />

UV<br />

Cu- 4- 4- 7<br />

=z =m.<br />

oW 4J =-a0 t<br />

-a4I<br />

00 -, n-V -


C.,<br />

a)<br />

0 W ~ W W- ) uQ<br />

Co -<br />

-- 1<br />

0 c) (: m W u<br />

0i >.<br />

.4-#<br />

E<br />

CU<br />

.4-0<br />

(n -<br />

ui 0


LUL<br />

x0 x x<br />

= -0 A -n 4<br />

au<br />

0 LL<br />

u C<br />

(Ii<br />

L (<br />

-J x x<br />

ufl C: Q)c<br />

-2 Cl) -<br />

L..L<br />

L (<br />

o<br />

C:<br />

CLCu<br />

'S-<br />

a.aaJ<br />

-M Q<br />

Cr c L uJ<br />

- ul (<br />

Cu Cua- 0 uZI<br />

in:0<br />

E<br />

z<br />

_I_<br />

0<br />

00u<br />

> 0 > 0U C (U Li<br />

C c C M~ '.: L<br />

Li u i c (U (U<br />

L<br />

0 0 C


0o<br />

X xU x<br />

4-J<br />

Cf )<br />

x- i<br />

u c Q<br />

L/)<br />

Q) u<br />

0 C<br />

LL<br />

:3 LI) 4.<br />

) -<br />

Lna<br />

CC<br />

x x> 0<br />

a<br />

a) UJ<br />

x 0>x0 "U 0) (<br />

LJ -- U - 0 C- Ia)


o<br />

Wu<br />

C<br />

w x<br />

U~~c<br />

'?>c:c)<br />

.2~Z<br />

-w x<br />

ub a_ a<br />

>'<br />

-Q)<br />

0) a<br />

L..<br />

00<br />

E<br />

uo CC a<br />

-d 0' wU L<br />

(D (<br />

>~~ 2 -Cu=0J L<br />

u u c 0 -<br />

I- C.p c c Cu U- LU<br />

"Z C) (1A di ' L>(.<br />

Cu Cu2<br />

T<br />

< ) CuQ u c ) L. ) C<br />

0<br />

> o~ Cu<br />

> u> -<br />

mU _0h LU mZ -a___C:_cm<br />

U


a S : 0 1<br />

EE<br />

0) 0 ,awo -<br />

a.~<br />

oa a.wQ a Ca<br />

CC Z<br />

!J a O r S r & r" = ~<br />

w<br />

Ca<br />

z<br />

cC<br />

u<br />

U<br />

2<br />

2I<br />

00<br />

Ch<br />

8~ ~ ~#<br />

m m#.<br />

(L E8<br />

a a99<br />

x ) CC<br />

z C)<br />

09( i<br />

0<br />

.522 0 .0<br />

2 0 -<br />

A ~C 0 ) 0<br />

o ) 2, (D ,== z~ ocM<br />

a. C .) E m:)<br />

a~5 =ltflI~ ~f<br />

0<br />

ar cc U)~~~~f<br />

a9 990 99'<br />

0 C<br />

US<br />

0C88 .0 m888~ 0


I- 0L<br />

z<br />

LU <<br />

0<br />

0<br />

z<br />

z<br />

LU<br />

CD CD 0 0 o 0 00 0 0 0-c<br />

V, ", ; N N QC~ C W < r ~ 0 4ULU 0<br />

a. z a.<br />

0:)> F- j fl 0 0<br />

-0I CLU 0 'U a 1<br />

0<br />

Z U) 0 ) F- 0<br />

w0 . ) 0 0<<br />

- . 4 L 0 0 Z 0<br />

'00 a: >. >- t 2 W - 0 - *-<br />

OfL LU 0 U U.a 0 t L a<br />

9L<br />

w U) CS) a) 0 CL 0<br />

0 >N , ><br />

0 P U) 00 0) 0<br />

0


_____ (3_ -0<br />

__<br />

00 c<br />

CC<br />

) m U) w< D I<br />

0- ai 0 C' 0 aU<br />

C0 C)aC<br />

C? ( n ) c ( ) I<br />

a 0C) 0 0 aC C) N- 0 0-<br />

CC<br />

CD CDC C) CD C? C? CD C) C 0 ND N CD1C<br />

a)~~<br />

CD 0, o)a) a<br />

CDDD.~.C<br />

00 C) 0 00 011 CD 0 0 CD<br />

cn a a, na, a, m (D(nm,6<br />

a, 0 ,a, ( ,C<br />

E5 0 , 000000 0~ a0 a 0 0 0 0<br />

00<br />

0 00 00 00 0 00 0 0 ) )0 4) (DQ D )mmm0m<br />

C(<br />

C4<br />

1 C ) ) C<br />

C)<br />

U) U)<br />

-) -) - - -<br />

0 0 ~ ) C) )~ 00 c 000L<br />

w) w CIS E) E E cm<br />

0~~~~c 0 0 0 0 0 0 0=00 0 0<br />

0 caO t O 0 coU 0 0 >U 0 ) C U) U) PU) U) U) U) < ) U) U) CO >) 0) UC U) U) CU U< -<br />

C)~~C a<br />

a (L acLa , CL a_~~~aa<br />

a-~~a~~a<br />

CLa a-<br />

0) C,)0C<br />

CLao o 0w ~ ~ C co 0 ca w2 06E 3 ~ ' C<br />

U), a0 E -~0 a.U cm U) Ee<br />

ca a u c aC E<br />

< 0 ~~< 0 ~~- w~-i<br />

~.<br />

IL C C CL L CL LL CL U) 00 U)U ;2u U J5<br />

CL<br />

C C , .- b) 00 2 c CoCo Co C) -<br />

cu00 0 CDf Cu U 0<br />

U)) 42 u) o2 oC =<br />

C6 Co U)U)CL<br />

0<br />

C0 M OCL<br />

-> Ua-* o 0~ it C IQ8v o m U) U) CU<br />

C- a<br />

L 0-U) s ( CC - t t (D C<br />

o<br />

C0 2C C C- -).- - o 0)<br />

0'1 0 0 0 ;<br />

2<br />

cm<br />

C U a)UC C N ~ C 0<br />

C0 -J U-<br />

Cj 6 _~ j 0 a, CC- CL E 5. -<br />

I - t4)- -C~<br />

-J o<br />

OZ-<br />

C<br />

;2 - F !<br />

-!<br />

000<br />

-M<br />

)0C f~ n'LfU ) _E C'


E<br />

z<br />

0<br />

0:<br />

Z).<br />

to ID I (D<br />

Z Z<br />

) a) L) U) L) U) a<br />

w c c c ca m<br />

aO) o<br />

-a toU<br />

0a) 4) 93 M(U 4) a o C L L .mmM (Un<br />

a)E 0 n Z3 zEU)<br />

V))C -'2 2 0 20<br />

022<br />

00C C0 L.C 2U &. L<br />

U) -Ra) a) a) a L ) U= a) a) a) ac)a)W ) a<br />

* =0= Em<br />

_<br />

C)C<br />

0 <<br />

-~ a0<br />

LL0 LL U- 0-<br />

U . U L L - U . U- U -U -L LL L L -U- L-U-L L U- L.-~ U. 0- -<br />

0-L<br />

Of2<br />

0: 0: m 0: U<br />

0 ) 00 . a) 0 0<br />

0)0<br />

0 0 U) =<br />

) .2 o --- aE U) CL<br />

00 0 ~ ~ ~(U 0 C) c r-0r v)<br />

c'J<br />

faU(( E~ u) '0a) 0~ .2 .2)UE<br />

0.0.E 0) ._ zz; . n 0 ) 1 *UQl2 ()<br />

2LO ac.<br />

LL<br />

10=<br />

O OUj E*0 '& c (<br />

0~. E~~a0<br />

CCC<br />

000. C .~ S92 ' tm.L<br />

o.-<br />

ClIC 0<br />

M0U cu ca 0 B~ * 0 E0 U ' ca~<br />

0 0 0 cc - -g<br />

-C )~~a<br />

_5 ca - - - ~ cc<br />

UU0 W U L0o;~ 2 E 10 10 0.a<br />

___ ~ L U Z ) . U C O 0 . ( 0 L U (D1 U U ( . . L 0 ) C 0. L


~I 0<br />

I a)<br />

E 0<br />

00<br />

cc<br />

CLC<br />

0 2<br />

0 ,d<br />

0<br />

U) a)<br />

-a<br />

d)<br />

E c<br />

-U - 12) r<br />

0* a0<br />

2 E<br />

a) 0<br />

y<br />

U<br />

-- a)<br />

C)0 c) 1<br />

000<br />

LL L -U - - - - LL - LL -L L L -<br />

~ a) a)<br />

cc cc -' 2 i )<br />

02 Co~<br />

0 a< a) 0 (<br />

m<br />

0~~ .0.2.<br />

aa<br />

E~ a) CUC<br />

0.. 7a E. (9-<br />

) a a a) CL 0<br />

Ca i L) g. gLC CL LL mL wLC ><br />

E<br />

A ) A E<br />

C<br />

4) 0 (-C<br />

m oE 9L CL 0 C<br />

a)6<br />

>,o 00<br />

a0-. a) U CL _j _5 j '<br />

< M<br />

cc N-a),'o = E<br />

E~a a) a)Z<br />

Ia) < ) --<br />

U) C- C-) M I .U.U<br />

a) a.


WCH Closure<br />

WC H <strong>Hanford</strong><br />

Washington<br />

Meeting Minutes<br />

CCN: 148830<br />

JW<br />

WEEKLY PROGRESS REVIEW MEETING C008753AO0<br />

Distribution<br />

11111=0"'M<br />

Christopher L. Beach<br />

EWAN= January 12, 2010 :1<br />

ATENEE<br />

ISTRIUTIO<br />

E. L. Adamson X3-40 S. C. Bentti X3-16<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

L. W. Grossarth X9-08 M. D. Clancy X3-16<br />

J. A. Heard H4-17 B. Collyer (DDI)<br />

W. R. Junkins X3-16 Q. L. Crist X3-16<br />

P. Kennedy (DDI) S. K. DeMers L6-06<br />

S. E. Parnell X3-16 R. A. Dodd H4-24<br />

M. Sherman (DDI) C. Flowers (DDI)<br />

A. S. White (DDI) T. A. Foster N3-30<br />

H. Williams III X3-16 R. Ganapathy X3-40<br />

A. E. Zacharias X3-16 T. M. Greager X3-16<br />

S. J. Henneman X3-16<br />

J. Janosky (Watts)<br />

M. Lapp (DDI)<br />

M. Lighty (DDI)<br />

R. A. Nunamaker X3-16<br />

J. Price (DDI)<br />

D. G. Saueressig N3-30<br />

D. B. Teachout X3-16<br />

J. A. Ware N3-30<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control 1-4-11I<br />

A meeting on the above subject was held on January 12, 2010 at 11I8-K, MO-755.<br />

I. SAFETY<br />

* Safety topic: Freezing roads during cold snaps.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

*DDI and WCH to discuss tank ladder fall protection requirements. DDI to propose providing<br />

JLG, manlift, etc. in process. WCH has this proposal for review. DDI is revising Fall Protection<br />

Plan. When this is complete, they will draft response and proposal to CNOO5. Whitney Sexmith<br />

is competent person for harness inspections. DDI resubmitted CN 005 proposal last week WCH<br />

in review. This is to be completed by 1/28/2010. Discussed diesel tank ladder use.<br />

Z:\Administrative Assistant~roject Progress Review Weekly Meetings\201I0\January\l -12-10 Weekly Progress. doc


Progress Review Meeting<br />

Page 2<br />

" Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCI{. Review and comments to be returned to RDC today. DL)1 incorporating<br />

comments and will resubmit.<br />

" PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC_ concerns and<br />

requests. Currently just waiting on the perm its to be issued by CHPRC. Discussed 150 gpin<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/12010.<br />

" WCH requests the status of the two small buildings-. (CN 007 R.1) Both shacks are- on site.<br />

Occupancy permits have been obtained. Upon completion of the work package JHA, ODI will<br />

schedule electricians to perob the electrical installations. Not yet scheduled, JHA is complete.<br />

* Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating firom an environmental<br />

perspective. ODI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDJ to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to burn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/2 1/2010.<br />

" WCH requests a site absences coverage plan. WCH to give DDI comments, DDI plans to submit<br />

this by 1/21/20 10.<br />

" Discussed safety incentive quarterly payment details. DDI asked if this applied to mobilization,<br />

WCH to follow up. DDI to provide personnel hours, WCH has received.<br />

" WCH requests G-02 hours for December. DOI needs to have these submitted by the P'~ day of<br />

each month. Transmittal back to DDI with status 2 due to mathematical errors inl hours<br />

calculation.<br />

" Discussed the potential upgrade from 2-watt to 4-watt radios. DDI indicated there should be a<br />

trade-in value from existing radios which will help off-set the cost. DDI evaluating quotes<br />

received and licensing potential issues. Also looking into alternatives such as installation of a<br />

repeater versus purchase of new radios. Possible change out this weekend.<br />

" Discussed schedule of monthly LSIT meetings. In addition, discussed how LSIT entries are<br />

managed and addresed. Additional discussion relating to LSIT entry for heating options and<br />

costs for the CTA tent Heaters to be delivered on site 1/13/2010.<br />

" Discussed DDI working to mobilize two haul trucks from ERDF. There is a total of four (4)<br />

needed for site operations. Negotiations about contracts, costs and ownership are in progress.<br />

DDI to work on a proposal and WCHl Procurement will follow up on request. Discussed details<br />

regarding WCH provision of two 22-ton capable haul truck and contract changes that would need<br />

to be made for the 25-ton minimum requirement. DDI to provide their own trucks rather than this<br />

proposal.<br />

" Discussed badging requests recovery of badge and TLD upon termination of employees.<br />

Currently there are two individuals that need to return their badge from DDLi~atts. Discussed<br />

(b)6)TLI) retrieval.<br />

" Discussed positive continuous improvement in POD work pre-evi. Continue to have feedback<br />

from DOE that there needs to be more employee interaction during the work package pre-ev<br />

briefing.<br />

" Shuttle truck cable directions have been requested (ONO 16). WCH to share video tutorial with<br />

DDI. Training using the video will be scheduled by the end of January.


Progress Review Meeting<br />

Page 3<br />

111. PROJECT DESIGN DRAWINGS<br />

*Electrical drawings are in process. Diesel storage tank electrical designs and trailer site electrical<br />

as well as as-built drawings. DDI will be re-submitting drawings which will incorporate WCH<br />

comments.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

* Discussed trench scheduled. DDI plans daily to have two primary sorts, two secondary sorts, and<br />

one load-out for now. DDI has begun work in trench DEP. Will perform two (2) loadouts in the<br />

beginning. After DEP trenches are complete, work will be moved to trench G before starting<br />

trench F.<br />

V. WEEKLY PRODUCTION TABLE<br />

* None.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

* See attached.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

*Electrical work package needs JHA completed before it can be approved. This is should be<br />

complete by the end of today along with Anomaly Response work package revisions.<br />

IX.<br />

MATERIAL<br />

0 None.<br />

X. QUALITY<br />

* WCH QA in process of scheduled assessments.<br />

XI.<br />

XII.<br />

XIII.<br />

XIV.<br />

REQUESTS FOR INFORMATION<br />

* None.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

0 See attached.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

CORRESPONDENCE<br />

* .Letter from DDI: Key Personnel, Patrick Kennedy<br />

" Monthly Industrial Hygiene Data 11 8K Burial Ground Remediation (HASP requirement)<br />

* Letter from DDI: "Employment Eligibility Certification"<br />

* Letter from DDI: Safety Awards Hours<br />

* Weekly Progress Review Meeting Minutes of 1/ 12/2010


Progress Review Meeting<br />

Page 4<br />

XV.<br />

XXI.<br />

IN VOICE AND PAYMENT STATUS<br />

* December invoice has been received and is in review.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* Discussed attention to detail in completion of G-02 form submittals.<br />

* Discussed 9/27/2010 Safety luncheon for meeting safety goals and VPP flag raising.<br />

* Discussed weekly site safety walkdowns to be conducted Wednesdays with craft and supervision<br />

support.<br />

Attachment(s): As noted above.


0<br />

0.<br />

0 D.<br />

> -u<br />

o o C =z a-.<br />

wa<br />

0 0 (3 4-J<br />

4-'<br />

L. a =- E:<br />

Z-o wO<br />

D( 4-1 4-M4-<br />

0 Q- 00<br />

o ><br />

22 ZE<br />

a.. L5<br />

co<br />

w ~.<br />

CY


0<br />

E- 0<br />

.5o<br />

1~ 0<br />

C6<br />

0<br />

Q) a<br />

0)<br />

.o f o-Jo 4 j U 4<br />

4-1O 0 0 +1 0 o ,u 0E<br />

-W o<br />

E<br />

x It<br />

M<br />

'Um40 4 - -I r r<br />

00E<br />

*0.<br />

rqiwC<br />

V


2 x x x x<br />

(A w<br />

C ) U<br />

Ln-C<br />

c<br />

U(<br />

c0<br />

0<br />

u<br />

*0 C L-~<br />

x1<br />

x<br />

U~U<br />

0--<br />

L.L<br />

oo (A<br />

< U<br />

__j<br />

CUU)(<br />

u 0 0 a.<br />

-o<br />

-0 0<br />

(A<br />

C UMWja<br />

- L<br />

xC C 0 0 U<br />

< o LU x o<br />

2 U U


0 V)<br />

E<br />

c-<br />

-,<br />

CL<br />

E<br />

X 42<br />

c<br />

CLL<br />

0<br />

0 O - __<br />

'0-'<br />

-~ ~ E<br />

00 < 1<br />

...<br />

0) (3 -<br />

LI 4 -,<br />

EL<br />

CI 4- w 4<br />

0 - C c c C *;-


C))<br />

E<br />

()W<br />

000<br />

C)(<br />

E<br />

a-<br />

1..4<br />

00<br />

QC <<br />

CO<br />

E<br />

C) L/)<br />

(U~<br />

*o(U<br />

E<br />

g Ln <<br />

4.LrL<br />

C<<br />

41)<br />

m<br />

LnL<br />

-. M- m ZH<br />

Cn E z z<br />

L. Q) aL ( c. .m I4- Lii2<br />

HLH W 0<br />

a) 4 1 Q) 4-, C Ju<br />

-o o mu m L C) m<br />

em I UJJW3 L -J I ~ ~ z


Cr0<br />

- 12 - 0a<br />

8 ~ Q g~ o<br />

0 r 0<br />

:2C z- z 2: z<br />

0 z<br />

0:<br />

I-<br />

8 z<br />

0<br />

0<br />

4) z<br />

c0


~ X3 -/7<br />

ID~t(r- /7<br />

C4<br />

c<br />

&7cz r~,P'-<br />

D7746<br />

.4r ~ / 2 ig//(~


WCH<br />

Closure<br />

<strong>Hanford</strong><br />

Meeting Minutes<br />

WashigtonCCN:<br />

148838<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach 7 > ~K >---<br />

January 26, 2010 "z<br />

E. L. Adamson X3-40 S. C. Bentti X3-16<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Grist X3-16 M. D. Clancy X3-16<br />

R. A. Dodd H4-24 C. Flowers (DDI)<br />

L. W. Grossarth X9-08 T. A. Foster N3-30<br />

J. A. Heard H4-17 R. Ganapathy X3-40<br />

W. R. Junkins X3-16 T. M. Greager X3-16<br />

P. Kennedy (DDI) S. J. Henneman X3-16<br />

S. E. Parnell X3-16 R. A. Nunamaker X3-16<br />

A. S. White (DDI) J. Price (DDI)<br />

H. Williams III X3-16 D. G. Saueressig N3-30<br />

M. Sherman (DDI)<br />

D. B. Teachout X3-16<br />

J. A. Ware N3-30<br />

A. E. Zacharias X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H-4- 11<br />

A meeting on the above subject was held on January 26, 2010 at 11 8-K, MO-755.<br />

1. SAFETY<br />

* Safety topic: Discussed driving in unpredictable and changing weather conditions. When<br />

traveling, make sure to have an emergency kit that is current. Also be watching for debris thrown<br />

up from tires and environmental changes.<br />

1I. ACTION ITEMS FROM LAST MEETING/STATUS<br />

* Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/20 10.<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

Z;\Administrative Assistant\Project Progress Review Weekly Meeflngs\20 l0\lanuary\ 1-26-10 Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/ 14/2010. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permnit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 02/05/2010 or 2/19/20 10.<br />

" Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to bum prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/2010.<br />

" WCH requests a site absences coverage plan. WCH to give DDI comments. DDI plans to submit<br />

this by 1/26/2010.<br />

" WCH requests G-02 hours for December. DDI needs to have these submitted by the 3' d day of<br />

each month. Transmittal back to DDI with status 2 due to mathematical errors in hours<br />

calculation. Discussed attention to detail in completion of G-02 form submittals. DDI is going<br />

back and auditing all the records so that the next submittal will show corrected figures. January<br />

report to be submitted by 2/3/20 10.<br />

* Discussed the potential upgrade from 2-watt to 4-watt radios. DDI indicated there should be a<br />

trade-in value from existing radios which will help off-set the cost. DDI evaluating quotes<br />

received and licensing potential issues. Also looking into alternatives such as installation of a<br />

repeater versus purchase of new radios. Possible change out this weekend. DDI to have two (2)<br />

5-watt radios on-site for testing approximately 1/20/20 10. WCH evaluating plans to implement<br />

5-watt radios.<br />

* Discussed DDI working to mobilize two haul trucks from ERDF. There is a total of four (4)<br />

needed for site operations. Negotiations about contracts, costs and ownership are in progress.<br />

DDI to work on a proposal and WCH Procurement will follow up on request. Discussed details<br />

regarding WCH provision of two 22-ton capable haul truck and contract changes that would need<br />

to be made for the 25-ton minimum requirement. DDI to provide their own trucks rather than this<br />

proposal. DDI plans to have the fourth haul truck onsite, no firm date for arrival. DDI requested<br />

to provide firm date. Discussed Kenworth truck only capable of 22-ton payload. WCH is<br />

pursuing custodianship and lease for additional trucks. The contract will have to be revised to<br />

allow for use of the 22-ton trucks.<br />

* Discussed positive continuous improvement in POD work pre-evs. Continue to have feedback<br />

from DOE that there needs to be more employee interaction during the work package pre-ev<br />

briefing.<br />

* Shuttle truck cable directions have been requested (CNO 16). WCH to share video tutorial with<br />

DDI. Training using the video will be scheduled by the end of January. Training to be held<br />

1/27/2010 Oat 1530 hours.<br />

" Discussed 1/27/20 10 Safety luncheon for meeting safety goals and VPP flag raising.<br />

" Discussed weekly site safety walkdowns to be conducted Wednesdays with craft and supervision<br />

support.<br />

* Discussed Trench I solo remediation planning and subcontractor involvement. DDI will be<br />

requested for feedback during the development process.<br />

* Discussed USQ evaluation of work guiding documents and the 11I8-K safety basis.


Progress Review Meeting<br />

Page 3<br />

111. PROJECT DESIGN DRAWINGS<br />

0 None.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

0 None.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

* See attached.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

IX.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

* None.<br />

XI.<br />

XII.<br />

XIII.<br />

XIV.<br />

XV.<br />

XVI.<br />

REQUESTS FOR INFORMATION<br />

0 None.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

0 See attached.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

CORRESPONDENCE<br />

" Transmittal from DDI: Acceptance of Change Notice 018, Indirect Fired Heaters<br />

* Transmittal to DDI: CN 018, Indirect Fired Heaters<br />

" Transmittal to DDI: CN 0 19, Light Tower at K Avenue and Entrance to 11I8-K- I<br />

* Weekly Progress Review Meeting Minutes of 1/26/2010.<br />

INVOICE AND PAYMENT STATUS<br />

* DDI to submit January.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

0 DDI to provide a plan to access the top of the diesel fuel storage tank.<br />

Attachment(s): As noted above.


a<br />

o<br />

0~ cm<br />

c-<br />

EE<br />

C(. 0 m<br />

UJ<br />

E<br />

.LM~ it 0U.- >2<br />

o -M<br />

L. L<br />

Sz 4 ~<br />

wul<br />

aE<br />

~E<br />

w" L-.<br />

n(<br />

(Ur1<br />

2aCC0C4-e<br />

u_<br />

-eL<br />

E 0 e e ,<br />

LO t 0 M 0 - z~ - mO()~ ~-<br />

ruu u<br />

u<br />

E E+14<br />

:E :E -u- wA -w -<br />

CL


C.M<br />

0. CmI<br />

~Eu<br />

0<br />

C 0<br />

Q0(0W ~~a<br />

coo 6i o- 0 v) r 6 Lmn 6<br />

Q :j 6 LA n E w rN-<br />

X 0 00m 0 0<br />

E<br />

4'


E<br />

da)-<br />

CL<br />

LI)<br />

C<br />

E<br />

V<br />

a) w a)<br />

.0<br />

(U 3<br />

00<br />

o~C __0 -<br />

_<br />

_ a) x xx<br />

(UV2<br />

Gj4J<br />

or.J<br />

I<br />

.~ --<br />

0* r1-<br />

(U-U<br />

u 0 *<br />

(A<br />

cu ~ aa) ~ ~ <<br />

> >0 0<br />

m _0-a<br />

_0 L c<br />

m mu M<br />

:E x x0 x 0<br />

--j j w Lu -- -- j 0<br />

a) -0


E<br />

o-4<br />

x x xx xx >< ) x L<<br />

LL:<br />

a) C:<br />

o CL<br />

4-,<br />

E<br />

0--<br />

o U-<br />

00<br />

0 L-<br />

0'- LL 4.-CJ<br />

-0 0 E<br />

u~ um0 0i<br />

< .0 -a 0<br />

m0 mcl ()<br />

ci)----<br />

x~~ 0<br />

C<br />

L<br />

o0x


0 E<br />

LLn<br />

x<br />

Xa)xx<br />

~~~Ca)<br />

E<br />

UU<br />

a..<br />

0_<br />

C -<br />

_ -~<br />

E<br />

x<br />

000 w<br />

(U(A<br />

LL<br />

L<br />

_ u cLLL -<br />

cu m z<br />

- 5CC 0 0 U<br />

uCu Cu U r k<br />

0.0<br />

4- -11 4-<br />

-~ u M~ u M U M .u<br />

x- o x o ca<br />

rr U -ILL ___ -<br />

_ _


MN T- T- m - M 1<br />

0) 0 000E 2<br />

N<br />

NN-<br />

0~~~0 0 04 0 0 0<br />

w -<br />

a)<br />

a000 0 0 0 0<br />

N a N a C C) ND<br />

N NN N N N N N<br />

cq N N N N N N N N N<br />

r<br />

-N N<br />

C'- ,<br />

00 a_ IL L 0- I IL IL C a<br />

IL c c c c c c c r<br />

z 0) a) a) ) 0) 0) a) 0) 0) 0l<br />

U. Q Q3 Q 0 0 0 02<br />

. C c a c c c C c c<br />

zO 0 0 0 .0 0 .0 .0 0 0 0 I.<br />

.u ) C.) (<br />

-<br />

75


E<br />

O -<br />

76 m<br />

2<br />

006<br />

o2~<br />

01.<br />

Z 0<br />

z<br />

C<br />

-o C<br />

0<br />

us<br />

E~ 5<br />

w zo<br />

o<br />

52 .1 !L 00<br />

8 8 1' QN1 1


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 148841<br />

IWO= WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

February 2, 2010<br />

DISRIBTIO<br />

C. L. Beach X3-16 E. L. Adamson X3-40<br />

Q. L. Crist X3-16 S. C. Bentti X3-16<br />

J . A. Heard H4-17 R. D. Cantwell N3-30<br />

W. R. Junkins X3-16 M. D. Clancy X3-16<br />

P. Kennedy (DDI) R. A. Dodd H4-24<br />

S. E. Parnell X3-16 C. Flowers (DDI)<br />

M. Sherman (DDI) T. A. Foster N3-30<br />

A. S. White (DDI) R. Ganapathy X3-40<br />

H. Williams III X3-16 T. M. Greager X3 -16<br />

L. W. Grossarth X9-08<br />

S. J. Henneman X3-16<br />

R. A. Nunamaker X3-16<br />

J. Price (DDI)<br />

D. G. Saueressig N3-30<br />

D. B. Teachout X3-16<br />

J. A. Ware N3-30<br />

A. E. Zacharias X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control 1-4-1 1<br />

A meeting on the above subject was held on February 2, 2010 at 118-K, MO-755.<br />

I. SAFETY<br />

* Safety topic: Watch for wildlife during commutes now that daylight hours are changing.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

" Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/2010. WCH has received, in preliminary<br />

review.<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Z:\Administrative Assistant~roject Progress Review Weekly Meetings\2010\February\2-2-1O Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/20 10. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010.<br />

" Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to bum prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/2010. DDI requesting<br />

assistance/support with shipping designees.<br />

* WCH requests a site absences coverage plan. WCH to give DDI comments. DDI plans to submit<br />

this by 1/26/2010.<br />

" WCH requests G-02 hours for December. DDI needs to have these submitted by the 3 rd day of<br />

each month. Transmittal back to DDI with status 2 due to mathematical errors in hours<br />

calculation. Discussed attention to detail in completion of G-02 form submittals. DDI is going<br />

back and auditing all the records so that the next submittal will show corrected figures. January<br />

report to be submitted by 2/3/20 10.<br />

* Discussed the potential upgrade from 2-watt to 5-watt radios. DDI indicated there should be a<br />

trade-in value from existing radios which will help off-set the cost. DDI evaluating quotes<br />

received and licensing potential issues. Also looking into alternatives such as installation of a<br />

repeater versus purchase of new radios. Possible change out this weekend. DDI to have two (2)<br />

5-watt radios on-site for testing approximately 1/20/2010. WCH evaluating plans to implement<br />

5-watt radios. Change notice to be issued.<br />

" Discussed DDI working to mobilize two haul trucks from ERDF. There is a total of four (4)<br />

needed for site operations. Negotiations about contracts, costs and ownership are in progress.<br />

DDI to work on a proposal and WCH Procurement will follow up on request. Discussed details<br />

regarding WCH provision of two 22-ton capable haul truck and contract changes that would need<br />

to be made for the 25-ton minimum requirement. DDI to provide their own trucks rather than this<br />

proposal. DDI plans to have the fourth haul truck onsite, no firm date for arrival. DDI requested<br />

to provide firm date. Discussed Kenworth truck only capable of 22-ton payload. WCH is<br />

pursuing custodianship and lease for additional trucks. The contract will have to be revised to<br />

allow for use of the 22-ton trucks. Change notice will be coming from WCH.<br />

" DDI to provide a plan to access the top of the diesel fuel storage tank. DDI confirmed ladder is<br />

on site. Will be meeting with WCH Safety about use and training requirements.<br />

I11. PROJECT DESIGN DRAWINGS<br />

0 DDI to submit revised electrical drawings this week.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

a See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

* None.


Progress Review Meeting<br />

Page 3<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

* See attached.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

*None.<br />

IX.<br />

MATERIAL<br />

* Can liners to be delivered to the site on 2/3/2010.<br />

* Ecology Blocks being delivered to the site 2/2/20 10.<br />

X. QUALITY<br />

0 None.<br />

XI.<br />

XII.<br />

XIII.<br />

XIV.<br />

XV.<br />

XVI.<br />

REQUESTS FOR INFORMATION<br />

0 None.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

CORRESPONDENCE<br />

* Transmittal from DDI: Acceptance of Change Notice 018, Indirect Fired Heaters<br />

* Transmittal from DDI: Acceptance of Change Notice 0 16, Inspection and Maintenance of<br />

Transport/Shuttle Trucks<br />

* Transmittal to DDI: Change Notice 019, Light tower at K Avenue and Entrance to 118-K-i<br />

* Weekly Progress Review Meeting Minutes of 1/26/20 10.<br />

INVOICE AND PAYMENT STATUS<br />

0 DDI to submit January invoice this week.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* Heather Weber was introduced as the new DDI admin assistant.<br />

Attachment(s): As noted above.


oo a)


4a 0<br />

w~ W<br />

a).<br />

cu00<br />

o) 0~ aa a)<br />

4- 4-<br />

4<br />

* 0<br />

-0 rr 0- o 0<br />

4-I4-<br />

E EF<br />

O 0Or ~ O ~<br />

-W 4.5a<br />

FA V)<br />

E ~ Ei


CE<br />

V)<br />

0o<br />

E<br />

a))<br />

U-X<br />

m x xx<br />

00<br />

0). E<br />

x~~ ~ ~<br />

x<br />

QO<br />

le3<br />

CNa<br />

Oo.<br />

X<br />

LO<br />

W U)<br />

0)0<br />

LLC. tCQ U d<br />

LL- C U. U a- 0 0L<br />

-C C= C U0 C :Q C2 C<br />

L. a) 0 0u u-1u<br />

0<br />

(3j<br />

~<br />

) 4 0 0<br />

Q) (n OL >-<br />

+1 4-E+' =<br />

-0 C -0 LU<br />

m0>0>0 +1 E) cu<br />

> uU C U U) mu U ) C a<br />

)< -0) m0 M -0 CL 0 C<br />

I.- LUJ. U .J J L CT=Z,


-4o<br />

E<br />

a- L<br />

CDA<br />

0 oJ<br />

(3 C<br />

0 co<br />

ccii<br />

0<br />

-<br />

E~ 0cV<br />

.X<br />

-<br />

(D<br />

(DE 0o C a)<br />

00<br />

E<br />

Ul-<br />

03 ~ajU<br />

(3 C U- C<br />

Li C U-


E<br />

00 o04<br />

4-,<br />

GJ G<br />

0 L<br />

4-,L<br />

E<br />

U-<br />

4<br />

00<br />

U.1<br />

Lh<br />

Qx<br />

~~~~ U<br />

CUCJ<br />

CU~~<br />

u<br />

W<br />

U LU o<br />

0 > > ro 0L<br />

ox ox 0 1 E<br />

L U aj L)U J U j r. aL- 4- L


- N - - -- I - 0I -1 N N VCI<br />

-) i CS - - 0 0 C D<br />

C0 00 0 000 0 C0<br />

001) ) 0 0<br />

o Z!~~-r !! CN NN N N NNN<br />

S0 000 N)0000 00)<br />

04 -0 Or 00 0 0<br />

C) 0 C<br />

00 000000 00<br />

00 0 0) 0 0) 0 0) 0 0<br />

C-4C1 N N N 1 N 0N 0N N 0N<br />

c )0 N N0 N N N CN N<br />

04 ' N N N N Nq N N N N<br />

C ) - -<br />

0 C.)<br />

0) 6 6l 0 0 6 0<br />

- - -. -. -. -. U -..<br />

- -. -. Ln 0)<br />

a.aCL 0 a .<br />

CL a_ d- .. c . I L 0>C<br />

c c c a c c c c c0<br />

m 0) a) a ) 0 ( 0 CD al a) 0 C 0 N<br />

c c c C c C: c C: c H<br />

z0 co 0 0 0 0 0 0 0 0 0 .)0.<br />

. .6 - -<br />

04<br />

0U 0 0 C) Q 0<br />

0 ( a 0<br />

-<br />

4.0) ><br />

E < < < < < < cu Q<br />

A2C 7 F a(<br />

-F<br />

S co 0~ Q cc<br />

-o a) 0.. a). 0.. ...<br />

D(L 0a))<br />

-<br />

CD CD ( O C ( O C D p<br />

U) -0 -0 ' _0 ' -0 'a HI- co<br />

Co<br />

Co -a-<br />

C C c *C C C.. C: 03 0 CL'<br />

ii C - -<br />

CL~ (D 0 (D 03D CD (U CU aU w 0 C<br />

o<br />

ca<br />

c co c c ' c c c cn)~<br />

-~~~~c ) .. 2U ~.<br />

0 0 0 .-..<br />

C<br />

0 C 1c3c- c~ _0_.<br />

_0 _ CL 0 .<br />

L ) - Co3))a _<br />

a ) 0) C 0)<br />

C<br />

ob 0 0 0 C OL0 0 0 0 0 O -If 0 r 00<br />

> 000i99E99<br />

M - - r -r o - -r ntl)U 0.<br />

0 M ~)~<br />

r -0 0 0 0 0: 0 0- 0 000 00 000LEf E000<br />

0) 0 0 0 "0 0 0 9) 0 000 00 00 0 0<br />

C A CD Q) 0 2 ) tO ( ) ) D tO ) LO0)) ) A? N N N C')C') 0 N<br />

0 ) .0 0 0 0 0 1 0 0 0 0 000 00 000000 N


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 148849<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

February 9, 20 10<br />

ATEDE<br />

DISRIBTIO<br />

E. L. Adamson X3-40 S. C. Bentti X3-16<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

L. W. Grossarth X9-08 M. D. Clancy X3-l6<br />

J. A. Heard H4-17 Q. L. Crist X3-16<br />

S. J. Henneman X3-16 R. A. Dodd H4-24<br />

W. R. Junkins, X3-16 C. Flowers (DDI)<br />

P. Kennedy (DDI) T. A. Foster N3-30<br />

S. E. Parnell X3-16 R. Ganapathy X3-40<br />

A. S. White (DDI) T. M. Greager X3-16<br />

H. Williams III X3-16 R. A. Nunamaker X3-16<br />

J. Price (DDI)<br />

D. G. Saueressig N3-30<br />

M. Sherman (DDI)<br />

D. B. Teachout X3-16<br />

J. A. Ware N3-30<br />

A. E. Zacharias X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H44- 11<br />

A meeting on the above subject was held on February 9, 2010 at 118-K, MO-755.<br />

1. SAFETY<br />

* Safety topic: Discussed reporting safety incidents and injuries.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/2010. WCH has received, in preliminary<br />

review.<br />

" PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

C:\Documents a nd Settings~cbeach\Local Settiiigs\Temnporary Internet Files\OLK I 07\2-9- 10 Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/2010. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete.<br />

* Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to burn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/2010. DDI requesting<br />

assistance/support with designations. WCH in review, WCH support DDI with required<br />

designations.<br />

" WCH requests a site absences coverage plan. WCH to give DDI comments. DDI plans to submit<br />

this by 1/26/20 10. WCH to provide review and comments.<br />

" Discussed the potential upgrade from 2-watt to 5-watt radios. DDI indicated there should be a<br />

trade-in value from existing radios which will help off-set the cost. DDI evaluating quotes<br />

received and licensing potential issues. Also looking into alternatives such as installation of a<br />

repeater versus purchase of new radios. Possible change out this weekend. DDI to have two (2)<br />

5-watt radios on-site for testing approximately 1/20/20 10. WCH evaluating plans to implement<br />

5-watt radios. Change notice to be issued. DDI to provide 5-watt radios for the site.<br />

* Discussed DDI working to mobilize two haul trucks from ERDF. There is a total of four (4)<br />

needed for site operations. Negotiations about contracts, costs and ownership are in progress.<br />

DDI to work on a proposal and WCH Procurement will follow up on request. Discussed details<br />

regarding WCH provision of two 22-ton capable haul truck and contract changes that would need<br />

to be made for the 25-ton minimum requirement. DDI to provide their own trucks rather than this<br />

proposal. DDI plans to have the fourth haul truck onsite, no firm date for arrival. DDI requested<br />

to provide firm date. Discussed Kenworth truck only capable of 22-ton payload. WCH is<br />

pursuing custodianship and lease for additional trucks. The contract will have to be revised to<br />

allow for use of the 22-ton trucks. Change notice will be coming from WCH. DDI to return<br />

acceptance of change notice prior to mobilizing these trucks.<br />

* DDI to provide a plan to access the top of the diesel fuel storage tank. DDI confirmed ladder is<br />

on site. Will be meeting with WCH Safety about use and training requirements prior to<br />

developing and implementing a plan for utilization.<br />

I11. PROJECT DESIGN DRAWINGS<br />

* None.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

* None.<br />

VI.<br />

MANPOWER<br />

* See attached.


Progress Review Meeting<br />

Page 3<br />

VII.<br />

VIII.<br />

IX<br />

EQUIPMENT<br />

0 See attached.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

0 Discuss Work Package controls for loading different capacity can/truck combinations.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

* None.<br />

XI.<br />

XII.<br />

XIII.<br />

XIV.<br />

XV.<br />

XVI.<br />

REQUESTS FOR INFORMATION<br />

* None.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

CORRESPONDENCE<br />

0 Weekly Progress Review Meeting Minutes of 2/9/2010.<br />

INVOICE AND PAYMENT STATUS<br />

0 None.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* Discussed contract flow down to sub-tiers.<br />

* Discussed sub-tier change of comment.<br />

" Monday, February 15 1his a holiday (Presidents Day) no on-site operations.<br />

* Discussed need to have project scheduler on site weekly.<br />

" Discussed use of soil pad-in materials.<br />

" Discussed implementing a more detailed briefing on Work Package and Technical Procedures<br />

each day in the POD starting next week.<br />

Attachment(s): As noted above.


a.C,<br />

0<br />

*03<br />

3: E<br />

4) < ~5~<br />

L 1<br />

00~~ . ~ c i<br />

~ LnlC(<br />

o E<br />

0uC Z -<br />

coo<br />

uCu<br />

E 0 - - le -y e -<br />

L -<br />

(n w = - = . =-.v U U<br />

4) rCU C n (4 _


.~<br />

0.<br />

'ui .0 z<br />

--<br />

4) 0) 'a<br />

Ow<br />

a) p 12A :I~<br />

050 0<br />

f A -<br />

a)a<br />

1 '(D0 0<br />

CU<br />

C<br />

4.6 4-1<br />

M<br />

w


cc u<br />

1tn 1 40<br />

~ ~f 125<br />

I I i<br />

S< ' ~ -(<br />


k14~ri IOrn J2 A//3<br />

> ell Pk 3 -1,


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 148850<br />

lag= WEEKLY PROGRESS REVIEW MEETING C008753AO0<br />

Distribution<br />

Christopher L. Beach<br />

February 16, 2010<br />

C. L. Beach X3-16 E. L. Adamson X3-40<br />

Q. L. Grist X3-16 S. C. Bentti X3-16<br />

L. W. Grossarth X9-08 R. D. Cantwell N3-30<br />

J. A. Heard H14-17 M. D. Clancy X3-16<br />

P. Kennedy (DDI) R. A. Dodd 114-24<br />

S. E. Parnell X3-16 C. Flowers (DDI)<br />

M. Sherman (DDI) T. A. Foster N3-30<br />

A. S. White (DDI) R. Ganapathy X3 -40<br />

H. Williams III X3-16 T. M. Greager X3-16<br />

S. J. Henneman X3-16<br />

W. R. Junkins X3-16<br />

R. A. Nunamaker X3-16<br />

J. Price (DDI)<br />

D. G. Saueressig N3 -3 0<br />

D. B. Teachout X3-16<br />

J. A. Ware N3-30<br />

A. E. Zachanias X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H14-11I<br />

A meeting on the above subject was held on February 16, 2010 at 118-K, MO-755.<br />

1. SAFETY<br />

* Safety topic: Discussed emergency response calling 911, and emergency preparedness.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/2010. WCH has received, in preliminary<br />

review, will return this week.<br />

" PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Z:\dmninistrative Assistant~roject Progress Review Weekly lveetings\2010\February\2-16-1O Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/20 10. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 1 00-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in.<br />

" Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to bumn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/20 10. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning.<br />

* WCH requests a site absences coverage plan. WCH to give DDI comments. DDI plans to submit<br />

this by 1/26/2010. WCH to provide review and comments.<br />

" Discussed the potential upgrade from 2-watt to 5-watt radios. DDI indicated there should be a<br />

trade-in value from existing radios which will help off-set the cost. DDI evaluating quotes<br />

received and licensing potential issues. Also looking into alternatives such as installation of a<br />

repeater versus purchase of new radios. Possible change out this weekend. DDI to have two (2)<br />

5-watt radios on-site for testing approximately 1/20/20 10. WCH evaluating plans to implement<br />

5-watt radios. Change notice to be issued. DDI to provide 5-watt radios for the site.<br />

" Discussed DDI working to mobilize two haul trucks from ERDF. There is a total of four (4)<br />

needed for site operations. Negotiations about contracts, costs and ownership are in progress.<br />

DDI to work on a proposal and WCH Procurement will follow up on request. Discussed details<br />

regarding WCH provision of two 22-ton capable haul truck and contract changes that would need<br />

to be made for the 25-ton minimum requirement. DDI to provide their own trucks rather than this<br />

proposal. DDI plans to have the fourth haul truck onsite, no firm date for arrival. DDI requested<br />

to provide firm date. Discussed Kenworth truck only capable of 22-ton payload. WCH is<br />

pursuing custodianship and lease for additional trucks. The contract will have to be revised to<br />

allow for use of the 22-ton trucks. Change notice will be coming from WCH for the 22-ton<br />

trucks. DDI to return acceptance of change notice prior to mobilizing these trucks. DDI is in the<br />

process of bringing these trucks on site.<br />

* DDI to provide a plan to access the top of the diesel fuel storage tank. DDI confirmed ladder is<br />

on site. Will be meeting with WCH Safety about use and training requirements prior to<br />

developing and implementing a plan for utilization.<br />

* Discussed use of soil pad-in materials. Need to minimize the materials being introduced into the<br />

trenches.<br />

" Discussed implementing a more detailed briefing on Work Package and Technical Procedures<br />

each day in the POD starting next week<br />

111. PROJECT DESIGN DRAWINGS<br />

* None.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE


Progress Review Meeting<br />

Page 3<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

* None.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

* See attached.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* Discuss work controls for loading different capacity can/truck combinations.<br />

IX.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

0 None.<br />

XI.<br />

XII.<br />

XIII.<br />

XIV.<br />

XV.<br />

XVI.<br />

REQUESTS FOR INFORMATION<br />

* None.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

*See attached.<br />

CORRESPONDENCE<br />

" Transmittal from DDI: Acceptance of Change Notice 022, Heavy Shuttle Trucks loaned<br />

* Transmittal from DDI: Acceptance of Change Notice 020, Radios, Exhibit D & E modifications<br />

" Change Notice 009 Exhibit G Rev 1 to DDI<br />

* Weekly Progress Review Meeting Minutes of 2/16/2010.<br />

INVOICE AND PAYMENT STATUS<br />

* January invoice was paid last week, including safety incentive.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* DDI will be shutting down 30-minutes early today for a management meeting in town.<br />

* Discussed application of fixative to areas where it is needed for dust control only. Soil crusting<br />

agent should not be applied to the haul roads and CTA. Do not apply fixatives or other water<br />

additives to vegetated areas.<br />

Attachment(s): As noted above.


Q1I ~C<br />

LU<br />

(D E<br />

(n 0 En a<br />

0 Z - a)ML<br />

w*D .0 I<br />

C 9 C<br />

o 0f<br />

0( Z<br />

E<br />

~ 50<br />

cc (D<br />

'-w<br />

EU<br />

E<br />

0 0 rf 4 -Z - d~- _ UU<br />

Cu~~~ CU uU~I ~ .<br />

E +E + .jC


0)<br />

0--<br />

T 0~c)L<br />

a.<br />

%-QI<br />

o0 Q)0<br />

I<br />

UU<br />

4- 44<br />

4<br />

m<br />

0<br />

-W m cm -om<br />

-"=~n<br />

m 0)z 00 mL Cc a<br />

+x 0 -4 a) >.<br />

.0 i<br />

E<br />

00<br />

E<br />

4-a 4-0<br />

LU<br />

WU


3 0 2CL<br />

z<br />

C,9j 55 -6~<br />

02O<br />

2~9~ C9<br />

0<br />

z<br />

z<br />

z<br />

az'<br />

7E50<br />

44-<br />

o<br />

z ~ ~t~ 0 E<br />

z~V.4 ' ' Nb o tC'0 0 00 . 0<br />

Vo


000000 O~ 0000 0 0 0) 0) 0<br />

ao a<br />

0a0a 0~0 C)o 0<br />

C) 0<br />

00 0 40 C)<br />

C) C<br />

0 N 04~ aN aNNN4 04 0 N 0 N Cl 0<br />

Q - N C'4 - -<br />

- -O<br />

0 0 0 0 01 01 0 0 0<br />

LU<br />

0<br />

04 (0 c0 N ' C'J N CN 4 N1 4<br />

00 a- (0 0- C0 0 M<br />

CL >) >. L L L. L L. L t.<br />

C, C : c c c<br />

z5 C4 .0 0 .) ) .0) .) ) .) .()<br />

0 _ g) g,<br />

0o- NO n 01 0) 0) co 01 (0 C<br />

CD~~ 04 01 0) 0) 01 0 01 0 0<br />

a.D 0CDC 0~<br />

Z ( 4 (L~. 0 - 0 0* 04 0<br />

C-4L~c<br />

oL<br />

~4) 0 0))U 0<br />

En<br />

C-) .2 C) C0) 2 Cq . 0 Q) .9 2 . A<br />

2 4) ) 0a 0CD<br />

70 -0 40 -0<br />

U) a:oc E l E~ E0<br />

cc -S S.S cc 0~ 2-o -a -o -a 70 7 -0<br />

27<br />

rn 0 - - - c a - cC - -<br />

C: ND mC= 0 a 0<br />

- C=) 0 0<br />

EE* 5 5 u.-<br />

S 04 -(a ia -a 75 'F - - 75 Fo :<br />

U ) 0 A.. - O O O t I O O I


00 0 (1400 ~~~~C 0<br />

CCo<br />

(N<br />

C) 0<br />

o ~ o0 ~ c)c 83 N 0<br />

04 N 2! (N Q<br />

-<br />

00 4 24 CN4~4<br />

U a) (A U) aj) 0) (A<br />

0~- .~ E) .T ? T<br />

CL o a a w (a (a -c<br />

t_ 0. 0. 0. 0 0 0.E<br />

zo wf A:: () Ui) (n~ (j)<br />

uj C1 < c<br />

.0 .0 0 0 0 0<br />

.0 0 0 D<br />

06 < < D<br />

-a -i 75 75 -c -5<br />

C4 i U) (a 2~U<br />

a C C CC %C<br />

-T i2 - 5<br />

03 )Q )- 0_ (L 0) CM 0> 0 a-<br />

u a) (.) 0) 0 4 aa<br />

0 M0 a0 a 0 0 0. 0 00<br />

-F


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 149655<br />

EVNV4---41WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

February 23, 2010 4<br />

DISTRBUTIO<br />

C. L. Beach X3-16 E. L. Adamson X3-40<br />

Q. L. Grist X3-16 R. D. Cantwell N3-30<br />

L. W. Grossarth X9-08 R. A. Dodd 1-4-24<br />

J. A. Heard H4-17 C. Flowers (DDI) X3-17<br />

W. R. Junkins X3-16 T. A. Foster N3-30<br />

P. Kennedy (DDI) R. Ganapathy X3-40<br />

S. E. Parnell X3-16 D. B. Teachout X3-16<br />

D. G. Saueressig N3-30 J. A. Ware N3-30<br />

M. Sherman (DDI) X3-17 A. S. White (DDI) X3-17<br />

H. Williams III X3-16 A. E. Zacharias X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H14-11<br />

A meeting on the above subject was held on February 23, 20 10 at 11 18-K, MO-755.<br />

I. SAFETY<br />

Safety topic: Discussed checking equipment before beginning use, this can be applied both at<br />

home and on the job.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/2010. WCH has received, in preliminary<br />

review, will return this week. WCH returned to DDI, status 2, with comments.<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/2010. Still waiting on permits from CHPRC.<br />

Z:\Administmative Assistant\Project Progress Review Weekly Meetings\2010\February\2-23-lO Weekly Progressdoc


Progress Review Meeting<br />

Page 2<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 1 00-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending.<br />

* Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to bum prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/2010. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning.<br />

* WCH requests a site absences coverage plan. WCH to give DDI comments. DDI plans to submit<br />

this by 1/26/2010. WCH to provide review and comments. DDI to resubmit incorporating WCH<br />

feedback.<br />

* Discussed the potential upgrade from 2-watt to 5-watt radios. DDI indicated there should be a<br />

trade-in value from existing radios which will help off-set the cost. DDI evaluating quotes<br />

received and licensing potential issues. Also looking into alternatives such as installation of a<br />

repeater versus purchase of new radios. Possible change out this weekend. DDI to have two (2)<br />

5-waif radios on-site for testing approximately 1/20/20 10. WCH evaluating plans to implement<br />

5-waif radios. Change notice to be issued. DDI to provide 5-watt radios for the site. Radios<br />

should be on-site tomorrow.<br />

* Discussed DDI working to mobilize two haul trucks from ERDF. There is a total of four (4)<br />

needed for site operations. Negotiations about contracts, costs and ownership are in progress.<br />

DDI to work on a proposal and WCH Procurement will follow up on request. Discussed details<br />

regarding WCH provision of two 22-ton capable haul truck and contract changes that would need<br />

to be made for the 25-ton minimum requirement. DDI to provide their own trucks rather than this<br />

proposal. DDI plans to have the fourth haul truck onsite, no firmn date for arrival. DDI requested<br />

to provide firm date. Discussed Kenworth truck only capable of 22-ton payload. WCH is<br />

pursuing custodianship and lease for additional trucks. The contract will have to be revised to<br />

allow for use of the 22-ton trucks. Change notice will be coming from WCH for the 22-ton<br />

trucks. DDI to return acceptance of change notice prior to mobilizing these trucks. DDI is in the<br />

process of bringing these trucks on site. DDI will be bringing a 6 th truck on site to serve as a<br />

backup.<br />

" DDI to provide a plan to access the top of the diesel fuel storage tank. DDI confirmed ladder is<br />

on site. Will be meeting with WCH Safety about use and training requirements prior to<br />

developing and implementing a plan for utilization. DDI plans to construct scaffolding with<br />

handrails to access top of tank. WCH will be issuing a new scaffolding procedure soon and will<br />

incorporate any potential changes or impacts to the subcontractor.<br />

" Discussed application of fixative to areas where it is needed for dust control only. Soil crusting<br />

agent should not be applied to the haul roads and CTA. Do not apply fixatives or other water<br />

additives to vegetated areas.


Progress Review Meeting<br />

Page 3<br />

111. PROJECT DESIGN DRAWINGS<br />

*WCH return electrical and traffic control drawings to DDI, status 2. DDI will be resubmitting<br />

soon incorporating the WCH comments.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

0 See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

*A Process Improvement meeting will be held with both key DDI and WCH personnel in<br />

attendance.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

* See attached.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

0 None.<br />

IX.<br />

MATERIAL<br />

* DDI will be providing calcium chloride for the water system when it is operational.<br />

X. QUALITY<br />

* None.<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

* None.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE<br />

" Transmittal from DDI: Acceptance of Change Notice 02 1, Exhibit G Bottle Cart Checklist<br />

" Transmittal from DDI: Acceptance of Change Notice 015, 2-days of Delay<br />

" Transmittal from DDI: Acceptance of Change Notice 007 Rev. 1, Provide two temporary<br />

buildings<br />

" Transmittal from DDI: Proposal for Change Notice 020<br />

* Weekly Progress Review Meeting Minutes of 2/23/2010<br />

INVOICE AND PAYMENT STATUS<br />

* February 19 'h was the month close, DDI to submit invoice.<br />

OTHER COMMENTS/NEW ACTION ITEMS


Progress Review Meeting<br />

Page 4<br />

* DDI to begin thinking about ideas to facilitate truck washing in order to make complete<br />

equipment inspections.<br />

* DDI needs to have more oversight in the field from management staff on a consistent basis to<br />

better coordinate work evolution, starts, stops and transitions.<br />

Attachment(s): As noted above.


4**j 0t L -4 rq<br />

(J- ><br />

0 c<br />

o<br />

0~<br />

LL<br />

z- ow<br />

4 0 i0<br />

17 C(L, 0<br />

D~ ~u<br />

00 o2<br />

WO<br />

co<br />

-~ 0)<br />

-1- 4-41ww< w<br />

aE: LM n--- -a .<br />

-1-- 4-W- 4 U 4<br />

(U<br />

LE<br />

0(A Lo. L. L CC Lj


0<br />

0<br />

0<br />

CD)<br />

0 -o<br />

o<br />

Uo<br />

-o~<br />

a)Lf<br />

U) -0z I U<br />

.mw<br />

E<br />

0 20<br />

0<br />

'I--<br />

~co<br />

-- h<br />

CO ) (D -a W W ~~U )U<br />

m. - 0 -<br />

"a ~ 4 I0 4 O I? 0o<br />

LU -1 -j x _j<br />

>, F, a)~ ina, )<br />

I. -1 0 = 0*-t -<br />

2F<br />

E<br />

EU<br />

*1-' .10<br />

E


o 2<br />

LL)<br />

C)0 E<br />

LL<br />

IL I-U .<br />

4) CUtU<br />

00<br />

U. )<br />

u) E24 -<br />

- r4 6 X 4,<br />

U) LL<br />

0% C U<br />

00 0<br />

Ac9C.<br />

(U-. - - _ ___ __ _ _ E<br />

0 2 j<br />

w,<br />

LL.<br />

40 V<br />

LL c


C)C<br />

E<br />

0 2<br />

(u-<br />

)<br />

IL.<br />

I- C CU<br />

0 LL -<br />

0- -a<br />

w 4- -<br />

-02<br />

00<br />

cc<br />

DLL4<br />

V-4c<br />

'- I-<br />

-a _ _ _<br />

__j*j<br />

LLI c c ), L<br />

LL m<br />

u~ a-o 2 z z<br />

5 -5c a CL 0 0QL<br />

a) "c)Cu)<br />

C-<br />

COuC<br />

C- CC0 0 0 a_<br />

W W 4- 1 U 4 1. (D 4-j 1<br />

x o x 0 x0L


o<br />

E<br />

x~~~<br />

xx<br />

xx<br />

-<br />

4-,<br />

C) E<br />

X<br />

U<br />

a.I<br />

0 a- LL<br />

I.-<br />

-~ E<br />

Ln<br />

CC CD U)<br />

(0 0 a .<br />

E<br />

-I<br />

X<br />

000 CU<br />

0 a.<br />

-j U LL- C: ,<br />

-0 CLJJL:5 cj 5( -1<br />

C: LU j C c -0'4 ( .2 U<br />

HU) c I<br />

u L) L W W.. 4--LI U)4U-<br />

-C C: 0 0<br />

0 V)<br />

4-J =L +J 4)<br />

=<br />

> 0>0>0 ' cu<br />

mo -a CZu U)CLz<br />

- o u Mr u mUU w U) wU<br />

x. 0 Ox 0 OL..<br />

0 3.U<br />

rv i __.ju I...j L .I L 4 CV M Z


LL<br />

0<br />

0<br />

0 c0<br />

10 C<br />

00<br />

- 0<br />

CD)<br />

00<br />

C)<br />

0<br />

o<br />

z<br />

.o 0 C4 0b A0 0 ~<br />

h0_<br />

C4, N N~ 0. 0<br />

r- .~ r4<br />

00<br />

* .m<br />

0,0<br />

U)M 0<br />

U)0 0j<br />

0 0' ><br />

EC<br />

n<br />

2 0 0<br />

C3 0 0<br />

~ 0 0 '0 0 0 0 0 0 00


2<br />

2<br />

0'a<br />

Occ<br />

2taI'a<br />

~~~~~~ A1 6. a j a a<br />

mm a 21<br />

z - 0 0<br />

22C<br />

27<br />

5 4 2 2rr


:t00 0000 0S 0 0n 0s56 0 0Q0o 0 0 0<br />

U)<br />

~CN 0C4 (C104N N N (N 04 C14<br />

M lC)m ~ C 0 0 )~ )C 0 0 0)<br />

C0 0 ; 83.:)8<br />

cl0C)4.'qNNC~ 1 0 0 0D<br />

0(0N<br />

04~~( N i<br />

(N!<br />

0 ) 0 0 0 0 0 000<br />

00 0 0 0) 0 0) 0 0 0 0) - a<br />

N N* N4 N1 CN 0 N 04 04 (N 0N<br />

0 0<br />

-U -~ - -.. ( N (N4 N<br />

(N Cj (1 N 04 NN<br />

N (N -C 04<br />

ON C a a<br />

(j) 04a) a<br />

>. CL a- C (I a- CL C C LLL<br />

z C) 0 0) .0 .0) .0 0) 0) _) .2 -t<br />

Fn Fn 75 U) Z5 U ) FA C66 C6 0 0<br />

CN (a) a2) 3) a2) a) a1) 4) a) a) C o<br />

j0 C 0)60 0 0 0 0 0 0 0 0 0CLO<br />

C*4CL )-C C: C C: c c C: c aC 2<br />

z) C C) C .<br />

Cl) C U))<br />


S00 00~<br />

0 00C<br />

04<br />

0 ) 00<br />

o) C) CD<br />

00<br />

G) 0)8 0N<br />

ou -<br />

0 E<br />

Ca a)<br />

.2 0<br />

E' -ff 0<br />

cZ 0<br />

0<br />

o<br />

CC<br />

0n<br />

(jLn<br />

c 0)<br />

0 2 -0<br />

a)0 0)mc',><br />

Eu<br />

(D C 0C<br />

> ca<br />

(n a)C<br />

> L> o<br />

0) -)<br />

CL<br />

0)<br />

-'<br />

__ WOW<br />

000< 0 00<br />

E2 99 99 5<br />

'I- 0 04 0(


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 149657<br />

I@SZMWEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

March 2, 2010<br />

C. L. Beach X3-16 E. L. Adamson X3-40<br />

Q. L. Crist X3-16 R. D. Cantwell N3-30<br />

L. W. Grossarth X9-08 R. A. Dodd H4-24<br />

J. A. Heard H4-17 C. Flowers (DDI) X3-17<br />

W. R. Junkins X3-16 T. A. Foster N3-30<br />

P. Kennedy (DDI) R. Ganapathy X3-40<br />

S. E. Parnell X3-16 D. G. Saueressig N3-30<br />

A. S. White (DDI) X3-17 M. Sherman (DDI) X3-17<br />

H. Williams III X3-16 D. B. Teachout X3-16<br />

J. A. Ware N3-30<br />

A. E. Zacharias X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4- 11<br />

A meeting on the above subject was held on March 2, 2010 at 1 18-K, MO-755.<br />

DITR<br />

UTO<br />

1. SAFETY<br />

0 Safety topic: Discussed BBQ and propane use safety.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

" Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/2010. WCH has received, in preliminary<br />

review, will return this week. WCH returned to DDI, status 2, with comments. DDI will be<br />

doing a walkdown with Mr. Teachout to incorporate comments and will resubmit drawings for<br />

approval.<br />

" PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permnit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currentlyjust waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permnits scheduled to be complete by 1/14/20 10. Still waiting on permits from CHPRC.<br />

Z:'Administrative Assistant\Project Progress Review Weekly Meetings\2010\March\3-2-lO Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/20 10. Excavation permit is<br />

complete. Discussed that 1 00-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/20 10. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010.<br />

" Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to burn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/2010. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning. DDI to submit revised OMP this week.<br />

* WCH requests a site absences coverage plan. WCH to give DDI comments. DDI plans to submit<br />

this by 1/26/20 10. WCH to provide review and comments. DDI to resubmit incorporating WCH<br />

feedback. DDI will resubmitted this week.<br />

* Discussed DDI working to mobilize two haul trucks from ERDF. There is a total of four (4)<br />

needed for site operations. Negotiations about contracts, costs and ownership are in progress.<br />

DDI to work on a proposal and WCH Procurement will follow up on request. Discussed details<br />

regarding WCH provision of two 22-ton capable haul truck and contract changes that would need<br />

to be made for the 25-ton minimum requirement. DDI to provide their own trucks rather than this<br />

proposal. DDI plans to have the fourth haul truck onsite, no firm date for arrival. DDI requested<br />

to provide firm date. Discussed Kenworth truck only capable of 22-ton payload. WCH is<br />

pursuing custodianship and lease for additional trucks. The contract will have to be revised to<br />

allow for use of the 22-ton trucks. Change notice will be coming from WCH for the 22-ton<br />

trucks. DDI to return acceptance of change notice prior to mobilizing these trucks. DDI is in the<br />

process of bringing these trucks on site. DDI will be bringing a 6 Ih truck on site to serve as a<br />

backup.<br />

* DDI to provide a plan to access the top of the diesel fuel storage tank. DDI confirmed ladder is<br />

on site. Will be meeting with WCH Safety about use and training requirements prior to<br />

developing and implementing a plan for utilization. DDI plans to construct scaffolding with<br />

handrails to access top of tank. WCH will be issuing a new scaffolding procedure soon and will<br />

incorporate any potential changes or impacts to the subcontractor. DDI will be installing a ladder<br />

and tie-off point next week. WCH will need to have the tie-off point inspected by a qualified<br />

person prior to use.<br />

* Discussed application of fixative to areas where it is needed for dust control only. Soil crusting<br />

agent should not be applied to the haul roads and CTA. Do not apply fixatives or other water<br />

additives to vegetated areas.<br />

* DDI will be providing calcium chloride for the water system when it is operational. Before<br />

Trench K is opened up, DDI to have calcium chloride on site for dust control. DDI to look into<br />

utilizing Dust Bond in trenches K, N, 0 and I.<br />

* DDI evaluating a location for truck washing. This will be coordinated with the WCH EPL.<br />

" DDI needs to have more oversight in the field from management staff on a consistent basis to<br />

better coordinate work evolution, starts, stops and transitions.


Progress Review Meeting<br />

Page 3<br />

111. PROJECT DESIGN DRAWINGS<br />

*WCH return electrical and traffic control drawings to DDI, status 2. DDI will be resubmitting<br />

soon incorporating the WCH comments.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

a See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

*A Process Improvement meeting will be held with both key DDI and WCH personnel in<br />

attendance.<br />

VI.<br />

VII.<br />

VIII.<br />

IX.<br />

MANPOWER<br />

a See attached.<br />

EQUIPMENT<br />

0 See attached.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* There will need to be a work package created for the installation of the tank ladder and fall<br />

protection for the ladder use.<br />

* DDI to evaluate work package and JHA needs to the water system installations.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

*Any time an "IF" is written, an SDR will be generated. DDI should expect to receive a SDR<br />

regarding the shuttle truck submittals and RWP requirements.<br />

XI.<br />

XII.<br />

XIII.<br />

XIV.<br />

XV.<br />

XVI.<br />

REQUESTS FOR INFORMATION<br />

* None.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

0 See attached.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

0 See attached.<br />

CORRESPONDENCE<br />

* Transmittal from DDI: Acceptance of Change Notice 015, 2-days of Delay<br />

* Transmittal from DDI: Proposal for Change Notice 020<br />

" Weekly Progress Review Meeting Minutes of 2/23/2010<br />

INVOICE AND PAYMENT STATUS<br />

0 Invoice has been signed off and should be paid this week.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

a ERDF will be having a stand down of sorts today beginning around 9:30 a.m. until approximately


Progress Review Meeting<br />

Page 4<br />

noon. This may affect deliver/pick-up of cans.<br />

* DDI asked if the issue regarding a scaffolding competent person has been resolved. WCH Safety<br />

Rep to follow up on any additional approvals that are required.<br />

* Discussed pre-excavation survey point limitations. DDI to have surveyors out to the site to<br />

review to ensure excavation limits are captured in the Pre-Excavation surveys.<br />

* Trench "I" planning and discussions are underway. DDI has not yet received any feedback from<br />

Rowand regarding bucket dimensions, spec sheet, cameras, etc. DDI to provide this information<br />

by Monday, 3/18/2010.<br />

" Discussed the utilization of Doug Bowers on SCBA. It is expected that this is a DDI function.<br />

Explained that DDI is to provide equipment for these types of entries. But, with that said, WCH<br />

will do everything it can to support these tasks as necessary.<br />

* DDI is to identify and establish a container dumping area. This will be coordinated with the<br />

WCH EPL.<br />

Attachment(s): As noted above.


04Q<br />

04 04 Q00 04 00 00 00 C04 04 0<br />

) CD _ 0 -) _ _ --<br />

C_<br />

_<br />

I- N N o [) N 0N<br />

4) - 0 -- )<br />

C)C )0 0 0 0 0 0 0) 0<br />

C0 !Z4 0 - -- - - o- - - - 0<br />

U) 04 0<br />

0 00<br />

0 0)<br />

> S a_ CL ( IL IL CL C<br />

0) O c a C: c c c c a c U) IL<br />

z NOl 0) 0) 0) 0) 0) 0) 0) 0) ) 0<br />

NO () a) al) al l) (1) ) 0 C<br />

0 CL C) 'm<br />

C C C C a<br />

mo a a a a a a a a 0 L<br />

ZCO 0) >.. 0 000000.<br />

0<br />

CD- < ) 0 Co ->1 --<br />

co Cl<br />

r m > )4 > 0 (D () 0 co 40 0 C tn (Cl 0) a) (Cl 0n a N 0n ()<br />

~a) 4)~~ w N) C)<br />

." oo a) a) - D "a N. O<br />

0: 0 0 0 Q0 0 N<br />

a)9 M C C0 C: a 0 00Q 0 0D 0 DwC 0 0 0D 0 oM 00<br />

fltLoc<br />

COt 0NN 5 - 1 - F- F- - - cc<br />

0000 0 0 0D 0 0 0 0 0 0- 0 0 0<br />

CUO 000000 0 0 )U 0) 0 0 u0 0 0)<br />

0 0 N<br />

000 0000000C<br />

----------------------------------------------------------------<br />

0 M0 0 0 0aL )C 0 M0 0 0 0 )a 0Ja


(N (N 04 CNNN<br />

00 1- 0 (.C<br />

C) 0) 0) 0<br />

00 r C<br />

(N (N4 -<br />

00 0<br />

NN<br />

LU --<br />

u .2) )<br />

o - -<br />

z. U . U)<br />

* O0- 0-0<br />

< 0)<br />

oo 0<br />

E~ E E 0-<br />

_~a Cl O)<br />

C u 0<br />

U) (D U9 >-.<br />

(l)a)<br />

ccc ccuz-<br />

w<br />

wCb C<br />

C C0) ) C) 0)<br />

CD<br />

ClC


4-,<br />

m<br />

0<br />

0<br />

- Q)<br />

a. COLa<br />

E<br />

-) 0- 0 §<br />

0-0 z~ a 0 (Uo<br />

41<br />

co w a<br />

~2 -<br />

aa 0J<br />

'-<br />

M a)<br />

w<br />

EU<br />

E<br />

C) 000<br />

0n<br />

D 0 C 0 L L) u u - e _Ile - e 0<br />

m<br />

JU 4-J 4- ,,, i24,<br />

4, - ) a) a<br />

LA0L .( :E :E cu w Q) -1


0<br />

4-,<br />

'4-<br />

0<br />

Q)<br />

C4)<br />

0C<br />

Ew<br />

(a -M z U<br />

(~ 4-0'><br />

IObo<br />

=<br />

00<br />

'7 0<br />

-= -<br />

.0a) W 0) G<br />

M 0 0 n.. 4J0 0<br />

rx 0 0 r,4 0<br />

0- 0<br />

V<br />

r rnE<br />

0 0<br />

E<br />

IA<br />

wU<br />

E<br />

-W .0<br />

in<br />

w


E<br />

c<br />

.L<br />

C) Ln<br />

E<br />

AC <<br />

C 0<br />

0* CU<br />

C3-<br />

U.- -c<br />

0<<br />

00o o CA<br />

Um rv<br />

0~ E<br />

u c u-<br />

>~- u u) j<br />

-J<br />

U c-~ CLo -<br />

OC U a uc).1<br />

Lfl ruV mu rU 0-. cc c-<br />

u U u MU u W L.. W) a C Q)<br />

x 0 xo 0 X 0 0 w- CU<br />

I-LIJUJLUJLUQ C - c Z


o<br />

E<br />

U<br />

C~ 0)<br />

Co E<br />

:Nd 0 L<br />

4. 0<br />

(U E<br />

LIL<br />

(U (U<br />

C0)0<br />

0 10<br />

AJ<br />

TO_ _ __ L L- _<br />

&-,<br />

LI<br />

cc Eui .c~L<br />

_ UC U<br />

W 4.~ 0).., )~-'~ ~ --4<br />

~Z<br />

0<br />

0 00 > 0e<br />

) .. 0 a 0<br />

U~ ~~~~~ (<br />

CUU<br />

Z ~ ~ ~ ~ O ~ N<br />

O L $ Z uI _ _ _


o<br />

E<br />

Ln<br />

mX x xxxx X X<br />

x x X --<br />

00<<br />

a):.<br />

o<br />

E<br />

I- x xx Ca ) a)<br />

LA.<br />

0~0<br />

o -- OLL-<br />

'-IC<br />

2<br />

-<br />

t. ) ,<br />

00c<br />

CUaa<br />

x (<br />

0 CL<br />

CO LL <<br />

-~ ~ U- C:<br />

- J uC:- DT<br />

C LUr C - LU (<br />

O Q4-0 m z<br />

0 CU .. C<br />

0-<br />

- C U C U CLr g' C U C<br />

U- )CL a)U 0- 0) L<br />

u- ua )u 0 C V<br />

u 0 0 O-4 a)La ><br />

F- Cu F- Fg-~ 0. 0 C z r0-o -<br />

U ~ C ~ U ~ C ; ) QuU (A ) U u C a<br />

h.~~: OX OL0 ., a~ - UC<br />

LU mf LU J m U.J0 4 H CL .


- 0 0 - C- - - - -<br />

0-0Q cl ~ U 0 0 0 0 0 a 0<br />

C'N C) N NN'! -4 C- 40 N *N 04 0<br />

CN C<br />

~C)a 0 C) 0 C 0 0 0<br />

CUN NZ rN N C q N 0 4 0<br />

N1 N4N<br />

- ii ii-<br />

C N N<br />

000 0 0 0 0 0 0 0 0 0<br />

wo<br />

- - 0_<br />

~ NN N N N N N 0 5 0 0<br />

4)) 0. 4) 4 2 . CL<br />

o<br />

z~~~~ ~ ~ 2 ~ . to0.<br />

U U)<br />

0 0 0 A<br />

0) > 0 0 0 0 0 0 t0<br />

0) w io- -<br />

D~O -- 0<br />

z ) -(a -u M) 0) 0 o 'Fu 0) 0 0v<br />

a)a:-a) a) )i a) Cd) CD 0d a) 4) 4)<br />

c, (D 0 0 0 02 0 0 0 0 0 0 o 'a.<br />

Z(O C (D - - ..-. a .- - - a C<br />

CO. cc mE0 ( 0 0D 0 C.D 0 0 0D a0:3<br />

0 -a<br />

-N CU C E ~<br />

CD _ U ~ < ,(CDU<br />

.0 ~ ~ C) o c -1 o -o ED~ - -o -o Fu -<br />

V) >C- 0 0_<br />

U)C 0; L-a-- 0 E<br />

E0 ZE<br />

E E c CO COE 0 O 0 C:C0o<br />

0<br />

o CL > o -o V -<br />

lal Q c U) 0) m) 4)0( eQ z 4<br />

C 0<br />

0D c ,CU ~ 0 '<br />

0 0 (D 0 0 L 0 (9 0 9 0 9<br />

0 a) c CL V<br />

c')<br />

--<br />

a Q<br />

u<br />

COfi U) -U- 0 0a) - 0- a)- ..<br />

0);-0 -)c<br />

.V C- aI (a- - 0)1 0<br />

- U)~~~<br />

X-X ~ ~ X 'a X x XX(<br />

.n LCU M E1) )a- U 0 ui aC UCL U CU CU<br />

0 CU cc LL c (5<br />

22 C0 0: 0 0 c,<br />

Ca-a<br />

CD<br />

CD C) CD<br />

(I 0w<br />

N<br />

LO - i 0 ~ 9C < C<br />

C C<br />

I C I<br />

in CU N- C O a of<br />

- U' 0-0)-o -) - ) o CU CU CU 0 I 0<br />

0 00 0 0000 a 0 a C -a _) 0 0<br />

U) ~ ~ ~ ~ ~ ~ 999 9 ~ C . 0 C. C.9 09<br />

CD<br />

eN e e<br />

C14 N M~ CO U O L U) LO tQ<br />

00 0<br />

0) LO<br />

C0551<br />


C) 000 c 00<br />

(D - 0<br />

CNi (N CC<br />

N 04<br />

OD 0 r- 00<br />

04<br />

0) CF<br />

C 00<br />

m4. 0 - C1<br />

0 ~j;:: (N<br />

w ) -- - - - - - - - - - -<br />

0 ,)<br />

o -<br />

zcoCL<br />

C4C<br />

00<br />

0 0a<br />

0<br />

CO~ a<br />

0)<br />

0 ) 0) M l<br />

E 0<br />

z 0 -<br />

c C0C<br />

0~ 0 0q<br />

C<br />

r- a<br />

co<br />

EZ<br />

po U.0-<br />

co '-( ;U<br />

CL -,<br />

0) -<br />

.0 > 0 a.<br />

- 0 r a<br />

2 97<br />

0-L -< I 0<br />

0 C) ri I<br />

C*.)


E .2<br />

z12 al-t<br />

ci -<br />

MRC<br />

9~ 9<br />

z<br />

z<br />

0<br />

i-<br />

CL<br />

A<br />

oo<br />

x o<br />

0 o<br />

13 to<br />

22 >


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 149663<br />

10MAMWEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

IIIIII-144"M Christopher L. Beach ~<br />

E MN =March 9, 2010 7<br />

E. L. Adamson X3-40 R. D. Cantwell N3-30<br />

C. L. Beach X3-16 R. W. Cross H4-25<br />

Q. L. Crist X3-16 R. A. Dodd H-4-24<br />

L. W. Grossarth X9-08 C. Flowers (DDI) X3-17<br />

J. A. Heard H4-17 T. A. Foster N3-30<br />

W. R. Junkins X3-16 R. Ganapathy X3 -40<br />

P. Kennedy (DDI) D. G. Saueressig N3-30<br />

S. E. Parnell X3-16 D. B. Teachout X3-16<br />

M. Sherman (DDI) X3-17 J. A. Ware N3-30<br />

A. S. White (DDI) X3-17<br />

H. Williams III X3-16A. E. Zacharias X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4- 11<br />

A meeting on the above subject was held on March 9, 2010 at 11I8-K, MO-755.<br />

1. SAFETY<br />

*Safety topic: Discussed changing conditions on the drive in and going home. Remember that<br />

time changes (spring forward) this weekend.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/2010. WCH has received, in preliminary<br />

review, will return this week. WCH returned to DDI, status 2, with comments. DDI will be<br />

doing a walkdown with Mr. Teachout to incorporate comments and will resubmit drawings for<br />

approval. DDI to check on status.<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

Z:\Administrative Assistant\Project Progress Review Weekly Meetings\2010\Msarch\3-9-10 Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

tank. Permits scheduled to be complete by 1/14/2010. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permnit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/20 10. Excavation permit is<br />

complete. Discussed that 100-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/20 10. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 19'h so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22.<br />

* Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to burn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/20 10. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning. DDI to submit revised OMP this week.<br />

DDI is working with WCH EPL on clarifications.<br />

* WCH requests a site absences coverage plan. WCH to give DDI comments. DDI plans to submit<br />

this by 1/26/2010. WCH to provide review and comments. DDI to resubmit incorporating WCH<br />

feedback. DDI will resubmit this week. WCH has returned with comments, status 2.<br />

" DDI to provide a plan to access the top of the diesel fuel storage tank. DDI confirmed ladder is<br />

on site. Will be meeting with WCH Safety about use and training requirements prior to<br />

developing and implementing a plan for utilization. DDI plans to construct scaffolding with<br />

handrails to access top of tank. WCH will be issuing a new scaffolding procedure soon and will<br />

incorporate any potential changes or impacts to the subcontractor. DDI will be installing a ladder<br />

and tie-off point next week. WCH will need to have the tie-off point inspected by a qualified<br />

person prior to use. DDI will install ladder bolts from the ground for the first two or three rungs<br />

and then contract with Northpoint to complete the remainder of the ladder installation.<br />

* DDI will be providing calcium chloride for the water system when it is operational. Before<br />

Trench K is opened up, DDI to have calcium chloride on site for dust control. DDI to look into<br />

utilizing Dust Bond in trenches K, N, 0 and 1. DDI to provide mixture ratios for WCH profile.<br />

WCH is looking into the availability of having Dust Bond totes on site for use with dust control.<br />

* DDI evaluating a location for truck washing. This will be coordinated with the WCH EPL.<br />

" DDI asked if the issue regarding a scaffolding competent person has been resolved. WCH Safety<br />

Rep to follow up on any additional approvals that are required. Per WCH Safety Rep, all training<br />

requirement for scaffold use have been met.<br />

" Discussed pre-excavation survey point limitations. DDI to have surveyors out to the site to<br />

review to ensure excavation limits are captured in the Pre-Excavation surveys. DDI will schedule<br />

the surveyors back on site to survey Trenches J, L, D, E, P and the north end of C.<br />

" Trench "I" planning and discussions are underway. DDI has not yet received any feedback from<br />

Rowand regarding bucket dimensions, spec sheet, cameras, etc. DDI to provide this information<br />

by Monday, 3/18/2010. The Jewel rep was on site this week and is going to provide additional<br />

information to answer the questions raised. DDI needs to provide a large number of ecology<br />

blocks for use in Trench 1. These need to be rate, in new or very good shape, and have a picking<br />

eye.


Progress Review Meeting<br />

Page 3<br />

" Discussed the utilization of Doug Bowers on SCBA. It is expected that this is a DDI function.<br />

Explained that DDI is to provide equipment for these types of entries. But, with that said, WCH<br />

will do everything it can to support these tasks as necessary. DDI is getting a person SCBA<br />

certified. A discussion regarding the use of WCH equipment by trained personnel is needed.<br />

* DDI is to identify and establish a container dumping area. This will be coordinated with the<br />

WCH EPL. Identifying this area needs to become a priority.<br />

111. PROJECT DESIGN DRAWINGS<br />

*WCH return electrical and traffic control drawings to DDI, status 2. DDI will be resubmitting<br />

soon incorporating the WCH comments.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

*A Process Improvement meeting will be held with both key DDI and WCH personnel in<br />

attendance.<br />

VI.<br />

V1I.<br />

VIII.<br />

IX.<br />

MANPOWER<br />

*See attached.<br />

EQUIPMENT<br />

* See attached.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* There will need to be a work package created for the installation of the tank ladder and fall<br />

protection for the ladder use.<br />

* DDI to evaluate work package and JI-A needs to the water system installations. This needs to be<br />

set into motion by 3/10 at the latest or the work package and JHA will not be complete in time for<br />

work on Friday, March 19.<br />

MATERIAL<br />

*None.<br />

X. QUALITY<br />

*Any time an "IF" is written, an SDR will be generated. DDI should expect to receive a SDR<br />

regarding the shuttle truck submittals and RAT requirements.<br />

XI.<br />

XII.<br />

XIII.<br />

XIV.<br />

REQUESTS FOR INFORMATION<br />

*None.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

*See attached.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

*See attached.<br />

CORRESPONDENCE


Progress Review Meeting<br />

Page 4<br />

* Transmittal from DDI: Proposal for Change Notice 010, Exhibit D, Decontamination Shower<br />

requirements<br />

* Transmittal from DDI: Acceptance and Proposal for Change Notice 016, Exhibit E, Technical<br />

Specifications<br />

* Transmittal from DDI: Letter advising costs for Change Notice 006, Exhibit E, Rev. 3 and<br />

Exhibit 1, Rev. 3<br />

* Transmittal from DDI: Acceptance and Proposal for Change Notice 014 - Water Fill Station,<br />

Exhibit E, Rev. 5<br />

* Weekly Progress Review Meeting Minutes of 3/2/2010<br />

XV.<br />

XVI.<br />

IN VOICE AND PAYMENT STATUS<br />

* None.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

" WCH has three confirmatory sampling sites what will require DDI support. More information<br />

will be provided soon.<br />

* Kudos to DDI - Pre-ev briefings have improved and it is noticed by Senior Management.<br />

* WCH is concerned that DDI has not produced a baseline schedule for the project.<br />

" DDI to develop a process for segregating metal debris from void space to keep the wrong items<br />

from being loaded out.<br />

" DDI needs to provide better direction with regards to Friday work. As of today there are no plans<br />

to work this Friday.<br />

" CRATER bucket brought on site this morning is slightly larger than specs. WCH is checking<br />

with CRATER engineer to see if it can be used. Until a response is received the bucket is not to<br />

be used. DDI to ensure that the bucket is not accidentally put into service. They plan to tag it out<br />

of service.<br />

Attachment(s): As noted above.


0 m<br />

4~CO<br />

ccU<br />

V W E<br />

03: E<br />

0 0<br />

U.-1<br />

C<br />

4) 0<br />

a<br />

(v<br />

CL<br />

CC,<br />

E<br />

0 0 0 L. - -he -l U U<br />

- -m<br />

rnr-<br />

4) -cl LD 0 Ln wm L. mU 4<br />

E E w "a-S0 LDU0<br />

0 00<br />

m w m m u -- Z:;-4- 4 w j ., aj~L.


.<br />

a<br />

0<br />

C~ M<br />

COWO<br />

a.<br />

0<br />

3: -&j4-<br />

md<br />

u~ ZD c~ r, w C4 o Cc<br />

>~ -3-<br />

r-, wn w<br />

4m c~0 ~cU0 r 0<br />

E- E~ ~<br />

IA<br />

I-U A = 0<br />

oi u. C<br />

rj


E<br />

L..L<br />

'-IC<br />

-<br />

E<br />

X<br />

C)<br />

o<br />

0LL4<br />

V _0<br />

-a)<br />

aU<br />

0 o)<br />

0 D.<br />

-C<br />

E<br />

ai<br />

C<br />

QJ<br />

-J<br />

-id<br />

_ _ _ (U 00<br />

~<br />

C<br />

I-- 0L<br />

0)<br />

- C T Z<br />

:


E<br />

a)W<br />

ai<br />

06<br />

1...C a) CU)<br />

00<br />

0L<br />

CL.<br />

I-c<br />

IU x X Xx > L<br />

0a) 0)<br />

41~<br />

q.4.<br />

(U<br />

C) ) - EO<br />

(A:<br />

L~Ln<br />

C6~~1-<br />

"0xxx<br />

4Q, Ln). )4J- a) <<br />

00X


o<br />

E<br />

x Q)<br />

1) - 4-<br />

o<br />

4-1<br />

E<br />

-c<br />

C.C,<br />

0~0<br />

I -c<br />

(DN<br />

0 0o<br />

-CL<br />

0 E<br />

x -0<br />

r-4<br />

bCL<br />

Li.<br />

U -<br />

~ LU~ c-d T LUJ<br />

fuMM -m z z)<br />

u C- .C 0 0<br />

000 0 co LL 0 C z<br />

w C : cc =<br />

* c < r<br />

u )C a) Q) (U 1)C c .Lu j LU<br />

0 1 - . oC=<br />

>. 0 > 0 > m CU a >)~ 0 ~ c a<br />

- x 0ox 0oX 0 0 L. X 0 ~<br />

! LU -j W w m_ w j m


R~Q C) 0 a a 0 C) C) 0 0 0 0 0 0) 0 C0<br />

o 0 0<br />

W,- 0 0 0 c)~ Co<br />

(o rZ Co'I 0<br />

04 0<br />

DC CZN 04 2 0 - -<br />

0 0 C 0 0 0)a 0 0 0 0<br />

0D 0 0 0 a 0) 0 0 0<br />

NN 4 C N*)a<br />

0<br />

N N4 N<br />

)<br />

0N N N N0N4<br />

N NI N\ N<br />

-- N N N 0N N N4 N N N<br />

we - - - - - -C<br />

o C N<br />

C00<br />

0 0 I<br />

4) 4) Q.00<br />

-<br />

0<br />

>. . Q- a. C L a_ CL CL CL M 2<br />

z N m .0 .0) .0) .0) .0) .0) .0) .0) 0 r-<br />

- e'C l C m U) Li i C) Ci) Ci) Ci) a) C 0<br />

0 al 0 a 0 0CC<br />

c C C iC C C C C C<br />

0~.L -o o 0 0 0 0 0 0 A=<br />

0)>O<br />

4) -Ft 0Fu<br />

0 ) ) 04 0 0) 0 0 W 0) <<br />

U) E E E E E E E E -F<br />

z~- c -a- C c c -3c a c -c -o c E<br />

Co a 4)<br />

m C3 C3 C C C C3 C C 0<br />

m 2 D (D (D (D CD 0D (D CD<br />

0) N 0m :3 -<br />

~<br />

C4 C: :3 Ca *C C *a<br />

N<br />

C *<br />

CO MC: CD m Goam C<br />

- N -C O x- () M - - '- -0- - - - - C -<br />

C~~O 22 > o--<br />

a) a) 0) CaCo<br />

a<br />

- CL -. 2.2 (<br />

E0 E0 00 0 00 00 C00<br />

00 a)~- 0~ 0o -o<br />

(Do 0- (Do C13 C-o U) 4) Cn<br />

c C Cc C CL IC<br />

C) CU C 0 0<br />

Y cyc e<br />

.4. a. -0. w2 a. F c U. - 0 a<br />

000 ~ ~ ~ -0.Co. * - - - - >* - -><br />

_~~4 uC CO . W: CJ 0 Cj I . C 0 . 0 a I Cw 0<br />

C.) (.n ~ -~ ><br />

Y0<br />

0O a- CL = > w.2<br />

i<br />

C<br />

c3<br />

OW O2fc - - N3. C(D<br />

N ~ 0 Cu w0<br />

LijN 0 0 D M ) 0 )! 0<br />

-oo<br />

5 0 0 0 a 0<br />

0 >0<br />

-<br />

9 9 ><br />

N<br />

=3~nc<br />

NNNN2-t M- CDW - - x- - -<br />

x 0<br />

Q)U)a-L0L 0oo ooi3 Uoo 0 La 0 LJ0 uj0 L 0 LU0 Lja 0 0 0U U 0U 0 0<br />

U, 9u M9 9 9 00 0 0 0 0 0 0 C 0) 0 0<<br />

000 o a00~ oc 0 0<br />

0 0aa 0 0 0) 0 C0 0 0<br />

9999 99 9. - 0 0CID


t C0 000 co<br />

0N (N CN CN<br />

CD<br />

-l 0 i 1 000<br />

)<br />

c<br />

C) 0- D 0 )<br />

C3 0 0<br />

co I.. N (N (N CN-4<br />

N<br />

NN<br />

(N) (N -<br />

-0<br />

a<br />

0~ 0<br />

0) C L (<br />

z D 1)U<br />

< <<br />

E0<br />

cf0* C 0<br />

01 C<br />

o 0n 0<br />

0 0 4)<br />

CU)<br />

cc Eg -LA<br />

C0 cn < - -<br />

c z m<br />

I Q)<br />

.0-<br />

>o C<br />

(U CU 0 > _<br />

(I) 4, >~ o~<br />

X<br />

TcTL<br />

oU<br />

" L<br />

(D<br />

.2,<br />

< <<br />

0 C)<br />

L C0)) 0)<br />

0M00 0 0<br />

C.-)


q0 (' 0 Cc E <br />

22<br />

Er<br />

E<br />

o~~ 0, 0<br />

6<br />

Z z 1 -1<br />

8 0,<br />

C. 2 -2 o<br />

4 h<br />

l<br />

x) 0)~ 42~


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 149667<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

March 16, 201 0<br />

ISTRIUTIO<br />

E. L. Adamson X3-40 R. D. Cantwell N3-30<br />

C. L. Beach X3-16 R. W. Cross H4-25<br />

Q. L. Crist X3-16 C. Flowers (DDI) X3-17<br />

R. A. Dodd H14-24 T. A. Foster N3-30<br />

A. Gagnon X9-08 R. Ganapathy X3-40<br />

L. W. Grossarth X9-08 S. E. Parnell X3-16<br />

J. A. Heard H4-17 M. Sherman (DDI) X3-17<br />

W. R. Junkins X3-16 D. B. Teachout X3-16<br />

P. Kennedy (DDI) J. A. Ware N3-30<br />

D. G. Saueressig N3-30 A. S. White (DDI) X3-17<br />

H. Williams III X3-16<br />

A. E. Zacharias X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H-4- 11<br />

A meeting on the above subject was held on March 16, 2010 at 118-K, MO-755.<br />

1. SAFETY<br />

*Safety topic: Time change, darker during morning commute, more pedestrians on roadway when<br />

going home.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/2010. WCH has received, in preliminary<br />

review, will return this week. WCH returned to DDI, status 2, with comments. DDI will be<br />

doing a walkdown with Mr. Teachout to incorporate comments and will resubmit drawings for<br />

approval. DDI to check on status. DDI waiting on North Point.<br />

" PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

C:\Doctimens a nd Settings~cbeach\Local Settiigs\Temporary I nternet Files\OLKIO7\3-16-1O Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/20 10. Still waiting on permits from CH-PRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/20 10. Excavation permit is<br />

complete. Discussed that 100-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 19 I so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride.<br />

" Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to burn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/2010. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning. DDI to submit revised OMP this week.<br />

DDI is working with WCH EPL on clarifications. WCH EPL to observe Watts's oil burning<br />

facility on 3/18/2010. DDI will submit OMP after that date.<br />

* DDI to provide a plan to access the top of the diesel fuel storage tank. DDI confirmed ladder is<br />

on site. Will be meeting with WCII Safety about use and training requirements prior to<br />

developing and implementing a plan for utilization. DDI plans to construct scaffolding with<br />

handrails to access top of tank. WCH will be issuing a new scaffolding procedure soon and will<br />

incorporate any potential changes or impacts to the subcontractor. DDI will be installing a ladder<br />

and tie-off point next week. WCH will need to have the tie-off point inspected by a qualified<br />

person prior to use. DDI will install ladder bolts from the ground for the first two or three rungs<br />

and then contract with Northpoint to complete the remainder of the ladder installation. DDI to<br />

complete fall prevention JHA and make sure that work package is discussed and clear to all<br />

involved. DDI discussing a "flip-plate" to be used to stick check levels in the tank from the top<br />

of the ladder. DDI needs to check that modifications made to the tank are in compliance with the<br />

manufacturer's specs.<br />

* DDI will be providing calcium chloride for the water system when it is operational. Before<br />

Trench K is opened up, DDI to have calcium chloride on site for dust control. DDI to look into<br />

utilizing Dust Bond in trenches K, N, 0 and 1. DDI to provide mixture ratios for WCH profile.<br />

WCH is looking into the availability of having Dust Bond totes on site for use with dust control.<br />

" DDI evaluating a location for truck washing. This will be coordinated with the WCH EPL.<br />

* Trench "I" planning and discussions are underway. DDI has not yet received any feedback from<br />

Rowand regarding bucket dimensions, spec sheet, cameras, etc. DDI to provide this information<br />

by Monday, 3/18/2010. The Jewel rep was on site this week and is going to provide additional<br />

information to answer the questions raised. DDI needs to provide a large number of ecology<br />

blocks for use in Trench I. These need to have a rated picking point and be in very good shape.<br />

DDI to follow-up with Jewell and Rowand machinery for information on cameras and<br />

dimensional information on clam shell.


Progress Review Meeting<br />

Page 3<br />

* Discussed the utilization of Doug Bowers on SCBA. It is expected that this is a DDI function.<br />

Explained that DDI is to provide equipment for these types of entries. But, with that said, WCH<br />

will do everything it can to support these tasks as necessary. DDI is getting a person SCBA<br />

certified. A discussion regarding the use of WCH equipment by trained personnel is needed.<br />

* DDI is to identify and establish a container dumping area. This will be coordinated with the<br />

WCH EPL. Identifying this area needs to become a priority.<br />

" WCH has three confirmatory sampling sites what will require DDI equipment support. More<br />

information will be provided soon.<br />

" WCH is concerned that DDI has not produced a baseline schedule for the project. DDI planning<br />

to submit next revision of baseline schedule on 3/16/20 10. WCH will be issuing an SDR to DDI<br />

for the lack of a baseline schedule.<br />

* DDI to develop a process for segregating metal debris from void space to keep the wrong items<br />

from being loaded out. DDI is developing a posting system to identify specific segregated areas.<br />

* DDI needs to provide better direction with regards to Friday work. As of today there are plans to<br />

work this Friday, March 19, 2010 installing. the waterlines across the fence to the WCH site.<br />

* CRATER bucket brought on site this morning is slightly larger than specs. WCH is checking<br />

with CRATER engineer to see if it can be used. Until a response is received the bucket is not to<br />

be used. DDI to ensure that the bucket is not accidentally put into service. They plan to tag it out<br />

of service. The bucket is being modified with welded plates to fit the proper specs.<br />

111. PROJECT DESIGN DRAWINGS<br />

*WCH return electrical and traffic control drawings to DDI, status 2. DDI will be resubmitting<br />

soon incorporating the WCH comments. DDI to submit by 3/18/2010.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

*See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

0 A Process Improvement meeting will be held with both key DDI and WCH personnel in<br />

attendance.<br />

VI.<br />

VII.<br />

MANPOWER<br />

*None.<br />

EQUIPMENT<br />

*None.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

" There will need to be a work package created for the installation of the tank ladder and fall<br />

protection for the ladder use.<br />

* DDI to evaluate work package and JIIA needs to the water system installations. This needs to be<br />

set into motion by 3/10 at the latest or the work package and JHA will not be complete in time for<br />

work on Friday, March 19. WCI- Planner should have revisions to General <strong>Site</strong> Maintenance<br />

work package for this work in next day or so.<br />

IX.<br />

MATERIAL<br />

*None.


Progress Review Meeting<br />

Page 4<br />

X. QUALITY<br />

* SDR to be provided for schedule and scheduler.<br />

* Sampler is a "Key" position and Pat Kennedy will serve as the QA contact when Drew White<br />

exits.<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

* None.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE<br />

* Weekly Progress Review Meeting Minutes of 3/9/2010<br />

" CN Negotiations Meeting Minutes 3/9/2010<br />

* SDDR Request #1 from DDI<br />

" Transmittal from DDI: Proposal for Change Notice 007, Rev. 1<br />

INVOICE AND PAYMENT STATUS<br />

* None.<br />

OTHER COMIMENTS/NEW ACTION ITEMS<br />

* None.<br />

Attachment(s): As noted above.


* C<br />

E 0<br />

a)<br />

00<br />

03<br />

AA<br />

0o ~o<br />

< <<br />

oj .j<br />

a Cc -<br />

o. n2: z a)<br />

A, 0<br />

No 0<br />

N, -a m<br />

md wC~ao<br />

0<br />

o<br />

_ _ _ _ _a.


- M T-<br />

- T- - - -<br />

.EEo5 6E50oo<br />

~000<br />

o000<br />

C000o C) 000OQ<br />

( 0 00 05<br />

C))C<br />

N 04 N 04 N N'JN (N N (N4 N<br />

0 1 N NN -<br />

CD 0~ 0~ 0 0) ~ D<br />

00 g -C<br />

g - - 0 o a<br />

JZ! N. 0 N-..4 N N N CN 'N<br />

CO O ;3 CO a r - (<br />

(o. r- Lf)<br />

N-0 C 0<br />

00 0) 0 0) 0)0 0) C 0 0)<br />

0s )0<br />

-<br />

NN CN<br />

CN N N N~ N N N<br />

w; ----<br />

-I<br />

o ~C 0i) m - -<br />

oi<br />

(n W ~ (1) ~<br />

0l 0)<br />

0. > 0 cu cc<br />

)0~<br />

m c<br />

CO) LL LL L (1 ci)<br />

z t-- 0 0 i<br />

-C 04~ C c aa<br />

_l<br />

0r9 C 0. CL -<br />

0) C) 01<br />

co) () U12 0 0 a ~ -<br />

w -N < c 0 0<br />

C<br />

>C0 0 _)<br />

0 0<br />

0) -D . 0<br />

oiD < < < ()nl -<br />

><br />

c<br />

< Co -ni m E 0)<br />

U) 0 0 0 00<br />

0) 0 Cl Ci :3 N~<br />

E co 0) E E E -0 t aw<br />

m ~ E Cl) D ) al) al<br />

C 0) C m -0 0 -0 C (n D o -0<br />

0 co~ -E D :3 n) : 00<<br />

.D N c o<br />

0-<br />

N I 0<br />

0<br />

m c<br />

- ~ 2~ 0" '-L4<br />

0= CN~d 0 CL 0<br />

o 0 -<br />

(fl -- Cf IL E0<br />

m<br />

) 0 C<br />

0 -N 0o<br />

'a-a 2 ,<br />

C -E~ c~C -N -- - CO<br />

0W ~ < W~CO<br />

-- e<br />

.9~ -D - -0 >) 0)l~<br />

CU<br />

C~~0 0) U) ~ o<br />

D e C.) C CL<br />

-2 U---.Eco . "WWWC.) C a c ~ ~ 0 0<br />

U) Cc) >~ > (I) U-q _ CL~ W ~ t~ r- 0 -1) 0 - MO U) _<br />

*~ss) 85 0.~~ -D N t,) CO) x-<br />

0c88 > C 8 508o<br />

0 CD 0<br />

NNNNCO JL 0 c C<br />

-<br />

C<br />

a<br />

)<br />

igc C -z<br />

0) CL<br />

--e >-<br />

0 CL CO) .2 L<br />

C><br />

000000<br />

0'[- E<br />

0~ 0T 0L 0<br />

- 0 -<br />

CNN<br />

N<br />

If) ') o ' r. U) It3<br />

a) ~ ~<br />

oo'o .- 000 0 0 00 o:J 00[01 0


0 C3 0c0 0<br />

-0 c0 C<br />

22 .9 a 3 C<br />

08i 0. v m


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 149671<br />

lg<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

E aMelk~i Christopher L. Beach<br />

Ely-AI=March 23, 2010<br />

* S m -: 0IO<br />

E. L. Adamson X3-40 R. D. Cantwell N3-30<br />

C. L. Beach X3-16 R. W. Cross H4-25<br />

D. Bollinger (DDI) C. Flowers (DDI) X3-17<br />

Q. L. Crist X3-16 R. A. Dodd H4-24<br />

A. Gagnon X9-08 T. A. Foster N3-30<br />

J. A. Heard H4-17 R. Ganapathy X3-40<br />

W. R. Junkins X3-16 L. W. Grossarth X9-08<br />

P. Kennedy (DDI) X3-17 S. E. Parnell X3-16<br />

A . S. White (DDI) X3-17 D. G. Saueressig N3-30<br />

NM. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

J. A. Ware N3-30<br />

H. Williams III X3-16<br />

A. E. Zacharias X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4- 11<br />

A meeting on the above subject was held on March 23, 2010 at 118-K, MO-755.<br />

I. SAFETY<br />

*Safety topic: Be watchful for deer and other wildlife during commutes. Also be aware that<br />

irrigation canals are being filled. Just this week, a young boy drowned when he slipped into a<br />

canal.<br />

1I. ACTION ITEMS FROM LAST MEETING/STATUS<br />

" Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/20 10. WCH has received, in preliminary<br />

review, will return this week. WCH returned to DDI, status 2, with comments. DDI will be<br />

doing a walkdown with Mr. Teachout to incorporate comments and will resubmit drawings for<br />

approval. DDI to check on status. DDI waiting on North Point. DDI still waiting on North<br />

Point. They have exceeded the 30-day expected response to a returned submittal.<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

Z:\Administrative Assistant\Project Progress Review Weekly Meetings\2OlO\March\3-23-1O Weekly Progressdoc


Progress Review Meeting<br />

Page 2<br />

approvals are with the CHPRC 100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/2010. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation pen-nit is<br />

complete. Discussed that 100-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/20 10. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the I 9 th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 100-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system.<br />

" Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to burn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/2010. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning. DDI to submit revised OMP this week.<br />

DDI is working with WCH EPL on clarifications. WCH EPL to observe Watts's oil burning<br />

facility on 3/18/2010. DDI will submit OMP after that date. OMP waiting on ARES revision to<br />

drawings, then DDI will submit.<br />

* DDI to provide a plan to access the top of the diesel fuel storage tank. DDL confirmed ladder is<br />

on site. Will be meeting with WCH Safety about use and training requirements prior to<br />

developing and implementing a plan for utilization. DDI plans to construct scaffolding with<br />

handrails to access top of tank. WCH will be issuing a new scaffolding procedure soon and will<br />

incorporate any potential changes or impacts to the subcontractor. DDI will be installing a ladder<br />

and tie-off point next week. WCH will need to have the tie-off point inspected by a qualified<br />

person prior to use. DDI will install ladder bolts from the ground for the first two or three rngs<br />

and then contract with Northpoint to complete the remainder of the ladder installation. DDI to<br />

complete fall prevention JHA and make sure that work package is discussed and clear to all<br />

involved. DDI discussing a "flip-plate" to be used to stick check levels in the tank from the top<br />

of the ladder. DDI needs to check that modifications made to the tank are in compliance with the<br />

manufacturer's specs. Ladder to be installed today (3/23/20 10).<br />

" DDI will be providing calcium chloride for the water system when it is operational. Before<br />

Trench K is opened up, DDI to have calcium chloride on site for dust control. DDI to look into<br />

utilizing Dust Bond in trenches K, N, 0 and 1. DDI to provide mixture ratios for WCH profile.<br />

WCH is looking into the availability of having Dust Bond totes on site for use with dust control.<br />

* DDI evaluating a location for truck washing. This will be coordinated with the WCH EPL.


Progress Review Meeting<br />

Page 3<br />

* Trench "I" planning and discussions are underway. DDI has not yet received any feedback from<br />

Rowand regarding bucket dimensions, spec sheet, cameras, etc. DDI to provide this information<br />

by Monday, 3/18/2010. The Jewel rep was on site this week and is going to provide additional<br />

information to answer the questions raised. DDI needs to provide a large number of ecology<br />

blocks for use in Trench 1. These need to have a rated picking point and be in very good shape.<br />

DDI to follow-up with Jewell and Rowand machinery for information on cameras and<br />

dimensional information on clam shell. DNFS13 presentation went well. WCH is planning a<br />

management review at the end of next week. WCH needs additional information on the camera<br />

and other equipment as soon as possible.<br />

* Discussed the utilization of Doug Bowers on SCBA. It is expected that this is a DDI function.<br />

Explained that DDI is to provide equipment for these types of entries. But, with that said, WCH<br />

will do everything it can to support these tasks as necessary. DDI is getting a person SCBA<br />

certified. A discussion regarding the use of WCH equipment by trained personnel is needed.<br />

* DDI is to identify and establish a container dumping area. This will be coordinated with the<br />

WCH EPL. Identifying this area needs to become a priority. The can in the HRA has been there<br />

a while and needs to be addressed.<br />

* WCH has three confirmatory sampling sites what will require DDI equipment support. More<br />

informnation will be provided soon. WCH pushing for an April timeframe to perform this work.<br />

* WCH is concerned that DDI has not produced a baseline schedule for the project. DDL planning<br />

to submit next revision of baseline schedule on 3/16/2010. WCH will be issuing an SDR to DDI<br />

for the lack of a baseline schedule. WCH has received submittal and is in review.<br />

a DDI to develop a process for segregating metal debris from void space to keep the wrong items<br />

from being loaded out. DDI is developing a posting system to identify specific segregated areas.<br />

DDI is working on this, nothing has been implemented to date.<br />

III.<br />

IV.<br />

PROJECT DESIGN DRAWINGS<br />

*WCH return electrical and traffic control drawings to DDI, status 2. DDI will be resubmitting<br />

soon incorporating the WCH comments. DDI to submit this week.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

* DDI Project Manager has given resignation, last day is Thursday, 3/25/20 10. Discussion of no<br />

field work activities potential on Monday 4/1/2010 without the PM Key Person onsite.<br />

V. WEEKLY PRODUCTION TABLE<br />

0 See attached.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* Several resumes for Samplers have been received by DDI, DDI is evaluating potential candidates.<br />

0 Discussed scheduling difficulties for physicals at AMH. Mr. Heard spoke with the WCH OH<br />

department that schedules AMH physicals. If a teamster has a current DOT physical, they can<br />

onsite until the AMH physical. WCH will provide additional information regarding this.<br />

EQUIPMENT<br />

*The John Deere 220 excavator is planned to be leaving the site; the 330 excavator will be<br />

equipped to utilize the CRATER. The 6th haul truck is on hold for use until final certification<br />

data is provided.


Progress Review Meeting<br />

Page 4<br />

VIII.<br />

IX.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

*Clarification of distance to remain from a non-bermed edge of a trench. The work package states<br />

6 feet and the CTA technical procedure states 4 feet.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

" SDR to be provided for schedule and scheduler.<br />

* Sampler is a "Key" position and Pat Kennedy will serve as the QA contact when Drew White<br />

exits. With the departure of Drew White, WCH plans to issue a letter to DDI about<br />

noncompliance to contract for not having a Sampler on site. DDI should expect another letter<br />

with the same wording for the vacant PM position.<br />

* WCH to perfonm the next scheduled QA surveillance after turnover of personnel is resolved.<br />

XI.<br />

XII.<br />

XIII.<br />

XIV.<br />

XV.<br />

XVI.<br />

REQUESTS FOR INFORMATION<br />

* None.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

CHANGE NOTICES/STATUS/CHANGE, ORDERS<br />

* See attached.<br />

CORRESPONDENCE<br />

* Transmittal from DDI: Proposal for Change Notice 007, Rev. 1<br />

" Transmittal from DDI: Amended Proposal for Change Notice 0 18, Two Indirect Heaters for CTA<br />

Tent<br />

" CN Negotiations, Meeting Minutes 3/16/2010<br />

" Letter to DDI: Required Reading for Implementing Revisions to PAS-2-1.l, R7 & PAS-2-l.4,<br />

Rev. 2<br />

INVOICE AND PAYMENT STATUS<br />

* None.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

" Discuss implementation and oversight of equipment maintenance plan with the resignation of the<br />

DDI mechanic.<br />

" Full/Loaded can in HRA needs to be dumped. Preparation for this need to be put into place<br />

ASAP.<br />

" DDI to make arrangements to de-mob the heaters in the tent prior to 3/3 1/2010.<br />

Attachment(s): As noted above.


N 00<br />

--- --- -- - -<br />

cl-c<br />

0 4<br />

100<br />

100<br />

0~ ~ - C. Ro -N ~<br />

UI<br />

.0<br />

V ~<br />

. 00<br />

V<br />

V<br />

to t0.7<br />

CD,<br />

C, 0<br />

.7<br />

7<br />

<


C) 0C) 0Es 5 550 5 o C) 0 5 55<br />

0000 00 000 0 0 00C<br />

04 C14 04 ~ 4 4 '~ 4 0 0 0 J cj CN cN (l M ce) 'CN N<br />

C0)<br />

0 ) 000 C) 0 0 0) 0 0) 0 0C 0<br />

00,4 0 0<br />

-(N . (N 04 (N - -( a N (! 0 N (404 N 04 (N (-<br />

C- (Y -<br />

D II--00 co c<br />

00- 0 Q<br />

- - - N0<br />

-" V)N CN 0 Cl (N ()<br />

N<br />

0 0T 004 0 0 0 0) 0<br />

0 C).- CN<br />

04 C- 0- 04 00 C l C14 C 0 0<br />

o~~<br />

3 c)<br />

~ N<br />

C-4 0) D i 00<br />

U) l f)c)0 0t<br />

04 C14 04I C Cl<br />

-o<br />

C a LD 0 CA)<br />

0> 02 0 cuo<br />

AD e).o - 0<br />

Fu<br />

0. > .C o (o Co a O<br />

a)< LL (0 (j)<br />

0L *C 0)(D<br />

E -<br />

V , CD 0D 0 0 ~<br />

I- CCU Col~ Co (0 Co<br />

CCI 04 < C: C c .2" Co<br />

000 ~CD r .- C C<br />

Co~~(4oE c~ 0 r<br />

-cuC3V-F 75 0 0 CC<br />

Om DO -<br />

c CC 4<br />

0<br />

0<br />

CD~c) 0~~~ -0 0<br />

ELLL<br />

om a)~<br />

E E D<br />

C) a)VV ca cc QU cco D-c<br />

z<br />

OC E a) Y -6<br />

a.JC<br />

4) 00<br />

)<br />

C: C:C 0 ) )co 3- OC<br />

cD2oC<br />

M~ 0 0 0 0 .. 2C~C 0 C C<br />

CCCW) 00 Cc~0C 0 D Co t< i>o ci<br />

0) ~~0 Q CnC 0C<br />

C))L.6 )) -0(990(9D0H


30 00 0000<br />

Q - U<br />

2 o 0) E ~ C 3 o0.<br />

00 O o M 03 202 03<br />

2~~2 ~ ~ ) 3: .3)03<br />

i3t 00 z<br />

0<br />

o _ _ _<br />

- - - - - - - - - - - - -<br />

z3~0 )3 0 0<br />

T)0 0-<br />

........<br />

2 :9 3 9<br />

C0M -0<br />

00 ,0 ) 000 0<br />

3 a 3


Washington<br />

closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 150028<br />

lg<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

E011 Christopher L. Beach ~~<br />

April 6, 2010<br />

DISTRBUTIO<br />

E. L. Adamson X3-40 D. Bollinger (DDI)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Crist X3-16 R. W. Cross H4-25<br />

T. Dance (DDI) X3-17 C. Flowers (DDI) X3-17<br />

A. Gagnon X9-08 R. A. Dodd 114-24<br />

W. R. Junkins X3-16 T. A. Foster N3-30<br />

S. E. Parnell X3-16 R. Ganapathy X3-40<br />

M. Sherman (DDI) X3-17 L. W. Grossarth X9-08<br />

H. C. Weber (DDI) X3-16 J. A. Heard H4-17<br />

D. G. Saueressig N3 -30<br />

D. B. Teachout X3-16<br />

J. A. Ware N3-30<br />

H. Williams III X3-16<br />

A. E. Zacharias X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control 114-11<br />

A meeting on the above subject was held on April 6, 2010 at 11 8-K, MO-755.<br />

1. SAFETY<br />

* Safety topic: There was a roll-over accident on Route 4 on the drive home commute. Need to<br />

practice defensive driving, observe traffic controls like speeding, passing, etc.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/2010. WCH has received, in preliminary<br />

review, will return this week. WCH returned to DDI, status 2, with comments. DDI will be<br />

doing a walkdown with Mr. Teachout to incorporate comments and will resubmit drawings for<br />

approval. DDI to check on status. DDI waiting on North Point. DDI still waiting on North<br />

Point. They have exceeded the 30-day expected response to a returned submittal. DDI to follow<br />

up with North Point again this week.<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

Z:\Administrative Assistari\Project Progress Review Weekly Meetings\2010\April\4-6-1O Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

approvals are with the CHPRC 100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Penmits scheduled to be complete by 1/14/2010. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 1 00-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 19 'h so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 1 00-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority.<br />

" Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to burn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Enviromnental will get WCH concurrence. DDI plans to submit by 1/27/20 10. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning. DDI to submit revised OMP this week.<br />

DDI is working with WCH EPL on clarifications. WCH EPL to observe Watts's oil burning<br />

facility on 3/18/2010. DDI will submit OMP after that date. OMP waiting on ARES revision to<br />

drawings, then DDI will submit. Drawings should be available for pickup by DDI this week then<br />

the OMP will be submitted.<br />

* DDI to provide a plan to access the top of the diesel fuel storage tank. DDI confirmed ladder is<br />

on site. Will be meeting with WCH Safety about use and training requirements prior to<br />

developing and implementing a plan for utilization. DDI plans to construct scaffolding with<br />

handrails to access top of tank. WCH will be issuing a new scaffolding procedure soon and will<br />

incorporate any potential changes or impacts to the subcontractor. DDI will be installing a ladder<br />

and tie-off point next week. WCH will need to have the tie-off point inspected by a qualified<br />

person prior to use. DDI will install ladder bolts from the ground for the first two or three rungs<br />

and then contract with Northpoint to complete the remainder of the ladder installation. DDI to<br />

complete fall prevention JHA and make sure that work package is discussed and clear to all<br />

involved. DDI discussing a "flip-plate" to be used to stick check levels in the tank from the top<br />

of the ladder. DDI needs to check that modifications made to the tank are in compliance with the<br />

manufacturer's specs. Ladder to be installed today (3/23/20 10). Ladder installation delayed<br />

because the bolts where too large for the holes.<br />

* DDI will be providing calcium chloride for the water system when it is operational. Before


Progress Review Meeting<br />

Page 3<br />

Trench K is opened up, DDI to have calcium chloride on site for dust control. DDI to look into<br />

utilizing Dust Bond in trenches K, N, 0 and 1. DDI to provide mixture ratios for WCH profile.<br />

WCH is looking into the availability of having Dust Bond totes on site for use with dust control.<br />

DDI to have calcium chloride on site before opening up Trench K excavations.<br />

* DDI evaluating a location for truck washing. This will be coordinated with the WCH EPL. This<br />

will be set up next to the high tank.<br />

* Trench "I" planning and discussions are underway. DDI has not yet received any feedback from<br />

Rowand regarding bucket dimensions, spec sheet, cameras, etc. DDI to provide this information<br />

by Monday, 3/18/2010. The Jewel rep was on site this week and is going to provide additional<br />

information to answer the questions raised. DDI needs to provide a large number of ecology<br />

blocks for use in Trench 1. These need to have a rated picking point and be in very good shape.<br />

DDI to follow-up with Jewell and Rowand machinery for information on cameras and<br />

dimensional information on clam shell. DNFSB presentation went well. WCH is planning a<br />

management review at the end of next week. WCH needs additional information on the camera<br />

and other equipment as soon as possible. WCH will be holding a workshop meeting with the<br />

local defense board, DOE and WCH management later in April. Any additional information that<br />

can be gathered on equipment will be beneficial.<br />

* WCH has three confirmatory sampling sites what will require DDI equipment support. More<br />

information will be provided soon. WCH pushing for an April timeframe to perform this work.<br />

A walkdown of one of the sites will be occurring today. WCH will schedule a discussion for next<br />

week to discuss the excavation of the two or 3 sites that are included in the current contract.<br />

" WCH is concerned that DDI has not produced a baseline schedule for the project. DDI planning<br />

to submit next revision of baseline schedule on 3/16/20 10. WCH will be issuing an SDR to DDI<br />

for the lack of a baseline schedule. WCH has received submittal and is in review.<br />

* DDI to develop a process for segregating metal debris from void space to keep the wrong items<br />

from being loaded out. DDI is developing a posting system to identify specific segregated areas.<br />

DDI is working on this, nothing has been implemented to date.<br />

* Discuss implementation and oversight of equipment maintenance plan with the resignation of the<br />

DDI mechanic.<br />

III.<br />

IV.<br />

PROJECT DESIGN DRAWINGS<br />

*WCH return electrical and traffic control drawings to DDI, status 2. DDI will be resubmitting<br />

soon incorporating the WCH comments. DDI to submit this week. Drawings are with North<br />

Point for revision and will be resubmitted upon their return.<br />

o Electrical drawings are a priority as CHPRC will be making some revisions to them for<br />

some additional air monitoring stations on the 118-K electrical service.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

" New PM has been hired by DDI and will be on-site this week.<br />

V. WEEKLY PRODUCTION TABLE<br />

* See attached.


Progress Review Meeting<br />

Page 4<br />

VI.<br />

VII.<br />

MANPOWER<br />

" Several resumes for Samplers have been received by DDI, DDI is evaluating potential candidates.<br />

Heather Weber will serve as sampler in addition to performing the admin tasks, her training<br />

should be completed by the end of the month to be able to perform sampling duties.<br />

* With the hiring of a new Project Manager (Raymond Ferguson) an updated "Key Personnel"<br />

letter will be submitted.<br />

EQUIPMENT<br />

* The John Deere 225 excavator is planned to be leaving the site; the 330 excavator will be<br />

equipped to utilize the CRATER. WCH will be discussing with DDI the possible use of the JD<br />

225 for the confirmatory sampling.<br />

* The Kenworth haul truck is on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

*Clarification of distance to remain from a non-bermed edge of a trench. The work package states<br />

6 feet and the CTA technical procedure states 4 feet. Planners are working on this clarification.<br />

IX.<br />

MATERIAL<br />

* DDI to address getting calcium chloride on site before current supply of fixative runs out.<br />

X. QUALITY<br />

" SDR to be provided for schedule and scheduler.<br />

* WCH to perform the next scheduled QA surveillance after turnover of personnel is resolved.<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

* None.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

XIV.<br />

CORRESPONDENCE<br />

* CN Negotiations Meeting Minutes of 3/23/2010<br />

* Letter to DDI: Release 57 <strong>Hanford</strong> <strong>Site</strong> Hoist and Rigging<br />

* Letter from DDI: Acknowledgement of Change Notice 023<br />

* Monthly Industrial Hygiene Data 118-K Burial Ground Remediation (HASP requirement)<br />

* Transmittal to DDI: Change Notice 024 - Exhibit K - IWCP Rev. 7


Progress Review Meeting<br />

Page 5<br />

XV.<br />

XVI.<br />

IN VOICE AND PAYMENT STATUS<br />

* DDI to submit March invoice this week.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* None.<br />

Attachment(s): As noted above.


6 0<br />

Z Dn-ito i -4 N<br />

w - >-<br />

0<br />

's<br />

E<br />

cc~<br />

~ 0) " GJ<br />

0. CL,<br />

4-<br />

0~<br />

CL k2 F-<br />

Inn<br />

m.. 0.<br />

a oC<br />

00 wr<br />

V-4<br />

E<br />

rN U U u<br />

E 0 Itn wj :3 Q U U __~ j<br />

A0- F F- ~ -<br />

LLcr<br />

E E E<br />

o or 0<br />

c 0 CfLO 0<br />

WJ 2e.R2 mE -i iU)AV :LL


0 - -- - - - - - - - - -<br />

---- -- -- Q<br />

- -- -- -- -- - - .<br />

-- - -- - --<br />

00<br />

o 0 o<br />

- -- --- - - -<br />

- ------ CD - - -----<br />

- ----<br />

- - -- - - -- -- V-V------ 0<br />

10 ----<br />

------- C9 - - ---<br />

0 ----------i - ---<br />

,---- It - --IQ---- I--I---<br />

ii<br />

-~~~~ ~<br />

i1 i<br />

-- ~ --- ----E---<br />

-- -- -- -II - 1<br />

- -1-- 1-- 7<br />

J- --<br />

--- ---<br />

-- - - -- ~<br />

C3jl<br />

Cy V<br />

1<br />

I- --4- -- -<br />

12 's --- ---<br />

I<br />

CY* 0 I<br />

00z<br />

---- ---- ------ - -. -- - - - - --- - - -<br />

0. ---- -- 0 0 0 0 0 0 0<br />

~ -0---- ---- 0<br />

01 40 .3 ---- --- - ----o ----- -- -- 3 - ------- ----<br />

0i 0 O<br />

.50<br />

di c ~ > S~ o =Oh<br />

co ~ O o . 0 . 20 1 ~ g 0 .<br />

0<br />

00 En 0. -<br />

0 ><br />

- 3<br />

m~ 030<br />

L~ w<br />

~~i S___ .0-


00<br />

U) to<br />

0i 2<br />

m -)<br />

z<br />

z<br />

0o --- --- --- -- - ---<br />

0a<br />

-- - - -- - - -- - -<br />

00L<br />

to Q CD 0 0 - 0 0 ~<br />

to


- --<br />

- - - - - - -a<br />

C800 00 00 C 0 0 0D 0 00 0<br />

C-4( (( C'JCCN m IC14 co N N ( CN) N~ cq(<br />

00 00 0)( CO)0 0<br />

0 ~ ~ 00 0 0 D 0<br />

0 0 )<br />

a CD 0CD<br />

- C - - - a j0<br />

- ~~~~ C- CD- CDN ( N ~ ~<br />

U)<br />

uci<br />

-. a)<br />

- 2! NN (Nj (N (N<br />

C, (N.<br />

-r-t<br />

C,<br />

-e co (N N (N~ i;5 coo<br />

8~~ ci a)<br />

a) 0) LL U - ) ) '<br />

0 0 0 0<br />

04)<br />

E<br />

c a- L a. (2 c<br />

Z) 0 CD CL a CD<br />

ao o: C -<br />

wI C4 (N~ a.< c . . CC<br />

a-) 0 0 0 0 0<br />

-19C CD rn<br />

o)<br />

CC -C CO Cob<br />

c C U) 0<br />

C.)~~ '- 0 C.) .a ~ C() 0. - - W. - -~ ~c~ C) CO- .S<br />

4)<br />

) U<br />

- -tCO 0 2-<br />

CO -o ) 0( 0)(0 CO0<br />

n~ C C C . ~ ~ o<br />

E 9 9 9<br />

0~ 0> 0 0<br />

U) U) a) (c C?<br />

00<br />

- C D 4)c 6c 0) c FL cc cc O r-<br />

-00 0 C10 -9 0 00 (D<br />

U, ). 000 0 00 0<br />

00<br />

00 0 00 0 0 0 0 0 0


a<br />

z<br />

E lE , 2 0 2~<br />

0 2<br />

e! 2 CI<br />

Z, z 0 ~ Q 12. 2. L9 <<br />

0 _ o 0 2 z :<br />

Ci<br />

IS<br />

~ I, I<br />

IW I<br />

0~ F Im<br />

CL :,<br />

-<br />

_i au<br />

_2 cf!-


wc HWashinigon<br />

CCN: 150031<br />

Closure<br />

WNW C H<strong>Hanford</strong><br />

Meeting Minutes<br />

WI .*4<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

111111=10J, Christopher L. Beach<br />

April 20, 2010<br />

ATEDE<br />

ISTRBUIO<br />

E. L. Adamson X3-40 D. Bollinger (DDI)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Crist X3-16 R. W. Cross H4-25<br />

T. Dance (DDI) X3-17 C. Flowers (DDI) X3-17<br />

R. A. Dodd H4-24 T. A. Foster N3-30<br />

A. Gagnon X9-08 R. Ganapathy X3-40<br />

W. R. Junkins X3-16 J. A. Heard H4-17<br />

S. E. Pamnell X3-16 D. G. Saueressig N3-30<br />

M. Shermnan (DDI) X3-17<br />

D. B. Teachout X3-16<br />

J. A. Ware N3-30<br />

H. C. Weber (DDI) X3-16<br />

H. Williams III X3-16<br />

A. E. Zacharias X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4-11I<br />

A meeting on the above subject was held on April 20, 2010 at 11 8-K, MO-755.<br />

I. SAFETY<br />

* Safety topic: Discussed traffic and that speeding seems to have increased recently. MSA is in the<br />

process of evaluating traffic patterns which also include speed which could lead to a stronger<br />

presence from the Benton County Sheriffs Department issuing speeding tickets.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

*PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currentlyjust waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/20 10. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permnit is in hand, waiting for excavation permit. Plan to performn<br />

work on water line on an off shift work day, pushing for Friday 2/19/20 10. Excavation permit is<br />

Z:\Admjinistralive Assislant~roject Progress Review Weekly Meetings'20l0\Aprij'4-20-io Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

complete. Discussed that 1 00-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/20 10. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permnits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the I91h so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 1 00-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDL to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project.<br />

" Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCI- is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to burn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/20 10. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDL with the required designations for waste oil burning. DDI to submit revised OMP this week.<br />

DDI is working with WCH EPL on clarifications. WCH EPL to observe Watts's oil burning<br />

facility on 3/18/2010. DDI will submit OMP after that date. OMP waiting on ARES revision to<br />

drawings, then DDI will submit. Drawings should be available for pickup by DDI this week then<br />

the OMP will be submitted. No update (4/20).<br />

" DDI to provide a plan to access the top of the diesel fuel storage tank. DDL confirmed ladder is<br />

on site. Will be meeting with WCH Safety about use and training requirements prior to<br />

developing and implementing a plan for utilization. DDI plans to construct scaffolding with<br />

handrails to access top of tank. WCH will be issuing a new scaffolding procedure soon and will<br />

incorporate any potential changes or impacts to the subcontractor. DDI will be installing a ladder<br />

and tie-off point next week. WCH will need to have the tie-off point inspected by a qualified<br />

person prior to use. DDI will install ladder bolts from the ground for the first two or three rungs<br />

and then contract with Northpoint to complete the remainder of the ladder installation. DDI to<br />

complete fall prevention JHA and make sure that work package is discussed and clear to all<br />

involved. DDL discussing a "flip-plate" to be used to stick check levels in the tank from the top<br />

of the ladder. DDI needs to check that modifications made to the tank are in compliance with the<br />

manufacturer's specs. Ladder to be installed today (3/23/2010). Ladder installation delayed<br />

because the bolts where too large for the holes. New DDI PM will be revisiting this matter.<br />

* DDI will be providing calcium chloride for the water system when it is operational. Before<br />

Trench K is opened up, DDI to have calcium chloride on site for dust control. DDI to look into<br />

utilizing Dust Bond in trenches K, N, 0 and 1. DDI to provide mixture ratios for WCH profile.<br />

WCH is looking into the availability of having Dust Bond totes on site for use with dust control.<br />

DDI to have calcium chloride on site before opening up Trench K excavations. No update (4/20).<br />

* DDI evaluating a location for truck washing. This will be coordinated with the WCH EPL. This<br />

will be set up next to the high tank. WCH EPL will be onsite this week to assist with designating


Progress Review Meeting<br />

Page 3<br />

a location.<br />

" Trench "I" planning and discussions are under-way. DDI has not yet received any feedback from<br />

Rowand regarding bucket dimensions, spec sheet, cameras, etc. DDI to provide this information<br />

by Monday, 3/18/2010. The Jewel rep was on site this week and is going to provide additional<br />

information to answer the questions raised. DDI needs to provide a large number of ecology<br />

blocks for use in Trench 1. These need to have a rated picking point and be in very good shape.<br />

DDI to follow-up with Jewell and Rowand machinery for information on cameras and<br />

dimensional information on clam shell. DNFSB presentation went well. WCH is planning a<br />

management review at the end of next week. WCH needs additional information on the camera<br />

and other equipment as soon as possible. WCH will be holding a workshop meeting with the<br />

local defense board, DOE and WCH management later in April. Any additional information that<br />

can be gathered on equipment will be beneficial. WCH workshop with DNFSB to be held<br />

4/21/2010.<br />

* WCH has three confirmnatory sampling sites what will require DDI equipment support. More<br />

information will be provided soon. WCH pushing for an April timeframe to perform this work.<br />

A walkdown of one of the sites will be occurring today. WCH will schedule a discussion for next<br />

week to discuss the excavation of the two or 3 sites that are included in the current contract.<br />

Potholing to commence 5/17/20 10 when DDI's new sampler has completed her training.<br />

" WCH is concerned that DDI has not produced a baseline schedule for the project. DDI planning<br />

to submit next revision of baseline schedule on 3/16/2010. WCH will be issuing an SDR to DDI<br />

for the lack of a baseline schedule. WCH has received submittal and is in review. WCH is<br />

currently in review of the resubmitted schedule.<br />

" DDI to develop a process for segregating metal debris from void space to keep the wrong items<br />

from being loaded out. DDI is developing a posting system to identify specific segregated areas.<br />

DDI is working on this, nothing has been implemented to date. No update (4/20)<br />

* Discuss implementation and oversight of equipment maintenance plan with the resignation of the<br />

DDI mechanic. DDI working to bring on project mechanic.<br />

III.<br />

IV.<br />

PROJECT DESIGN DRAWINGS<br />

*WCH return electrical and traffic control drawings to DDI, status 2. DDI will be resubmitting<br />

soon incorporating the WCH comments. DDI to submit this week. Drawings are with North<br />

Point for revision and will be resubmitted upon their return.<br />

o Electrical drawings are a priority as CHPRC will be making some revisions to them for<br />

some additional air monitoring stations on the 11I8-K electrical service. No update (4/20).<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

* See attached.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* DDI is working on securing project mechanic on site full time.<br />

* DD[ has extended an offer to a CIH candidate.<br />

EQUIPMENT<br />

* WCH will be discussing with DDI the possible use of the JD 225 for the confirmatory sampling.<br />

* The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is


Progress Review Meeting<br />

Page 4<br />

provided. Submittal for certification was returned status 3.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

*Clarification of distance to remain from a non-bermed edge of a trench. Planners are working on<br />

this clarification.<br />

IX.<br />

MATERIAL<br />

* DDI to address getting calcium chloride on site before current supply of fixative runs out.<br />

X. QUALITY<br />

* SDR to be provided for schedule and scheduler.<br />

" WCH to perform the next scheduled QA surveillance after turnover of personnel is resolved.<br />

XI.<br />

XII.<br />

XIII.<br />

XIV.<br />

XV.<br />

XVI.<br />

REQUESTS FOR INFORMATION<br />

0 None.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

* Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/20 10. WCH has received, in preliminary<br />

review, will return this week. WCH- returned to DDI, status 2, with comments. DDL will be<br />

doing a walkdown with Mr. Teachout to incorporate comments and will resubmit drawings for<br />

approval. DDI to check on status. DDI waiting on North Point. DDI still waiting on North<br />

Point. They have exceeded the 30-day expected response to a returned submittal. DDI to follow<br />

up with North Point again this week. No update, still with DDI (4/20).<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

CORRESPONDENCE<br />

" Letter from DDI: Acknowledgement of Change Notice 024<br />

* Letter from DDI: Subcontractor Deficiency Report Number FR-2010-IF-01 I I-SDR-005<br />

* Weekly Progress Review Meeting Minutes of 4/6/2010<br />

* Change Notice 025 - Exhibit A Rev. 8<br />

IN VOICE AND PAYMENT STATUS<br />

0 WCH in review of March invoice.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* Discussed contract milestones; is DDI considering extra work days?<br />

Attachment(s): As noted above.


0 ~ 0~<br />

r- E CE a-<br />

I w<br />

a,~ -o- au<br />

~ 2 m<br />

c 41 m ~ ~ *<br />

LLu<br />

E<br />

kn<br />

Ln0 M -It L - 4 en


10 c<br />

313<br />

00<br />

mg w<br />

3:'<br />

0 <<br />

0 'NC.<br />

ts<br />

LUU<br />

;K~<br />

t<br />

uj LO 0l<br />

i<br />

u '0


TTo<br />

0 T<br />

I<br />

cK<br />

y<br />

- I I 1<br />

it~<br />

74


C) ~ 13 ~ ~ r -) - E3 )0<br />

C1f545 C14 0 CN~ 04 51 5N 555 C5 5'4 1 C 51 C4 5%<br />

C sIV a T:<br />

o 0 a~ o 0 000o 0100 C0 0 0 00<br />

~o00 0000 0 00000<br />

!ci 04 C(N (N C14 (I C1 N - CN(N4 C1 (N N 14 C14N<br />

05 0O LOJ[ 0 -~0<br />

0 0 0 Q0<br />

(jN - - - - 0<br />

C..)<br />

-~ - v44<br />

oC 4)V ---- - -- --<br />

ci) ci 4<br />

C> Ci)<br />

C1 N<br />

4) CN 4)J 4) > N C: C14<br />

ua<br />

0 .0 -0<br />

0<br />

000<br />

CL<br />

'<br />

5 L, (<br />

0. 0. 0<br />

(D a) i' > 0 0 .<br />

0 00 0<br />

I 0. 00 0 . 0.<br />

t4<br />

0a<br />

cro<br />

a~<br />

C : O.<br />

cC C<br />

<<br />

,<br />

<<br />

4v 4<br />

0j<br />

C- CL CO<br />

0 D 02 C) a0a<br />

0D<br />

0q Cl cc 4)I ECI oo A= :) )<br />

5l 23 ~ CD c Q4ci <<br />

Cu Cu 1! Cu> 0)<br />

_ !<br />

C~~~)-4 4 )* ~ ' .9 -.24<br />

ccaL~<br />

_~ 0 0C 0 7- 4<br />

a... C ~)<br />

4) 0 4) a) 4) ~5 !~K '~ 4<br />

zQfu<br />

lC I~ I 04) C) cWlW CC - I C0C><br />

al<br />

- tn'o 0 toI.<br />

0<br />

E4 12<br />

EI 4 4) Q)0) q) (D En4) c ~ E E~W W<br />

0QG9<br />

CO<br />

m c c a 4) E 4: ? a-<br />

'<br />

4)C


U) '<br />

0n 0 04<br />

. N CN) CC4<br />

00 0 00)C<br />

0 0<br />

C1 N<br />

CNJ<br />

C')<br />

*i t<br />

-- OSi<br />

2N 2<br />

U) 1<br />

z. R<br />

CC<br />

_<br />

&(. c.<br />

c .E<br />

om 0o c<br />

0 c d)<br />

00)- C 0<br />

a) :3C C3<br />

C 1 C* 0<br />

F- -F6i<br />

0l cc: 1 0 0 Mz ) 3<br />

Q9 0 ( 0<br />

9 919<br />

91 o 1 C.2 I (<br />

0) ), 0 0),<br />

COD (N


WCH Washington<br />

WC H <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 150033<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

April 27, 2010<br />

DISTRIBUTIO<br />

E. L. Adamson X3-40 D. Bollinger (DDI)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Grist X3-16 R. W. Cross H4-25<br />

T. Dance (DDI) X3-17 R. A. Dodd H4-24<br />

R. Ferguson (DDI) X3-17 C. Flowers (DDI) X3-17<br />

A. Gagnon X9-08 T. A. Foster N3-30<br />

S. E. Parnell X3-16 R. Ganapathy X3-40<br />

M. Sherman (DDI) X3-17 J. A. Heard H4-17<br />

H. Williams III X3-16 W. R. Junkins X3-16<br />

D. G. Saueressig N3-30<br />

D. B. Teachout X3-16<br />

J. A. Ware N3-30<br />

H. C. Weber (DDI) X3-16<br />

A. E. Zacharias X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4-11I<br />

A meeting on the above subject was held on April 27, 2010 at 11 8-K, MO-755.<br />

I. SAFETY<br />

* Safety topic: Discuss WCH PPE policy including the definition of substantial footwear for<br />

persons going out on site. If you do a 360 walk-around and then get distracted with paperwork, a<br />

phone call, etc. it would be prudent to do another walk-around as conditions can change at any<br />

time. As an extension of this, there are very few, if any, situations that warrant<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/20 10. Still waiting on permnits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

ZAAdministrative Assistant'Froject Progress Review Weekly Meetings\2010\April\4-27-10 Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

work on water line on an off shift work day, pushing for Friday 2/19/20 10. Excavation permit is<br />

complete. Discussed that 1 00-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 1 9 th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 100-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27).<br />

" Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss fujrther with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to burn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/2010. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning. DDI to submit revised OMP this week.<br />

DDI is working with WCH EPL on clarifications. WCH EPL to observe Watts's oil burning<br />

facility on 3/18/2010. DDI will submit OMP after that date. OMP waiting on ARES revision to<br />

drawings, then DDI will submit. Drawings should be available for pickup by DDI this week then<br />

the OMP will be submitted. No update (4/20). DDI is working on final review of this submittal<br />

and will submit by 5/11/2010 (4/27).<br />

" DDI to provide a plan to access the top of the diesel fuel storage tank. DDI confirmed ladder is<br />

on site. Will be meeting with WCH Safety about use and training requirements prior to<br />

developing and implementing a plan for utilization. DDI plans to construct scaffolding with<br />

handrails to access top of tank. WCH will be issuing a new scaffolding procedure soon and will<br />

incorporate any potential changes or impacts to the subcontractor. DDI will be installing a ladder<br />

and tie-off point next week. WCH will need to have the tie-off point inspected by a qualified<br />

person prior to use. DDI will install ladder bolts from the ground for the first two or three rungs<br />

and then contract with Northpoint to complete the remainder of the ladder installation. DDI to<br />

complete fall prevention THA and make sure that work package is discussed and clear to all<br />

involved. DDI discussing a "flip-plate" to be used to stick check levels in the tank from the top<br />

of the ladder. DDI needs to check that modifications made to the tank are in compliance with the<br />

manufacturer's specs. Ladder to be installed today (3/23/20 10). Ladder installation delayed<br />

because the bolts where too large for the holes. New DDI PM will be revisiting this matter<br />

(4/20). Watts is looking into the costs associated with placing scaffolding around the tank.<br />

Another alternative is to bring a man-lift to the site (4/27).


Progress Review Meeting<br />

Page 3<br />

" DDI will be providing calcium chloride for the water system when it is operational. Before<br />

Trench K is opened up, DDI to have calcium chloride on site for dust control. DDI to look into<br />

utilizing Dust Bond in trenches K, N, 0 and 1. DDI to provide mixture ratios for WCH profile.<br />

WCH is looking into the availability of having Dust Bond totes on site for use with dust control.<br />

DDI to have calcium chloride on site before opening up Trench K excavations. No update (4/20).<br />

DDI indicated the plan is to have a 250 gallon tote that will be used through the injection system<br />

tied into the water system (4/27).<br />

" DDI evaluating a location for truck washing. This will be coordinated with the WCH EPL. This<br />

will be set up next to the high tank. WCH EPL will be onsite this week to assist with designating<br />

a location. WCH EPL is in review of proposed location with preference for location in the AOC<br />

(4/27).<br />

" Trench "I" planning and discussions are underway. DDI has not yet received any feedback from<br />

Rowand regarding bucket dimensions, spec sheet, cameras, etc. DDI to provide this information<br />

by Monday, 3/18/2010. The Jewel rep was on site this week and is going to provide additional<br />

information to answer the questions raised. DDI needs to provide a large number of ecology<br />

blocks for use in Trench 1. These need to have a rated picking point and be in very good shape.<br />

DDI to follow-up with Jewell and Rowand machinery for information on cameras and<br />

dimensional information on clam shell. DNFSB presentation went well. WCH is planning a<br />

management review at the end of next week. WCH needs additional information on the camera<br />

and other equipment as soon as possible. WCH will be holding a workshop meeting with the<br />

local defense board, DOE and WCLI management later in April. Any additional information that<br />

can be gathered on equipment will be beneficial. WCH workshop with DNFSB held 4/21/2010.<br />

WCH will be submitting Start-up Review Report to DOE for approval to begin working on PSR.<br />

A meeting will be scheduled soon to develop plan for procuring equipment that will be needed for<br />

the Trench I Silo excavation work. This meeting will need to include WCH, Watts, and DDI<br />

personnel (4/27).<br />

* WCH has three confirmatory sampling sites what will require DDI equipment support. More<br />

information will be provided soon. WCH pushing for an April timeframe to perform this work.<br />

A walkdown of one of the sites will be occurring today. WCH will schedule a discussion for next<br />

week to discuss the excavation of the two or 3 sites that are included in the current contract.<br />

Potholing to commence 5/17/2010 when DDI's new sampler has completed her training. A<br />

meeting will be held prior to the sampling to ensure that DDI has everything on hand to support<br />

the excavation activities for confirmatory sampling at 600-29 (4/27).<br />

* WCH is concerned that DDI has not produced a baseline schedule for the project. DDI planning<br />

to submit next revision of baseline schedule on 3/16/2010. WCH will be issuing an SDR to DDI<br />

for the lack of a baseline schedule. WCH has received submittal and is in review. WCH is<br />

currently in review of the resubmitted schedule. WCH has returned the submittal status 1. No<br />

SDR will be issued at this time (4/27).<br />

" DDI to develop a process for segregating metal debris from void space to keep the wrong items<br />

from being loaded out. DDI is developing a posting system to identify specific segregated areas.<br />

DDI is working on this, nothing has been implemented to date. No update (4/20). DDI will<br />

review and evaluate if there is further need to develop a plan (4/27).<br />

* Discuss implementation and oversight of equipment maintenance plan with the resignation of the<br />

DDI mechanic. DDI working to bring on project mechanic. WCH suggests that DDI review their<br />

equipment maintenance processes, particularly with regards to equipment daily inspections and<br />

how repairs will be made (4/27).


Progress Review Meeting<br />

Page 4<br />

111. PROJECT DESIGN DRAWINGS<br />

*WCH return electrical and traffic control drawings to DDI, status 2. DDI will be resubmitting<br />

soon incorporating the WCH comments. DDI to submit this week. Drawings are with North<br />

Point for revision and will be resubmitted upon their return. DDI is well beyond the 30-day<br />

resubmission for updated drawings. WCH will be issuing an SDR regarding this issue. DDI has<br />

indicated they are working on a deficiency letter which will be submitted to Watts for this and<br />

several other deficiencies.<br />

o Electrical drawings are a priority as CHPRC will be making some revisions to them for<br />

some additional air monitoring stations on the 118-K electrical service. No update (4/20).<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

* See attached.<br />

VI.<br />

VII.<br />

MANPOWER<br />

*DDI has extended an offer to a CIH candidate. The candidate has accepted the offer of <strong>Site</strong><br />

Safety and Health Officer. DDI is struggling to find a CIH to fill the CIII Key personnel position.<br />

EQUIPMENT<br />

" WCH will be discussing with DDI the possible use of the JD 225 for the confirmatory sampling.<br />

" The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3.<br />

" DDI has instructed Watts to continue installation of the soil bonding agent injection system that<br />

will tie into the water system.<br />

" Equipment to be identified for the Trench I Silo remediation.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

*Clarification of distance to remain from a non-bermed edge of a trench. Planners are working on<br />

this clarification.<br />

IX<br />

MATERIAL<br />

0 DDI to address getting calcium chloride on site before current supply of fixative runs out.<br />

X. QUALITY<br />

*Construction, Drawings and Procedures Surveillance to be completed this week (DDI QA Manual<br />

Section 5).<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

* DDI will be issuing an RFI for the scheduler position, duties and WCH expectations.<br />

* DDI will be issuing an REI to further discuss the independent CIH position and other possible<br />

options.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

" See attached.<br />

* Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating


Progress Review Meeting<br />

Page 5<br />

comments and will resubmit. DDI to submit by 1/28/2010. WCH has received, in preliminary<br />

review, will return this week. WCH returned to DDI, status 2, with comments. DDI will be<br />

doing a walkdown with Mr. Teachout to incorporate comments and will resubmit drawings for<br />

approval. DDI to check on status. DDI waiting on North Point. DDI still waiting on North<br />

Point. They have exceeded the 30-day expected response to a returned submittal. DDI to follow<br />

up with North Point again this week. No update, still with DDI (4/20). No update (4/27).<br />

*WCH requests as-built drawings of the energized water system.<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE<br />

* Letter from DDI: Acknowledgement of Change Notice 025<br />

* Weekly Progress Review Meeting Minutes of 4/20/2010<br />

IN VOICE AND PAYMENT STATUS<br />

* April month end was April 22, 2010.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* Discussed issue of inaccurate scale weights. DDI has instructed Watts to install a new scale. The<br />

scale is part of the contract between Watts and DDI. WCH asks that the work be completed no<br />

later than the end of May with work to be completed on weekends so not to take away from<br />

production.<br />

* An informal meeting with WCH, DDI and ESHI will be scheduled to discuss start and stop times<br />

in the HRA.<br />

" DDI is reminded that Daily Reports are to be submitted to WCH the following day. If the person<br />

who normally completes these is out, a back up needs to be identified and trained.<br />

" There is an issue with not having Tyvec booties for some site personnel when they are required to<br />

enter the trenches for sampling. DDI commits to getting some on site immediately.<br />

* DDI needs to survey signage used in the CRZ postings. Currently some signs state "Caution"<br />

while others on the same rope state "Danger". The correct warning level for the CRZ is<br />

"Caution". DDI will address this.<br />

" DDI asked that WCH clarify the definition of anomalies. There seems to be some confusion on<br />

what actually constitutes an anomaly.<br />

Attachment(s): As noted above.


Ni<br />

00 Lo<br />

F-<br />

M0o<br />

CD 0 MD co 1t<br />

Eca sk e -<br />

.1 Ea<br />

< f'~<br />

cc<br />

C- 6 N0dc (ibC .O<br />

(U<br />

)<br />

CoC<br />

Cc<br />

V M a M Mi<br />

0 0 0 0 0 0 0 0 8 3<br />

~W


6 0<br />

0 1<br />

C --<br />

0 E<br />

~ E<br />

CA 0 U)<br />

C<br />

c E OI- < I-<br />

tw w<br />

000<br />

wj<br />

00 u~0<br />

E<br />

E<br />

-4 CO N<br />

4m<br />

0~U 0~ C)-<br />

0I 0 u u 4--44 u u<br />

~. E E E ~:3 = 0 U CU (U<br />

00 zzmcc:<br />

CL w -


HE F3 600E E5 E E5 F0 6 C55F 55<br />

0 0 55 F E3E3EF<br />

~0 0 0 0 0 0 0 0 C 0 0C)0 C0 0 00<br />

40 CNN (D N C) 0) ~ s<br />

C) C0~ 0~<br />

C))C<br />

04) CDC CO0) 04O CO)N 0 0 0 00 0 0 a<br />

L-C% 0 04 N 0i ,- o 0 - 1 -~ 4 N N<br />

0<br />

-O 04 (0N C) l 0 0 0A 0 0 0<br />

04. N 04 o000 C-<br />

N CN<br />

(D C4- - C)<br />

C)~ C) C)*-~)~ CN a CN NC)<br />

4) - - C)<br />

C<br />

U))<br />

4) -C,-0 0 0) 0 00<br />

0<br />

N~ C14 N N NN 0 C0 0C 0<br />

Cu~ £ ~ Z c) 04---<br />

c ItCO ) C1 N N N CN ', Cl) CO) C<br />

(** U) (2 Ci)<br />

L) R A ) A<br />

0 .0 _u - u<br />

.) r5 a3 -<br />

CL> 0 cu ca MU c a<br />

43) (D (n L L U.. a) 1) -<br />

CO~~<br />

_<br />

V : ( 0r 0 Qc<br />

(M C >c .2 0 0 E<br />

a Co<br />

L -<br />

-o -o - a 0<br />

Cu Cl C;) a LU 0US 01 ( c)<br />

C-4 Nc<br />

Ci)<br />

0~l<br />

o w o.S; C:Ci a c c<br />

Co~~~( .02 C D D _(~<br />

0~~ ~ a)CNUc~<br />

N ~ C CD-' CD ( ~<br />

CO MO 5 C8 E 0 2 0- 'a .2 C<br />

) a) w a 0 a) ) o e c<br />

E<br />

E<br />

Ca. 0) 0<br />

a-aaua 2~ E- a) 4 a-<br />

ofw L w0 _ ~ 00<br />

z a.-C/)'0) a)C (U U<br />

a) M o w ci) C-<br />

C)~~- ca 'a _ -<br />

0><br />

M 4N - p E- - " .2-<br />

0W CD <br />

c 0 04 0 00f 0a 0D F 00<br />

00-0 0F 0<br />

00004 00 0)CMu Z 0 0 -<br />

N<br />

COc' -9. 9 co 9 9 O<br />

C) 'aO M)<br />

0c 0)<br />

0 0 000000 00 0 0a 0 00 D<br />

0 00<br />

ca- ca - - m -0<br />

< - - - - - - - - - - - -- F- - - -


2' . . . 2 3<br />

-<br />

0 ~2 cl- 0Z Z' 2<br />

R,<br />

p) v~ al<br />

46 7E 6cu 66 t<br />

C-)5<br />

Lg4<br />

zO0 ,N' 4 0 ~ 4


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 150037<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

May11, 2010<br />

ATEDE<br />

DISRIBTIO<br />

E. L. Adamson X3-40 D. Bollinger (DDI)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Grist X3-16 R. W. Cross H4-25<br />

R. A. Dodd H4-24 T. Dance (DDI) X3-17<br />

R. Ferguson (DDI) X3-17 C. Flowers (DDI) X3-17<br />

A. Gagnon X9-08 T. A. Foster N3-30<br />

S. E. Parnell X3-16 R. Ganapathy X3-40<br />

M. Sherman (DDI) X3-17 J. A. Heard H4-17<br />

H. Williams III X3-16 W. R. Junkins X3-16<br />

D. G. Saueressig N3-30<br />

D. B. Teachout X3-16<br />

J. A. Ware N3-30<br />

H. C. Weber (DDI) X3-16<br />

A. E. Zacharias X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4-11I<br />

A meeting on the above subject was held on May 11, 2010 at 11 8-K, MO-755.<br />

1. SAFETY<br />

0 Safety topic: Watch where you are walking, keeping an eye on the terrain. Another thing while<br />

walking is to keep hands from pockets. This will allow you to catch yourself before falling.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

0 PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/2010. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permnit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 1 00-K water will be shut-off this weekend. Friday work is pending.<br />

Z:\Administrative Assistant\Project Progress Review Weekly Meetings\2010\May\5-l 1-10 Weekly Progressdoc


Progress Review Meeting<br />

Page 2<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/20 10. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 1 9 th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 100-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDJ to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/2 0). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit ths week (5/4). DDI has run<br />

calcs on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11)<br />

" Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to bum prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/2010. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning. DDI to submit revised OMP this week.<br />

DDI is working with WCH EPL on clarifications. WCH EPL to observe Watts's oil burning<br />

facility on 3/18/2010. DDI will submit OMP after that date. OMP waiting on ARES revision to<br />

drawings, then DDI will submit. Drawings should be available for pickup by DDI this week then<br />

the OMP will be submitted. No update (4/20). DDI is working on final review of this submittal<br />

and will submit by 5/11/2010 (4/27). On track to submit by 5/11/2010 (5/4). DDI confirmed that<br />

the OMP will be submitted 5/12/2010. Since the OMP is not yet approved, DDI is not to remove<br />

used oil from the site. Any questions about exceptions to this need to be discussed with the WGH<br />

EPL. (5/11)<br />

* DDI to provide a plan to access the top of the diesel fuel storage tank. DDI confirmed ladder is<br />

on site. Will be meeting with WCH Safety about use and training requirements prior to<br />

developing and implementing a plan for utilization. DDJ plans to construct scaffolding with<br />

handrails to access top of tank. WCH will be issuing a new scaffolding procedure soon and will<br />

incorporate any potential changes or impacts to the subcontractor. DDI will be installing a ladder<br />

and tie-off point next week. WCH will need to have the tie-off point inspected by a qualified<br />

person prior to use. DDI will install ladder bolts from the ground for the first two or three rungs<br />

and then contract with Northpoint to complete the remainder of the ladder installation. DDI to<br />

complete fall prevention JHA and make sure that work package is discussed and clear to all<br />

involved. DDI discussing a "flip-plate" to be used to stick check levels in the tank from the top<br />

of the ladder. DDI needs to check that modifications made to the tank are in compliance with the


Progress Review Meeting<br />

Page 3<br />

manufacturer's specs. Ladder to be installed today (3/23/2010). Ladder installation delayed<br />

because the bolts where too large for the holes. New DDI PM will be revisiting this matter<br />

(4/20). Watts is looking into the costs associated with placing scaffolding around the tank.<br />

Another alternative is to bring a man-lift to the site (4/27). No update. (5/4) No update. (5/11)<br />

* WCH has three confirmatory sampling sites what will require DDI equipment support. More<br />

information will be provided soon. WCH pushing for an April timeframe to perform this work.<br />

A walkdown of one of the sites will be occurring today. WCH will schedule a discussion for next<br />

week to discuss the excavation of the two or 3 sites that are included in the current contract.<br />

Potholing to commence 5/17/2010 when DDI's new sampler has completed her training. A<br />

meeting will be held prior to the sampling to ensure that DDI has everything on hand to support<br />

the excavation activities for confirmatory sampling at 600-29 (4/27). On track to have sampler<br />

training in place by 5/17/2010 (5/4). Pot holing to begin 5/18/2010. (5/11)<br />

* Discussed issue of inaccurate scale weights. DDI has instructed Watts to install a new scale. The<br />

scale is part of the contract between Watts and DDI. WCH asks that the work be completed no<br />

later than the end of May with work to be completed on weekends so not to take away from<br />

production. (5/4) No change. WCT discussed the need to coordinate long lead time for<br />

scheduling teamster to remove from site the scale being replaced. (5/11)<br />

* An informal meeting with WCH, DDI and ESHI will be scheduled to discuss start and stop times<br />

in the HRA. (4/27) This schedule is to be implemented by Monday, 5/17/20 10.<br />

* DDI is reminded that Daily Reports are to be submitted to WCH the following day. If the person<br />

who normally completes these is out, a back up needs to be identified and trained. This continues<br />

to be a challenge. (4/27) WCH noted that this is the DDI PM's responsibility. As this continues<br />

to be an issue, DDI is putting themselves in a deficient position. (5/11)<br />

* There is an issue with not having Tyvec booties for some site personnel when they are required to<br />

enter the trenches for sampling. DDI commits to getting some on site immediately. DDI has<br />

procured, will provide arrival date. (5/4) Tyvec booties have been received, but DDI is still<br />

waiting on rubber overshoes. (5/11)<br />

" DDI asked that WCH clarify the definition of anomalies. There seems to be some confusion on<br />

DDI's part what actually constitutes an anomaly. No update. A meeting will be held to discuss<br />

this today (5/4). DDI requested an additional meeting to discuss delays related to anomalies.<br />

This is scheduled for 5/12/2010 at 1:00. (5/11)<br />

* Getting rock truck back on site in order to complete safety bench in trench L is a priority. (5/4)<br />

This is not an issue; the truck is on-site at the 1 00-K project next door and can be made available<br />

as needed. (5/11)<br />

III.<br />

IV.<br />

PROJECT DESIGN DRAWINGS<br />

*DDI still needs to submit for WCH review as-builts for electrical as well as the energized water<br />

line.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

* See attached.<br />

VI.<br />

MANPOWER<br />

*DDI is struggling to find another CIH to fill the CIH Key personnel position.<br />

0 Bill McKee (CIH) is no longer on staff. DDI is pursuing another CIH candidate at this time


Progress Review Meeting<br />

Page 4<br />

with no success. No change. (5/11)<br />

VII.<br />

VIII.<br />

IX.<br />

EQUIPMENT<br />

" Possible use of the JD 225 for the confirmatory sampling. DDI will be bringing another<br />

excavator on site for the sampling instead of using equipment already on site.<br />

* The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3. No update (5/4). No update. (5/11)<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

*Clarification of distance to remain from a non-bermned edge of a trench. Planners are working on<br />

this clarification to the container loading technical procedure.<br />

MATERIAL<br />

0 None.<br />

X. QUALITY<br />

* Instructions, Drawings and Procedures Surveillance to be completed this week (DDI QA Manual<br />

Section 5). No deficiencies were found. (5/4)<br />

" DDI fiowdown surveillance to be scheduled soon.<br />

* Breathing air surveillance to be scheduled soon.<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

" DDI will be issuing an RFI for the scheduler position, duties and WCH expectations. No update<br />

(5/4). No update. (5/11)<br />

* DDI will be issuing an RFI to further discuss the independent CIH position and other possible<br />

options. No update (5/4). No update. (5/11)<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

" See attached.<br />

* Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/2010. WCH has received, in preliminary<br />

review, will return this week. WCH returned to DDI, status 2, with comments. DDI will be<br />

doing a walkdown with Mr. Teachout to incorporate comments and will resubmit drawings for<br />

approval. DDI to check on status. DDI waiting on North Point. DDI still waiting on North<br />

Point. They have exceeded the 30-day expected response to a returned submittal. DDI to follow<br />

up with North Point again this week. No update, still with DDI (4/20). No update (4/27). No<br />

update (5/4).<br />

" WCH return electrical and traffic control drawings to DDI, status 2. DDI will be resubmitting<br />

soon incorporating the WCH comments. DDI to submit this week. Drawings are with North<br />

Point for revision and will be resubmitted upon their return. DDI is well beyond the 30-day<br />

resubmission for updated drawings. WCH will be issuing an SDR regarding this issue. DDI has<br />

indicated they are working on a deficiency letter which will be submitted to Watts for this and<br />

several other deficiencies.<br />

*Electrical drawings are a priority as CHPRC will be making some revisions to them for some<br />

additional air monitoring stations on the 11I8-K electrical service. No update (4/2 0). No<br />

update (5/4)<br />

" WCH requests as-built drawings of the energized water system. No update (5/4).


Progress Review Meeting<br />

Page 5<br />

XIII.<br />

XIV.<br />

XV.<br />

XVI.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

CORRESPONDENCE<br />

" Letter from DDI: Monthly IH Report for April 2010 (per HASP)<br />

" Weekly Progress Review Meeting Minutes of 5/11/2010<br />

* Letter from DDI: Recall Work Performed Paperwork<br />

INVOICE AND PAYMENT STATUS<br />

* April invoice is in WCH approval process.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* DDIs new <strong>Site</strong> Safety Officer, Ilene Strong, started on Monday. Whitney Sexsmith's last day is<br />

to be Thursday 5/13.<br />

* DDI has not yet responded to the Subcontractor Deficiency Report - FR-201 0-IF-0045-SDR-0 10.<br />

* An All-Hands Meeting will be held next week at the Three Rivers Convention Center. This<br />

meeting will be discussing the site-wide beryllium program. More info to follow.<br />

" Tuesday and Wednesday of next week is the Safety Expo to be held at TRAC. The site will<br />

shutdown early to allow all employees (WCH, ESHI and all Subcontractor) to attend. More<br />

information to follow.<br />

* DDI has not received any information on the Trench I camera specs or equipment specs for the<br />

400 excavator. They will follow up with the vendor.<br />

* There are several safety items that need DDI attention from last week's safety walkdown.<br />

(Cover/Storage fort he breathing air bottles, cord trees for the fans used in the field, fixative hose<br />

at the tent, and move the batteries charging in the conex.)<br />

Attachment(s): As noted above.


cCc;<br />

0;C<br />

~ ~. ~In<br />

Cl S8 :.8<br />

0>0 0 - 08 0-<br />

o<br />

CD<br />

co<br />

o 7L 7L 7<br />

LJo)<br />

6~ gg ji It<br />


O0OQ a 0)aC 0 a00<br />

o o CQ 0 0 0 cQ00 0 00<br />

CO)N N 0N CO C) ce) C'N<br />

C')D<br />

0 a )<br />

0 0 0 00 C 0 0 0<br />

C) ~ c, 0~<br />

IC; 0 0 0)0 0 0) 0<br />

C ZE -<br />

Lo~<br />

'L iZ i - C)0<br />

0a) ~ ~ ~ T A)- N N~<br />

(0 F<br />

Co C) -o COc<br />

(:)5 LL L L 2 -0<br />

0<br />

00<br />

0.<br />

IL<br />

0~C<br />

IL C<br />

IL<br />

6 0)<br />

a 0 -<br />

-C 2 a a a - - w<br />

LU cmCN -0 0 c<br />

0


2 e2<br />

i5<br />

S<br />

c.,<br />

2, A<br />

0 0 E -<br />

12 ~~~<br />

o2 2<br />

d,,09<br />

CC<br />

~~9 ' 0<br />

29<br />

L, Z '<br />

z 2 I<br />

66


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 150041<br />

JIM= WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach K< ;<br />

,<br />

May 18, 2010<br />

DUISTRIUTIO<br />

E. L. Adamson X3-40 D. Bollinger (DDI)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Crist X3-16 R. W. Cross H4-25<br />

R. Ferguson (DDI) X3-17 T. Dance (DDI) X3-17<br />

A. Gagnon X9-08 R. A. Dodd H4-24<br />

S. J. Henneman X3-18 C. Flowers (DDI) X3-17<br />

S. J. Huddleston X3-16 T. A. Foster N3 -3 0<br />

W. R. Junkins X3-16 R. Ganapathy X3 -40<br />

S. E. Parnell X3-16 J. A. Heard H4-17<br />

M. Sherman (DDI) X3-17 D. G. Saueressig N3-30<br />

D. B. Teachout X3-16<br />

H. C. Weber (DDI) X3-16<br />

H. Williams III X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4-1 1<br />

A meeting on the above subject was held on May 18, 2010 at 118-K, MO-755.<br />

I. SAFETY<br />

* Safety topic: Use common sense when driving in the rain. Maintain safe distances and use<br />

speeds appropriate to the road conditions. In addition, maintain vehicle maintenance and check<br />

and/or replace windshield wiper blades periodically.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

*PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals arc with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/2010. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

Z:\Administrative Assistant\Project Progress Review Weekly Meetings\2010\May\5-l8-lO Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

complete. Discussed that 1 00-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the I 9th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 100-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

calcs on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18)<br />

* Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to bum prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/2010. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning. DDI to submit revised OMP this week.<br />

DDI is working with WCH EPL on clarifications. WCH EPL to observe Watts's oil burning<br />

facility on 3/18/2010. DDI will submit OMP after that date. OMP waiting on ARES revision to<br />

drawings, then DDI will submit. Drawings should be available for pickup by DDI this week then<br />

the OMP will be submitted. No update (4/20). DDI is working on final review of this submittal<br />

and will submit by 5/11/2010 (4/27). On track to submit by 5/11/2010 (5/4). DDI confirmed that<br />

the OMP will be submitted 5/12/2010. Since the OMP is not yet approved, DDI is not to remove<br />

used oil from the site. Any questions about exceptions to this need to be discussed with the WCH<br />

EPL. (5/11) DDI continues to work on completing the OMP with support from the WCH EPL.<br />

DDI plans to submit the OMP next week. (5/18)<br />

" DDI to provide a plan to access the top of the diesel fuiel storage tank. DDI confirmed ladder is<br />

on site. Will be meeting with WCH Safety about use and training requirements prior to<br />

developing and implementing a plan for utilization. DDI plans to construct scaffolding with<br />

handrails to access top of tank. WCH will be issuing a new scaffolding procedure soon and will<br />

incorporate any potential changes or impacts to the subcontractor. DDI will be installing a ladder<br />

and tie-off point next week. WCH will need to have the tie-off point inspected by a qualified<br />

person prior to use. DDI will install ladder bolts from the ground for the first two or three rungs


Progress Review Meeting<br />

Page 3<br />

and then contract with Northpoint to complete the remainder of the ladder installation. DDI to<br />

complete fall prevention JHA and make sure that work package is discussed and clear to all<br />

involved. DDI discussing a "flip-plate" to be used to stick check levels in the tank from the top<br />

of the ladder. DDI needs to check that modifications made to the tank are in compliance with the<br />

manufacturer's specs. Ladder to be installed today (3/23/2010). Ladder installation delayed<br />

because the bolts where too large for the holes. New DDI PM will be revisiting this matter<br />

(4/20). Watts is looking into the costs associated with placing scaffolding around the tank.<br />

Another alternative is to bring a man-lift to the site (4/27). No update. (5/4) No update. (5/11)<br />

No update. (5/18)<br />

* Discussed issue of inaccurate scale weights. DDI has instructed Watts to install a new scale. The<br />

scale is part of the contract between Watts and DDI. WCH asks that the work be completed no<br />

later than the end of May with work to be completed on weekends so not to take away from<br />

production. (5/4) No change. WCH discussed the need to coordinate long lead time for<br />

scheduling teamster to remove from site the scale being replaced. (5/11) No change. DDI subtier<br />

(Watts) has to plans at this time to replace scale. (5/18)<br />

* DDI is reminded that Daily Reports are to be submitted to WCH the following day. If the person<br />

who normally completes these is out, a back up needs to be identified and trained. This continues<br />

to be a challenge. (4/27) WCH noted that this is the DDI PM's responsibility. As this continues<br />

to be an issue, DDI is putting themselves in a deficient position. (5/11) No change. (5/18)<br />

* DDI asked that WCH clarify the definition of anomalies. There seems to be some confusion on<br />

DDI' s part what actually constitutes an anomaly. No update. A meeting will be held to discuss<br />

this today (5/4). DDI requested an additional meeting to discuss delays related to anomalies.<br />

This is scheduled for 5/12/2010 at 1:00. (5111) Meeting rescheduled for Thursday, 5/20/2010.<br />

(5/18)<br />

" Tuesday and Wednesday of this week is the Safety Expo to be held at TRAC. The site will<br />

shutdown early to allow all employees (WCH, P5111 and all Subcontractor) to attend. All will<br />

attend; curtail site operations two hours early.<br />

" DDI has not received any information on the Trench I camera specs or equipment specs for the<br />

400 excavator. They will follow up with the vendor. (5111) Some specs have been received, but<br />

more are needed. Confer with D. Teachout for specifics. (5/18)<br />

* There are several safety items that need DDI attention from last week's safety walkdown.<br />

(Cover/Storage for the breathing air bottles, cord trees for the fans used in the field, fixative hose<br />

at the tent, and move the batteries charging in the conex.) (5111) There has been no progress<br />

made in making these corrections. (5/18)<br />

111. PROJECT DESIGN DRAWINGS<br />

*DDI still needs to submit for WCH review as-builts for electrical as well as the energized water<br />

line. (5/11) No change, (5/18)<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

*See attached.<br />

VI.<br />

MANPOWER<br />

0 DDI is struggling to find another CIH to fill the CIH Key personnel position.<br />

0 Bill McKee (CIII) is no longer on staff. DDI is pursuing another CIII candidate at this time


Progress Review Meeting<br />

Page 4<br />

with no success. No change. (5/111)<br />

minimum requirements. (5/18)<br />

DDI submitted two resumes for review, both meet<br />

VII.<br />

EQUIPMENT<br />

*The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3. No update (5/4). No update. (5/11)<br />

No update. (5/18)<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

*Clarification of distance to remain from a non-bermed edge of a trench. Planners are working on<br />

this clarification to the container loading technical procedure. (5/11) No update. WCH to followup.<br />

(5/18)<br />

IX<br />

MATERIAL<br />

0 None.<br />

X. QUALITY<br />

* DDI flowdown surveillance to be scheduled soon. WCH QA performing currently.<br />

* Breathing air surveillance to be performed this week. WCH QA is waiting on information from<br />

subcontractor to complete.<br />

* DDI has not yet responded to the Subcontractor Deficiency Report - FR-2010-IF-0045-SDR-O10.<br />

(5/11) DDI to submit by Thursday, 5/20. (5/18)<br />

* DDI was issued SDR (FR-201 0-IF-03 82-SDR-0 15) on 5/17/2010 for as-built drawings.<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

* DDI will be issuing an RFI for the scheduler position, duties and WCH expectations. No update<br />

(5/4). No update. (5/11) No change. (5/18)<br />

* DDI will be issuing an RFI to further discuss the independent CIH position and other possible<br />

options. No update (5/4). No update. (5/11) No update. (5/18)<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

* Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/2010. WCH has received, in<br />

preliminary review, will return this week. WCH returned to DDI, status 2, with comments.<br />

DDI will be doing a walkdown with Mr. Teachout to incorporate comments and will resubmit<br />

drawings for approval. DDI to check on status. DDI waiting on North Point. DDI still<br />

waiting on North Point. They have exceeded the 30-day expected response to a returned<br />

submittal. DDI to follow up with North Point again this week. No update, still with DDI<br />

(4/20). No update (4/27). No update (5/4). No update from DDI. WCH issued SDR. (5/18)<br />

* Electrical drawings are a priority as CHPRC will be making some revisions to them for some<br />

additional air monitoring stations on the 118-K electrical service. No update (4/20). No<br />

update (5/4)


Progress Review Meeting<br />

Page 5<br />

* WCH return traffic control drawings to DDI, status 2. DL)I will be resubmitting soon<br />

incorporating the WCH corrments. DDI to submit this week. Drawings are with North Point for<br />

revision and will be resubmitted upon their return. DDI is well beyond the 30-day resubinission<br />

for updated drawings. WCU will be issuing an SDR regarding this issue, DL)I has indicated they<br />

are working on a de-ficiency letter which will be submitted to Watts for this and several other<br />

deficiencies. (5/11) No update, (5/18)<br />

* WCH requests as-built drawings of the energized water system. No update (514). No update.<br />

(5/11) SDR provided, no update (5/18)<br />

XIII.<br />

XIV.<br />

XV.<br />

XVI-<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

*See attached.<br />

CORRESPONDENCE<br />

* Resume for I(b)(6) JCIII<br />

0 Resume fo (b)(6) JCII<br />

0 Weekly Progress Review Meeting Minutes of 511/12010<br />

* Letter to DDT: Transmittal of Safety Incentive Confirmation<br />

* Subcontractor Deficiency Report: FR-201 0-IF-03 82-SDR-0 15<br />

INVOICE AND PAYMENT STATUS<br />

*This week is the end of the May accounting month.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

" DDJ has sent notice to WCH- requesting to work this Friday, 5/21/2010.<br />

" WCH asked if DDI intends to use misters in the field during the hot work season. If so, WCH<br />

will require lead time and approximtate number and usage in order to schedule potable water<br />

delivery. DDI to investigate.<br />

" DL)I to submit REA for mandatory JBeiyllium training held on 5/17/2010. This will be part of the<br />

delay discussion meeting to be held on Thursday 5/20/2010.<br />

" Discussed Incidental Welding proceduire. Surveillance performned, identified necessary changes<br />

to be made for clarifications.<br />

" WCH expressed concerns about delays in completion of subcontract administrative duties and<br />

paperwork. WCH suggests that DDI take a look at how to best resolve this issue.<br />

Attachment(s): As noted above.


6 c U,<br />

o E-<br />

Z<br />

co 0<br />

cc S1 "---j<br />

U<br />

uu<br />

V-U,<br />

EE<br />

In<br />

Eo<br />

5n1*L<br />

o~~~ *u<br />

(q - -b X<br />

uui i uo u<br />

4-==== Ln<br />

0<br />

4-F<br />

U.':E 0 -<br />

2rEEEmm+<br />

o t<br />

u 4 -Jc (<br />

1U, : F o')L U ' ) :-: 3<br />

J


co 8 8 8 8<br />

c 00<br />

OD N<br />

8<br />

is8<br />

2 Z<br />

ui<br />

LL<br />

0 0 0 0 0 0 0 0 Ci 0


- - - - - - - - 0<br />

~0 C)o C 0 0 0 C) 0 0 0 00<br />

L- C NN 0 N N N N\JN N~ N 04 N<br />

0000N 0 OD 0 00 14 0 0 0N<br />

N 04 N N N N N<br />

---- N- CD - - ~- ~- - -<br />

M-OLO N CN CNCM Cl) Cl) N<br />

G) C) C)0C0 0 MO O 0D 0 C<br />

CU 4 N N C'.Zl N~ N~<br />

No - 00C-0<br />

w l - o __- 4- -<br />

c')<br />

CV) ~U 0U)CN U)C C L<br />

u .) (4) (D)<br />

00<br />

zc. 0 U) C/) () LLa) a -o<br />

N. -<br />

-<br />

~<br />

0 C) 0 C) () ~ ~ (<br />

CD -C :t- 0 0 E<br />

Sm0. N < c < .C: %z :n<br />

>~ V 0 - 0 0 0<br />

wj EE E 22i c<br />

7m) U) 'F 0 0 0 ~ I=<br />

CU 0 ZIC)U 160 c c C)<br />

q<br />

oo<br />

a) a)<br />

(1) (<br />

_)W<br />

CD 030) 00 1<br />

c N 3 F C<br />

- C a C C<br />

E Na 0 c -0 '- cc E: . a<br />

N a C C HE-<br />

N M -<br />

(<br />

'-5l<br />

It<br />

C)03 CDU0<br />

3): 0 (D C Q C)t3 t 5 <<br />

0 co - -0 (3<br />

- CD a)<br />

- N1 a)) No<br />

U)<br />

0 0n 0, 0)00 0 0 00<br />

> -00 - - 0: -00 L<br />

c ccr c0c c co~ 0) co c<br />

0 0 06 c--<br />

0000 0 0 0<br />

C, E a) £<br />

o o<br />

CNNNC') 0 1D0- a1Lc30 1 0 ) 0 0 C))<br />

~N<br />

N<br />

- o o c 0m 0 0 0 0 00


22 &<br />

o2<br />

w2<br />

4,* * *~ , 4<br />

'4w4<br />

L.)<br />

400<br />

> ><br />

.t'<br />

~~~~ S ,<br />

2'O<br />

'Q0 0 . 40<br />

-- x~',)<br />

'0 CCNO cor Nt'. N 0)4, 4,0<br />

*4, 'Wt ~ 'WO V''W 0 '44 tt*' 00<br />

z 0)0 0<br />

c- Z0-W<br />

4,o<br />

M-T ,<br />

C, 2 (D<br />

061 2 2,8<br />

3TiA<br />

U) z~ i<br />

I


~V .Washinoten<br />

CCN: 3<br />

Cissurs<br />

NO11N1<br />

Meeting Minutes<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Chnistopher L. Beach < 'X~<br />

May 4, 2010<br />

ATEDE<br />

DSTRIBTIO<br />

C. L. Beach X3-16 E. L. Adamson X3-40<br />

Q. L. Crist X3-16 D. Bollinger (DDI)<br />

R. Ferguson (DDI) X3-17 R. D. Cantwell N3-30<br />

A. Gagnon X9-08 R. W. Cross H4-25<br />

W. R. Junkins X3-16 T. Dance (DDI) X3-17<br />

S. E. Parnell X3-16 R. A. Dodd H4-24<br />

H. C. Weber (DDI) X3-16 C. Flowers (DDI) X3-17<br />

H. Williams III X3-16 T. A. Foster N3-30<br />

R. Ganapathy X3-40<br />

J. A. Heard H44-17<br />

D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

J. A. Ware N3-30<br />

A. E. Zacharias X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4- 11<br />

A meeting on the above subject was held on May 4, 2010 at 118-K, MO-755.<br />

I. SAFETY<br />

*Safety topic: Discuss watching when opening car doors during windy conditions to avoid both<br />

personal and property damage. If you are in a parking lot with shopping carts when it is windy,<br />

watch out for errant carts that have not been stowed properly.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/20 10. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to performi<br />

Z:'Adrninistrative Assistant\Project Progress Review Weekly Nleetings\2010'.May\5-04-1O Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 1 00-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/20 10. DDL<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the I 9th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the I100-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDL to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4).<br />

" Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to burn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/2010. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning. DDI to submit revised OMP this week.<br />

DDI is working with WCH EPL on clarifications. WCH EPL to observe Watts's oil burning<br />

facility on 3/18/2010. DDI will submit OMP after that date. OMP waiting on ARES revision to<br />

drawings, then DDI will submit. Drawings should be available for pickup by DDI this week then<br />

the OMP will be submitted. No update (4/20). DDI is working on final review of this submittal<br />

and will submit by 5/11/2010 (4/27). On track to submit by 5/11/2010 (5/4).<br />

* DDI to provide a plan to access the top of the diesel fuel storage tank. DDI confirmed ladder is<br />

on site. Will be meeting with WCH Safety about use and training requirements prior to<br />

developing and implementing a plan for utilization. DDI plans to construct scaffolding with<br />

handrails to access top of tank. WCH will be issuing a new scaffolding procedure soon and will<br />

incorporate any potential changes or impacts to the subcontractor. DDI will be installing a ladder<br />

and tie-off point next week. WCH will need to have the tie-off point inspected by a qualified<br />

person prior to use. DDI will install ladder bolts from the ground for the first two or three rungs<br />

and then contract with Northpoint to complete the remainder of the ladder installation. DDI to<br />

complete fall prevention JHA and make sure that work package is discussed and clear to all<br />

involved. DDI discussing a "flip-plate" to be used to stick check levels in the tank from the top<br />

of the ladder. DDI needs to check that modifications made to the tank are in compliance with the<br />

manufacturer's specs. Ladder to be installed today (3/23/20 10). Ladder installation delayed<br />

because the bolts where too large for the holes. New DDL PM will be revisiting this matter<br />

(4/20). Watts is looking into the costs associated with placing scaffolding around the tank.<br />

Another alternative is to bring a man-lift to the site (4/27). No update (5/4)


Progress Review Meeting<br />

Page 3<br />

" DDI will be providing calcium chloride for the water system when it is operational. Before<br />

Trench K is opened up, DDI to have calcium chloride on site for dust control. DDI to look into<br />

utilizing Dust Bond in trenches K, N, 0 and 1. DDI to provide mixture ratios for WCH profile.<br />

DDI is looking into the availability of having Dust Bond totes on site for use with dust control.<br />

DDI to have calcium chloride on site before opening up Trench K excavations. No update (4/20).<br />

DDI indicated the plan is to have a 250 gallon tote that will be used through the injection system<br />

tied into the water system (4/27). 250 pound tote is now on site. The temporary plan of use will<br />

be to draw from the tote into the trucks using a hand pump. This is the solution until the injection<br />

system is installed and working properly (5/4).<br />

* DDI evaluating a location for truck washing. This will be coordinated with the WCH EPL. This<br />

will be set up next to the high tank. WCH EPL will be onsite this week to assist with designating<br />

a location. WCH EPL is in review of proposed location with preference for location in the AOC<br />

(4/27). WCH EPL has approved the truck wash down station at the water tank. Radiological<br />

courtesy surveys will be completed on the trucks prior to wash down of undercarriage (5/4).<br />

* WCH has three confirmatory sampling sites what will require DDI equipment support. More<br />

information will be provided soon. WCH pushing for an April timeframe to perform this work.<br />

A walkdown of one of the sites will be occurring today. WCH will schedule a discussion for next<br />

week to discuss the excavation of the two or 3 sites that are included in the current contract.<br />

Potholing to commence 5/17/2010 when DDL's new sampler has completed her training. A<br />

meeting will be held prior to the sampling to ensure that DDI has everything on hand to support<br />

the excavation activities for confirmatory sampling at 600-29 (4/27). On track to have sampler<br />

training in place by 5/17/20 10 (5/4).<br />

" Discuss implementation and oversight of equipment maintenance plan with the resignation of the<br />

DDI mechanic. DDI working to bring on project mechanic. WCH suggests that DDI review their<br />

equipment maintenance processes, particularly with regards to equipment daily inspections and<br />

how repairs will be made (4/27). Daily inspections are occurring, will have an offsite mechanic<br />

support the project as needed. DDI discussing with their subcontractor that this may have<br />

production impacts. (5/4)<br />

" Discussed issue of inaccurate scale weights. DDI has instructed Watts to install a new scale. The<br />

scale is part of the contract between Watts and DDI. WCH asks that the work be completed no<br />

later than the end of May with work to be completed on weekends so not to take away from<br />

production. (5/4)<br />

* An informal meeting with WCH, DDI and ESHI will be scheduled to discuss start and stop times<br />

in the HRA. (4/27)<br />

" DDI is reminded that Daily Reports are to be submitted to WCH the following day. If the person<br />

who normally completes these is out, a back up needs to be identified and trained. This continues<br />

to be a challenge. (4/27)<br />

" There is an issue with not having Tyvec booties for some site personnel when they are required to<br />

enter the trenches for sampling. DDI commits to getting some on site immediately. DDI has<br />

procured, will provide arrival date. (5/4)<br />

* DDI needs to survey signage used in the CR-Z postings. Currently some signs state "Caution"<br />

while others on the same rope state "Danger". The correct warning level for the CRZ is<br />

"Caution". DDI will address this. (4/27) No change (5/4).<br />

* DDI asked that WCH clarify the definition of anomalies. There seems to be some confusion on<br />

DDI's part what actually constitutes an anomaly. No update. A meeting will e held to discuss<br />

this today (5/4).


Progress Review Meeting<br />

Page 4<br />

111. PROJECT DESIGN DRAWINGS<br />

*WCH return electrical and traffic control drawings to DDI, status 2. DDI will be resubmitting<br />

soonl incorporating the WCH comments. DDI to submit this week. Drawings are with North<br />

Point for revision and will be resubmitted upon their return. DDL is well beyond the 30-day<br />

resubmission for updated drawings. WCH will be issuing an SDR regarding this issue. DDL has<br />

indicated they are working on a deficiency letter which will be submitted to Watts for this and<br />

several other deficiencies.<br />

o Electrical drawings are a priority as CHPRC will be making some revisions to them for<br />

some additional air monitoring stations on the 11I8-K electrical service. No update (4/20).<br />

No update (5/4).<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

0 See attached.<br />

VI.<br />

VII.<br />

MANPOWER<br />

*DDI has extended an offer to a CIH candidate. The candidate has accepted the offer of <strong>Site</strong><br />

Safety and Health Officer. DDI is struggling to find another CIH to fill the CIH Key personnel<br />

position.<br />

*Bill McKee (CIH) is no longer on staff. DDI is pursuing another CIH candidate at this time<br />

with no success.<br />

EQUIPMENT<br />

" Possible use of the JD 225 for the confirmatory sampling.<br />

* The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3. No update (5/4).<br />

* DDI has instructed Watts to continue installation of the soil bonding agent injection system that<br />

will tie into the water system. No completion date has been committed to. (5/4)<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

*Clarification of distance to remain from a non-bermed edge of a trench. Planners are working on<br />

this clarification.<br />

IX.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

*Construction, Drawings and Procedures Surveillance to be completed this week (DDI QA Manual<br />

Section 5). No deficiencies were found. (5/4)<br />

XI.<br />

REQUESTS FOR INFORMATION<br />

* DDI will be issuing an RFI for the scheduler position, duties and WCH expectations. No update<br />

(5/4).<br />

* DDI will be issuing an RFI to further discuss the independent CIH position and other possible<br />

options. No update (5/4).


Progress Review Meeting<br />

Page 5<br />

XII.<br />

XIII.<br />

XIV.<br />

XV.<br />

XVI.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

* Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/2010. WCH has received, in preliminary<br />

review, will return this week. WCH returned to DDI, status 2, with comments. DDI will be<br />

doing a walkdown with Mr. Teachout to incorporate comments and will resubmit drawings for<br />

approval. DDI to check on status. DDI waiting on North Point. DDI still waiting on North<br />

Point. They have exceeded the 30-day expected response to a returned submittal. DDI to follow<br />

up with North Point again this week. No update, still with DDI (4/20). No update (4/27). No<br />

update (5/4).<br />

* WCH requests as-built drawings of the energized water system. No update (5/4).<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

0 See attached.<br />

CORRESPONDENCE<br />

* Weekly Progress Review Meeting Minutes of 4/27/2010<br />

IN VOICE AND PAYMENT STATUS<br />

* DDI will be submitting April invoice soon.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* Getting rock truck back on site in order to complete safety bench in trench L is a priority.<br />

* WCH needs documentation of safety recall repairs that has been completed on the two leased<br />

shuttle trucks.<br />

Attachment(s): As noted above.


(U 0<br />

a: a.<br />

0 0<br />

~ 44<br />

UU4<br />

cc-<br />

2 a<br />

1-4<br />

am<br />

c<br />

" ;] c*-<br />

'v t<br />

In<br />

CL Z -<br />

M<br />

'


f ><br />

lLf cnI<br />

88 1<br />

S<br />

8~~8I<br />

Si P,<br />

Ln C)<br />

0 0<br />

z<br />

z<br />

Cb C&U<br />

f~ U<br />

- "0<br />

cn ><br />

> )<br />

q 9 8 9 -<br />

£3 £3 ~ l<<br />

UA


00<br />

o r -4i tomV<br />

CL T- -4-<br />

nM0<br />

0 (r r,0000 000 0 q'-4-<br />

-4<br />

'-4<br />

1-4<br />

1- hLn en<br />

-6 LaO LA<br />

o r -4 o o oo o -<br />

C r<br />

0 0 ICT000000O000C )<br />

0<br />

0 0e<br />

0<br />

z<br />

E<br />

r ooooooooo0 or- Ln C<br />

0 LA C'J r<br />

en<br />

C<br />

fn<br />

0 m m<br />

E t E E<br />

0)<br />

l~m -,LQ ~ - o7 E-C " 0 0 oL 0<br />

4 -uuj -C - ' 0 -<br />

2<br />

U Jo tr IIco


On ti 06 m~r<br />

r- i C ri 14<br />

m ' E 6<br />

000<br />

aU C<br />

U Jj (U<br />

0 0 0


C-4 040 0 4 N N0e.J m C4 N<br />

D )0 0 0 00 0 0 CD<br />

c 000C 0 0 00 0 a0<br />

(4NQ 0 0- 04 00 0 C-0 .0<br />

-r Co ;5<br />

0-a 4<br />

C 00 0 0 O ~ 0 OeN<br />

C' C 4 Y 4 Cq0 ~; c5<br />

CO0 4~c., ~<br />

0004<br />

CO<br />

i;5C<br />

0 LL LL LL 4) 4) '<br />

z C 0V- V-0 0 0<br />

C,4 acj 0~ 0L (D0<br />

0 * L 0. 0 0<br />

>; O) C) CL S C w<br />

zC# n C C 0 0 C<br />

> 0 u<br />

E E, E S<br />

C CU<br />

.~~-j~ 0- I=- C'<br />

0u E 0 :3<br />

-~~~ .. 0~~<br />

E h~5 0 0> .<br />

ca. a CD -~<br />

O<br />

CN :3 o m,<br />

CC .m CoC<br />

3L0 mO (<br />

( (<br />

0C- - - - 0..CC C.<br />

Co = >. 0<br />

0C 00 0 CI<br />

40 0) 0 00 0<br />

aC(I (L (0 (0 FL ~ N<br />

003 0 0 - 0<br />

~<br />

*a) CL SCQ o S) ut ) 0l b )<br />

(n0 0L ) 1 0 0 0 0 0 0_


CL<br />

01C<br />

0t<br />

31z<br />

03


WCH Washingtonf<br />

Closure<br />

WC H <strong>Hanford</strong><br />

Meeting Minutes<br />

EM101*11WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

CCN:<br />

1t'q ID<br />

Martol'im<br />

Christopher L. Beach<br />

May 25, 2010<br />

IIST<br />

C. L. Beach X3-16 E. L. Adamson X3-40<br />

Q. L. Grist X3-16 D. Bollinger (DDI)<br />

R. Ferguson (DDI) X3-17 R. D. Cantwell N3-30<br />

A. Gagnon X9-08 R. W. Cross H4-25<br />

J. A. Heard H4-17 T, Dance (DDI) X3-17<br />

S. J. Huddleston X3-16 R. A. Dodd H-4-24<br />

W. R. Junkins X3-16 C. Flowers (DDI) X3-17<br />

S. E. Parnell X3-16 T. A. Foster N3-30<br />

M. Sherman (DDI) X3-17 R. Ganapathy X3-40<br />

D. G. Saueressig N3-30<br />

D. B. Teachout X3-16<br />

H. C. Weber (DDI) X3-16<br />

H. Williams III X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3- 16<br />

Records and Document Control H4- 11<br />

A meeting on the above subject was held on May 25, 2010 at 11 8-K, MO-755.<br />

1. SAFETY<br />

* Safety topic: Use patience when driving, both on and off the road.<br />

D<br />

ITO<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/2010. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/20 10. Excavation permit is<br />

complete. Discussed that 100-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

Z:\dministrative Assistant'Project Progress Review Weekly Meetings\2010\May\5-25-lO Weekly Progressedoc


Progress Review Meeting<br />

Page 2<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the I 9th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 1 00-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

calcs on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrntpe on Tpesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/25)<br />

" Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to burn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCI- concurrence. DDI plans to submit by 1/27/20 10. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning. DDI to submit revised OMP this week.<br />

DDI is working with WCH EPL on clarifications. WCH EPL to observe Watts's oil burning<br />

facility on 3/18/2010. DDI will submit OMP after that date. OMP waiting on ARES revision to<br />

drawings, then DDI will submit. Drawings should be available for pickup by DDI this week then<br />

the OMP will be submitted. No update (4/20). DDI is working on final review of this submittal<br />

and will submit by 5/11/2010 (4/27). On track to submit by 5/11/2010 (5/4). DDI confirmed that<br />

the OMP will be submitted 5/12/2010. Since the OMP is not yet approved, DDI is not to remove<br />

used oil from the site. Any questions about exceptions to this need to be discussed with the WCH<br />

EPL. (5/11) DDI continues to work on completing the OMP with support from the WCH EPL.<br />

DDI plans to submit the OMP next week. (5/18) Submission of OMP pushed out to 6/3/2010.<br />

(5/25)<br />

" DDI to provide a plan to access the top of the diesel fuel storage tank. DDI confirmed ladder is<br />

on site. Will be meeting with WCH Safety about use and training requirements prior to<br />

developing and implementing a plan for utilization. DDI plans to construct scaffolding with<br />

handrails to access top of tank. WCH will be issuing a new scaffolding procedure soon and will<br />

incorporate any potential changes or impacts to the subcontractor. DDI will be installing a ladder<br />

and tie-off point next week. WCH will need to have the tie-off point inspected by a qualified<br />

person prior to use. DDI will install ladder bolts from the ground for the first two or three rungs


Progress Review Meeting<br />

Page 3<br />

and then contract with Northpoint to complete the remainder of the ladder installation. DDI to<br />

complete fall prevention JHA and make sure that work package is discussed and clear to all<br />

involved. DDI discussing a "flip-plate" to be used to stick check levels in the tank from the top<br />

of the ladder. DDI needs to check that modifications made to the tank are in compliance with the<br />

manufacturer's specs. Ladder to be installed today (3/23/2010). Ladder installation delayed<br />

because the bolts where too large for the holes. New DDI PM will be revisiting this matter<br />

(4/20). Watts is looking into the costs associated with placing scaffolding around the tank.<br />

Another alternative is to bring a man-lift to the site (4/27). No update. (5/4) No update. (5/11)<br />

No update. (5/18) DDI has re-evaluated and determined no reconfigurations will be made to the<br />

tank. (5/25)<br />

* Discussed issue of inaccurate scale weights. DDI has instructed Watts to install a new scale. The<br />

scale is part of the contract between Watts and DDI. WCH asks that the work be completed no<br />

later than the end of May with work to be completed on weekends so not to take away from<br />

production. (5/4) No change. WCH discussed the need to coordinate long lead time for<br />

scheduling teamster to remove from site the scale being replaced. (5/11) No change. DDI subtier<br />

(Watts) has to plans at this time to replace scale. (5/18) It is questionable if scale is issuing<br />

consistent weight that is reliable.<br />

* DDI is reminded that Daily Reports are to be submitted to WCH the following day. If the person<br />

who normally completes these is out, a back up needs to be identified and trained. This continues<br />

to be a challenge. (4/27) WCH noted that this is the DDI PM's responsibility. As this continues<br />

to be an issue, DDI is putting themselves in a deficient position. (5/11) No change. (5/18)<br />

a<br />

DDI asked that WCI I clarify thc dcfinition of anomalies. There seems to be some confusion on<br />

DDI's part what actually constitutes an anomaly. No update. A meeting will be held to discuss<br />

this today (5/4). DDI requested an additional meeting to discuss delays related to anomalies.<br />

This is scheduled for 5/12/20 10 at 1:00. (5/11) Meeting rescheduled for Thursday, 5/20/2010.<br />

(5/18) Meeting held 5/25/20 10.<br />

0 DDI has not received any information on the Trench I camera specs or equipment specs for the<br />

400 excavator. They will follow up with the vendor. (5/11) Some specs have been received, but<br />

more are needed. Confer with D. Teachout for specifics. (5/18) WCH is in development of<br />

change notice for Trench I work.<br />

* There are several safety items that need DDI attention from last week's safety walkdown.<br />

(Cover/Storage for the breathing air bottles, cord trees for the fans used in the field, fixative hose<br />

at the tent, and move the batteries charging in the conex.) (5/11) There has been no progress<br />

made in making these corrections. (5/18) "S"-hook installed for electrical cords, fixative hose has<br />

been corrected, and batteries are no longer being charged in Conex. No progress on cover and<br />

storage for breathing air bottles. (5/25)<br />

0 DDI to submit REA for mandatory Beryllium training held on 5/17/20 10. This will be part of the<br />

delay discussion meeting to be held on Thursday 5/20/2010. DDI will be submitting and REA for<br />

All-Hand meeting and Safety Expo.<br />

* Discussed Incidental Welding procedure. Surveillance performed, identified necessary changes<br />

to be made for clarifications. (5/18) No update. (5/2 5)<br />

* WCH expressed concerns about delays in completion of subcontract administrative duties and<br />

paperwork. WCH suggests that DDI take a look at how to best resolve this issue. (5/18)<br />

11I. PROJECT DESIGN DRAWINGS<br />

*DDI still needs to submit for WCH review as-builts for electrical as well as the energized water<br />

line. (5111) No change. (5/18) No change. (5/25)


Progress Review Meeting<br />

Page 4<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

0 See attached.<br />

VI.<br />

VII.<br />

VIII.<br />

IX.<br />

MANPOWER<br />

*DDI is struggling to find another CIH to fill the CIH Key personnel position.<br />

*Bill McKee (CIII) is no longer on staff. DDI is pursuing another CIH candidate at this time<br />

with no success. No change. (5/11) DDI submitted two resumes for review, both meet<br />

minimum requirements. (5/18) DDI has retained Bill Bliss as CIH to the project. (5/25)<br />

EQUIPMENT<br />

* See attached.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

MATERIAL<br />

0 None.<br />

x. QUALITY<br />

" DDI flowdown surveillance to be scheduled soon. WCH QA performing currently.<br />

* Breathing air surveillance to be performed this week. WCH QA is waiting on information from<br />

subcontractor to complete.<br />

" DDI has not yet responded to the Subcontractor Deficiency Report - FR-2010-IF-0045-SDR-010.<br />

(5/11) DDI to submit by Thursday, 5/20. (5/18)<br />

* DDI was issued SDR (FR-201I0-IF-03 82-SDR-0 15) on 5/17/2010 for as-built drawings.<br />

" The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3. No update (5/4). No update. (5111)<br />

No update. (5/18)<br />

*WCH issued SDR (FR-2010-IF-0092-017) to DDI on 5/24/2010 for shuttle truck<br />

specifications. (5/25)<br />

* WCH QA will be conducting a surveillance on contract flowdown and review of sub-tier QA<br />

programs.<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

* DDI will be issuing an RFI for the scheduler position, duties and WCH expectations. No update<br />

(5/4). No update. (5/11) No change. (5/18) Received, WCH in review. (5/25)<br />

" DDI will be issuing an RFI to further discuss the independent CIII position and other possible<br />

options. No update (5/4). No update. (5/11) No update. (5/18) DDI does not plan for any<br />

changes. (5/25)<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

*See attached.<br />

*Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and conmments to be returned to RDC today. DDI incorporating


Progress Review Meeting<br />

Page 5<br />

comments and will resubmit. DDI to submit by 1/28/2010. WCH has received, in<br />

preliminary review, will return this week. WCH returned to DDI, status 2, with comments.<br />

DDI will be doing a walkdown with Mr. Teachout to incorporate comments and will resubmit<br />

drawings for approval. DDI to check on status. DDI waiting on North Point. DDI still<br />

waiting on North Point. They have exceeded the 30-day expected response to a returned<br />

submittal. DDI to follow up with North Point again this week. No update, still with DDI<br />

(4/20). No update (4/27). No update (5/4). No update from DDI. WCH issued SDR. (5/18)<br />

No update. (5/25)<br />

Electrical drawings are a priority as CHPRC will be making some revisions to them for some<br />

additional air monitoring stations on the 118 -K electrical service. No update (4/20). No<br />

update (5/4)<br />

* WCH return traffic control drawings to DDI, status 2. DDI will be resubmitting soon<br />

incorporating the WCH comments. DDI to submit this week. Drawings are with North Point for<br />

revision and will be resubmitted upon their return. DDI is well beyond the 30-day resubmission<br />

for updated drawings. WCH will be issuing an SDR regarding this issue. DDI has indicated they<br />

are working on a deficiency letter which will be submitted to Watts for this and several other<br />

deficiencies. (5/11) No update. (5/18) No update. (5/25)<br />

* WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5/11) SDR provided, no update. (5/18) No update. (5/25)<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

" See attached.<br />

" DDI can expect to see revision soon to Change Notice 025 regarding use of last for digits of<br />

employee social security numbers as identifier.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE<br />

" Weekly Progress Review Meeting Minutes of 5/18/2010<br />

" Subcontractor Deficiency Report: FR-2010-IF-0045-SDR-010<br />

INVOICE AND PAYMENT STATUS<br />

* None.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* DDI is requesting to work Friday, June 4, if so, WCH may plan to also perform confirmatory<br />

sampling test pit and trench activities at 1 00-K-2.<br />

* Discussed Beryllium controls and medical surveillance requirements for Trench I remediation.<br />

More discussion about this to come.<br />

Attachment(s): As noted above.


- - - --- -<br />

0<br />

U!, 0,<br />

0<br />

00<br />

0<br />

1 V16<br />

CD v C) t C 0v ~ -~v ~ N<br />


6 0 Lfl<br />

Z<br />

-I0 wn N 0o<br />

4-.<br />

.0 E<br />

c~ E~ 2<br />

wJ 0 0~<br />

ou 0<br />

'-I-<br />

za<br />

E<br />

i000<br />

+1 ~ ~ 41 ~ 4U L<br />

C3 -e -e l .<br />

-o<br />

0 0tLiL Li 0n Li- -<br />

) - L<br />

Q) -LU -j4<br />

oE E E 4- +. = '<br />

000ot -C=MO == COb COO


m - - - M -<br />

~~~ Q 0 0 0 003<br />

~C'4 N C1 0N N N 04 0 ce) 0~ N 0<br />

0)<br />

- 00 0 0 0: 0 0 0 0 C)0<br />

a) 0 0 C) C<br />

-0 0 C<br />

0N 04 04 N N N 04 0 N CN 04 .<br />

N o 00 c 00 4) L) ( gNo~<br />

C~l CN N C0)Lo ce~) e C4<br />

C) 0 a0 0)000 0 0 0) CO<br />

-0 0 )<br />

04 0 N N C) N Z~ N ) CN<br />

NC1 N CN<br />

C) NCu 't) -<br />

0o<br />

0N<br />

w U) U) U)<br />

CL<br />

C) C<br />

C (I)<br />

0o U) LL L L4 ) _<br />

-o o - -- -( 0 a)<br />

NCD 0 0 0 E<br />

0. C. 0. L 0<br />

(1)<br />

a - .- 0. 0<br />

-W cc (I U) V) 0 0 V<br />

NK C. 0 t<br />

0 0 0 ) C 0<br />

*E < < < cn U) 03<br />

faU C!U V V Co 0 aC~<br />

U) '3)<br />

ca<br />

E 0 E 2) 2 E<br />

aU~ ?) E 'D '3D a) OCL a.a (<br />

as C: C: co<br />

CL 0i<br />

,.o~<br />

CO 2O CO UO - 1 -5AL<br />

0- .2 CL<br />

~~0ca 0(~'..<br />

>~ .7N (D~ (D<br />

0 .<br />

m<br />

0 . 0-)? -. Q?)Z)<br />

_ WCC tj~tj 0 0<br />

i- C)0 - C . CDO ) E 00 co<br />

4.a) Nu N CvD c<br />

N 4)' > 0<br />

-;a-<br />

( ( - 0 C c - C c0 CO v)- -)drra<br />

CLC: - 0 0)E DC 0 000 .0 0( ,r0 CLC<br />

(0<br />

09 0 0 9 0<br />

e~JcI!) ) ) ) C.) a) ))) ) 0 0 0 0<br />

0000) 0 0 00 0 0 00


0l<br />

Q<br />

0 0<br />

a<br />

0. z.<br />

00 00 00<br />

0<br />

za:L x' 3


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 150049<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

June 1, 2010<br />

ATEDE<br />

ISTRIUTIO<br />

E. L. Adamson X3-40 D. Bollinger (DDD)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

T. A. Brines N3-30 R. W. Cross H4-25<br />

Q. L. Crist X3-16 T. Dance (DDI) X3-17<br />

R. Ferguson (DDI) X3-17 R. A. Dodd H4-24<br />

A. Gagnon X9-08 C. Flowers (DDI) X3-17<br />

S. J. Huddleston X3-16 T. A. Foster N3-30<br />

W. R. Junkins X3-16 R. Ganapathy X3-40<br />

S. E. Parnell X3-16 J. A. Heard 1-4-17<br />

D. E. Welker N3-30 D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

H. C. Weber (DDI) X3-16<br />

H. Williams III X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4-1 1<br />

A meeting on the above subject was held on June 1, 2010 at 118-K, MO-755.<br />

1. SAFETY<br />

*Safety topic: Interesting to watch how far safety devices and restraints have progressed; case in<br />

point being a crash in the last lap of the Indy 500 where the car was pretty well destroyed but the<br />

driver came away with just some bumps, bruises and a broken leg. In the past, this type of crash<br />

would have caused more significant injuries.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

*PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/20 10. Still waiting on permits from CHPRC.<br />

C:\Documnents and Settings~cbeach\Local Settings\Temporary Internet Files\OLK 107\6- 1-10 Weekly Progressadoc


Progress Review Meeting<br />

Page 2<br />

WCH following up. Hydrant permnit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 100-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/20 10. DDI<br />

to complete system construction while new permnits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 19th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 100-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

calcs on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/25) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pressures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm). (6/1)<br />

*Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to burn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/2010. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning. DDI to submit revised OMP this week.<br />

DDI is working with WCH EPL on clarifications. WCH EPL to observe Watts's oil burning<br />

facility on 3/18/2010. DDI will submit OMP after that date. OMP waiting on ARES revision to<br />

drawings, then DDI will submit. Drawings should be available for pickup by DDI this week then<br />

the OMP will be submitted. No update (4/20). DDI is working on final review of this submittal<br />

and will submit by 5/11/2010 (4/27). On track to submit by 5/11/2010 (5/4). DDI confirmed that<br />

the OMP will be submitted 5/12/2010. Since the OMP is not yet approved, DDI is not to remove<br />

used oil from the site. Any questions about exceptions to this need to be discussed with the WCH<br />

EPL. (5/11) DDI continues to work on completing the OMP with support from the WCH EPL.<br />

DDI plans to submit the OMP next week. (5/18) Submission of OMP pushed out to 6/3/20 10.<br />

(5/25) No change. (6/1)


Progress Review Meeting<br />

Page 3<br />

" Discussed issue of inaccurate scale weights. DDI has instructed Watts to install a new scale. The<br />

scale is part of the contract between Watts and DDI. WCH asks that the work be completed no<br />

later than the end of May with work to be completed on weekends so not to take away from<br />

production. (5/4) No change. WCH discussed the need to coordinate long lead time for<br />

scheduling teamster to remove from site the scale being replaced. (5/11) No change. DDI subtier<br />

(Watts) has to plans at this time to replace scale. (5/18) It is questionable if scale is issuing<br />

consistent weight that is reliable. (5/25) On 5/27, the scale went down; it was repaired and<br />

recertified for use. Plans in the works for replacement of scale. Schedule is still being<br />

determined. (6/1)<br />

* DDI asked that WCH clarify the definition of anomalies. There seems to be some confusion on<br />

DDI's part what actually constitutes an anomaly. No update. A meeting will be held to discuss<br />

this today (5/4). DDI requested an additional meeting to discuss delays related to anomalies.<br />

This is scheduled for 5/12/20 10 at 1:00. (5/11) Meeting rescheduled for Thursday, 5/20/20 10.<br />

(5/18) Meeting held 5/25/20 10. (5/25) Weekly meetings will be held beginning 6/1/20 10 to<br />

discuss delays.<br />

* DDI has not received any information on the Trench I camera specs or equipment specs for the<br />

400 excavator. They will follow up with the vendor. (5/11) Some specs have been received, but<br />

more are needed. Confer with D. Teachout for specifics. (5/18) WCH is in development of<br />

change notice for Trench I work. (5/25) No update. (6/1)<br />

" There are several safety items that need DDI attention from last week's safety walkdown.<br />

(Cover/Storage for the breathing air bottles, cord trees for the fans used in the field, fixative hose<br />

at the tent, and move the batteries charging in the conex.) (5/11) There has been no progress<br />

made in making these corrections. (5/18) "S"-hook installed for electrical cords, fixative hose has<br />

been corrected, and batteries are no longer being charged in Conex. No progress on cover and<br />

storage for breathing air bottles. (5/25) No update, DDI plans to have remaining items addressed<br />

this week. (6/1)<br />

" Discussed Incidental Welding procedure. Surveillance performed, identified necessary changes<br />

to be made for clarifications. (5/18) No update. (5/25) DDI to revise this week. (6/1)<br />

* DDI is requesting to work Friday, June 4. In addition to all crews working, WCH is planning to<br />

perform confirmatory sampling on one test pit and two trenches for 100-K-2.<br />

" Discussed Beryllium controls and medical surveillance requirements for Trench I remediation.<br />

(5/25) Medical screen in the process of being scheduled. All DDI employees will participate in<br />

this medical surveillance process.<br />

II1.<br />

IV.<br />

PROJECT DESIGN DRAWINGS<br />

* DDI still needs to submit for WCH review as-builts for electrical as well as the energized water<br />

line. (5/11) No change. (5/18) No change. (5/25) Electrical drawing modifications have been<br />

discussed between DDI and WCH STR. Water line as-builts are being marked up for WCH<br />

review prior to being submitted. (6/1)<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* None provided.<br />

" WCH looking for completion date on:<br />

" Trenches D, E and P;<br />

o Status of Trench K;<br />

" Status of Trench F;<br />

o Status of Trenches J and L;<br />

o Start of TrenchO0.


Progress Review Meeting<br />

Page 4<br />

V. WEEKLY PRODUCTION TABLE<br />

0 None provided.<br />

VI.<br />

VII.<br />

VIII.<br />

IX.<br />

MANPOWER<br />

*DDI is struggling to find another CTH to fill the CIII Key personnel position.<br />

*Bill McKee (CIII) is no longer on staff. DDI is pursuing another ClII candidate at this time<br />

with no success. No change. (5/11) DDI submitted two resumes for review, both meet<br />

minimum requirements. (5/18) DDI has retained Bill Bliss as CIH to the project. (5/25) Mr.<br />

Bliss will be a back-up CIII. DDI has submitted an additional resume for approval as primary<br />

CIII. (6/1)<br />

EQUIPMENT<br />

" See attached.<br />

* DDI should include the equipment on site being utilized as part of confirmatory sampling.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

" Breathing air surveillance to be performed this week. WCH QA is waiting on information from<br />

subcontractor to complete. (5/25) Surveillance is complete. Qualifications of A. L. Compressed<br />

Gas Company for breathing air gasses and containers has been approved by DDI and confirmed<br />

by WCH QA as acceptable.<br />

" DDI has not yet responded to the Subcontractor Deficiency Report - FR-2010-IF-0045-SDR-010.<br />

(5/11) DDI to submit by Thursday, 5/20. (5/18) DDI submitted acceptable response to WCH on<br />

5/25/2010. (6/1)<br />

* DDI was issued SDR (FR-2010-IF-0382-SDR-015) on 5/17/2010 for as-built drawings. (5/25)<br />

No update. (6/1)<br />

* The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3. No update (5/4). No update. (5/11)<br />

No update. (5/18) No update. (6/1)<br />

*WCH issued SDR (FR-2010-LF-0092-017) to DDI on 5/24/2010 for shuttle truck<br />

specifications. (5/25) No update. (6/1)<br />

" WCH QA will be conducting a surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1)<br />

" WCH QA submitted 2010 Surveillance Schedule to DDI identifying surveillances to be<br />

performed by the end of the calendar year. (Copy of schedule attached.) (6/1)<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

*DDI will be issuing an RFI for the scheduler position, duties and WCH expectations. No update<br />

(5/4). No update. (5/11) No change. (5/18) Received, WCH in review. (5/25) No update. (6/1)<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

*See attached.


Progress Review Meeting<br />

Page 5<br />

" Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/20 10. WCH has received, in<br />

preliminary review, will return this week. WCH returned to DDI, status 2, with comments.<br />

DDI will be doing a walkdown with Mr. Teachout to incorporate comments and will resubmit<br />

drawings for approval. DDI to check on status. DDI waiting on North Point. DDI still<br />

waiting on North Point. They have exceeded the 30-day expected response to a returned<br />

submittal. DDI to follow up with North Point again this week. No update, still with DDI<br />

(4/20). No update (4/27). No update (5/4). No update from DDI. WCH issued SDR. (5/18)<br />

No update. (5/25)<br />

" Electrical drawings are a priority as CHPRC will be making some revisions to them for some<br />

additional air monitoring stations on the 11 8-K electrical service. No update (4/20). No<br />

update (5/4)<br />

" WCH return traffic control drawings to DDI, status 2. DDI will be resubmitting soon<br />

incorporating the WCH comments. DDI to submit this week. Drawings are with North Point for<br />

revision and will be resubmitted upon their return. DDI is well beyond the 30-day resubmission<br />

for updated drawings. WCH will be issuing an SDR regarding this issue. DDI has indicated they<br />

are working on a deficiency letter which will be submitted to Watts for this and several other<br />

deficiencies. (5/11) No update. (5/18) No update. (5/25)<br />

* WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5/11) SDR provided, no update. (5/18) No update. (5/25)<br />

XIII.<br />

XIV.<br />

XV.<br />

XVI.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

* DDI can expect to see revision soon to Change Notice 025 regarding use of last for digits of<br />

employee social security numbers as identifier.<br />

" WCH returned CN 016 to DDI for corrections and changes. (6/1)<br />

CORRESPONDENCE<br />

* Weekly Progress Review Meeting Minutes of 5/25/2010<br />

IN VOICE AND PAYMENT STATUS<br />

0 None.<br />

OTHER COMMSENTS/NEW ACTION ITEMS<br />

" Clarified dust control requirements. It is not necessary for fixative to be a "crusting agent," but<br />

does need to be effective as dust control.<br />

* It appears the potable water holding tank in the shower trailer is just bolted into the wall. DDI to<br />

take a look at this configuration for safety considerations.<br />

Attachment(s): As noted above.


6 0 L<br />

Z m~ r- w (N 0 N%<br />

La )<br />

cc 0. In<br />

UU,<br />

r m o E -a<br />

1~ .3<br />

Z I-<br />

00 LU<br />

'-4<br />

4<br />

C14<br />

r-L<br />

a a-d-' 0<br />

Y Y<br />

0 V uUdI ; :<br />

CO (DU<br />

'-Iu<br />

'<br />

'n V, cu<br />

o) U) a) (U<br />

4<br />

or E E E 4- 4-'+1<br />

wU 00L 0 C C.n - ) - -<br />

0-


.00 0 0 0 0 000 0 0 000<br />

C)<br />

(. 04 04 (N (N (N (NN CN 04 ((<br />

S -D0<br />

0 00 0 0 0c 0 00 0 0L)<br />

a) q C1 CC 00<br />

C) - - - Q<br />

O~ziC.- - (ND - -<br />

04 (N N 41 C(4 Cl) O c CN<br />

0) 0 0)0<br />

C 0 0) 0) C0 0 0<br />

4)5 > 00<br />

C)C<br />

N N N (N (N 4<br />

'T Co 0<br />

C - - - 0<br />

0--- CN (N (N (Nc u) ('O<br />

04 C14 C:<br />

C<br />

LO LO LO CVo Lo Cfol)<br />

-j U) U) U)<br />

ILV o 0 m a) aa<br />

c ) L- LL LL a) a) 'a<br />

-o-S ~ 0 0 a E<br />

C14 L C<br />

C C<br />

CD 0 C<br />

wz. c( 0f 0~ ) U 0 0 c<br />

Lu CM c p ;,<br />

>~ * 0 0 )<br />

Ca)<br />

m _<br />

co co 0S~ 0 - C-<br />

w i5 2a ;5<br />

" 02 3C0<br />

FL a) 4) 0 ) 0 )c<br />

Za a) a) a) 4) a C' o c<br />

m _ E0~<br />

a) LOa)<br />

m ., .<br />

o-0<br />

* C<br />

W-0<br />

cc -t cc cc c<br />

CE> m ca<br />

o<br />

m )-qO-<br />

C 0~0 00 2 ~.<br />

EC o 0 0aEo >)><br />

0..~a O o<br />

()-D<br />

U) Cfl a :3 : 'a ~ a) 0 - 0)<br />

c00n > < < <<br />

0 0 0 0 o 0 0 > 0 0 0 0 0 0 0<br />

.acccc'o~ ~ ~<br />

- c cc c c~- c ir- -<br />

-~> 0 00000 0<br />

0 0 0 0 000 0 0 0o0 (<br />

C~cI L 0 ) ) a~ 0) 00) 0)0 )<br />

0 0 0 0 0 c 0 a 00 0 0 0<br />

- L a 0-s- - - - --- - - - - - - -- - - -


3 - nl a<br />

c<br />

T -' o 5 E0<br />

.2O0 ~<br />

2.00<br />

0 0 O1o 42 1 :1O<br />

51 "!<br />

I A 28 S<br />

23<br />

070<br />

01<br />

7<br />

0<br />

hi 0<br />

1) 1 ! 8<br />

Z c z z. ~ -<br />

01,<br />

!~8 1 EO22<br />

fl<br />

~ 3i6<br />

!2<br />

L::' L %f~ "0~ s


0<br />

00<br />

co (0 - - ? > 00 T 00 (<br />

0- C) 0 000 (0 L) )00' Q (0L) 00 N)0 0u 0 0 000 000)<br />

0 0 0008 0 NO.0 'O 800 (00 n( 0 0' 00 00I0000000 0000)6<br />

(n0(0 0(0 0 0 a 0)0 a 0* 000 (0 00 00 (lu 0 (0 (00 (0(0(0(a000no(00 (0 0 0 _0<br />

W ) (n- 0- l-~ 1- w -(0 - ; Cio -- W 6 60 f<br />

ii0g0m00 0D<br />

0 0 0 0 - 0 0 0 r, 0 0 0 0 0 0 0 0 0 0-<br />

a(3n0n 000 0 0a0 00< 0 0 0000000000000<br />

0 000 00 0 00 000a00 0 00 0 00 0 000a0a000<br />

0 00000000 0000 00 000000 000 o0 0 00 00 00<br />

ID 0 n 0 0 n0 0); ; Z; O09~OOO<br />

Na 0 00 000<br />

C- C0 !000s00E 2<br />

(n.00 0)0000000 000000 ) 00) 0))0) 00) 0 00000000000M MW W0 00 0(D00<br />

-0 000 0000 zOz z zZ o00000o0 0a0 ~ -, -- - - - - LL U.U---- L WU 0<br />

CL to0 (n U) V)C/) W ) U) ( rn U)< (n (n U (fl U 0(U fl(0(0< )


d0 0 C<br />

0 0<br />

(D o 01 0<br />

0 C 00<br />

Cr 04 0<br />

c 4 0 0<br />

0 1:L 00 0 0 vi<br />

000 0 <<br />

2 - 0 0 0 0 0<br />

0 m D CD CD?0 CD CD<br />

dl L - W - m -L<br />

10 0000<br />

o C 40 03 M 04<br />

0<br />

w4<br />

7<br />

m4<br />

) ; ;; 0C4 . 0.0<br />

C) ) 0 a o0 uD<br />

- Z


P<br />

E0<br />

CD<br />

co<br />

0~~ ~ 0 000 0o0<br />

a0 l0<br />

c0c<br />

£0<br />

0 0 0<br />

C> £0<br />

£0C;<br />

L. L .6.6<br />


Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

WashigtonCCN:<br />

151804<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

MIMI=June 8, 2010<br />

DISTRBUTIO<br />

E. L. Adamson X3-40 D. Bollinger (DDI)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Crist X3-16 R. W. Cross H4-25<br />

T. Dance (DDI) X3-17 R. A. Dodd H4-24<br />

R. Ferguson (DDI) X3-17 C. Flowers (DDI) X3-17<br />

A. Gagnon X9-08 T. A. Foster N3-30<br />

J. A. Heard H4-17 R. Ganapathy X3-40<br />

S. E. Parnell X3-16 S. J. Huddleston X3-16<br />

H. C. Weber (DDI) X3-16 W. R. Junkins X3-16<br />

H. Williams III X3-16 D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control 114-1 1<br />

A meeting on the above subject was held on June 8, 2010 at I118-K, MO-755.<br />

1. SAFETY<br />

*Safety topic: Discussed that the symptoms of heat stress and over hydrating in hot weather are<br />

similar. Any one interested in the specifics can see the hand out given to Bill Junkins.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currentlyjust waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/20 10. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

Z:\Administrative Assistant\Project Progress Review Weekly Meetings\2010\June\6-8-1O Weekly Progress~doc


Progress Review Meeting<br />

Page 2<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 100-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 1 9 1h so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 1 00-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&LD of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

calcs on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/25) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pressures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm). (6/1) DDI is<br />

sending a letter to Watts to rework system for increased pressure. (6/8)<br />

*Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designiation of non-regulated and/or specification on used oil that<br />

qualifies to burn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/20 10. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning. DDI to submit revised OMP this week.<br />

DDI is working with WCH EPL on clarifications. WCH EPL to observe Watts's oil burning<br />

facility on 3/18/2010. DDI will submit OMP after that date. OMP waiting on ARES revision to<br />

drawings, then DDI will submit. Drawings should be available for pickup by DDI this week then<br />

the OMP will be submitted. No update (4/20). DDI is working on final review of this submittal<br />

and will submit by 5/11/2010 (4/27). On track to submit by 5/11/2010 (5/4). DDI confirmed that<br />

the OMP will be submitted 5/12/2010. Since the OMP is not yet approved, DDI is not to remove<br />

used oil from the site. Any questions about exceptions to this need to be discussed with the WCH<br />

EPL. (5/11) DDI continues to work on completing the OMP with support from the WCH EPL.<br />

DDI plans to submit the OMP next week. (5/18) Submission of OMP pushed out to 6/3/2010.<br />

(5/25) No change. (6/1) DDI is still working on OMP submittal. (6/8)


Progress Review Meeting<br />

Page 3<br />

" Discussed issue of inaccurate scale weights. DDI has instructed Watts to install a new scale. The<br />

scale is part of the contract between Watts and DDI. WCH asks that the work be completed no<br />

later than the end of May with work to be completed on weekends so not to take away from<br />

production. (5/4) No change. WCH discussed the need to coordinate long lead time for<br />

scheduling teamster to remove from site the scale being replaced. (5/11) No change. DDI subtier<br />

(Watts) has to plans at this time to replace scale. (5/18) It is questionable if scale is issuing<br />

consistent weight that is reliable. (5/25) On 5/27, the scale went down; it was repaired and<br />

recertified for use. Plans in the works for replacement of scale. Schedule is still being<br />

determined. (6/1) DDI plans to replace the scale on Friday, Jun 18. Briefing of job hazards and<br />

specific job scope will be done prior to that date. (6/8)<br />

* DDI has not received any information on the Trench I camera specs or equipment specs for the<br />

400 excavator. They will follow up with the vendor. (5/11) Some specs have been received, but<br />

more are needed. Confer with D. Teachout for specifics. (5/18) WCH is in development of<br />

change notice for Trench I work. (5/25) No update. (6/1) DDI is to follow-up ASAP to provide<br />

the specs. Trench I operations scheduled to begin late July/early August. (6/8)<br />

* There are several safety items that need DDI attention from last week's safety walkdown.<br />

(Cover/Storage for the breathing air bottles, cord trees for the fans used in the field, fixative hose<br />

at the tent, and move the batteries charging in the conex.) (5/1l) There has been no progress<br />

made in making these corrections. (5/18) "S"-hook installed for electrical cords, fixative hose has<br />

been corrected, and batteries are no longer being charged in Conex. No progress on cover and<br />

storage for breathing air bottles. (5/25) No update, DDI plans to have remaining items addressed<br />

this week. (6/1) Some of the breathing air bottles have been moved to the tent, others are at the<br />

entrance gate under a tarp. It needs to be discussed with WCH PSR to ensure this is adequate.<br />

(6/8)<br />

* Discussed Incidental Welding procedure. Surveillance performed, identified necessary changes<br />

to be made for clarifications. (5/18) No update. (5/25) DDI to revise this week. (6/I) DDI to<br />

submit by 6/10/2010. (6/8)<br />

" DDI and WCH are planning to perform confirmatory sampling on one test pit and two trenches<br />

for 100-K-2 on the day the scale is being replaced - June 18. (6/8)<br />

" Discussed Beryllium controls and medical surveillance requirements for Trench I remediation.<br />

(5/25) Medical screen in the process of being scheduled. All DDI employees will participate in<br />

this medical surveillance process. More information to follow.<br />

* Clarified dust control requirements. It is not necessary for fixative to be a "crusting agent," but<br />

does need to be effective as dust control.<br />

* It appears the potable water holding tank in the shower trailer is just bolted into the wall. DDI to<br />

take a look at this configuration for safety considerations. (6/1) DDI feels that current<br />

configuration is adequate. DDI to revisit issue with WCH STR.<br />

111. PROJECT DESIGN DRAWINGS<br />

" DDI still needs to submit for WCH review as-builts for electrical as well as the energized water<br />

line. (5/1l) No change. (5/18) No change. (5/25) Electrical drawing modifications have been<br />

discussed between DDI and WCH STR. (6/1) This is a topic of discussion in a meeting on 6/10<br />

between Watts and DDI. (6/8)<br />

" Water line as-builts are being marked up for WCH review prior to being submitted. (6/1) No<br />

change. WCH stressed that the as-builts need to indicate the location of the water lines from hook<br />

up at the fence to the high tower. (6/8)<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE


Progress Review Meeting<br />

Page S<br />

DDI will be doing a walkdown with Mr. Teachout to incorporate comments and will resubmit<br />

drawings for approval. DD11) to check on status. DDT waiting on North Point. DJ still<br />

waiting on North Point. They have exceeded the 30-day expected response to a returned<br />

submittal. DDT to follow up with North Point again this week. No update, still with DD1<br />

(4/20). No update (4/27). No update (5/4). No -update from DDT, WCHi issued SDR. (5418)<br />

No update. (5125) No update. (618)<br />

&WCII return. traffic control drawings to DDT, status 2. DDI will be resubmitting soon<br />

incorporating the WCH comments. DDI to submit this week. Drawings are with North Point for<br />

revision and will be resubmitted upon their return. DDT is well beyond the 30-day resubmission<br />

for updated drawings. WCHi will be issuing an SDR regarding this issue. DDT has indicated they<br />

are working on a deficiency letter wicih will be submitted to Watts for this and several other<br />

deficiencies. (5/11) No update. (5/1l8) No update, (5/25) WCH received traffic control submittal<br />

6/3 and is in review of same. (6/8)<br />

& WCH requests as-built drawings of the energized water system, No update (5/4). No update.<br />

(5/11) SDR provided, no update. (5/18) No update. (5/25) No update, (6/8)<br />

XflL. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

0 See attached.<br />

* DD)1 can expect to see revision soon to Change Notice 025 regarding use of last for digits of<br />

employee social security numbers as identifier.<br />

* WCH returned CN 016 to DDI for corrections and changes. (6/ 1) No update- (618)<br />

* WCH is returning CN 007 R. 1 and CTN 0 19 for corrections and changes. (6/8)<br />

MIV.<br />

CORRESPONDENCE<br />

* Weekly Progress Review Meeting Minutes of 06/08/2010<br />

* Letter to DD)I: HSSA Labor Rate Changes effective June 1, 2010<br />

& Letter to DDI: HISSA Labor Rate Changes effective June 1, 2010 for laborers<br />

0 Letter to DDI: Deficiency Reports<br />

* Letter to DD)!: 600 HR Routine Cable Replacement for Roll Off Truck<br />

0 E-mail from DDI: Resume for I(b)(6)I<br />

a E-mail from DDT: Request for TamAra Dance as backup schedtuler


Progress Review Meeting<br />

Page 6<br />

XV.<br />

XVI.<br />

IN VOICE AND PAYMENT STATUS<br />

*WCH has received billing for May and is reviewing.<br />

o WCH will be sending a letter to DDI indicating that WCH intends to withhold payment until<br />

the overdue as-built drawings are received. DDI requested WCH to provide value of<br />

holdback. WCH agreed to communicate this by the end of the day. (6/8)<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* DDI requests a discussion about the cost of the confirmatory samples sent out for processing.<br />

" DDI asked about safety and cascading coverage requirements when a key individual is off site.<br />

Specific reference was made to situation on Friday June 4 when crew was scheduled to work but<br />

DDI did not have an HSO on site and did not communicate this to WCH until that morning.<br />

WCH instructed that this would not be allowed to happen again.<br />

* DDI requested assistance from WCH STR and PM for help in understanding where to draw<br />

contractual lines with subtier subcontractors.<br />

* There will a site-wide emergency preparedness drill on June 17. WCH understand that this will<br />

be a "take cover" situation. All sites will be participating.<br />

* Discussed work package controls, specifically Craft Work Packages. A Performance Sheet need<br />

to be completed anytime a craft work package is briefed to be worked to per IWCP procedures.<br />

This should include description of work to be done, who did the briefing, who will be working to<br />

the work package, etc. This needs to be signed by the DDI SS and the WCH RM (either Chris<br />

Beach or Scott Parnell).<br />

" DDI HSO did not make her physical appointment yesterday. The soonest this can be rescheduled<br />

will be late July. There is some question whether she can enter the HRA. WCH is to confirm.<br />

" DDI will be bringing deli trays for lunch for the whole crew (including RCTs and WCH<br />

personnel) as a thank you for a good job.<br />

" WCH approved CIH Samuel Englehard as CIH. Visit last week from Phil Bartley went well;<br />

DDI received excellent review of the current CIH plan and implementation under Joe Price. (6/8)<br />

Attachment(s): As noted above.


og 0 00 - r<br />

a) -0 wC<br />

LO 0<br />

CD m Clol V,17<br />

9 0 0 0 ~ . ~ . 00<br />

O ~ cb -jr 00 )- 0 )(71 w 10 Lb<br />

0 0~. 00 Cc 00- 0 00 - 0~ 0) ) N.<br />

o 0<br />

2 - --- I IN 8),<br />

0)) M50ID r-<br />

1? 819 o~ .89 98 C- 91<br />

- 0% 8 f. I6 ILI~<br />

'. I u 0><br />

wm<br />

'I<br />

m ~<br />

w


C,0o 0, C 0 0 00 a 0 0 a 0 00<br />

N Nl C% N1 ~ N1 N 14 04 m Cl) N 0N<br />

0 0,<br />

G D 0 0p 0 0> 0D0 0 0 0 0<br />

0 a<br />

l ) C) C5 0 C C<br />

CN<br />

N 0 N N N 0 0N N<br />

060<br />

N 0NC<br />

0 0 0) Q000 0) 0<br />

a 0<br />

C) C 0'D<br />

C D<br />

>~ a c)<br />

N) N<br />

0 C)C)c 0 C<br />

0)<br />

-. 4C~<br />

N<br />

N 04f Nc - N 0 N-.- N. 0<br />

j 3 ZB cis NO N q idL Ci~s 8'<br />

CO) aO co)<br />

oU C.0 U) U<br />

0 t ~ tC L )~<br />

a.~c o co m w o<br />

E<br />

0. a a) a)<br />

0) 0 CL 0<br />

CL<br />

Z- LOx- =C<br />

0 0<br />

Wc C) Cl ClD cl C)<br />

C_ Cc<br />

4) .2> 0 0 0 0<br />

co W - -<br />

= - i<br />

0 . ( D CD<br />

~ .0 )~ E E E cL.± -<br />

CCD) CD a) CCo~ 00 CO ci M o<br />

U~ ~~ 0 0 C G c ) W<br />

U) 4) V2 0 CD E E<br />

(D 0 c O 0LC<br />

Z<br />

a) m w_ : 3 o0 oe U<br />

.C CU - n 0 - - I<br />

-3 c) C: - )c-w w2 2 c<br />

. :C c. :3 :3 '0)C<br />

- a))<br />

~< < F cu<br />

-0 0 r ci CEO -0 (- .2-D .9 0 m iF~o<br />

M 3: 0 o C<br />

C.) o ad a. 4) Q)0 0 . C)c<br />

s M<br />

0<br />

.O2o<br />

is>)><br />

O Nb N -ba,- C> .,<br />

CN)y (<br />

0 00 0 0 0a 0L 000 0r 0t 0 0006<br />

0 0 0 0 0 000 0o 0 0 000 0<br />

00000 0 0mE nC .) 0 00 2. 0 0 0 000<br />

- - - - - - - - - - - - - - - - --- - -C


J I M oaoI I<br />

1 1: .0 -4<br />

l<br />

2<br />

-jA ~<br />

.Q..s<br />

*6 j y - - o j !qp:g-.<br />

Z 5' mltaZur 8-j<br />

j ~i<br />

m, g<br />

-22<br />

i<br />

4 Z 6 -.<br />

:E '<br />

io<br />

2 ~ 000 0 GO 0 0 s 0 0


Washington<br />

closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 151813<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

June 15, 2010 /<br />

E. L. Adamson X3-40 D. Bollinger (DDI)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

T. Dance (DDI) X3-17 Q. L. Grist X3-.16<br />

R. A. Dodd H4-24 R. W. Cross 114-25<br />

R. Ferguson (DDI) X3-17 C. Flowers (DDI) X3-17<br />

A. Gagnon X9-08 T. A. Foster N3-30<br />

J. A. Heard H4-17 R. Ganapathy X3-40<br />

H. C. Weber (DDI) X3-16 S. J. Huddleston X3-16<br />

H. Williams III X3-16 W. R. Junkins X3-16<br />

S. E. Parnell X3-16<br />

D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4- 11<br />

A meeting on the above subj ect was held on June 15, 2010 at 11 8-K, MO-755.<br />

1. SAFETY<br />

* Safety topic: Discussed changing conditions, cascading affect of adverse conditions. Evaluating<br />

the potential for adverse conditions.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/20 10. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

Z:\Administrative Assistant'Project Progress Review Weekly Meetings\20l0\June\6-l5-lO Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

complete. Discussed that 100-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3119/20 10. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 1 9 1h so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 100-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

calcs on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/25) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pressures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm). (6/1) DDI is<br />

sending a letter to Watts to rework system for increased pressure. (6/8) DDI to submit letter,<br />

request for clarification for intent of water supply. (6/15)<br />

*Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to burn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/2010. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning. DDI to submit revised OMP this week.<br />

DDI is working with WCH EPL on clarifications. WCH EPL to observe Watts's oil burning<br />

facility on 3/18/2010. DDI will submit OMP after that date. OMP waiting on ARES revision to<br />

drawings, then DDI will submit. Drawings should be available for pickup by DDI this week then<br />

the OMP will be submitted. No update (4/20). DDI is working on final review of this submittal<br />

and will submit by 5/11/2010 (4/27). On track to submit by 5/11/2010 (5/4). DDI confirmed that<br />

the OMP will be submitted 5/12/2010. Since the OMP is not yet approved, DDI is not to remove<br />

used oil from the site. Any questions about exceptions to this need to be discussed with the WCH<br />

EPL. (5/11) DDI continues to work on completing the OMP with support from the WCH EPL.<br />

DDI plans to submit the OMP next week. (5/18) Submission of OMP pushed out to 6/3/2010.<br />

(5/25) No change. (6/1) DDI is still working on OMP submittal. (6/8) No change, DDI to


Progress Review Meeting<br />

Page 3<br />

submit by 6/24/10. (6/15)<br />

" Discussed issue of inaccurate scale weights. DDI has instructed Watts to install a new scale. The<br />

scale is part of the contract between Watts and DDL. WCH asks that the work be completed no<br />

later than the end of May with work to be completed on weekends so not to take away from<br />

production. (5/4) No change. WCH discussed the need to coordinate long lead time for<br />

scheduling teamster to remove from site the scale being replaced. (5/11) No change. DDI subtier<br />

(Watts) has to plans at this time to replace scale. (5/18) It is questionable if scale is issuing<br />

consistent weight that is reliable. (5/25) On 5/27, the scale went down; it was repaired and<br />

recertified for use. Plans in the works for replacement of scale. Schedule is still being<br />

determined. (6/1) DDI plans to replace the scale on Friday, Jun 18. Briefing ofjob hazards and<br />

specific job scope will be done prior to that date. (6/8)<br />

" DDI has not received any information on the Trench I camera specs or equipment specs for the<br />

400 excavator. They will follow up with the vendor. (5/11) Some specs have been received, but<br />

more are needed. Confer with D. Teachout for specifics. (5/18) WCH is in development of<br />

change notice for Trench I work. (5/2 5) No update. (6/1) DDI is to follow-up ASAP to provide<br />

the specs. Trench I operations scheduled to begin late July/early August. (6/8) WCH discussed<br />

concerns (6/15)<br />

* Discussed Incidental Welding procedure. Surveillance performed, identified necessary changes<br />

to be made for clarifications. (5/18) No update. (5/25) DDI to revise this week. (6/1) DDI to<br />

submit by 6/10/2010. (6/8) DDI commits to submitting no later than 6/24/10. (6/15)<br />

* DDI and WCH are planning to perform confirmatory sampling on one test pit and two trenches<br />

for 1 00-K-2 on the day the scale is being replaced - June 18. (6/8)<br />

* Discussed Beryllium controls and medical surveillance requirements for Trench I remediation.<br />

(5/25) Medical screen in the process of being scheduled. All DDI employees will participate in<br />

this medical surveillance process. More information to follow. (6/1) Discussed medical physical<br />

scheduling. (6/15)<br />

* Clarified dust control requirements. It is not necessary for fixative to be a "crusting agent," but<br />

does need to be effective as dust control. (6/1) Discussed CTA dust control requirements and<br />

responsibility. DDI to submit letter for clarification. (6/15)<br />

* It appears the potable water holding tank in the shower trailer is just bolted into the wall. DDJ to<br />

take a look at this configuration for safety considerations. (6/1) DDI feels that current<br />

configuration is adequate. DDI to revisit issue with WCH STR. (6/8) No change. (6/15)<br />

* DDI requests a discussion about the cost of the IH monitoring in support of confirmatory<br />

sampling sent out for processing. (6/8) WCH in review of REA. (6/15)<br />

* DDI asked about safety and cascading coverage requirements when a key individual is off site.<br />

Specific reference was made to situation on Friday June 4 when crew was scheduled to work but<br />

DDI did not have an HSO on site and did not communicate this to WCH until that morning.<br />

WCH instructed that this would not be allowed to happen again. (6/8) WCH in review of site<br />

absence coverage plan. (6/15)<br />

* There will a site-wide emergency preparedness drill on June 17. WCH understand that this will<br />

be a "take cover" situation. All sites will be participating.<br />

" DDI HSO did not make her physical appointment yesterday. The soonest this can be rescheduled<br />

will be late July. There is some question whether she can enter the HRA. WCH is to confirm.<br />

(6/8) DDI HSO may enter HRA, but may not participate in activities requiring respiratory<br />

protection or exclusion zone entry. (6/15)


Progress Review Meeting<br />

Page 4<br />

111. PROJECT DESIGN DRAWINGS<br />

" DDI still needs to submit for WCH review as-builts for electrical as well as the energized water<br />

line. (5/11) No change. (5/18) No change. (5/25) Electrical drawing modifications have been<br />

discussed between DDI and WCH STR. (6/1) This is a topic of discussion in a meeting on 6/10<br />

between Watts and DDI. (6/8) DDI has additional questions about these as-built requirements.<br />

(6/15)<br />

* Water line as-builts are being marked up for WCH review prior to being submitted. (6/1) No<br />

change. WCH stressed that the as-builts need to indicate the location of the water lines from hook<br />

up at the fence to the high tower. (6/8) No change. (6/15)<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

* See attached.<br />

VI.<br />

VII.<br />

VIII.<br />

IX.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

* See attached.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

* Breathing air surveillance to be performed this week. WCH QA is waiting on information from<br />

subcontractor to complete. (5/2 5) Surveillance is complete. Qualifications of A. L. Compressed<br />

Gas Company for breathing air gasses and containers has been approved by DDI and confirmed<br />

by WCH QA as acceptable. (6/1) 118-K site is satisfactory. WCH QA still working on<br />

completion of this surveillance as it contains multiple sites. Anticipate completion by June 17.<br />

(6/8)<br />

* DDI was issued SDR (FR-201 0-IF-03 82-SDR-01 5) on 5/17/2010 for as-built drawings. (5/25)<br />

No update. (6/1) No update. (6/8)<br />

" The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3. No update (5/4). No update. (5/11)<br />

No update. (5/18) No update. (6/1) No update. (6/8)<br />

*WCH issued SDR (FR-2010-IF-0092-017) to DDI on 5/24/2010 for shuttle truck<br />

specifications. (5/25) No update. (6/1) No update. (6/8)<br />

" WCH QA will be conducting surveillance on contract fiowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the fiowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8)


Progress Review Meeting<br />

Page 5<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

*DDI will be issuing an RFI for the scheduler position, duties and WCH expectations. No update<br />

(5/4). No update. (5/11) No change. (5/18) Received, WCH in review. (5/25) No update. (6/1)<br />

WCH commits to having a response to DDI no later than 6/15. (6/8)<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/20 10. WCH has received, in<br />

preliminary review, will return this week. WCH returned to DDI, status 2, with comments.<br />

DDI will be doing a walkdown with Mr. Teachout to incorporate comments and will resubmit<br />

drawings for approval. DDI to check on status. DDI waiting on North Point. DDI still<br />

waiting on North Point. They have exceeded the 30-day expected response to a returned<br />

submittal. DDI to follow up with North Point again this week. No update, still with DDI<br />

(4/20). No update (4/27). No update (5/4). No update from DDI. WCH issued SDR. (5/18)<br />

No update. (5/25) No update. (6/8)<br />

* WCH return traffic control drawings to DDI, status 2. DDI will be resubmitting soon<br />

incorporating the WCH comments. DDI to submit this week. Drawings are with North Point for<br />

revision and will be resubmitted upon their return. DDI is well beyond the 30-day resubmission<br />

for updated drawings. WCH will be issuing an SDR regarding this issue. DDI has indicated they<br />

are working on a deficiency letter which will be submitted to Watts for this and several other<br />

deficiencies. (5/11) No update. (5/18) No update. (5/25) WCH received traffic control submittal<br />

6/3 and is in review of same. (6/8)<br />

" WCH reques ts as-built drawings of the energized water system. No update (5/4). No update.<br />

(5111) SDR provided, no update. (5/18) No update. (5/25) No update. (6/8)<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

* DDI can expect to see revision soon to Change Notice 025 regarding use of last for digits of<br />

employee social security numbers as identifier.<br />

* WCH returned CN 016 to DDI for corrections and changes. (6/1) No update. (6/8)<br />

" WCH is returning CN 007 R. 1 and CN 0 19 for corrections and changes. (6/8)<br />

* WCH is issuing CN 026 for the Trench I equipment and materials.<br />

XIV.<br />

XV.<br />

CORRESPONDENCE<br />

* Letter to DDI: Deficiency Reports<br />

IN VOICE AND PAYMENT STATUS<br />

*WCH has received billing for May and is reviewing.<br />

o WCH will be sending a letter to DDI indicating that WCH intends to withhold payment until<br />

the overdue as-built drawings are received. DDI requested WCH to provide value of<br />

holdback. WCH agreed to communicate this by the end of the day. (6/8) Proficiency<br />

withholding (retainage) to be released when as-builts are received and deemed compliant.<br />

(6/15)


Progress Review Meeting<br />

Page 6<br />

XVI.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

" DDI to provide letter of clarification request for potential additional quantities in Trench 0.<br />

" DDI to provide letter of clarification request for payment withholding for subcontractor<br />

deficiencies. (6/15)<br />

Attachment(s): As noted above.


6 Lo<br />

- L<br />

E<br />

CA<br />

00 0<br />

CA: ~ 0. :Z c<br />

Z<br />

t 0- I-<br />

La4<br />

Z u 0<br />

co<br />

0<br />

V44<br />

ob<br />

LU<br />

CC<br />

c<br />

EE<br />

0<br />

E A,<br />

U) a, ~ Cn-4m<br />

E n Ln Ln<br />

0 0 C: 0<br />

u Un U-e-Ne 0<br />

2 22<br />

m~ U, a, ) a)(<br />

oE E E M M M m<br />

Cu~ Cu Cu ~ 4 4 4 4 4 a , a 1 _C 4-<br />

4 -<br />

L


0v<br />

N<br />

'I-:<br />

w.<br />

w<br />

7:<br />

0 0 90<br />

0 q q<br />

c rl<br />

ai<br />

wll<br />

Ct)<br />

j-,z I-<br />

r-_-<br />

-c - o.~ o o -<br />

0 0 0 -<br />

0 0<br />

E -5 o<br />

<<br />

00 N<br />

00 o 0 - 0 . 0 wo -<br />

C1<br />

600<br />

w, 0<br />

-U LL<br />

o<br />

LL<br />

0 ~ ~~~~ le<br />

ifj<br />

-j<br />

a , C - C<br />

*l I U) 80 V) 00 00 V 00 00<br />

w -


0 z<br />

L)~<br />

Is 0<br />

CL<br />

31 E<br />

m2 3<br />

0~~ CJ,-<br />

.o CC<br />

z<br />

a cc<br />

z<br />

~A R<br />

(0<br />

41<br />

f<br />

Se<br />

(0<br />

t~o(0 (00 t T<br />

O<br />

C'JN 0(0RL0(


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

Igo= WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

1111191 0 Christopher L. Beach 4 '>< z'<br />

1111191-11 June 22, 2010<br />

CCN: 151814<br />

C. L. Beach X3-16 E. L. Adamson X3-40<br />

Q. L. Crist X3-16 D. Bollinger (DDI)<br />

R. Ferguson (DDI) X3-17 R. D. Cantwell N3-30<br />

A. Gagnon X9-08 R. W. Cross H4-25<br />

W. R. Junkins X3-16 T. Dance (DDI) X3-17<br />

S. E. Parnell X3-16 R. A. Dodd H4-24<br />

D. G. Saueressig N3-30 C. Flowers (DDI) X3-17<br />

H. C. Weber (DDI) X3-16 T. A. Foster N3-30<br />

R. Ganapathy X3-40<br />

J. A. Heard H4-17<br />

S. J. Huddleston X3-16<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

H. Williams III X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4-1 1<br />

A meeting on the above subject was held on June 22, 2010 at 118-K, MO-755.<br />

1. SAFETY<br />

*Safety topic: The most mentioned and most commonly regurgitated safety topic is slips trips and<br />

falls.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

0 PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/2010. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 100-K water will be shut-off this weekend. Friday work is pending.<br />

C:\Documents and Settiiigs\c~beach\LocaI Setfings\Temporiry Internet Files\OLK1I07\6-22- 10 Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 1 9 th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 100-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

calcs on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/25) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pressures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm). (6/1) DDI is<br />

sending a letter to Watts to rework system for increased pressure. (6/8) DDI to submit letter,<br />

request for clarification for intent of water supply. (6/15) No change. (6/22)<br />

*Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to burn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/20 10. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning. DDI to submit revised OMP this week.<br />

DDI is working with WCH EPL on clarifications. WCH EPL to observe Watts's oil burning<br />

facility on 3/18/20 10. DDI will submit OMP after that date. OMP waiting on ARES revision to<br />

drawings, then DDI will submit. Drawings should be available for pickup by DDI this week then<br />

the OMP will be submitted. No update (4/20). DDI is working on final review of this submittal<br />

and will submit by 5/11/2010 (4/27). On track to submit by 5/11/2010 (5/4). DDI confirmed that<br />

the OMP will be submitted 5/12/2010. Since the OMP is not yet approved, DDI is not to remove<br />

used oil from the site. Any questions about exceptions to this need to be discussed with the WCH<br />

EPL. (5/11) DDI continues to work on completing the OMP with support from the WCH EPL.<br />

DDI plans to submit the OMP next week. (5/18) Submission of OMP pushed out to 6/3/20 10.<br />

(5/25) No change. (6/1) DDI is still working on OMP submittal. (6/8) No change, DDI to<br />

submit by 6/24/10. (6/15) DDI is on schedule to meet 6/24 submission. (6/22)


Progress Review Meeting<br />

Page 3<br />

" Discussed issue of inaccurate scale weights. DDI has instructed Watts to install a new scale. The<br />

scale is part of the contract between Watts and DDI. WCH asks that the work be completed no<br />

later than the end of May with work to be completed on weekends so not to take away from<br />

production. (5/4) No change. WCH discussed the need to coordinate long lead time for<br />

scheduling teamster to remove from site the scale being replaced. (5/11) No change. DDI subtier<br />

(Watts) has to plans at this time to replace scale. (5/18) It is questionable if scale is issuing<br />

consistent weight that is reliable. (5/25) On 5/27, the scale went down; it was repaired and<br />

recertified for use. Plans in the works for replacement of scale. Schedule is still being<br />

determined. (6/1) DDI plans to replace the scale on Friday, Jun 18. Briefing of job hazards and<br />

specific job scope will be done prior to that date. (6/8) Truck scale replacement completed on<br />

6/18. (6/22)<br />

" DDI has not received any information on the Trench I camera specs or equipment specs for the<br />

400 excavator. They will follow up with the vendor. (5/11) Some specs have been received, but<br />

more are needed. Confer with D. Teachout for specifics. (5/18) WCH is in development of<br />

change notice for Trench I work. (5/25) No update. (6/1) DDI is to follow-up ASAP to provide<br />

the specs. Trench I operations scheduled to begin late July/early August. (6/8) WCH discussed<br />

concerns (6/15) WCH has transmitted to DDI CN 026 to provide clamshell and camera<br />

excavation equipment. (6/22)<br />

* Discussed Incidental Welding procedure. Surveillance performed, identified necessary changes<br />

to be made for clarifications. (5/18) No update. (5/25) DDI to revise this week. (6/1) DDI to<br />

submit by 6/10/2010. (6/8) DDI commits to submitting no later than 6/24/10. (6/15) DDI on<br />

schedule for submission by 6/24. (6/22)<br />

" DDI and WCH are planning to perform confirmatory sampling on one test pit and two trenches<br />

for 100-K-2 on the day the scale is being replaced - June 18. (6/8) This activity was rescheduled<br />

with new date TBD. (6/22)<br />

" Discussed Beryllium controls and medical surveillance requirements for Trench I remediation.<br />

(5/25) Medical screen in the process of being scheduled. All DDI employees will participate in<br />

this medical surveillance process. More information to follow. (6/1) Discussed medical physical<br />

scheduling. (6/15) No change. (6/22)<br />

* Clarified dust control requirements. It is not necessary for fixative to be a "crusting agent," but<br />

does need to be effective as dust control. (6/1) Discussed CTA dust control requirements and<br />

responsibility. DDI to submit letter for clarification. (6/15) No change. (6/22)<br />

" It appears the potable water holding tank in the shower trailer is just bolted into the wall. DDI to<br />

take a look at this configuration for safety considerations. (6/1) DDI feels that current<br />

configuration is adequate. DDI to revisit issue with WCH STR. (6/8) No change. (6/15) No<br />

change. (6/22)<br />

* DDI requests a discussion about the cost of the IH monitoring in support of confirmatory<br />

sampling sent out for processing. (6/8) WCH in review of REA. (6/15) No change. (6/24)<br />

" DDI asked about safety and cascading coverage requirements when a key individual is off site.<br />

Specific reference was made to situation on Friday June 4 when crew was scheduled to work but<br />

DDI did not have an HSO on site and did not communicate this to WCH until that morning.<br />

WCH instructed that this would not be allowed to happen again. (6/8) WCH in review of site<br />

absence coverage plan. (6/15) WCH has returned this to DDI. (6/22)<br />

* DDI to provide letter of clarification request for potential additional quantities in Trench 0. (6/15)<br />

WCH has not yet received letter. (6/22)<br />

* DDI to provide letter of clarification request for payment withholding for subcontractor<br />

deficiencies. (6/15) WCH has not yet received letter. (6/22)


Progress Review Meeting<br />

Page 4<br />

111. PROJECT DESIGN DRAWINGS<br />

" DDI still needs to submit for WCH review as-builts for electrical as well as the energized water<br />

line. (5/11) No change. (5/18) No change. (5/25) Electrical drawing modifications have been<br />

discussed between DDI and WCH STR. (6/1) This is a topic of discussion in a meeting on 6/10<br />

between Watts and DDI. (6/8) DDI has additional questions about these as-built requirements.<br />

(6/15) No change. (6/22)<br />

" Water line as-builts are being marked up for WCH review prior to being submitted. (6/1) No<br />

change. WCH stressed that the as-builts need to indicate the location of the water lines from hook<br />

up at the fence to the high tower. (6/8) No change. (6/15) No change. (6/22)<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

* See attached.<br />

" No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

V1. MANPOWER<br />

* See attached.<br />

VII.<br />

VIII.<br />

IX.<br />

EQUIPMENT<br />

* See attached.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

MATERIAL<br />

9 None.<br />

X. QUALITY<br />

" Breathing air surveillance to be performed this week. WCH QA is waiting on information from<br />

subcontractor to complete. (5/25) Surveillance is complete. Qualifications of A. L. Compressed<br />

Gas Company for breathing air gasses and containers has been approved by DDI and confirmed<br />

by WCH QA as acceptable. (6/1) 118-K site is satisfactory. WCH QA still working on<br />

completion of this surveillance as it contains multiple sites. Anticipate completion by June 17.<br />

(6/8)<br />

" DDI was issued SDR (FR-2010-LF-0382-SDR-015) on 5/17/20 10 for as-built drawings. (5/25)<br />

No update. (6/1) No update. (6/8) DDI to provide CAR by 6/24/10. (6/22)<br />

" The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3. No update (5/4). No update. (5/11)<br />

No update. (5/18) No update. (6/1) No update. (6/8)<br />

*WCH issued SDR (FR-2010-IF-0092-017) to DDI on 5/24/2010 for shuttle truck<br />

specifications. (5/25) No update. (6/1) No update. (6/8) DDI to provide CAR by 6/24/20 10.<br />

(6/22)


Progress Review Meeting<br />

Page 5<br />

*WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8)<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

*DDI will be issuing an RFI for the scheduler position, duties and WCH expectations. No update<br />

(5/4). No update. (5/il) No change. (5/18) Received, WCH in review. (5/25) No update. (6/1)<br />

WCH commits to having a response to DDI no later than 6/15. (6/8)<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/20 10. WCH has received, in<br />

preliminary review, will return this week. WCH returned to DDI, status 2, with comments.<br />

DDI will be doing a walkdown with Mr. Teachout to incorporate comments and will resubmit<br />

drawings for approval. DDI to check on status. DDI waiting on North Point. DDI still<br />

waiting on North Point. They have exceeded the 30-day expected response to a returned<br />

submittal. DDI to follow up with North Point again this week. No update, still with DDI<br />

(4/20). No update (4/27). No update (5/4). No update from DDI. WCH issued SDR. (5/18)<br />

No update. (5/25) No update. (6/8)<br />

* WCH return traffic control drawings to DDI, status 2. DDI will be resubmitting soon<br />

incorporating the WCH comments. DDI to submit this week. Drawings are with North Point for<br />

revision and will be resubmitted upon their return. DDI is well beyond the 30-day resubmission<br />

for updated drawings. WCH will be issuing an SDR regarding this issue. DDI has indicated they<br />

are working on a deficiency letter which will be submitted to Watts for this and several other<br />

deficiencies. (5/11) No update. (5/18) No update. (5/25) WCH received traffic control submittal<br />

6/3 and is in review of same. (6/8) WCH has returned to DDI. (6/22)<br />

" WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5111) SDR provided, no update. (5/18) No update. (5/25) No update. (6/8)<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

* DDI can expect to see revision soon to Change Notice 025 regarding use of last four digits of<br />

employee social security numbers as identifier.<br />

* WCH returned CN 016 to DDI for corrections and changes. (6/1) No update. (6/8) WCH has<br />

received proposal and is making minor adjustments. (6/22)<br />

" WCH is returning CN 007 R. 1 and CN 0 19 for corrections and changes. (6/8) Well has<br />

received proposal for CN 007 R. 1 and is reviewing. (6/22)<br />

* WCH has issued CN 026 for the Trench I equipment and materials. (6/22)<br />

XIV.<br />

CORRESPONDENCE<br />

" Letter from DDI: 600 HR Routine Cable Replacement for Roll-Off Truck<br />

" Letter from DDI: 1H Monitoring for Option Area 600-29 and 1 00-K-2<br />

" Transmittal from DDI: Proposal for Change Notice 007, Rev. 1<br />

" Transmittal from DDI: Proposal for Change Notice 0 19


Progress Review Meeting<br />

Page 6<br />

* Weekly Progress Review Meeting Minutes of 6/15/20 10<br />

* WCH transmittal to DDI: Change Notice 026 (Clam shell and camera for Trench 1)<br />

XV.<br />

XVI.<br />

IN VOICE AND PAYM4ENT STATUS<br />

* None. End of the month is this week.<br />

OTHER COMNMNTS/NEW ACTION ITEM<br />

" DDI to develop NCR for the SCI lift points on the new truck scale.<br />

" DDI to submit REA for 100-K-2 confirmatory sampling.<br />

* Discussed future start-up plans for Trench N. DDI to present plan for Trench N for WCH<br />

concurrence before the start of intrusive activities.<br />

* DDI is scheduling a 25-ton certification scale test for Kenworth trucks on Tuesday, June 29 at<br />

10:00. A WCH engineer will participate in witnessing the test.<br />

* Discussed requirements for daily reports. Daily reports are to be provided to WCH by noon the<br />

following business day.<br />

* Discussed the status of plans to handle and disposition of known large canisters in Trench K.<br />

* WCH to conduct fact finding meeting regarding truck scale receipt deficiency tomorrow (6/23) at<br />

0900 hours.<br />

Attachment(s): As noted above.


ILo<br />

0 0 8<br />

0 40<br />

8 8 8 8 8 8<br />

8 8.8 8<br />

8 86 8<br />

fao~~~<br />

0 0 0 00<br />

~ 00 x00 00<br />

NN~~ NNu ZZA A<br />

00 000 000 00


Z ~4 co N<br />

O N<br />

I:;<br />

cc E<br />

0L<br />

w~o<br />

o ~ Q.n LnO<br />

o<br />

Ort2c<br />

'Ii G.<br />

~CL<br />

'-4<br />

E<br />

0<br />

E0<br />

(U 1w<br />

.0 : c o 0 0 M R<br />

C) w<br />

3 0Omn<br />

u u<br />

0 0 0 o 'o C


C)o 0 0 0 0 0 00 0 0 0 0 )0<br />

-CNN N- 04 ( N 0 04 C NNN C4 (N ~(<br />

CoN<br />

6 - - rs ; - 4~ Lo -<br />

cc 0 - -<br />

(0 o o 0 04 cc c C1 'L CV) - C<br />

C) C0t () C)(<br />

a 0 0 0 ) C, 0 0 o 0<br />

000<br />

S) %<br />

.w C> 0 0 03 0 C - E) C-<br />

C(N N(\ N (N CN N(qNN .-. q<br />

~.c) - 0j<br />

Co~~c Ce) C'4<br />

CO)<br />

C.) U) U ) U<br />

=3 -ff 75<br />

0. 0 m m cu c C:<br />

0~U<br />

c L CL a, a v D )c<br />

Z- ~NQ L.<br />

o-D 0 CL ~ ~ CD C<br />

Z~ 0<br />

ca (n C/ c c- 'a '<br />

W 0 0 C c<br />

_0N C'4 a c c<br />

W(Ja>.. a) 0> 0 0<br />

.2 .2<br />

~o 2 0 0 0 .1 0 C D<br />

()~~~ U)U) ~~<br />

~ ~ EE C C 0<br />

.0 ) E - - 0 -<br />

55 a, a, a, c:)U U u) C<br />

CoE "0 a, E E E 0L 0<br />

m S ( E a) ~ n(D<br />

0 CL CL m<br />

CO<br />

cu<br />

rn C o U) C C<br />

-0 c 0 ~00<br />

a)~ _0 c 0 0 cc<br />

c<br />

Mo 0 CE 0 C) 2.. U a0D .- 0<br />

CL<br />

>~ ><br />

~ a, cc<br />

0~~~~~ F r a<br />

,m 0o<br />

>C - =3 :3~ OCC.<br />

_0<br />

a M ) C C C C<br />

> cc ED cc m m ) a c<br />

03 a)a m.- a-<br />

o05 C> ><br />

a c<br />

1=(<br />

0 4z~D c2 M<br />

Cb C C 6 .9<br />

-<br />

- a,<br />

L CL-r-m<br />

ac<br />

0-<br />

-,<br />

0<br />

: 0 :. C) -*<br />

a, CD 0 0 - MC<br />

0<br />

-K > 0<br />

) >- p. 0<br />

N a. _L C a-<br />

_D U-<br />

00 0 0 0a 00 000 0o 000 0<br />

0 0n 0) 000 0) a)x- (<br />

>N(N 0 ) U) = 0 4 0 )a) 0 0) M~c (N<br />

00a' 0 0 ~ > -Q< 0 oooj(L<br />

tz LLCLC<br />

,- __


, D- 20 C)<br />

EO~ 28a 5<br />

z-o -a0 a- < C~ 3: 0.<br />

z<br />

0<br />

CD<br />

z 0<br />

c~ z<br />

37<br />

u)<br />

o 8o<br />

.2- f2 ; 'l<br />

0.)V<br />

C.,2<br />

odc<br />

II<br />

00 iN<br />

00 0 0. N0


WCH Closure<br />

WCH <strong>Hanford</strong><br />

Washinton<br />

Meeting Minutes<br />

CCN: 151818<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach ~ %<br />

M June 29, 2010<br />

DISRIBTIO<br />

E. L. Adamson X3-40 D. Bollinger (DDI)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Crist X3-16 R. W. Cross H14-25<br />

T. Dance (DDI) X3-17 R. A. Dodd H4-24<br />

R. Ferguson (DDI) X3-17 C. Flowers (DDI) X3-17<br />

A. Gagnon X9-08 T. A. Foster N3-30<br />

W. R. Junkins X3-16 R. Ganapathy X3-40<br />

S. E. Parnell X3-16 J. A. Heard H4-17<br />

H. C. Weber (DDI) X3-16 S. J. Huddleston X3-16<br />

J. M. Mercer H14-25 D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

H. Williams III X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H14-11<br />

A meeting on the above subject was held on June 29, 2010 at 118-K, MO-755.<br />

1. SAFETY<br />

*Safety topic: Discussed driver courtesy and how the intent is good, it can sometimes lead to<br />

confusion and potential accidents.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/2010. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/20 10. Excavation permit is<br />

Z:'Adnministrative Assistant\Project Progress Review Weekly Meetings\2010\Yune\6-29-1O Weekly Progress.doc


Piogress Review Meeting<br />

Page 2<br />

complete. Discussed that 100-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 1 9 th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 1 00-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide informnation/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDJ is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

calcs on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/li) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/25) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pressures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm). (6/1) DDI is<br />

sending a letter to Watts to rework system for increased pressure. (6/8) DDI to submit letter,<br />

request for clarification for intent of water supply. (6/15) No change. (6/22) WCH has not<br />

received letter from DDI about water supply. (6/29)<br />

*Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to burn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environental will get WCH concurrence. DDI plans to submit by 1/27/20 10. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning. DDI to submit revised OMP this week.<br />

DDJ is working with WCH EPL on clarifications. WCH EPL to observe Watts's oil burning<br />

facility on 3/18/2010. DDI will submit OMP after that date. OMP waiting on ARES revision to<br />

drawings, then DDI will submit. Drawings should be available for pickup by DDI this week then<br />

the OMP will be submitted. No update (4/2 0). DDI is working on final review of this submittal<br />

and will submit by 5/11/2010 (4/27). On track to submit by 5/11/2010 (5/4). DDI confirmed that<br />

the OMP will be submitted 5/12/2010. Since the OMP is not yet approved, DDI is not to remove<br />

used oil from the site. Any questions about exceptions to this need to be discussed with the WCH<br />

EPL. (5/11) DDI continues to work on completing the OMP with support from the WCH EPL.<br />

DDI plans to submit the OMP next week. (5/18) Submission of OMP pushed out to 6/3/2010.


Progress Review Meeting<br />

Page 3<br />

(5/25) No change. (6/1) DDI is still working on OMP submittal. (6/8) No change, DDI to<br />

submit by 6/24/10. (6/15) DDI is on schedule to meet 6/24 submission. (6/22) WCH has<br />

received OMP and is in review. (6/29)<br />

* Discussed Incidental Welding procedure. Surveillance performed, identified necessary changes<br />

to be made for clarifications. (5/18) No update. (5/25) DDI to revise this week. (6/1) DDI to<br />

submit by 6/10/20 10. (6/8) DDI commits to submitting no later than 6/24/10. (6/15) DDI on<br />

schedule for submission by 6/24. (6/22) WCH has received and is in review. (6/29)<br />

* DDI and WCH are planning to perform confirmatory sampling on one test pit and two trenches<br />

for 100-K-2 on the day the scale is being replaced - June 18. (6/8) This activity was rescheduled<br />

with new date TBD. (6/22) No change. (6/29)<br />

* Clarified dust control requirements. It is not necessary for fixative to be a "crusting agent," but<br />

does need to be effective as dust control. (6/1) Discussed CTA dust control requirements and<br />

responsibility. DDI to submit letter for clarification. (6/15) No change. (6/22) Watts/DDI is<br />

arranging with ERDF for an ERDF driver to operate a DDI water truck when the CTA needs dust<br />

control on the swing shift. (6/29)<br />

* It appears the potable water holding tank in the shower trailer is just bolted into the wall. DDI to<br />

take a look at this configuration for safety considerations. (6/1) DDI feels that current<br />

configuration is adequate. DDI to revisit issue with WCH STR. (6/8) No change. (6/15) No<br />

change. (6/22) No change. (6/29)<br />

* DDI to provide letter of clarification request for potential additional quantities in Trench 0. (6/15)<br />

WCH has not yet received letter. (6/22) DDI has determined no letter is needed. (6/29)<br />

" DDI to provide letter of clarification request for payment withholding for subcontractor<br />

deficiencies. (6/15) WCH has not yet received letter. (6/22) DDI has determined no letter is<br />

needed at this time. (6/29)<br />

* DDI to develop NCR for the suspect/modified lift points on the new truck scale. (6/22) NCR has<br />

been implemented and DDI is developing a documented path forward to address the NCR. (6/29)<br />

" DDI to submit REA for I100-K-2 confirmatory sampling. (6/22) DDI to submit by 6/30. (6/29)<br />

* Discussed future start-up plans for Trench N. DDI to present plan for Trench N for WCH<br />

concurrence before the start of intrusive activities. (6/22)<br />

* DDI is scheduling a 25-ton certification scale test for Kenworth trucks on Tuesday, June 29 at<br />

10:00. A WCH engineer will participate in witnessing the test. (6/22) Test rescheduled to 6/30.<br />

DDI working to obtain information from G & H for hoist modifications. (6/29)<br />

" Discussed requirements for daily reports. Daily reports are to be provided to WCH by noon the<br />

following business day. (6/22) DDI commits to making this happen. (6/29)<br />

* Discussed the status of plans for handling and disposition of known large canisters in Trench K,<br />

DDI to provide details.<br />

* Discussed Beryllium controls and medical surveillance requirements for Trench I remediation.<br />

(5/25) Medical screen in the process of being scheduled. All DDI employees will participate in<br />

this medical surveillance process. More information to follow. (6/1) Discussed medical physical<br />

scheduling. (6/15) No change. (6/22) WCH is working with AMH to schedule all project<br />

persons for physicals and training. (6/29)


Progress Review Meeting<br />

Page 4<br />

111. PROJECT DESIGN DRAWINGS<br />

" DDI still needs to submit for WCH review as-builts for electrical as well as the energized water<br />

line. (5/11) No change. (5/18) No change. (5/25) Electrical drawing modifications have been<br />

discussed between DDI and WCH STR. (6/1) This is a topic of discussion in a meeting on 6/10<br />

between Watts and DDI. (6/8) DDI has additional questions about these as-built requirements.<br />

(6/15) No change. (6/22) WCH has received and is in review. (6/29)<br />

* Water line as-builts are being marked up for WCH review prior to being submitted. (6/1) No<br />

change. WCH stressed that the as-builts need to indicate the location of the water lines from hook<br />

up at the fence to the high tower. (6/8) No change. (6/15) No change. (6/22) WCH to provide<br />

new drawing number for the as-built drawing. (6/29)<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

0 See attached.<br />

V. WEEKCLY PRODUCTION TABLE<br />

* See attached.<br />

" No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

VI.<br />

VII.<br />

VIII.<br />

IX.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

* See attached.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

" Breathing air surveillance to be performed this week. WCH QA is waiting on information from<br />

subcontractor to complete. (5/25) Surveillance is complete. Qualifications of A. L. Compressed<br />

Gas Company for breathing air gasses and containers has been approved by DDI and confirmed<br />

by WCH QA as acceptable. (6/1) 118-K site is satisfactory. WCH QA still working on<br />

completion of this surveillance as it contains multiple sites. Anticipate completion by June 17.<br />

(6/8) WCH QA is fine tuning and will distribute surveillance shortly. (6/29)<br />

" DDI was issued SDR (FR-201 0-IF-03 82-SDR-0 15) on 5/17/2010 for as-built drawings. (5/25)<br />

No update. (6/1) No update. (6/8) DDI to provide CAR by 6/24/10. (6/22) WCH received<br />

CAR today. (6/29)<br />

* The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3. No update (5/4). No update. (5/11)<br />

No update. (5/18) No update. (6/1) No update. (6/8)<br />

*WCH issued SDR (FR-2010-IF-0092-017) to DDI on 5/24/2010 for shuttle truck<br />

specifications. (5/25) No update. (6/1) No update. (6/8) DDI to provide CAR by 6/24/20 10.<br />

(6/22) WCH received CAR today. (6/29)


Progress Review Meeting<br />

Page 5<br />

*WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCH QA in the near future. (6/29)<br />

XI.<br />

XII.<br />

XIII.<br />

REQUESTS FOR INFORMATION<br />

* DDI will be issuing an RFI for the scheduler position, duties and WCH expectations. No update<br />

(5/4). No update. (5/11) No change. (5/18) Received, WCH in review. (5/25) No update. (6/1)<br />

WCH commits to having a response to DDI no later than 6/15. (6/8)<br />

* DDI requests a discussion about the cost of the 1Hl monitoring in support of confirmatory<br />

sampling sent out for processing. (6/8) WCH in review of REA. (6/15) No change. (6/24) No<br />

change. (6/29)<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/20 10. WCH has received, in<br />

preliminary review, will return this week. WCH returned to DDI, status 2, with comments.<br />

DDI will be doing a walkdown with Mr. Teachout to incorporate comments and will resubmit<br />

drawings for approval. DDI to check on status. DDI waiting on North Point. DDI still<br />

waiting on North Point. They have exceeded the 30-day expected response to a returned<br />

submittal. DDI to follow up with North Point again this week. No update, still with DDI<br />

(4/20). No update (4/27). No update (5/4). No update from DDI. WCH issued SDR. (5/18)<br />

No update. (5/25) No update. (6/8) WCH is in review of drawing. (6/29)<br />

* WCH return traffic control drawings to DDI, status 2. DDI will be resubmitting soon<br />

incorporating the WCH comments. DDI to submit this week. Drawings are with North Point for<br />

revision and will be resubmitted upon their return. DDI is well beyond the 30-day resubmission<br />

for updated drawings. WCH will be issuing an SDR regarding this issue. DDI has indicated they<br />

are working on a deficiency letter which will be submitted to Watts for this and several other<br />

deficiencies. (5/11) No update. (5/18) No update. (5/25) WCH received traffic control submittal<br />

6/3 and is in review of same. (6/8) WCH has returned to DDI status 2. (6/22) No change. (6/29)<br />

" WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5/11) SDR provided, no update. (5/18) No update. (5/25) No update. (6/8) DDI submitted redline<br />

copies. WCH will provide a drawing number to DDI. (6/29)<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.


Progress Review Meeting<br />

Page 6<br />

" DDI can expect to see revision soon to Change Notice 025 regarding use of last four digits of<br />

employee social security numbers as identifier.<br />

* WCH returned CN 016 to DDI for corrections and changes. (6/1) No update. (6/8) WCH has<br />

received proposal and is making minor adjustments. (6/22)<br />

* WCH is returning CN 007 R. 1 and CN 0 19 for corrections and changes. (6/8) WCH has<br />

received proposal for CN 007 R. I and is reviewing. (6/22)<br />

* WCI{ has issued CN 026 for the Trench I equipment and materials. (6/22)<br />

" DDI has not received any information on the Trench I camera specs or equipment specs for the<br />

400 excavator. They will follow up with the vendor. (5/11) Some specs have been received, but<br />

more are needed. Confer with D. Teachout for specifics. (5/18) WCH is in development of<br />

change notice for Trench I work. (5/2 5) No update. (6/1) DDI is to follow-up ASAP to provide<br />

the specs. Trench I operations scheduled to begin late July/early August. (6/8) WCH discussed<br />

concerns (6/15) WCH has transmitted to DDI CN 026 to provide clamshell and camera<br />

excavation equipment. (6/22) Proposal to be provided to WCH by close of business this week.<br />

(6/29)<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE<br />

" Weekly Progress Review Meeting Minutes of 6/22/2010<br />

" Letter from DDI: Response to SDR-01 5 (As-Builts)<br />

* Letter from DDI: Response to SDR-01 7 (shuttle trucks)<br />

* Letter from DDI: Deficiency Reports<br />

IN VOICE AND PAYMENT STATUS<br />

* None.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* None.<br />

Attachment(s): As noted above.


0<br />

oo<br />

oo 0 0<br />

In I, 5<br />

0 0o In In: In ,<br />

V5<br />

05 o<br />

or<br />

c<br />

03<br />

000<br />

o E 3 0)<br />

C,, h s<br />

90 0 - -- Al 09 90 0 -<br />

s,'<br />

0<br />

.0 04 -<br />

40<br />

f3ft


~d 0woo<br />

4-.<br />

E<br />

U' 0 ><br />

LU4 -<br />

C- w o-~ w<br />

m<br />

r- u c o E~ -o<br />

o * o uzjJOii<br />

~ w<br />

~m<br />

E<br />

'4 E<br />

CN -<br />

Cu<br />

u0<br />

E LOU n " ,n . . . . . Sa -<br />

n vi L O u w -L<br />

+1 4-1~:t 4-1 Q, T- -<br />

00 m m U U U-4 - _) 0<br />

.C 0 M- 4-<br />

C- E E E C 41 ~ - 4- 4- 4- 4- 0C<br />

o o o :L CuCuC C


.~000000 0 5 a 0 0005 a a 00<br />

C3 a C 0 0 0 0 0 0 0 0 0 C)0<br />

NU<br />

C~*~* C- N<br />

04 C- 04 0.N 04) CMr 0 N 0NN<br />

00 00 0 0 0Oo o<br />

(U 0 0<br />

C1 04 Co - N<br />

0<br />

a 0> a 0 0 CD 0<br />

00<br />

(a -.. Cl C u . 0 0<br />

N~<br />

0<br />

C4(<br />

0 0 03<br />

N 04 N ( N !; !<br />

cqC zC q N v -q.a<br />

0. c U) a) Q)<br />

- 0 0<br />

0 0<br />

c* -L -L L. 0 a<br />

0 'o e t: )<br />

0V0<br />

ZC0 0 0 E 0<br />

-- r C 0C<br />

CU .w 0. CL) CL) C C C V<br />

coc ) n U 0 0 C C:<br />

LU -<br />

> ;;<br />

0 c<br />

0 00 0<br />

:<br />

0<br />

0~ C . (<br />

(U 0 U<br />

ZE ~JL0(a E O.C ~ 0T~<br />

0<br />

CD<br />

0 C0MC o 'a U)<br />

C:~ ~<br />

00,<br />

~<br />

()<br />

~ O!<br />

4) 'C)C<br />

0 0) 4) CD CC occ<br />

Ca)O 0~U<br />

E<br />

4) C)<br />

C C<br />

aO<br />

U) OC<br />

0 0 0 cm<br />

E ~ ~ ~ (D w<br />

z- 0 o)<br />

0<br />

CD 0- 0 2<br />

0C C 0<br />

O'-<br />

0 .2.2<br />

-<br />

f ;<br />

C 0. .<br />

10 -a 2<br />

_0 CL0<br />

_o 6 -DC ~ C C 3 0<br />

2~ -0 2- 0CC<br />

C -2 --<br />

U) ~~ ~ U<br />

E~0 cu u 9 *c )<br />

-~r :3 >a O r C0 )0 )<br />

-)<br />

-0 .-<br />

=<br />

~~W .i .U<br />

C<br />

-O<br />

Ca:<br />

Cm U)C. 0c<br />

o<br />

.6 CI) 6-<br />

0<br />

0) 2?-<br />

LL- f r CO) -CO'<br />

1<br />

= = -<br />

03 c CC .2:<br />

0 0 00T) 0 0 0<br />

0 0 0 0 0<br />

E E C Y o 23 0 000 0a 0 0 00 ><br />

L0 0 000 C<br />

0c0 CL<br />

0L 0)<br />

00oo 000 0 0 0> 9L .<br />

9 CL<br />

-L a~o 0 0 0 : 02<br />

0 0 m0m - -


E9<br />

0 .9 0<br />

9 - C0<br />

9. --<br />

.9


Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

WashigtonCCN:<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

151819<br />

Distribution<br />

Christopher L. Beach<br />

July 6, 2010<br />

_<br />

DITRBUIO<br />

C. L. Beach X3-16 E. ,L. Adamson X3-40<br />

Q. L. Grist X3-16 D. Bollinger (DDI)<br />

R. Ferguson (DDI) X3-17 R. D. Cantwell N3-30<br />

A. Gagnon X9-08 R. W. Cross H4-25<br />

M. Sherman (DDI) X3-17 T. Dance (DDI) X3-17<br />

H. Williams III X3-16 R. A. Dodd H4-24<br />

C. Flowers (DDI) X3-17<br />

T. A. Foster N3-30<br />

R. Ganapathy X3-40<br />

J. A. Heard H4-17<br />

S. J. Huddleston X3-16<br />

W. R. Junkins X3-16<br />

S. E. Parnell X3-16<br />

D. G. Saueressig N3-30<br />

D. B. Teachout X3-16<br />

H. C. Weber (DDI) X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4- 11<br />

A meeting on the above subject was held on July 6, 2010 at 118-K, MO-755.<br />

I. SAFETY<br />

* Safety topic: Discussed defensive driving and being aware of what is going on around you.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

*PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/20 10. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/20 10. Excavation permit is<br />

C:\Documnents and Settings\clbeach\Loca I Settings\Temporary Internet Files\OLK 107\7-6- 10 Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

complete. Discussed that 100-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 19th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 100-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

calcs on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/25) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pressures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm). (6/1) DDI is<br />

sending a letter to Watts to rework system for increased pressure. (6/8) DDI to submit letter,<br />

request for clarification for intent of water supply. (6/15) No change. (6/22) WCH has not<br />

received letter from DDI about water supply. (6/29) DDI states they send letter on 6/23, but<br />

WCH STR has not received copy. (7/6)<br />

*Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to burn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/2010. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning. DDI to submit revised OMP this week.<br />

DDI is working with WCH EPL on clarifications. WCH EPL to observe Watts's oil burning<br />

facility on 3/18/20 10. DDI will submit OMP after that date. OMP waiting on ARES revision to<br />

drawings, then DDI will submit. Drawings should be available for pickup by DDI this week then<br />

the OMP will be submitted. No update (4/20). DDI is working on final review of this submittal<br />

and will submit by 5/11/2010 (4/27). On track to submit by 5/11/2010 (5/4). DDI confirmed that<br />

the OMP will be submitted 5/12/2010. Since the OMP is not yet approved, DDI is not to remove<br />

used oil from the site. Any questions about exceptions to this need to be discussed with the WCII<br />

EPL. (5/11) DDI continues to work on completing the OMP with support from the WCH EPL.


Progress Review Meeting<br />

Page 3<br />

DDI plans to submit the OMP next week. (5/18) Submission of OMP pushed out to 6/3/2010.<br />

(5/25) No change. (6/1) DDI is still working on OMP submittal. (6/8) No change, DDI to<br />

submit by 6/24/10. (6/15) DDI is on schedule to meet 6/24 submission. (6/22) WCH has<br />

received OMP and is in review. (6/29) WCH is still reviewing. (7/6)<br />

* Discussed Incidental Welding procedure. Surveillance performed, identified necessary changes<br />

to be made for clarifications. (5/18) No update. (5/25) DDI to revise this week. (6/1) DDI to<br />

submit by 6/10/2010. (6/8) DDI commits to submitting no later than 6/24/10. (6/15) DDI on<br />

schedule for submission by 6/24. (6/22) WCH has received and is in review. (6/29) WCH has<br />

returned to DDI status 2. (7/6)<br />

" DDI and WCH are planning to perform confirmatory sampling on one test pit and two trenches<br />

for 100-K-2 on the day the scale is being replaced - June 18. (6/8) This activity was rescheduled<br />

with new date TBD. (6/22) No change. (6/29) No change. (7/6)<br />

" It appears the potable water holding tank in the shower trailer is just bolted into the wall. DDI to<br />

take a look at this configuration for safety considerations. (6/1) DDI feels that current<br />

configuration is adequate. DDI to revisit issue with WCH STR. (6/8) No change. (6/15) No<br />

change. (6/22) No change. (6/29) No change. (7/6)<br />

" DDI to develop NCR for the suspect/modified lift points on the new truck scale. (6/22) NCR has<br />

been implemented and DDI is developing a documented path forward to address the NCR. (6/29)<br />

* DDI to submit REA for 100-K-2 confirmatory sampling. (6/22) DDI to submit by 6/30. (6/29)<br />

No change. (7/6)<br />

" Discussed future start-up plans for Trench N. DDI to present plan for Trench N for WCH<br />

concurrence before the start of intrusive activities. (6/22) No change. (7/6)<br />

" DDI is scheduling a 25-ton certification scale test for Kenworth trucks on Tuesday, June 29 at<br />

10:00. A WCH engineer will participate in witnessing the test. (6/22) Test rescheduled to 6/30.<br />

DDI working to obtain information from G & H for hoist modifications. (6/29) Test, as<br />

performed, was not successful. DDI is making arrangements for another test, tentatively<br />

scheduled for 7/12/2010. (7/6)<br />

* Discussed requirements for daily reports. Daily reports are to be provided to WCH by noon the<br />

following business day. (6/22) DDI commits to making this happen. (6/29)<br />

" Discussed the status of plans for handling and disposition of known large canisters in Trench K,<br />

DDI to provide details. (6/29) No update. (7/6)<br />

* Discussed Beryllium controls and medical surveillance requirements for Trench I remediation.<br />

(5/25) Medical screen in the process of being scheduled. All DDI employees will participate in<br />

this medical surveillance process. More information to follow. (6/1) Discussed medical physical<br />

scheduling. (6/15) No change. (6/22) WCH is working with AMH to schedule all project<br />

persons for physicals and training. (6/29) WCH has scheduled beryllium training, physicals still<br />

in process. (7/6)


Progress Review Meeting<br />

Page 4<br />

111. PROJECT DESIGN DRAWINGS<br />

" DDI still needs to submit for WCH review as-builts for electrical as well as the energized water<br />

line. (5/11) No change. (5/18) No change. (5/25) Electrical drawing modifications have been<br />

discussed between DDI and WCH STR. (6/1) This is a topic of discussion in a meeting on 6/10<br />

between Watts and DDI. (6/8) DDI has additional questions about these as-built requirements.<br />

(6/15) No change. (6/22) WCH has received and is in review. (6/29)<br />

" Water line as-builts are being marked up for WCH review prior to being submitted. (6/1) No<br />

change. WCH stressed that the as-builts need to indicate the location of the water lines from hook<br />

up at the fence to the high tower. (6/8) No change. (6/15) No change. (6/22) WCH to provide<br />

new drawing number for the as-built drawing. (6/29) WCH will also provide a CADD base file<br />

to DDI for this drawing. (7/6)<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

* See attached.<br />

* No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

* See attached.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

e None.<br />

IX.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

" Breathing air surveillance to be performed this week. WCH QA is waiting on information from<br />

subcontractor to complete. (5/25) Surveillance is complete. Qualifications of A. L. Compressed<br />

Gas Company for breathing air gasses and containers has been approved by DDI and confirmed<br />

by WCH QA as acceptable. (6/1) 118-K site is satisfactory. WCH QA still working on<br />

completion of this surveillance as it contains multiple sites. Anticipate completion by June 17.<br />

(6/8) WCH QA is fine tuning and will distribute surveillance shortly. (6/29)<br />

* DDI was issued SDR (FR-2010-IF-0382-SDR-015) on 5/17/2010 for as-built drawings. (5/25)<br />

No update. (6/1) No update. (6/8) DDI to provide CAR by 6/24/10. (6/22) WCH received<br />

CAR today. (6/29)<br />

* The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3. No update (5/4). No update. (5/11)<br />

No update. (5/18) No update. (6/1) No update. (6/8)<br />

*WCH issued SDR (FR-2010-IF-0092-017) to DDI on 5/24/2010 for shuttle truck<br />

specifications. (5/25) No update. (6/1) No update. (6/8) DDI to provide CAR by 6/24/20 10.<br />

(6/22) WCH received CAR today. (6/29)


Progress Review Meeting<br />

Page 5<br />

*WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCH QA in the near future. (6/29)<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

* DDI will be issuing an RFI for the scheduler position, duties and WCH expectations. No update<br />

(5/4). No update. (5/11) No change. (5/18) Received, WCH in review. (5/25) No update. (6/1)<br />

WCH commits to having a response to DDI no later than 6/15. (6/8)<br />

* DDI requests a discussion about the cost of the 111 monitoring in support of confirmatory<br />

sampling sent out for processing. (6/8) WCH in review of REA. (6/15) No change. (6/24) No<br />

change. (6/29)<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

*Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/20 10. WCH has received, in<br />

preliminary review, will return this week. WCH returned to DDI, status 2, with comments.<br />

DDI will be doing a walkdown with Mr. Teachout to incorporate comments and will resubmit<br />

drawings for approval. DDI to check on status. DDI waiting on North Point. DDI still<br />

waiting on North Point. They have exceeded the 30-day expected response to a returned<br />

submittal. DDI to follow up with North Point again this week. No update, still with DDI<br />

(4/20). No update (4/27). No update (5/4). No update from DDI. WCH issued SDR. (5/18)<br />

No update. (5/25) No update. (6/8) WCH is in review of drawing. (6/29)<br />

* WCH return traffic control drawings to DDI, status 2. DDI will be resubmitting soon<br />

incorporating the WCH comments. DDI to submit this week. Drawings are with North Point for<br />

revision and will be resubmitted upon their return. DDI is well beyond the 30-day resubmission<br />

for updated drawings. WCH will be issuing an SDR regarding this issue. DDI has indicated they<br />

are working on a deficiency letter which will be submitted to Watts for this and several other<br />

deficiencies. (5/11) No update. (5/18) No update. (5/25) WCH received traffic control submittal<br />

6/3 and is in review of same. (6/8) WCH has returned to DDI status 2. (6/22) No change. (6/29)<br />

0 WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5/11) SDR provided, no update. (5/18) No update. (5/25) No update. (6/8) DDI submitted redline<br />

copies. WCH will provide a drawing number to DDI. (6/29)<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.


Progress Review Meeting<br />

Page 6<br />

" DDI can expect to see revision soon to Change Notice 025 regarding use of last four digits of<br />

employee social security numbers as identifier.<br />

* WCH returned CN 016 to DDI for corrections and changes. (6/1) No update. (6/8) WCH has<br />

received proposal and is making minor adjustments. (6/22)<br />

* WCH is returning CN 007 R. 1 and CN 0 19 for corrections and changes. (6/8) WCH has<br />

received proposal for CN 007 R. 1 and is reviewing. (6/22)<br />

" WCH has issued CN 026 for the Trench I equipment and materials. (6/22)<br />

" DDI has not received any information on the Trench I camera specs or equipment specs for the<br />

400 excavator. They will follow up with the vendor. (5/11) Some specs have been received, but<br />

more are needed. Confer with D. Teachout for specifics. (5/18) WCH is in development of<br />

change notice for Trench I work. (5/25) No update. (6/1) DDI is to follow-up ASAP to provide<br />

the specs. Trench I operations scheduled to begin late July/early August. (6/8) WCH discussed<br />

concerns (6/15) WCH has transmitted to DDI CN 026 to provide clamshell and camera<br />

excavation equipment. (6/22) Proposal to be provided to WCH by close of business this week.<br />

(6/29) WCH has requested a delivery schedule for equipment. DDI will provide drawings/details<br />

for equipment (7/6)<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE<br />

* Weekly Progress Review Meeting Minutes of 6/29/2010<br />

INVOICE AND PAYMENT STATUS<br />

*DDI to submit June billing this week. WCH will be discussing requirement for cost backup<br />

details.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* None.<br />

Attachment(s): As noted above.


N-<br />

C)<br />

U),<br />

0~0<br />

o , 0<br />

UM, 12 N)<br />

*0<br />

00<br />

CD00(0 (><br />

'6 'b' ~ A~ ,<br />

N0* 4 (0 6 d<br />

m4a<br />

1 - 1<br />

_q C3 0 N<br />

I !<br />

'D<br />

Lo_<br />

J) 0)lo<br />

__5


0<br />

Z 0<br />

0 0<br />

GD 2 l 2 G w<br />

'IF<br />

LL- <<br />

~E<br />

~-0 0<br />

0<br />

0<br />

.4-;<br />

u U to<br />

* D n r 0 u -<br />

m m m Q 4 6<br />

*~ ~ C0 ~ 4-4- ~ ~- 4 - 41 -<br />

CiE E E m m m 0<br />

oU o o :!-, L uU


LO)<br />

06 0 N N N N CV N (Y) m 0 N C14<br />

C51<br />

0)0 0 0 0 000 0 0 0 o0, C<br />

0 )- - - - - - . -<br />

0 ) 0 0) 0 000DCD 0 0 0 0 C)0<br />

N-. N N N NN N N N N N N<br />

NU c ~- 0 - c - i- - ;a -<br />

N N - -N<br />

a) C 0 0 0 0 0 0)~ 0C0 000<br />

>~ o -0 0 - - - 0 5 a~55 o<br />

N 0 0<br />

D 0 0 CN<br />

N DN0<br />

N - - N N N -CN N N N<br />

It qq ) o-NN"<br />

N) N NLf m~ c,. ojNN<br />

U) Uoc ) U)<br />

0 LP<br />

00<br />

a.D ca (a cc M C:<br />

- CC LL U) LL LL IL 0 0) 0 'a<br />

o0 -- 9 -t ,<br />

0 ~ 0 0 0 0 66E E<br />

C<br />

0 _L<br />

0LCL<br />

V mU U) (I) C) 0 0 c<br />

W V q NC - c 'P :3 :<br />

>0 ~ 2 00 0 0<br />

C) c 0 .5 .0 -3 :3 0<br />

mr. < < < Ci) U)<br />

Cm T 0<br />

0 o 0 0 U) :3)u<br />

_<br />

E w E E E E 0")~<br />

~- ~ 0 *C 00<br />

42 q)<br />

(0 a)<br />

0 a) 0- a_ cc~ o<br />

Z<br />

Vj 0 Yw 7 -aCC<br />

V . C: 0 0 ) ) 00w CO .22<br />

CD a C4 n 0 W .2 ,<br />

NC0 0 ~<br />

D) 4)o0 .0! C q<br />

15 .2 c-) cu ic Mc i- - -L<br />

cE Co C, y 2 m 0<br />

U) -J 0 )L. :CC3C O O C O<br />

0 O<br />

o 0<br />

Q<br />

=- - d: a.<br />

0 C0- - O N C- N -~-<br />

.= .-<br />

000 0. 0 0C 00 0 0 0 000<br />

0 1<br />

0<br />

-0 0 0) 0 0 00 0 > 2- 0<br />

N~ m) ) L) L)U) fO0<br />

) 0)0000)<br />

CD<br />

000 o 0 0 0o 0 000 0 0 000<br />

D - - > ) -F 0 -


z2L 0 28<br />

-A<br />

0. 2<br />

a.~ 00Q2~<br />

0 z<br />

00<br />

C L 7<br />

U -u<br />

010<br />

:- o. ~ 1<br />

ja 10<br />

,i I'M H - 25~<br />

Ca)~~1 9 1 ~<br />

c_ .6,6<br />

0i<br />

J I0 -C) ~ 0 OC O oo


Meeting Minutes<br />

washingmCCN: 152502<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

- Distribution<br />

Scott E. Parnell<br />

July 14,2010<br />

ATNS<br />

t srRBTO --<br />

Q L. Crist X~3-16 E.L. Adamson X3-40<br />

R. Ferguson (1311)) X3-17 C. L. Beach X3-16<br />

J. A. Heard H4-17 D. Bollinger (DDT)<br />

S, E. Parnell X3-16 R. D. Cantwell N3-30<br />

M. Sherman (DDI) X3.-17 R. W. Cross 114-25<br />

H. C. W~eber (D31)) X3-16 T. Dance (DDI)) X3-17<br />

H. Williamns III X3-16 R. A. Dodd H4-24<br />

C. Flowers (DDI)) X3-17<br />

T. A. Foster N3-30<br />

A. Gagnon X9-08<br />

R. Ganapathy X3-40<br />

S. J. Huddleston X3-116<br />

W. R. Junkcins X3-16<br />

D,. G. Saueressig N3-30<br />

13. B. Teachout X3-16<br />

1 Zeisloft A3-04<br />

Project File, X3. 16<br />

---- - ---- Records and Documient Control H4-11I<br />

A meeting on the above subject was held on July 14, 2010 at 1 I 8-K, MO-75 5.<br />

I. SA-FETY<br />

Safety topic: it pays to use prope PPE for tasks being performed. 1(b)(6) __elated<br />

incident<br />

her<br />

on a 4-wheeler last week. Safety needs to be the first concern and safety awareness does<br />

not end when you leave the project.<br />

I. ACTION ITEMS FROM LAST MEETINGISTATIUS<br />

PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC I100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this conftiguration by<br />

Protection<br />

the Fire<br />

Enginee. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. CurrentlyJust waiting on the ptrnnits to be issued by CHPRC. Discussed 150 gprn<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/2010. Still waiting on permits fromn CHPRC,<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permi t. Plan to perform<br />

Z.'Amoijtmivr A mirrca Prrosm R5cew Weekly Meel QOIOIul97.l440 Wutky Progreeedo


Progress Review Meeting<br />

Page 2<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 1 00-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 19 1h so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 100-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. Well requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4.). DDI has run<br />

calcs on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/25) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pressures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm). (6/1) DDI is<br />

sending a letter to Watts to rework system for increased pressure. (6/8) DDI to submit letter,<br />

request for clarification for intent of water supply. (6/15) No change. (6/22) WCH has not<br />

received letter from DDI about water supply. (6/29) DDI states they send letter on 6/23, but<br />

WCH STR has not received copy. (7/6) WCH received letter 7/12. WCH PM is following up<br />

with CHPRC before responding to letter. (7/14)<br />

*Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to burn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/20 10. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning. DDI to submit revised OMP this week.<br />

DDI is working with WCH EPL on clarifications. WCH EPL to observe Watts's oil burning<br />

facility on 3/18/2010. DDI will submit OMP after that date. OMP waiting on ARES revision to<br />

drawings, then DDI will submit. Drawings should be available for pickup by DDI this week then<br />

the OMP will be submitted. No update (4/20). DDI is working on final review of this submittal<br />

and will submit by 5/11/2010 (4/27). On track to submit by 5/11/2010 (5/4). DDI confirmed that<br />

the OMP will be submitted 5/12/2010. Since the OMP is not yet approved, DDI is not to remove


Progress Review Meeting<br />

Page 3<br />

used oil from the site. Any questions about exceptions to this need to be discussed with the WCH<br />

EPL. (5/11) DDI continues to work on completing the OMP with support from the WCH EPL.<br />

DDI plans to submit the OMP next week. (5/18) Submission of OMP pushed out to 6/3/2010.<br />

(5/25) No change. (6/1) DDI is still working on OMP submittal. (6/8) No change, DDI to<br />

submit by 6/24/10. (6/15) DDI is on schedule to meet 6/24 submission. (6/22) WCH has<br />

received OMP and is in review. (6/29) WCH is still reviewing. (7/6) DDI has received<br />

submittal back with WCH comments. DDI requests to remove SPCC submitted from showing as<br />

due since they are working to the OMP. (7/14)<br />

" Discussed Incidental Welding procedure. Surveillance performed, identified necessary changes<br />

to be made for clarifications. (5/18) No update. (5/25) DDI to revise this week. (6/1) DDI to<br />

submit by 6/10/2010. (6/8) DDI commits to submitting no later than 6/24/10. (6/15) DDI on<br />

schedule for submission by 6/24. (6/22) WCH has received and is in review. (6/29) WCH has<br />

returned to DDI status 2. (7/6) DDI has received back and is working through comments. (7/14)<br />

* DDI and WCH are planning to perform confirmatory sampling on one test pit and two trenches<br />

for 100-K-2 on the day the scale is being replaced - June 18. (6/8) This activity was rescheduled<br />

with new date TBD. (6/22) No change. (6/29) No change. (7/6) This will be tentatively<br />

rescheduled for Friday, July 30 pending support availability. (7/14)<br />

* DDI to develop NCR for the suspect/modified lift points on the new truck scale. (6/22) NCR has<br />

been implemented and DDI is developing a documented path forward to address the NCR. (6/29)<br />

No update. It is suggested by WCH QA that a reminder be put into place that a new lift plan will<br />

need to be developed prior to the scale being removed at the end of the project. (7/14)<br />

* DDI to submit REA for 100-K-2 confirmatory sampling. (6/22) DDI to submit by 6/3 0. (6/29)<br />

No change. (7/6) DDI submitted letter with questions about costs related to analysis of<br />

confirmatory sampling activities. WCH commits to providing a response to DDI by 7/19. (7/14)<br />

* Discussed future start-up plans for Trench N. DDI to present plan for Trench N for WCH<br />

concurrence before the start of intrusive activities. (6/22) No change. (7/6) DDI to schedule a<br />

meeting Monday 7/19 with pertinent DDI and WCH personnel to discuss plan for Trench N.<br />

(7/14)<br />

* DDI is scheduling a 25-ton certification scale test for Kenworth trucks on Tuesday, June 29 at<br />

10:00. A WCH engineer will participate in witnessing the test. (6/22) Test rescheduled to 6/3 0.<br />

DDI working to obtain information from G & H for hoist modifications. (6/29) Test, as<br />

performed, was not successful. DDI is making arrangements for another test, tentatively<br />

scheduled for 7/12/20 10. (7/6) A second test was performed without success. DDI is submitting<br />

certifications today for four (4) of the shuttle trucks. These do not include the 22-ton shuttle<br />

trucks. (7/14)<br />

" Discussed the status of plans for handling and disposition of known large canisters in Trench K,<br />

DDI to provide details. (6/29) No update. (7/6) This will be included in the discussion to be<br />

scheduled on Monday afternoon, 7/19. (7/14)<br />

" Discussed Beryllium controls and medical surveillance requirements for Trench I remediation.<br />

(5/25) Medical screen in the process of being scheduled. All DDI employees will participate in<br />

this medical surveillance process. More information to follow. (6/1) Discussed medical physical<br />

scheduling. (6/15) No change. (6/22) WCH is working with AMH to schedule all project<br />

persons for physicals and training. (6/29) WCH has scheduled beryllium training, physicals still<br />

in process. (7/6) WCH has received some beryllium medical appointments (to begin next week)<br />

with the remainder to come. DDI needs to ensure that scheduled employees are aware of and<br />

show up for their scheduled appointments. Missed appointments can further impact the Trench I<br />

Silo schedule. (7/14)


Progress Review Meeting<br />

Page 4<br />

111. PROJECT DESIGN DRAWINGS<br />

" DDI still needs to submit for WCH review as-builts for electrical as well as the energized water<br />

line. (5/11) No change. (5/18) No change. (5/25) Electrical drawing modifications have been<br />

discussed between DDI and WCH STR. (6/1) This is a topic of discussion in a meeting on 6/10<br />

between Watts and DDI. (6/8) DDI has additional questions about these as-built requirements.<br />

(6/15) No change. (6/22) WCH has received and is in review. (6/29) DDI has received the<br />

reviewed comments from WCH and is working to get the drawing updated. They commit to<br />

having the drawing resubmitted by 7-21. (7/14)<br />

* Water line as-builts are being marked up for WCH review prior to being submitted. (6/1) No<br />

change. WCH stressed that the as-builts need to indicate the location of the water lines from hook<br />

up at the fence to the high tower. (6/8) No change. (6/15) No change. (6/22) WCH to provide<br />

new drawing number for the as-built drawing. (6/29) WCII will also provide a CADD base file<br />

to DDI for this drawing. (7/6) DDI has received base CADD file and is in process of updating<br />

drawing. They commit to resubmitting drawing by 7/21. (7/14)<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

*See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

" See attached.<br />

* No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

* See attached.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

0 None.<br />

IX.<br />

MATERIAL<br />

* DDI to begin the process of ordering ecology block that will be used in the Trench I Silo<br />

remediation.<br />

X. QUALITY<br />

" DDI was issued SDR (FR-201 0-IF-03 82-SDR-01 5) on 5/17/2010 for as-built drawings. (5/25)<br />

No update. (6/1) No update. (6/8) DDI to provide CAR by 6/24/10. (6/22) WCH received<br />

CAR today. (6/29) WCH is reviewing CAR. DDI has received the reviewed comments from<br />

WCH and is working to get the drawing updated. They commit to having the drawing<br />

resubmitted by 7-21. (7/14)<br />

* The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3. No update (5/4). No update. (5/11)<br />

No update. (5/18) No update. (6/1) No update. (6/8)<br />

*WCH issued SDR (FR-2010-IF-0092-017) to DDI on 5/24/2010 for shuttle truck<br />

specifications. (5/25) No update. (6/1) No update. (6/8) DDI to provide CAR by 6/24/2010.<br />

(6/22) WCH received CAR today. (6/29) WCH is in review of the CAR (7/14)


Progress Review Meeting<br />

Page 5<br />

*WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCH QA in the near future. (6/29) DDI provided copy of surveillance by WCH QA. This<br />

surveillance will be ongoing this week and next. (7/14)<br />

XI.<br />

XII.<br />

XIII.<br />

REQUESTS FOR INFORMATION<br />

* DDI will be issuing an REI for the scheduler position, duties and WCH expectations. No update<br />

(5/4). No update. (5/11) No change. (5/18) Received, WCH in review. (5/25) No update. (6/1)<br />

WCH commits to having a response to DDI no later than 6/15. (6/8) WCH commits to having<br />

response to DDI 7/15. (7/14)<br />

* DDI requests a discussion about the cost of the IH monitoring in support of confirmnatory<br />

sampling sent out for processing. (6/8) WCH in review of letter from DDI. (6/15) No change.<br />

(6/24) No change. (6/29) WCH commits to a response by next week. (7/14)<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/2010. WCH has received, in<br />

preliminary review, will return this week. WCH returned to DDI, status 2, with comments.<br />

DDI will be doing a walkdown with Mr. Teachout to incorporate comments and will resubmit<br />

drawings for approval. DDI to check on status. DDI waiting on North Point. DDI still<br />

waiting on North Point. They have exceeded the 30-day expected response to a returned<br />

submittal. DDI to follow up with North Point again this week. No update, still with DDI<br />

(4/20). No update (4/27). No update (5/4). No update from DDI. WCH issued SDR. (5/18)<br />

No update. (5/2 5) No update. (6/8) WCH is in review of drawing. (6/29) DDI has received<br />

the reviewed comments from WCH and is working to get the drawing updated. They commit<br />

to having the drawing resubmitted by 7-21. (7/14)<br />

" WCH return traffic control drawings to DDI, status 2. DDI will be resubmitting soon<br />

incorporating the WCH comments. DDI to submit this week. Drawings are with North Point for<br />

revision and will be resubmitted upon their return. DDI is well beyond the 30-day resubmission<br />

for updated drawings. WCH will be issuing an SDR regarding this issue. DDI has indicated they<br />

are working on a deficiency letter which will be submitted to Watts for this and several other<br />

deficiencies. (5/11) No update. (5/18) No update. (5/25) WCH received traffic control submittal<br />

6/3 and is in review of same. (6/8) WCH has returned to DDI status 2. (6/22) No change. (6/29)<br />

DDI has received base CADD file and is in process of updating drawing. They commit to<br />

resubmitting drawing by 7/21. (7/14)<br />

* WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5/11) SDR provided, no update. (5/18) No update. (5/25) No update. (6/8) DDI submitted redline<br />

copies. WCH will provide a drawing number to DDI. (6/29) DDI has received the reviewed<br />

comments from WCH and is working to get the drawing updated. (7/14)<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

" See attached.<br />

" DDI can expect to see revision soon to Change Notice 025 regarding use of last four digits of


Progress Review Meeting<br />

Page 6<br />

employee social security numbers as identifier. DDI indicates they have not yet received this<br />

revision. WCH to follow-up. (7/14)<br />

* WCH returned CN 016 to DDI for corrections and changes. (6/ 1) No update. (6/8) WCH has<br />

received proposal and is making minor adjustments. (6/22)<br />

" WCH is returning CN 007 R. 1 and CN 019 for corrections and changes. (6/8) WCH has<br />

received proposal for CN 007 R. 1 and is reviewing. (6/22) WCH commits to completing review<br />

by 7/19. (7/14)<br />

" WCH has issued CN 026 for the Trench I equipment and materials. (6/22) Discussion about start<br />

of fabrication for Trench I equipment from Jewell. WCH requests DDI confirm that fabrication<br />

started on 7/14. DDI to provide WCH with itemized procurement and delivery schedule for<br />

fabricated equipment. (7/14)<br />

o DDI has not received any information on the Trench I camera specs or equipment<br />

specs for the 400 excavator. They will follow up with the vendor. (5/11) Some specs<br />

have been received, but more are needed. Confer with D. Teachout for specifics.<br />

(5/18) WCH is in development of change notice for Trench I work. (5/25) No update.<br />

(6/1) DDI is to follow-up ASAP to provide the specs. Trench I operations scheduled<br />

to begin late July/early August. (6/8) WCH discussed concerns (6/15) WCH has<br />

transmitted to DDI CN 026 to provide clamshell and camera excavation equipment.<br />

(6/22) Proposal to be provided to WCH by close of business this week. (6/29) WCH<br />

has requested a delivery schedule for equipment. DDI will provide drawings/details<br />

for equipment (7/6)<br />

" DDI has submitted proposal today for CN 016, WCH to review. (7/14)<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE<br />

* Letter from DDI: Written Change Notice Request and Schedule Modification Request<br />

* Transmittal from DDI: Proposal for Change Notice 026<br />

" Letter from DDI: Water Requirements fort he 118 -K- I Burial Ground Contract/Notice of<br />

Deficiency No. 151448<br />

* Resume for Glenn Holbrook, CIH<br />

" Transmittal from DDI: Proposal for Change Notice 012<br />

* E-mail to DDI: Acceptance of Glenn Holbrook, CIII<br />

* Weekly Progress Review Meeting Minutes of 7/6/2010<br />

IN VOICE AND PAYMENT STATUS<br />

* WCH made modifications to June invoice. WCH will not be withholding additional 15% from<br />

this billing.<br />

" Discussion of completion incentive by trench. Per Exhibit D of the contract DDI has the potential<br />

for partial release of retention.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* None.<br />

Attachment(s): As noted above.


z I-<br />

F--r<br />

cm<br />

C3- 10<br />

cI:<br />

z. -z<br />

I2<br />

M<br />

0. 0B; 00<br />

0<br />

CD~<br />

0<br />

CD 0, io (D w M . . I<br />

CCD<br />

CD T ~~~000 Qc o c<br />

M, 0.5 M . ~ a . .. .. C<br />

0 0 0d ad O6C 0<br />

.b '- - -?w0L<br />

7 - D D CD 01 l! 0 CI4 cl D b<br />

Ln~0<br />

>bU)a<br />

CC<br />

w c 'i<br />

00 0 0 0 0 I-<br />

00<br />

NN<br />

W<br />

0)


Z6 3 -ir 0 LI4<br />

E<br />

u~ E cu<br />

WA 0 Uf<br />

3~ CLo C<br />

o0 fo c<br />

2 ~m L<br />

WW 0i U 0<br />

ca<br />

00 Pw 0<br />

E<br />

Sw<br />

Cu<br />

000 r 0 F a) CU u - ~- U<br />

oE E E~ m 4- 4 4 4<br />

=w


Acrobat 9.0<br />

WCH SURVEILLANCE REPORT<br />

1. Surveillance No.: 2. ProjectlFunction/SubcontractorOHC: 3. Date(s):<br />

FR-2010-SO72<br />

4. Topic:<br />

Remedial Action/i 181/Dance Design Inc (DDI)<br />

ODI PROCUREMENT DOCUMENT CONTROL/CONTROL OF PURCHASED ITEMS AND SERVICES<br />

5. Location:<br />

6. Surveillance Personnel: 7. Personnel Contacted:<br />

8. Applicable Requirements:<br />

DDI Q.A. Manual rev 0, Sections 4 and 7<br />

9. Results: (Record numbers of any IFs, NCRs, SDRs or OHCDRs)<br />

10. Description of Surveillance: (e.g., what methods were used in the surveillance, what observations were noted, what<br />

deficiencies were noted.)<br />

Requested, and obtained a copy of DDI Subcontract No.: WCH09199-S01, issued to WATTS Construction. Selected Attachment B -<br />

General Conditions parts GC 7.30 Quality Assurance Program, GC 8.1 Authorized Representative to assist in verification of DDI's<br />

QAM Sections 4 and 7 Implementation. This verification is intended to provide objective evidence of DDI's conformance to NQA-1<br />

requirements for PROCUREMENT DOCUMENT CONTROL/CONTROL OF PURCHASED ITEMS AND SERVICES.<br />

11. Describe Any Immediate Action Taken:<br />

WCH-QA-047a (02/05/2009) Page 1 of 2


Acrobat 9.0<br />

WCH SURVEILLANCE REPORT<br />

1. Surveillance No.: 2. ProjectlFunctionlSubcontractorOHC: 3. Date(s):<br />

FR-2010-S072<br />

Remedial Action/i 18K1/Dance Design Inc (DOI)<br />

12. Surveillance Performed By:<br />

ADAMSON EVERETT L<br />

___________<br />

Name Signature Date<br />

13. Reviewed by STRJWork Order Originator, if applicable:<br />

BEACH CHRISTOPHER L___<br />

_________<br />

Name Signature Date<br />

14. Approved by Initiating Manager:<br />

PARNELL SCOTT E X3-16<br />

____________<br />

Name Signature Date<br />

15. Continuation Sheets or Attachments: Yes No No. of Pages: 5<br />

If yes, list:<br />

16. Distribution:<br />

Initiator: ADAMSON EVERETT L X3-40<br />

STIR for subcontractor surveillances: BEACH CHRISTOPHER L X3-16<br />

Work Order Originator for OHC surveillances: N/A<br />

Affected Management: (including subcontractor or OHC through<br />

the responsible STIR or Work Order Originator, if applicable): FERGUSON RAYMOND J X3-17<br />

Initiating Manager: PARNELL SCOTT E X3-16<br />

QA&S Manager: HAS SELL HAROLD (MIKE) M H-4-25<br />

Environmental Manager: JOHNSON WAYNE F H4-22<br />

CAMS Coordinator: WOODFORD TERRY L H-4-25<br />

PAAA Coordinator: CHRISTENSEN KEVIN C H4-25<br />

Document Control (original of Report and copies of any Deficiency Reports): H4-11I<br />

HUXOLL ROBIN L N3-30<br />

CANTWELL ROBERT D N3-30<br />

CARTER ROBERT A N3-23<br />

WCH-QA-047a (02/05/2009) Page 2 of 2


F P-L9OI0- so<br />

SECTION 4<br />

PROCUREMENT DOCUMENT CONTROL<br />

1.0 SCOPE<br />

This section identifies the requirements and establishes the criteria for the DDI Team<br />

Procurement Document Control and addresses Requirement 4 of ASME NQA- 1.<br />

2.0 DEFINITIONS<br />

2.1 PROCUREMENT DOCUMENT - Purchase requisitions, purchase orders, drawings,<br />

contracts, specifications, or instructions used to define requirements for purchase<br />

2.2 PURCHASER - The organization responsible for incorporating requirements into<br />

procurement documents and for the issuance and/or administration of these documents.<br />

2.3 RIGHT OF ACCESS - The right of a Purchaser<br />

the premises<br />

or designated<br />

of a supplier<br />

representative<br />

for the purpose<br />

to enter<br />

of inspection, surveillance, or QA audit.<br />

3.0 PROCUREMENT DOCUMENT CONTROL<br />

23.1 The 1D ea1 prcr nt doumnt sa I include provisions for the information<br />

3.2 A statement of the scope of the work to be performed by the Supplier.<br />

3.3 Technical requirements, where necessary, shall be specified by reference to specific<br />

drawings, specifications, codes, standards, regulations, procedures, or instructions,<br />

including revisions thereto, that describe the items or services to be furnished.<br />

3.4 Identification of DDI Team test, inspection, and acceptance requirements for monitoring<br />

and evaluating the Supplier's performance.<br />

3.5 A requirement for the Supplier to have a documented QA Program that implements<br />

appropriate portions of a national quality standard (e.g. ASMFE NQA-l) as identified by<br />

the DDI Team. The extent of the required program shall depend upon the scope of the<br />

supplier's activities and the importance and for complexity of the item or service being<br />

procured.<br />

36 Areqi rement that the Supl:!iher incorporate QA Program requirements and any other<br />

applicable flow down requirements such as the Price Anderson Amendment Act (PAAA)<br />

or 10 CFR 21 reporting into sub-tier procuremn documents.<br />

DDt Team QA Program Rev 0 Page 13 of 48


3.7 A provision for the DDI Team to have access to the Supplier's and sub-tier suppliers<br />

plant, facilities, and records for inspection, surveillance, or audit by the DDI Team or its<br />

designated representatives.<br />

3.8 Identification of the documentation required to be submitted for information, review, or<br />

approval by the DDI Team. The time of submittal shall be established.<br />

3.9 When the DDI Team requires the Supplier to maintain specific QA records, the duration<br />

of retention and disposition requirements shall be prescribed.<br />

3.10 A requirement for reporting and approving the disposition of non-conformances.<br />

3.12 A requirement for the identification of appropriate spare and replacement parts or<br />

assemblies and the appropriate delineation to the technical and QA-related data required<br />

for ordering these parts or assemblies.<br />

C3.13 A rovision prohibiting the supply or use of suspect and/or counterfeit items.<br />

3.14 A review of the procurement documents and changes thereto shall be made to ensure that<br />

documents transmitted to the prospective Supplier(s) include appropriate provisions to<br />

ensure that items or services meet the specified requirements.<br />

(~) 3.15 Reviews shall beperformed and documented to provide objective evidence, of<br />

sshallor beccompltofschrviw prior toth contract<br />

shl<br />

ThsReviewshlticueyhpfloig:l<br />

award.<br />

Ae pfrev e by h QA Representative and Technical h Lead. s Rebvessalb<br />

3.1 Canealysis f eptn or haes euetedn<br />

deoroteminton<br />

or pencife<br />

ih rcrmn<br />

at supp<br />

cudhv<br />

l<br />

ouet.Tervef such changes<br />

sh<br />

andaves<br />

l bevco<br />

ult effecto<br />

e be<br />

fteies<br />

te f to r ro i he nr c w r .T isr ve h l n lu et<br />

3.17<br />

ef<br />

eview<br />

lo i g<br />

reqied by this QARpreduraie sall becherform<br />

pertitinfration<br />

ead per<br />

ad<br />

e whoveacsst<br />

hoe have aen adeute udestndicns f heeuirmnt and<br />

ben<br />

3.18Changes of rocueetiocnts halles reieed<br />

ManaermiTnical an apprved<br />

Lead su<br />

by the<br />

changes<br />

project<br />

laffe tecnialvree or quality ssurane qiemnts<br />

of1 thvew cracte b th s rchag e shall s be prviewed by aersAnRepresenave andsst<br />

documented on the Procurement Document Review form.<br />

D~i~j reami QA Program Rev 0 Page 14 of 48


SECTION 7<br />

CONTROL OF PURCHASED ITEMS AND SERVICES<br />

1.0 SCOPE<br />

This section identifies the requirements and establishes the criteria for the DDI Team Control of<br />

Purchased Items and Services and addresses Requirement 7 of ASME NQA- 1.<br />

2.0 DEFINITIONS<br />

2.1 SUPPLIER - Any individual or organization that furnishes items or services in<br />

accordance with a procurement document. An all-inclusive term used in place of any of<br />

the following: vendor, seller, contractor, subcontractor, fabricator, consultant, and their<br />

sub tier levels.<br />

2.2 PROCUREMENT DOCUMENT - Purchase requisitions, purchase orders, drawings,<br />

contracts, specifications, or instructions used to define requirements for purchase.<br />

2.3 COMMERCIAL GRADE ITEM - A structure, system, or component, or part thereof,<br />

that affects its safety function, that was not designed and manufactured in accordance<br />

with a nuclear quality standard. An item satisfying these elements:<br />

* Not subject to design or specification requirements that are unique to nuclear<br />

facilities;<br />

" Used in applications other than nuclear facilities; and<br />

" Ordered from the manufacturer or supplier on the basis of specifications set forth<br />

in the manufacturer's published product description such as a catalog.<br />

3.0 CONTROL OF PROCURED ITEMS AND SERVICES<br />

Procurement actions which provide an item or service to the DDI Team Corporation shall be<br />

performed in compliance with either the DDI Team QA Program or the Supplier's QA Program<br />

as approved by the DDI Team.<br />

3.1 ITEMS OR SERVICES PROVIDED UNDER THE DDI TEAM'S QA PROGRAM<br />

Suppliers whose QA Programs have not been approved by THE DDI Team may supply<br />

items or services to the DDI TEAM provided they are supplied in compliance with the<br />

requirements of the DDI Team QA Program.<br />

Suppl ier personnel who 1ill provide e item or service shall be trained in those portions<br />

f the DDI Team A Pogram deeme Iica le b the DDI Team A Manager. he<br />

training shall be docmete consisent wtthe DDI Team QA Poram requirments.<br />

DDI reami QA Program Rev 0 Page 20 of 48


1OF3.2<br />

ITEMS OR SERVICES PROVIDED UNDER THE SUPPLIER'S QA PROGRAM<br />

Qualified DDI TEAM personnel selected by the DDI Team QA Manager shall review<br />

and evaluate the Supplier's QA Program. The results of the review concern iny e_<br />

acceptability of the Supplier's A Manual shall be documented. In dditinJ DDI<br />

shal t' ze a e st he of t e methods described below to ev luate and ac e t _<br />

apa ility of the Supplier to comp y with the Q requirements of the procurement<br />

Eval ation of the Supplier's istory f providing an identical or similar product<br />

which pe orms satis actorily in actual use. This history evaluation must reflect<br />

current capabilities. Data evaluated could include the experience of other users of<br />

valuation of the ~u lier's current QA recor upported by any documented<br />

ua itative and quantitative information at can be evaluated objectively. This<br />

should include review of the Supplier's current QA records for evidence of<br />

corn liance with t 'A Pro am and im lementin rocedures as appropriate.<br />

* Evaluatio of e Su 1* r's tec nical an quality capability ased on an<br />

eva uation of the Supplier's fact ities, personne , an QA Program<br />

implementation.<br />

S The selection of the Su lier shall be ap roved b the DDI3 Team QA Manager. The<br />

resu ts o t e evaluation shall be documented on the 'Supplier Qualiication" form<br />

shown.<br />

3.3 ACCEPTANCE OF ITEMS OR SERVICES<br />

All procured items shall, as a minimum, be receipt inspected for conformance with<br />

procurement document requirements. Additional methods for acceptance such as a<br />

Supplier certificate of conformance, source inspection, or post-installation testing shall be<br />

performed as required by design documents. Receiving inspections shall include<br />

verification that suspect and counterfeit items have not been supplied (see DOE G 414.1 -<br />

3 for guidance).<br />

For procured services, the DDI Team acceptance method shall be by technical<br />

verification of the data produced and/or review of objective evidence for conformance to<br />

the procurement document requirements.<br />

DDI Teamn QA Progranii Rev 0 Page 21 of '18


FTR-9oi/o)go -7<br />

CA eekLL 57' P,6- r<br />

3.4 COMMERCIAL GRADE ITEMS<br />

When it is necessary to procure commercial grade items, the following requirements may<br />

be considered an acceptable alternate to other requirements of this procedure:<br />

" The commercial grade item is identified in an approved design output document,<br />

and not unique to nuclear facilities.<br />

* Source evaluation and selection shall be in accordance with the requirements of<br />

Section 3.2 of this procedure when the QA Manager determines that source<br />

evaluation and selection is necessary.<br />

* Commercial grade items shall be identified in the purchase order by the<br />

manufacturer's published product description, and<br />

* After receipt of a commercial grade item and prior to acceptance, it shall be<br />

determined that: 1) damage was not sustained during shipment, 2) the item<br />

received was the item ordered, 3) inspection and/or testing is accomplished, as<br />

required by the DDI TEAM, to ensure conformance with the manufacture's<br />

published requirements, and 4) documentation, as applicable to the item, was<br />

received and is acceptable.<br />

3.5 APPROVED SUPPLIERS LIST<br />

shal b btheDD mintine Tem Q Mna r.upp lers sha place on t is list<br />

aer they have had an acceptab e eva uation. Supp ters shall remain onthis list whein the<br />

following conditions are met: 1) An acceptable evaluation has been performed on an<br />

annual basis, and 2) an acceptable triennial audit has been performed beginning with the<br />

initial evaluation (program review and survey).<br />

DO! Feam QA Program Rev 0 Page 22 of 48


0000 0 000 0 0 0 0000<br />

* U) 0 ) 4 N0 C1 0 4000 04 l 0 4 0 404<br />

Va C ) 0 0 0 C0 0 C0 0 0) 0<br />

Q4. a C) 0<br />

(D 0 P-<br />

00<br />

04 DC4 0<br />

1<br />

04 4 C1 00<br />

0 '?0) C- (0 CNO<br />

Vg C) (NZ3( (N (NOO<br />

QL<br />

CN!Z( 0<br />

wO -- N -- N I -<br />

0O Z;, 0 Z; (0<br />

0 .2u :L!<br />

C) L LL Q0 Q) V<br />

z 0 C 140<br />

D<br />

20 0 E E<br />

C: U) C CL) C C V<br />

: 0) 0L C V<br />

'r C C -<br />

it > 0 02 0 0 0 0<br />

00 (n W -<br />

1 > >ee~<br />

m~c > C<br />

0<br />

CC<br />

e a > r- F-' FL=<br />

< e -<br />

a. a. c ':<br />

CL C CO D 0<br />

.:3 C: C CL .0)( .0 .0 0 02 a- 00<br />

- C<br />

000 0 0 0 - 0 0 000 0 0D<br />

U) -0 0 0 0 - a--<br />

a) m C.9 9 9u 9 9 99_9 9 9 49CD<br />

CO)~ LO 'C:~ O O 1) Ca .0 C: ~ C O0<br />

000 0 000a 0 0 0 00


2 2 2 E 2<br />

0 c C 0h<br />

ZIP<br />

z'<br />

02 o0 2<br />

z<br />

I o~ ~ 20~ a 0a 0 0<br />

00 o 0 & 2 2 ~ 0 ~ z 11<br />

0 ~ ~ ~ C z<br />

9u0 0,<br />

j~ 0~MEN<br />

00 - 0 0- a 0 ~ 8 "<br />

L) i~<br />

-JE<br />

L,, U,<br />

8<br />

22 EE<br />

j.<br />

I0. s 20<br />

I~ "low U) oil _O<br />

- Ulr D)a C<br />

0 ~15<br />

- ~ ~ ~ e00 ~ ~ ~ N t0<br />

,'<br />

2 o~~~~ 9oz Z ZO;<br />

9<br />

0j


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 152504<br />

W-A9:111WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

111111*01"M Scott E. Pamnellr -4Z<br />

July 20, 2010<br />

ATEDE<br />

DISRIBTIO<br />

D. Bollinger (DDI) E. L. Adamson X3-40<br />

Q. L. Grist X3-16 C. L. Beach X3-16<br />

R. Ferguson (DDI) X3-17 R. D. Cantwell N3-30<br />

A. Gagnon X9-08 R. W. Cross 114-25<br />

J. A. Heard H4-17 T. Dance (DDI) X3-17<br />

W. R. Junkins X3-16 R. A. Dodd H14-24<br />

S. E. Parnell X3-16 C. Flowers (DDI) X3-17<br />

H. C. Weber (DDI) X3-16 T. A. Foster N3-30<br />

H. Williams III X3-16 R. Ganapathy X3-40<br />

S. J. Huddleston X3-l6<br />

D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3- 16<br />

Records and Document Control H4-1 1<br />

A meeting on the above subject was held on July 20, 2010 at 11 8-K, MO-755.<br />

I. SAFETY<br />

*Safety topic: Tomorrow the 618-10 project will be doing a "flame-off' of a buried tank along<br />

side the highway. This will be a potential for driving distractions.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

*PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/20 10. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

Z:\Adininistrative Assistant\Project Progress Review Weekly Meetings\20l0\July\7-20-O Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

complete. Discussed that 1 00-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 19 th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 1 00-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

informnation prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

calcs on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/2 5) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pressures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm). (6/1) DDI is<br />

sending a letter to Watts to rework system for increased pressure. (6/8) DDI to submit letter,<br />

request for clarification for intent of water supply. (6/15) No change. (6/22) WCH has not<br />

received letter from DDI about water supply. (6/29) DDI states they send letter on 6/23, but<br />

WCH STR has not received copy. (7/6) WCH received letter 7/12. WCH PM is following up<br />

with CHPRC before responding to letter. (7/14) WCH PM followed up with the CHPRC Deputy<br />

Fire Marshal about the permit. They hope to have updated information to us by the end of the<br />

week. WCH discussed how using additional percentage of calcium chloride could control dust<br />

and use less water. It was also suggested that DDI look into bringing an additional water tower<br />

on site that could be filled at the start of the day to provide additional water. (7/20)<br />

*Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to bum prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/2010. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning. DDI to submit revised OMP this week.<br />

DDI is working with WCH EPL on clarifications. WCH EPL to observe Watts's oil burning<br />

facility on 3/1 8/20 10. DDI will submit OMP after that date. OMP waiting on ARES revision to<br />

drawings, then DDI will submit. Drawings should be available for pickup by DDI this week then


Progress Review Meeting<br />

Page 3<br />

the OMP will be submitted. No update (4/20). DDI is working on final review of this submittal<br />

and will submit by 5/11/2010 (4/27). On track to submit by 5/11/2010 (5/4). DDI confirmed that<br />

the OMP will be submitted 5/12/2010. Since the OMP is not yet approved, DDI is not to remove<br />

used oil from the site. Any questions about exceptions to this need to be discussed with the WCH<br />

EPL. (5/11) DDI continues to work on completing the OMP with support from the WCH EPL.<br />

DDI plans to submit the OMP next week. (5/18) Submission of OMP pushed out to 6/3/2010.<br />

(5/25) No change. (6/1) DDI is still working on OMP submittal. (6/8) No change, DDI to<br />

submit by 6/24/10. (6/15) DDI is on schedule to meet 6/24 submission. (6/22) WCH has<br />

received OMP and is in review. (6/29) WCH is still reviewing. (7/6) DDI has received<br />

submittal back with WCH comments. DDI requests to remove SPCC submitted from showing as<br />

due since they are working to the OMP. (7/14) DDI expects to submit by 7/22. (7/20)<br />

* Discussed Incidental Welding procedure. Surveillance performed, identified necessary changes<br />

to be made for clarifications. (5/18) No update. (5/25) DDI to revise this week. (6/1) DDI to<br />

submit by 6/10/2010. (6/8) DDI commits to submitting no later than 6/24/10. (6/15) DDI on<br />

schedule for submission by 6/24. (6/22) WCH has received and is in review. (6/29) WCH has<br />

returned to DDI status 2. (7/6) DDI has received back and is working through comments. (7/14)<br />

DDI indicated they have submitted the procedure; WCH has not yet received, but will review<br />

when received. (7/20)<br />

* DDI and WCH are planning to perform confirmatory sampling on one test pit and two trenches<br />

for 100-K-2 on the day the scale is being replaced - June 18. (6/8) This activity was rescheduled<br />

with new date TBD. (6/22) No change. (6/29) No change. (7/6) This will be tentatively<br />

rescheduled for Friday, July 30 pending support availability. (7/14) DDI expressed beryllium<br />

concerns for this activity. WCH has determined this site to be beryllium free, but this is being reevaluated<br />

by WCH IH. (7/20)<br />

" DDI to develop NCR for the suspect/modified lift points on the new truck scale. (6/22) NCR has<br />

been implemented and DDI is developing a documented path forward to address the NCR. (6/29)<br />

No update. It is suggested by WCH QA that a reminder be put into place that a new lift plan will<br />

need to be developed prior to the scale being removed at the end of the project. (7/14)<br />

Discussion surrounding what plan is being put into place to ensure the scale is not removed using<br />

the modified lifting eyes. DDI instructed to develop a reminder to ensure that the lifting eyes are<br />

not used. (7/20)<br />

* DDI to submit REA for 100-K-2 confirmatory sampling. (6/22) DDI to submit by 6/30. (6/29)<br />

No change. (7/6) DDI submitted letter with questions about costs related to analysis of<br />

confirmatory sampling activities. WCH commits to providing a response to DDI by 7/19. (7/14)<br />

WCH will have response to DDI by 7/22. (7/20)<br />

* Discussed future start-up plans for Trench N. DDI to present plan for Trench N for WCH<br />

concurrence before the start of intrusive activities. (6/22) No change. (7/6) DDI to schedule a<br />

meeting Monday 7/19 with pertinent DDI and WCH personnel to discuss plan for Trench N.<br />

(7/14) This meeting has been delayed until the week of 7/26 to ensure key DDI personnel are<br />

able to attend. (7/20)<br />

" DDI is scheduling a 25-ton certification scale test for Kenworth trucks on Tuesday, June 29 at<br />

10:00. A WCH engineer will participate in witnessing the test. (6/22) Test rescheduled to 6/3 0.<br />

DDI working to obtain informnation from G & H for hoist modifications. (6/29) Test, as<br />

performed, was not successful. DDI is making arrangements for another test, tentatively<br />

scheduled for 7/12/20 10. (7/6) A second test was performed without success. DDI is submitting<br />

certifications today for four (4) of the shuttle trucks. (7/14) These include the 22-ton shuttle<br />

trucks. (7/14) DDI has submitted certs, WCH has not received. DDI is planning on bringing an<br />

additional 25-ton truck to the project. (7/20)


Progress Review Meeting<br />

Page 4<br />

* Discussed the status of plans for handling and disposition of known large canisters in Trench K,<br />

DDI to provide details. (6/29) No update. (7/6) This will be included in the discussion to be<br />

scheduled on Monday afternoon, 7/19. (7/14) This meeting has been delayed until the week of<br />

7/26 so key DDI personnel are able to attend. (7/20)<br />

* Discussed Beryllium controls and medical surveillance requirements for Trench I remediation.<br />

(5/25) Medical screen in the process of being scheduled. All DDI employees will participate in<br />

this medical surveillance process. More information to follow. (6/1) Discussed medical physical<br />

scheduling. (6/15) No change. (6/22) WC- is working with AMH to schedule all project<br />

persons for physicals and training. (6/29) WCH has scheduled beryllium training, physicals still<br />

in process. (7/6) WCH has received some beryllium medical appointments (to begin next week)<br />

with the remainder to come. DDI needs to ensure that scheduled employees are aware of and<br />

show up for their scheduled appointments. Missed appointments can further impact the Trench I<br />

Silo schedule. (7/14) In process. Discussed cost allocations - Per the contract, WCH will cover<br />

the cost of the medical surveillances and training; DDI will be responsible for the labor costs, to<br />

and from the appointments and the time during the appointments. (7/20)<br />

11I. PROJECT DESIGN DRAWINGS<br />

" DDI still needs to submit for WCH review as-builts for electrical as well as the energized water<br />

line. (5/11) No change. (5/18) No change. (5/25) Electrical drawing modifications have been<br />

discussed between DDI and WCH STR. (6/1) This is a topic of discussion in a meeting on 6/10<br />

between Watts and DDI. (6/8) DDI has additional questions about these as-built requirements.<br />

(6/15) No change. (6/22) WCH has received and is in review. (6/29) DDI has received the<br />

reviewed comments from WCH and is working to get the drawing updated. They commit to<br />

having the drawing resubmitted by 7/21. (7/14) No change. (7/20)<br />

" Water line as-builts are being marked up for WCH review prior to being submitted. (6/1) No<br />

change. WCH stressed that the as-builts need to indicate the location of the water lines from hook<br />

up at the fence to the high tower. (6/8) No change. (6/15) No change. (6/22) WCH to provide<br />

new drawing number for the as-built drawing. (6/29) WCH will also provide a CADD base file<br />

to DDI for this drawing. (7/6) DDI has received base CADD file and is in process of updating<br />

drawing. They commit to resubmitting drawing by 7/21. (7/14) DDI has had issues with the<br />

CADD file, submission bumped to 7/26. (7/20)<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

*No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

VI.<br />

VII.<br />

MANPOWER<br />

" See attached.<br />

* DDI is down one operator. They will address with their sub-tier about filling this position.<br />

EQUIPMENT<br />

" See attached.<br />

" Rock truck shown on the report is not on site.


Progress Review Meeting<br />

Page 5<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

4 WCH intends to begin working on Trench I silo work packages in early August.<br />

IX.<br />

MATERIAL<br />

*DDI to begin the process of ordering ecology block that will be used in the Trench I Silo<br />

remediation.<br />

X. QUALITY<br />

* DDI was issued SDR (FR-201 0-IF-03 82-SDR-0 15) on 5/17/2010 for as-built drawings. (5/25)<br />

No update. (6/1) No update. (6/8) DDI to provide CAR by 6/24/10. (6/22) WCH received<br />

CAR today. (6/29) WCH is reviewing CAR. DDI has received the reviewed comments from<br />

WCH and is working to get the drawing updated. They commit to having the drawing<br />

resubmitted by 7/21. (7/14) CAR has been reviewed by WCH and will be closed. (7/20)<br />

* The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3. No update (5/4). No update. (5/11)<br />

No update. (5/18) No update. (6/1) No update. (6/8)<br />

*WCH issued SDR (FR-201 0-IF-0092-017) to DDI on 5/24/2010 for shuttle truck<br />

specifications. (5/25) No update. (6/1) No update. (6/8) DDI to provide CAR by 6/24/2010.<br />

(6/22) WCH received CAR today. (6/29) WCH is in review of the CAR (7/14) WCH QA<br />

would like DDI to update the letter provided in response with current information and dates.<br />

(7/20)<br />

* WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCH QA in the near future. (6/29) DDI provided copy of surveillance by WCH QA. This<br />

surveillance will be ongoing this week and next. (7/14) The surveillance will be conducted on<br />

7/22 for this site. (7/20)<br />

" A surveillance was completed today on compressed gas bottles/cylinders. DDI was provided the<br />

checklist for the surveillance last week. WCH is concerned because the inspection today showed<br />

deficiencies even after the criteria were provided ahead of time. (7/20)<br />

* WCH PSR and WCH IHI will be performing a heat stress assessment today. No problems are<br />

anticipated. (7/20)<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

* DDI will be issuing an RFI for the scheduler position, duties and WCH expectations. No update<br />

(5/4). No update. (5/11) No change. (5/18) Received, WCH in review. (5/25) No update. (6/1)<br />

WCH commits to having a response to DDI no later than 6/15. (6/8) WCH commits to having<br />

response to DDI 7/15. (7/14) This will be issued by WCH by the end of the week. (7/20)<br />

* DDI requests a discussion about the cost of the IH monitoring in support of confirmatory<br />

sampling sent out for processing. (6/8) WCH in review of letter from DDI. (6/15) No change.<br />

(6/24) No change. (6/29) WCH commits to a response by next week. (7/14) On schedule to be<br />

completed by the end of this week. (7/20)<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.


Progress Review Meeting<br />

Page 6<br />

*Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and conmments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/2010. WCH has received, in<br />

preliminary review, will return this week. WCH returned to DDI, status 2, with comments.<br />

DDI will be doing a walkdown with Mr. Teachout to incorporate comments and will resubmit<br />

drawings for approval. DDI to check on status. DDI waiting on North Point. DDI still<br />

waiting on North Point. They have exceeded the 30-day expected response to a returned<br />

submittal. DDI to follow up with North Point again this week. No update, still with DDI<br />

(4/20). No update (4/27). No update (5/4). No update from DDI. WCH issued SDR. (5/18)<br />

No update. (5/2 5) No update. (6/8) WCH is in review of drawing. (6/29) DDI has received<br />

the review comments from WCH and is working to get the drawing updated. They commit to<br />

having the drawing resubmitted by 7-21. (7/14)<br />

" WCH return traffic control drawings to DDI, status 2. DDI will be resubmitting soon<br />

incorporating the WCH comments. DDI to submit this week. Drawings are with North Point for<br />

revision and will be resubmitted upon their return. DDI is well beyond the 30-day resubmission<br />

for updated drawings. WCH will be issuing an SDR regarding this issue. DDI has indicated they<br />

are working on a deficiency letter which will be submitted to Watts for this and several other<br />

deficiencies. (5/11) No update. (5/18) No update. (5/25) WCH received traffic control submittal<br />

6/3 and is in review of same. (6/8) WCH has returned to DDI status 2. (6/22) No change. (6/29)<br />

They commit to resubmitting drawing by 7/21 (7/14). DDI will install signs to match the traffic<br />

control drawing then resubmit. (7/20)<br />

" WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5/11) SDR provided, no update. (5/18) No update. (5/25) No update. (6/8) DDI submitted redline<br />

copies. WCH will provide a drawing number to DDI. (6/29) DDI has received the reviewed<br />

comments from WCH and is working to get the drawing updated. WCH has provided base<br />

CADD file and DDI is in process of updating drawing. (7/14). DDI is working with their<br />

design group to update the drawings. (7/20)


Progress Review Meeting<br />

Page 7<br />

XIII.<br />

XIV.<br />

XV.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

" DDI can expect to see revision soon to Change Notice 025 regarding use of last four digits of<br />

employee social security numbers as identifier. DDI indicates they have not yet received this<br />

revision. WCH to follow-up. (7/14) WCH will be issuing a revision to this CN by the end of the<br />

week. (7/20)<br />

* WCH returned CN 016 to DDI for corrections and changes. (6/1) No update. (6/8) WCH has<br />

received proposal and is making minor adjustments. (6/22) DDI will resubmit proposal by 7/26.<br />

(7/20)<br />

" WCH is returning CN 007 R. 1 and CN 019 for corrections and changes. (6/8) WCH has<br />

received proposal for CN 007 R. 1 and is reviewing. (6/22) WCH commits to completing review<br />

by 7/19. (7/14)<br />

* WCII has issued CN 026 for the Trench I equipment and materials. (6/22) Discussion about start<br />

of fabrication for Trench I equipment from Jewell. WCH requests DDI confirm that fabrication<br />

started on 7/14. DDI to provide WCH with itemized procurement and delivery schedule for<br />

fabricated equipment. (7/14)<br />

o<br />

DDI has not received any information on the Trench I camera specs or equipment<br />

specs for the 400 excavator. They will follow up with the vendor. (5/11) Some specs<br />

have been received, but more are needed. Confer with D. Teachout for specifics.<br />

(5/18) WCH is in development of change notice for Trench I work. (5/25) No update.<br />

(6/1) DDI is to follow-up ASAP to provide the specs. Trench I operations scheduled<br />

to begin late July/early August. (6/8) WCH discussed concerns (6/15) WCH has<br />

transmitted to DDI CN 026 to provide clamshell and camera excavation equipment.<br />

(6/22) Proposal to be provided to WCH by close of business this week. (6/29) WCH<br />

has requested a delivery schedule for equipment. DDI will provide drawings/details<br />

for equipment (7/6)<br />

" DDI has submitted proposal today for CN 012, WCH to review. (7/14) WCH is reviewing<br />

proposal, but still needs the signed Change Notice acknowledgement from DDI. (7/20)<br />

CORRESPONDENCE (since last meeting)<br />

* Transmittal from DDI: Acceptance for Change Notice 0 12<br />

" Weekly Progress Review Meeting Minutes of 7/14/2010<br />

INVOICE AND PAYMENT STATUS<br />

* Reminder that this Sunday is the end of the July reporting period. DDI should note that WCH<br />

needs to receive the electrical and energized water system drawings or the additional 15% will be<br />

deducted from the July payment.<br />

0 Discussion of completion incentive by trench. Per the contract DDI has the potential for partial<br />

release of retention.


Progress Review Meeting<br />

Page 8<br />

XVI.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

" WCH is still waiting on a procurement schedule for the fabrication items for Trench 1. This has<br />

been requested by the FR director. DDI is identifying which type of schedule is needed, is a gantbar<br />

schedule adequate? WCH has requested that DDI include all work to be performed on the 3-<br />

week look ahead schedule.<br />

o How is DDI tracking the progress of the fabrication of equipment for Trench I?<br />

* On 7/8/2010 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20)<br />

Attachment(s): As noted above.


o00<br />

75<br />

*7<br />

CC)<br />

C3<br />

tof *0l0 4) 0)<br />

m0<br />

0a<br />

bE1<br />

C3-<br />

m u0 -1o -n<br />

J00 .<br />

- ZZz~ U) ~~~z z<br />

I ~ ~ ~ Z<br />

0 m0<br />

z 0 C-7la z z<br />

m<br />

m. NCR-<br />

2<br />

19 V" 'a2<br />

14 --<br />

0<br />

CnC<br />

151<br />

~ ~ ~ oo~j 4)


6 C)o<br />

~ ~ E<br />

Lo~<br />

0- 0 u<br />

0. C


o000 0 00 0 0<br />

CO)<br />

O0 c) 0 00 0 0 0<br />

C) Co<br />

0 00<br />

C) 0 000 0) 0 0<br />

U)) 0 0N - - ;5o 0<br />

;5N 00 0 0<br />

(U ~ ~ ~N 4) C1 N (.. N-.<br />

C fl- )<br />

co 0<br />

0D N 0 0z( a~ CD~ N C<br />

CD-.<br />

4) 04 - N C4 NZ<br />

w -N 04 04 N<br />

U)Ci<br />

0 0)<br />

C.) ))<br />

a. C) cc a a r<br />

Z) -~LL LL a) 4)<br />

_N o -Dt 0 (D<br />

c 0) 0. 0<br />

CL c c<br />

0o co3<br />

Z a 0 0 r_2<br />

(D > 0 ~ . 0<br />

.0 I < U) U) -<br />

Z~ E (D 0<br />

U)) -. a - En c LO<br />

ca -0 U)<br />

0<br />

:3 2 0) ( CU 0 c<br />

00 :<br />

E_<br />

0) w > >o<br />

0 a)~ (Do<br />

C) -JO (D C) 0 -)<br />

ca1 3: ~ -2 b C -E (<br />

< -tC: CL m t"<br />

U) .0 c )0 5 0c4<br />

E 2 1 0 > 0<br />

IL) o) _ 0 CL ;a<br />

-~ -- - m<br />

ON 0 c F- N -<br />

00) 0 0 000<br />

0L<br />

vNC) 14) 140 0) 0) )<br />

000 a 0 0) )0 0 0 000


* tIL<br />

C<br />

IfI


Washington<br />

Closure<br />

WC H <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 152508<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach 2 -<br />

July 27, 2010<br />

BTIO<br />

E. L. Adamson X3-40 D. Bollinger (DDI)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Grist X3-16 R. W. Cross 1-4-25<br />

R. Ferguson (DDD) X3-17 T. Dance (DDI) X3-17<br />

A. Gagnon X9-08 R. A. Dodd 1-4-24<br />

J. A. Heard 1-4-17 C. Flowers (DDJ) X3-17<br />

S. E. Parnell X3-16 T. A. Foster N3-30<br />

R. Ganapathy X3-40<br />

S. J. Huddleston X3-16<br />

W. R. Junkins X3-16<br />

D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

H. C. Weber (DDI) X3-16<br />

H. Williams III X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control 1-4-l11<br />

A meeting on the above subject was held on July 27, 2010 at 11 8-K, MO-755.<br />

bISR3<br />

I. SAFETY<br />

* Safety topic: There are new rules that went into effect January I relating to passengers carrying<br />

on batteries. There is not a limit of 2 that can be carried on and they must be placed into a clear<br />

plastic baggie.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

0 PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpmn<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/2010. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

Z:\Administmative Assistant\Project Progress Review Weekly Meetings\20l0'July\7-27-O Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 1 00-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 19 th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 1 00-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

calcs on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/25) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pressures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm). (6/1) DDI is<br />

sending a letter to Watts to rework system for increased pressure. (6/8) DDI to submit letter,<br />

request for clarification for intent of water supply. (6/15) No change. (6/22) WCH has not<br />

received letter from DDI about water supply. (6/29) DDI states they send letter on 6/23, but<br />

WCH STR has not received copy. (7/6) WCH received letter 7/12. WCH PM is following up<br />

with CHPRC before responding to letter. (7/14) WCH PM followed up with the CHPRC Deputy<br />

Fire Marshal about the permit. They hope to have updated information to us by the end of the<br />

week. WCH discussed how using additional percentage of calcium chloride could control dust<br />

and use less water. It was also suggested that DDI look into bringing an additional water tower<br />

on site that could be filled at the start of the day to provide additional water. (7/20) DDI has<br />

submitted WCH suggestions to sub-tier for proposal if there is no increase in water permitted at<br />

the hydrant restrictor.<br />

*Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to burn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/20 10. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to<br />

DDI with the required designations for waste oil burning. DDI to submit revised OMP this week.


Progress Review Meeting<br />

Page 3<br />

DDI is working with WCH EPL on clarifications. WCH EPL to observe Watts's oil burning<br />

facility on 3/18/2010. DDI will submit OMP after that date. OMP waiting on ARES revision to<br />

drawings, then DDI will submit. Drawings should be available for pickup by DDI this week then<br />

the OMP will be submitted. No update (4/20). DDI is working on final review of this submittal<br />

and will submit by 5/11/2010 (4/27). On track to submit by 5/11/2010 (5/4). DDI confirmed that<br />

the OMP will be submitted 5/12/2010. Since the OMP is not yet approved, DDI is not to remove<br />

used oil from the site. Any questions about exceptions to this need to be discussed with the WCH<br />

EPL. (5/11) DDI continues to work on completing the OMP with support from the WCH EPL.<br />

DDI plans to submit the OMP next week. (5/18) Submission of OMP pushed out to 6/3/2010.<br />

(5/25) No change. (6/1) DDI is still working on OMP submittal. (6/8) No change, DDI to<br />

submit by 6/24/10. (6/15) DDI is on schedule to meet 6/24 submission. (6/22) WCH has<br />

received OMP and is in review. (6/29) WCH is still reviewing. (7/6) DDI has received<br />

submittal back with WCH comments. DDI requests to remove SPCC submitted from showing as<br />

due since they are working to the OMP. (7/14) DDI expects to submit by 7/22. (7/20) DDI to<br />

submit by 7/27. (7/27)<br />

" Discussed Incidental Welding procedure. Surveillance performed, identified necessary changes<br />

to be made for clarifications. (5/18) No update. (5/25) DDI to revise this week. (6/1) DDI to<br />

submit by 6/10/2010. (6/8) DDI commits to submitting no later than 6/24/10. (6/15) DDI on<br />

schedule for submission by 6/24. (6/22) WCH has received and is in review. (6/29) WCH has<br />

returned to DDI status 2. (7/6) DDI has received back and is working through comments. (7/14)<br />

DDI indicated they have submitted the procedure; WCH has not yet received, but will review<br />

when received. (7/20) WCH has received, but it does not appear that changes were incorporated<br />

into the document. (7/27)<br />

* DDI and WCH are planning to perform confirmatory sampling on one test pit and two trenches<br />

for 100-K-2 on the day the scale is being replaced - June 18. (6/8) This activity was rescheduled<br />

with new date TBD. (6/22) No change. (6/29) No change. (7/6) This will be tentatively<br />

rescheduled for Friday, July 30 pending support availability. (7/14) DDI expressed beryllium<br />

concerns for this activity. WCH has determined this site to be beryllium free, but this is being reevaluated<br />

by WCH IH. (7/20) A re-evaluation determined the area to be beryllium free. The<br />

"Beryllium Free Facility" form has been signed off by WCH III. WCH will evaluate if there is<br />

support available for working on 7/3 0. (7/27)<br />

* DDI to develop NCR for the suspect/modified lift points on the new truck scale. (6/22) NCR has<br />

been implemented and DDI is developing a documented path forward to address the NCR. (6/29)<br />

No update. It is suggested by WCH QA that a reminder be put into place that a new lift plan will<br />

need to be developed prior to the scale being removed at the end of the project. (7/14)<br />

Discussion surrounding what plan is being put into place to ensure the scale is not removed using<br />

the modified lifing eyes. DDI instructed to develop a reminder to ensure that the lifting eyes are<br />

not used. (7/20) Tags will remain on lifting eyes. DDI instructed sub-tier to develop plan for<br />

reminder that the lifting eye for the scale has been tagged out. DDI to develop lifting plan. (7/27)<br />

* DDI to submit REA for 100-K-2 confirmatory sampling. (6/22) DDI to submit by 6/3 0. (6/29)<br />

No change. (7/6) DDI submitted letter with questions about costs related to analysis of<br />

confirmatory sampling activities. WCH commits to providing a response to DDI by 7/19. (7/14)<br />

WCH will have response to DDI by 7/22. (7/20) WCH sent a letter in response - these costs are<br />

included in Exhibit "D" of the contract. DDI will be submitting a more detailed REA in response<br />

to this letter. (7/27)<br />

* Discussed future start-up plans for Trench N. DDI to present plan for Trench N for WCH<br />

concurrence before the start of intrusive activities. (6/22) No change. (7/6) DDI to schedule a<br />

meeting Monday 7/19 with pertinent DDI and WCH personnel to discuss plan for Trench N.


Progress Review Meeting<br />

Page 4<br />

(7/14) This meeting has been delayed until the week of 7/26 to ensure key DDT personnel are<br />

able to attend. (7/20) Meeting to be scheduled for 7/29 at 1:00. (7/27)<br />

"DDI is scheduling a 25-ton certification scale test for Kenworth trucks on Tuesday, June 29 at<br />

10:00. A WCH engineer will participate in witnessing the test. (6/22) Test rescheduled to 6/3 0.<br />

DDI working to obtain information from G & H for hoist modifications. (6/29) Test, as<br />

performed, was not successful. DDI is making arrangements for another test, tentatively<br />

scheduled for 7/12/20 10. (7/6) A second test was performed without success. DDI is submitting<br />

certifications today for four (4) of the shuttle trucks. (7/14) These include the 22-ton shuttle<br />

trucks. (7/14) DDI has submitted certs, WCH has not received. DDI is planning on bringing an<br />

additional 25-ton truck to the project. (7/20) One Kenworth truck will be removed from the site,<br />

to be replaced by a 25T Peterbilt truck. (7/27)<br />

* Discussed the status of plans for handling and disposition of known large canisters in Trench K,<br />

DDI to provide details. (6/29) No update. (7/6) This will be included in the discussion to be<br />

scheduled on Monday afternoon, 7/19. (7/14) This meeting has been delayed until the week of<br />

7/26 so key DDI personnel are able to attend. (7/20) This meeting will be rescheduled to the<br />

same time as the Trench N discussion. (7/27)<br />

* Discussed Beryllium controls and medical surveillance requirements for Trench I remediation.<br />

(5/25) Medical screen in the process of being scheduled. All DDI employees will participate in<br />

this medical surveillance process. More information to follow. (6/1) Discussed medical physical<br />

scheduling. (6/15) No change. (6/22) WCH is working with AMH to schedule all project<br />

persons for physicals and training. (6/29) WCH has scheduled beryllium training, physicals still<br />

in process. (7/6) WCH has received some beryllium medical appointments (to begin next week)<br />

with the remainder to come. DDI needs to ensure that scheduled employees are aware of and<br />

show up for their scheduled appointments. Missed appointments can further impact the Trench I<br />

Silo schedule. (7/14) In process. Discussed cost allocations - Per the contract, WCH will cover<br />

the cost of the medical surveillances and training; DDI will be responsible for the labor costs, to<br />

and from the appointments and the time during the appointments. (7/20) Ongoing. (7/27)<br />

" WCH is still waiting on a procurement schedule for the fabrication items for Trench 1. This has<br />

been requested by the FR director. DDI is identifying which type of schedule is needed, is a gantbar<br />

schedule adequate? WCH has requested that DDI include all work to be performed on the 3-<br />

week look-ahead schedule. (7/20) Jewel anticipated to update schedule on a weekly basis.<br />

(7/27)<br />

o How is DDI tracking the progress of the fabrication of equipment for Trench 1? (7/20) What<br />

are WCH QA plans for reviewing the equipment?<br />

" Whether the equipment is "off-the-shelf' or "custom" determines the level of<br />

oversight necessary by WCH QA. (7/27)<br />

" WCH QA is concerned about the flow down from DDI to sub-tier Jewell. (7/27)<br />

" WCH suggests a visit to sub-tier Jewell next week - tentatively Monday a.m. (7/27<br />

" On 7/8/2010 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20)<br />

1I1. PROJECT DESIGN DRAWINGS<br />

*DDI still needs to submit for WCH review as-builts for electrical as well as the energized water<br />

line. (5/11) No change. (5/18) No change. (5/25) Electrical drawing modifications have been<br />

discussed between DDI and WCH STR. (6/1) This is a topic of discussion in a meeting on 6/10<br />

between Watts and DDI. (6/8) DDI has additional questions about these as-built requirements.<br />

(6/15) No change. (6/22) WCH has received and is in review. (6/29) DDI has received the<br />

reviewed comments from WCH and is working to get the drawing updated. They commit to


Progress Review Meeting<br />

Page 5<br />

having the drawing resubmitted by 7/21. (7/14) No change. (7/20) The drawing needs to revved<br />

to reflect 15 amp versus 20 amp fuses. (7/27)<br />

*Water line as-builts are being marked up for WCH review prior to being submitted. (6/1) No<br />

change. WCH stressed that the as-builts need to indicate the location of the water lines from hook<br />

up at the fence to the high tower. (6/8) No change. (6/15) No change. (6/22) WCH to provide<br />

new drawing number for the as-built drawing. (6/29) WCH will also provide a CADD base file<br />

to DDI for this drawing. (7/6) DDI has received base CADD file and is in process of updating<br />

drawing. They commit to resubmitting drawing by 7/2 1. (7/14) DDI has had issues with the<br />

CADD file, submission bumped to 7/26. (7/20) DDI is reviewing the cost of drawing; anticipate<br />

submittal of drawing by 8/3. (7/27)<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

*None provided at the time of the meeting.<br />

o Not provided by DDI as a result of a unilateral decision by DDI corporate.<br />

V. WEEKLY PRODUCTION TABLE<br />

* No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

" No production table has been provided. This would include quantity of can counts, updated<br />

weekly, separated and denoted by trench. DDI feels they are able to provide this weekly.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

* DDI is down one operator. They will address with their sub-tier about filling this position. No<br />

update. (7/20) Now down a teamster in addition to an operator. No update on filling either<br />

position. (7/27)<br />

EQUIPMENT<br />

* See attached.<br />

* Rock truck shown on the report is not on site. (7/20) Rock truck is returning 7/27. (7/27)<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

" None.<br />

" WCH intends to begin working on Trench I silo work packages in early August.<br />

IX.<br />

MATERIAL<br />

*DDI to begin the process of ordering ecology block that will be used in the Trench I Silo<br />

remediation.<br />

X. QUALITY<br />

*The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3. No update (5/4). No update. (5/11)<br />

No update. (5/18) No update. (6/1) No update. (6/8)<br />

*WCH issued SDR (FR-201 0-I17-0092-017) to DDI on 5/24/2010 for shuttle truck<br />

specifications. (5/25) No update. (6/1) No update. (6/8) DDI to provide CAR by 6/24/2010.<br />

(6/22) WCH received CAR today. (6/29) WCH is in review of the CAR (7/14) WCH QA<br />

would like DDI to update the letter provided in response with current information and dates.<br />

(7/20) DDI to submit letter with updated information on 7/27. (7/27)


Progress Review Meeting<br />

Page 6<br />

" WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCI- QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCH QA in the near future. (6/29) DDI provided copy of surveillance by WCH QA. This<br />

surveillance will be ongoing this week and next. (7/14) The surveillance will be conducted on<br />

7/22 for this site. (7/20) This surveillance is ongoing to additional sub-tiers, including Jewell.<br />

Results are not anticipated to be positive. There appears to be serious issues with flowdown of<br />

DDI QA plan to sub tiers. WCH QA is concerned about how the QA plan is being implemented<br />

by sub-tiers, specifically Jewell. These issues are of considerable concern to WCII. (7/27)<br />

* A surveillance was completed today on compressed gas bottles/cylinders. DDI was provided the<br />

checklist for the surveillance last week. WCH is concerned because the inspection today showed<br />

deficiencies even after the criteria were provided ahead of time. (7/20) WCH QA will follow up<br />

on this surveillance and results. DDI should anticipate that an SDR will be issued by WCH.<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

" DDI will be issuing an RFI for the scheduler position, duties and WCH expectations. No update<br />

(5/4). No update. (5/11) No change. (5/18) Received, WCH in review. (5/25) No update. (6/1)<br />

WCH conmnits to having a response to DDI no later than 6/15. (6/8) WCH commits to having<br />

response to DDI 7/15. (7/14) This will be issued by WCH by the end of the week. (7/20) WCH<br />

has provided response letter to DDI outlining expectations. (7/27)<br />

* DDI requests a discussion about the cost of the 114 monitoring in support of confirmatory<br />

sampling sent out for processing. (6/8) WCH in review of letter from DDI. (6/15) No change.<br />

(6/24) No change. (6/29) WCH commits to a response by next week. (7/14) On schedule to be<br />

completed by the end of this week. (7/20) WCH has provided response letter to DDI on this<br />

subject. (7/27)<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

*See attached.<br />

*Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/2010. WCH has received, in<br />

preliminary review, will return this week. WCH returned to DDI, status 2, with comments.<br />

DDI will be doing a walkdown with Mr. Teachout to incorporate comments and will resubmit<br />

drawings for approval. DDI to check on status. DDI waiting on North Point. DDI still<br />

waiting on North Point. They have exceeded the 30-day expected response to a returned<br />

submittal. DDI to follow up with North Point again this week. No update, still with DDI<br />

(4/20). No update (4/27). No update (5/4). No update from DDI. WCH issued SDR. (5/18)<br />

No update. (5/25) No update. (6/8) WCH is in review of drawing. (6/29) DDI has received<br />

the review comments from WCH and is working to get the drawing updated. They commit to<br />

having the drawing resubmitted by 7/21. (7/14)


Progress Review Meeting<br />

Page 7<br />

" WCH return traffic control drawings to DDI, status 2. DDI will be resubmitting soon<br />

incorporating the WCH comments. DDI to submit this week. Drawings are with North Point for<br />

revision and will be resubmitted upon their return. DDI is well beyond the 30-day resubmission<br />

for updated drawings. WCH will be issuing an SDR regarding this issue. DDI has indicated they<br />

are working on a deficiency letter which will be submitted to Watts for this and several other<br />

deficiencies. (5/11) No update. (5/18) No update. (5/2 5) WCH received traffic control submittal<br />

6/3 and is in review of same. (6/8) WCH has returned to DDI status 2. (6/22) No change. (6/29)<br />

They commit to resubmitting drawing by 7/21 (7/14). DDI will install signs to match the traffic<br />

control drawing then resubmit. (7/20)<br />

" WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5/11) SDR provided, no update. (5/18) No update. (5/2 5) No update. (6/8) DDI submitted redline<br />

copies. WCH will provide a drawing number to DDI. (6/29) DDI has received the reviewed<br />

comments from WCH and is working to get the drawing updated. WCH has provided base<br />

CADD file and DDI is in process of updating drawing. (7/14). DDI is working with their<br />

design group to update the drawings. (7/20)<br />

XIII.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

* DDI can expect to see revision soon to Change Notice 025 regarding use of last four digits of<br />

employee social security numbers as identifier. DDI indicates they have not yet received this<br />

revision. WCH to follow-up. (7/14) WCH will be issuing a revision to this CN by the end of the<br />

week. (7/20) WCH has submitted to DDI. (7/27)<br />

* WCH returned CN 016 to DDI for corrections and changes. (6/1) No update. (6/8) WCH has<br />

received proposal and is making minor adjustments. (6/22) DDI will resubmit proposal by 7/26.<br />

(7/20) WCH waiting on DDI response to hours needed to change out cable. (7/27)<br />

* WCH is returning CN 007 R. 1 and CN 019 for corrections and changes. (6/8) WCH has<br />

received proposal for CN 007 R. 1 and is reviewing. (6/22) WCH commits to completing review<br />

by 7/19. (7/14) WCH is waiting on proposal from DDI for CN 019. (7/27)<br />

* WCH has issued CN 026 for the Trench I equipment and materials. (6/22) Discussion about start<br />

of fabrication for Trench I equipment from Jewell. WCH requests DDI confirm that fabrication<br />

started on 7/14. DDI to provide WCH with itemized procurement and delivery schedule for<br />

fabricated equipment. (7/14)<br />

o DDI has not received any information on the Trench I camera specs or equipment<br />

specs for the 400 excavator. They will follow up with the vendor. (5/11) Some specs<br />

have been received, but more are needed. Confer with D. Teachout for specifics.<br />

(5/18) WCH is in development of change notice for Trench I work. (5/25) No update.<br />

(6/1) DDI is to follow-up ASAP to provide the specs. Trench I operations scheduled<br />

to begin late July/early August. (6/8) WCH discussed concerns (6/15) WCH has<br />

transmitted to DDI CN 026 to provide clamshell and camera excavation equipment.<br />

(6/22) Proposal to be provided to WCH by close of business this week. (6/29) WCH<br />

has requested a delivery schedule for equipment. DDI will provide drawings/details<br />

for equipment (7/6) DDI provided schedule for equipment fabrication from Jewell.<br />

(7/27)<br />

* DDI has submitted proposal today for CN 012, WCH to review. (7/14) WCH is reviewing<br />

proposal, but still needs the signed Change Notice acknowledgement from DDI. (7/20) NO<br />

update.<br />

" WCH will be issuing CN 027 to DDI today. (7/27)


Progress Review Meeting<br />

Page 8<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE (since last meeting)<br />

* Transmittal from DDI: Acceptance of CN 025 Rev. 1<br />

" Weekly Progress Review Meeting Minutes of 7/27/2010<br />

INVOICE AND PAYMENT STATUS<br />

* Discussion of completion incentive by trench. Per the contract DDI has the potential for partial<br />

release of retention. For Trenches D, E, P and G one-half of the retainage may be released when<br />

completed. A topographical survey will be required.<br />

* DDI to submit invoice this week for July work.<br />

o As energized as-builts have not yet been received, WCH anticipates additional 15%<br />

withholding from July payment.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

0 Monthly Air Quality Data Summary Records have not been seen/reviewed by Dan Saueressig<br />

(WCH EPL) since November.<br />

* WCH asked how DDI is tracking BCL material. No measurement/tracking of BCL material has<br />

been provided to WCH.<br />

o DDI indicated a survey will be completed to measure quantity when the stockpile is<br />

completed.<br />

& Delay meeting will be held 7/27 at 1:00.<br />

Attachment(s): As noted above.


0 E<br />

c Ec<br />

(U 0 0 u<br />

Z~ 0<br />

o (D 4 a<br />

m 60 00- -j i<br />

00 wi<br />

T-4<br />

In 't -0r<br />

N 0000 00 00 n :t r 0<br />

-N - - -e -d 1fu1<br />

+1 X_ a 0CCCC


L 000 51 1 0 m m 0oo<br />

c) 0<br />

E 0 0 0 C) CD<br />

(Dc C - -<br />

a4. CON( (0- - (<br />

04 C- (N C4 C' C<br />

to 00 0 0 00<br />

0 -<br />

0> ( 040~ 0<br />

0 ~ ~ C 0N 2~2 C) £(<br />

> C<br />

wt -- Z- N N !Z<br />

0 a)<br />

Ci<br />

G( 0<br />

0.) ic (v,)<br />

a. oc0 (acu<br />

Z: C L LL (2) a) '0<br />

0 o -0. E<br />

C: C.C C.) c<br />

Z 00a . 0~ c<br />

UJ<br />

30C CD<br />

> 0<br />

I D0.2 E~ 2<br />

.2 0).< 0) U<br />

0 Aco 0<br />

FO a~) (D aC) 03 Ci ~C MC1<br />

CIO<br />

2i<br />

2 FL<br />

CO 0 00 r*_<br />

C>W<br />

a) 05<br />

:3 ()Oc<br />

N~.<br />

*B w 0) U C)<br />

1.S~5<<br />

a) cac<br />

4' - p0<br />

0(N~ 0<br />

(N C) zo-~ Lx<br />

0Um o0<br />

(0 0 a<br />

0<br />

00 0 00 -- C-<br />

00CLC 0 0 00 0<br />

cO )0F 0a 0 ) .)0)<br />

) Q 0 0 0F 000


S~~1<br />

-0 N.C~<br />

C~<br />

a - R<br />

IL 93<br />

~~C ~ ~ 4~'L~ o ~ ~ '<br />

- ~~~t a ~ 2~0 0 o<br />

-z CI z 0 m m za:<br />

0 0o<br />

0<br />

U) 9<br />

~~~~00~~~ 8 OO. 6bZ ~ 0 0<br />

W. M 6 - -b<br />

IL<br />

.r - r.<br />

m<br />

u<br />

, I<br />

ui~ ~ CD0<br />

-i<br />

R~~<br />

cc5<br />

1<br />

ap r~~g 8<br />

08 6 -<br />

.<br />

0S b 6 4 N


FL<br />

i 5 1<br />

-<br />

4V U A,.71<br />

C6L<br />

M in7nw J 11i' mmmmmmm mm M M mmln r<br />

L 4W 2L<br />

K]


.2 I<br />

EE<br />

LlLJ<br />

ad<br />

M<br />

min<br />

a a


-o<br />

Co.<br />

S<br />

~Fi~<br />

O<br />

r<br />

Ii~ ~<br />

H<br />

Li<br />

a<br />

8<br />

O<br />

H<br />

~Li<br />

7<br />

Ii~<br />

III<br />

'Ii<br />

0~<br />

o 0 0 0 0 0 0 0 0 0 C 0 0 0 0 0 0 C 0 0 -<br />

5<br />

C C C C 55 ~ ~ 5555555:<br />

CCC ScOC Ccc<br />

0 0 C C 0 0 0 0 0 0 0 0 0 0 0 0<br />

I _<br />

J<br />

'5-.<br />

C-c- e-<br />

C-c-C-c-<br />

~ C--C-c-C-<br />

01-. - to ..<br />

a N - - :"<br />

0<br />

- 0<br />

0<br />

- - U<br />

= 0 5<br />

S C a a<br />

00 501<br />

0-, C S 0 0<br />

C:, - -<br />

2 0 ~;ji~irj~J ~ ~<br />

C<br />

C<br />

- --<br />

S - -----<br />

000 0N4~t 0CC-C C~N'N~ 02<br />

- COO 00 0 OCOCO OCO 00<br />

0<br />

NO<br />

a-


CCN: 152509<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

EMIMM11WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

August 3, 2010<br />

DISTRBUTIO<br />

E. L. Adamson X3-40 D. Bollinger (DDI)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Crist X3-16 R. W. Cross H4-25<br />

T. Dance (DDI) X3-17 R. A. Dodd H14-24<br />

R. Ferguson (DDI) X3-17 C. Flowers (DDI) X3-17<br />

R. T. Hansen H14-17 T. A. Foster N3-30<br />

J. A. Heard 114-17 A. Gagnon X9-08<br />

S. E. Parnell X3-16 R. Ganapathy X3-40<br />

H. Williams III X3-16 S. J. Huddleston X3-16<br />

W. R. Junkins X3-16<br />

D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

H. C. Weber (DDI) X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3- 16<br />

Records and Document Control 114-11<br />

A meeting on the above subject was held on August 3, 2010 at 118-K, MO-755.<br />

I. SAFETY<br />

0 Safety topic: Be aware of people's reaction to situations, both expected and unexpected situations<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm.<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/20 10. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 1 00-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backfiow preventer versus air-gap installation requirements. DDI is pursuing<br />

Z:\Administrative Assistant\Project Progress Review Weekly Meetings\2010\August\8-3-lO Weekly Progressdoc


Progress Review Meeting<br />

Page 2<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/20 10. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 19h so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 100-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

calcs on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/25) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pressures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm). (6/1) DDI is<br />

sending a letter to Watts to rework system for increased pressure. (6/8) DDI to submit letter,<br />

request for clarification for intent of water supply. (6/15) No change. (6/22) WCH has not<br />

received letter from DDI about water supply. (6/29) DDI states they send letter on 6/23, but<br />

WCH STR has not received copy. (7/6) WCH received letter 7/12. WCH PM is following up<br />

with CHPRC before responding to letter. (7/14) WCH PM followed up with the CHPRC Deputy<br />

Fire Marshal about the permit. They hope to have updated information to us by the end of the<br />

week. WCH discussed how using additional percentage of calcium chloride could control dust<br />

and use less water. It was also suggested that DDI look into bringing an additional water tower<br />

on site that could be filled at the start of the day to provide additional water. (7/2 0) DDI has<br />

submitted WCH suggestions to sub-tier for proposal if there is no increase in water permitted at<br />

the hydrant restrictor. (7/27) DDI has not received a response from WCI on alternative<br />

dust/water suppression chemicals or methods. CHPRC is restricting water on their site. They are<br />

evaluating methods other than the slow fill of the basins (still wells). WCH is concerned that<br />

WCI is allowing projects other than 11 8-K to fill their water trucks from the 11I8-K tank; it would<br />

appear that there is enough water if more than the 11I8-K project is using the tank. (8/3)<br />

*Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to bum prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/27/2010. DDI requesting<br />

assistance/support with designations. WCH in review of the OMP, WCH will provide support to


Progress Review Meeting<br />

Page 3<br />

DDT with the required designations for waste oil burning. DDI to submit revised OMP this week.<br />

DDI is working with WCH EPL on clarifications. WCH EPL to observe Watts's oil burning<br />

facility on 3/18/2010. DDI will submit OMP after that date. OMP waiting on ARES revision to<br />

drawings, then DDI will submit. Drawings should be available for pickup by DDI this week then<br />

the OMP will be submitted. No update (4/20). DDI is working on final review of this submittal<br />

and will submit by 5/11/2010 (4/27). On track to submit by 5/11/2010 (5/4). DDI confirmed that<br />

the OMP will be submitted 5/12/2010. Since the OMP is not yet approved, DDI is not to remove<br />

used oil from the site. Any questions about exceptions to this need to be discussed with the WCH<br />

EPL. (5/11) DDI continues to work on completing the OMP with support from the WCH EPL.<br />

DDI plans to submit the OMP next week. (5/18) Submission of OMP pushed out to 6/3/2010.<br />

(5/25) No change. (6/1) DDI is still working on OMP submittal. (6/8) No change, DDI to<br />

submit by 6/24/10. (6/15) DDI is on schedule to meet 6/24 submission. (6/22) WCH has<br />

received OMP and is in review. (6/29) WCH is still reviewing. (7/6) DDI has received<br />

submittal back with WCH comments. DDI requests to remove SPCC submitted from showing as<br />

due since they are working to the OMP. (7/14) DDI expects to submit by 7/22. (7/20) DDI to<br />

submit by 7/27. (7/27) WCH has received and it is being returned status 1. (8/3)<br />

* Discussed Incidental Welding procedure. Surveillance performed, identified necessary changes<br />

to be made for clarifications. (5/18) No update. (5/25) DDI to revise this week. (6/1) DDI to<br />

submit by 6/10/2010. (6/8) DDI commits to submitting no later than 6/24/10. (6/15) DDI on<br />

schedule for submission by 6/24. (6/22) WCH has received and is in review. (6/29) WCH has<br />

returned to DDI status 2. (7/6) DDI has received back and is working through comments. (7/14)<br />

DDI indicated they have submitted the procedure; WCH has not yet received, but will review<br />

when received. (7/20) WCH has received, but it does not appear that changes were incorporated<br />

into the document. (7/27) WCH has received and it is being returned status 1. (8/3)<br />

* DDI and WCH are planning to perform confirmatory sampling on one test pit and two trenches<br />

for 100-K-2 on the day the scale is being replaced - June 18. (6/8) This activity was rescheduled<br />

with new date TBD. (6/22) No change. (6/29) No change. (7/6) This will be tentatively<br />

rescheduled for Friday, July 30 pending support availability. (7/14) DDI expressed beryllium<br />

concerns for this activity. WCH has determined this site to be beryllium free, but this is being reevaluated<br />

by WCH TH. (7/20) A re-evaluation determined the area to be beryllium free. The<br />

"Beryllium Free Facility" form has been signed off by WCH TH-. WCH will evaluate if there is<br />

support available for working on 7/30. (7/27) Work did not occur on 7/30, DDI to request<br />

working Friday, 8/20 when their sampler is available to support this work. (8/3)<br />

" Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3)<br />

" DDI to submit REA for 100-K-2 confirmatory sampling. (6/22) DDI to submit by 6/3 0. (6/29)<br />

No change. (7/6) DDI submitted letter with questions about costs related to analysis of<br />

confirmatory sampling activities. WCH commits to providing a response to DDI by 7/19. (7/14)<br />

WCH will have response to DDI by 7/22. (7/20) WCH sent a letter in response - these costs are<br />

included in Exhibit "D" of the contract. DDI will be submitting a more detailed REA in response<br />

to this letter. (7/27) DDI is reviewing letter with legal counsel. Will follow up to WCH with a<br />

revised request. (8/3)<br />

o DDI requests a discussion about the cost of the IH monitoring in support of confirmatory<br />

sampling sent out for processing. (6/8) WCH in review of letter from DDT. (6/15) No<br />

change. (6/24) No change. (6/29) WCH commits to a response by next week. (7/14) On<br />

schedule to be completed by the end of this week. (7/20), WCH has provided response letter<br />

to DDI on this subject. (7/27) DDI is reviewing. (8/3)<br />

" Discussed future start-up plans for Trench N. DDI to present plan for Trench N for WCH


Progress Review Meeting<br />

Page 4<br />

concurrence before the start of intrusive activities. (6/22) No change. (7/6) DDI to schedule a<br />

meeting Monday 7/19 with pertinent DDI and WCH personnel to discuss plan for Trench N.<br />

(7/14) This meeting has been delayed until the week of 7/26 to ensure key DDI personnel are<br />

able to attend. (7/20) Meeting to be scheduled for 7/29 at 1:00. (7/27) DDI is developing work<br />

plan as discussed in meeting. A follow up meeting scheduled for Thursday afternoon at 1:00.<br />

Discussed the status of plans for handling and disposition of known large canisters in Trench K,<br />

DDI to provide details. (6/29) No update. (7/6) This will be included in the discussion to be<br />

scheduled on Monday afternoon, 7/19. (7/14) This meeting has been delayed until the week of<br />

7/26 so key DDI personnel are able to attend. (7/20) This meeting will be rescheduled to the<br />

same time as the Trench N discussion. (7/27) Canisters will be loaded out into single use<br />

containers. This will be included as part of the discussion in Thursday's meeting. (8/3)<br />

"DDI is scheduling a 25-ton certification scale test for Kenworth trucks on Tuesday, June 29 at<br />

10:00. A WCH engineer will participate in witnessing the test. (6/22) Test rescheduled to 6/30.<br />

DDI working to obtain information from G & H for hoist modifications. (6/29) Test, as<br />

performed, was not successful. DDI is making arrangements for another test, tentatively<br />

scheduled for 7/12/2010. (7/6) A second test was performed without success. DDI is submitting<br />

certifications today for four (4) of the shuttle trucks. (7/14) These include the 22-ton shuttle<br />

trucks. (7/14) DDI has submitted certs, WCH has not received. DDI is planning on bringing an<br />

additional 25-ton truck to the project. (7/20) One Kenworth truck will be removed from the site,<br />

to be replaced by a 25T Peterbilt truck. (7/27) WCH has received submittals and is in review.<br />

Truck will be on-site by the end of this week. (8/3)<br />

" WCH is still waiting on a procurement schedule for the fabrication items for Trench 1. This has<br />

been requested by the FR director. DDI is identifying which type of schedule is needed, is a gantbar<br />

schedule adequate? WCH has requested that DDI include all work to be performed on the 3-<br />

week look-ahead schedule. (7/20) Jewel anticipated to update schedule on a weekly basis.<br />

(7/27) Jewell indicates they are on schedule. DDI will include milestone dates on the schedule<br />

for Trenchl1. (8/3)<br />

o How is DDI tracking the progress of the fabrication of equipment for Trench 1? (7/20) What<br />

are WCH QA plans for reviewing the equipment?<br />

x Whether the equipment is "off-the-shelf 'or "custom" determines the level of<br />

oversight necessary by WCH QA. (7/27) WCH RE is developing a list of tests to be<br />

performed at Jewell's facility prior to delivery. (8/3)<br />

M WCH QA is concerned about the flow down from DDI to sub-tier Jewell. (7/27)<br />

M WCH suggests a visit to sub-tier Jewell next week - tentatively Monday a.m. (7/27)<br />

* On 7/8/2010 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3)<br />

" WCH asked how DDI is tracking BCL material. No measurement/tracking of BCL material has<br />

been provided to WCH. (7/27)<br />

o DDI indicated a survey will be completed to measure quantity when the stockpile is<br />

completed. (7/27) DDI indicates this is being tracked. WCH would like to review data; DDI<br />

will include in production report next week. (8/3)<br />

111. PROJECT DESIGN DRAWINGS<br />

*DDI still needs to submit for WCH review as-builts for electrical as well as the energized water<br />

line. (5/11) No change. (5/18) No change. (5/25) Electrical drawing modifications have been<br />

discussed between DDI and WCH STR. (6/1) This is a topic of discussion in a meeting on 6/10<br />

between Watts and DDI. (6/8) DDI has additional questions about these as-built requirements.


Progress Review Meeting<br />

Page 5<br />

(6/15) No change. (6/22) WCH has received and is in review. (6/29) DDI has received the<br />

reviewed comments from WCH and is working to get the drawing updated. They commit to<br />

having the drawing resubmitted by 7/21. (7/14) No change. (7/20) The drawing needs to revved<br />

to reflect 15 amp versus 20 amp fuses. (7/27) Fuse has been changed out in accordance with the<br />

drawing. WCH is returning status 1. (8/3)<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

o See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

* No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

" See attached.<br />

VI.<br />

VII.<br />

VIII.<br />

IX.<br />

MANPOWER<br />

* See attached.<br />

" DDI is down one operator. They will address with their sub-tier about filling this po'sition. No<br />

update. (7/20) Now down a teamster in addition to an operator. No update on filling either<br />

position. (7/27) PNF's have been processed on a new laborer and operator. (8/3)<br />

EQUIPMENT<br />

* See attached.<br />

* Rock truck left the site on 8/2. (8/3)<br />

* 350 excavator will be on site by the end of the week. Bucket that may be utilized on this machine<br />

is coming from the WCH 1 00-D project. (8/3)<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

* WCH intends to begin working on Trench I silo work packages in early August. Tentative<br />

meeting set for 8/16 to discuss work package for Trench I silos. WCH to confirm with planners<br />

on schedule. (8/3)<br />

MATERIAL<br />

*DDI is planning to begin the process of ordering ecology blocks that will be used in the Trench I<br />

Silo remediation. (7/27) DDI is planning for approximately 150 ecology blocks. (8/3)<br />

X. QUALITY<br />

* The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3. No update (5/4). No update. (5/11)<br />

No update. (5/18) No update. (6/1) No update. (6/8)<br />

*WCH issued SDR (FR-201 0-IF-0092-017) to DDI on 5/24/2010 for shuttle truck<br />

specifications. (5/25) No update. (6/1) No update. (6/8) DDI to provide CAR by 6/24/2010.<br />

(6/22) WCH received CAR today. (6/29) WCH is in review of the CAR (7/14) WCH QA<br />

would like DDI to update the letter provided in response with current information and dates.<br />

(7/20) DDI to submit letter with updated information on 7/27. (7/27) DDI to provide by 8/4.<br />

(8/3)<br />

* WCI{ QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals


Progress Review Meeting<br />

Page 6<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCH QA in the near future. (6/29) DDI provided copy of surveillance by WCH QA. This<br />

surveillance will be ongoing this week and next. (7/14) The surveillance will be conducted on<br />

7/22 for this site. (7/20) This surveillance is ongoing to additional sub-tiers, including Jewell.<br />

Results are not anticipated to be positive. There appears to be serious issues with flowdown of<br />

DDI QA plan to sub tiers. WCH QA is concerned about how the QA plan is being implemented<br />

by sub-tiers, specifically Jewell. These issues are of considerable concern to WCH. (7/27) DDI<br />

and WCH QA to meet to discuss flow downs. (8/3)<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

*DDI will be issuing an RFI for the scheduler position, duties and WCH expectations. No update<br />

(5/4). No update. (5/li) No change. (5/18) Received, WCH in review. (5/25) No update. (6/1)<br />

WCH commits to having a response to DDI no later than 6/15. (6/8) WCH commits to having<br />

response to DDI 7/15. (7/14) This will be issued by WCH by the end of the week. (7/20) WCH<br />

has provided response letter to DDI outlining expectations. (7/27) DDI is reviewing. (8/3)<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

* Water line as-builts are being marked up for WCH review prior to being submitted. (6/1) No<br />

change. WCH stressed that the as-builts need to indicate the location of the water lines from hook<br />

up at the fence to the high tower. (6/8) No change. (6/15) No change. (6/22) WCH to provide<br />

new drawing number for the as-built drawing. (6/29) WCH will also provide a CADD base file<br />

to DDI for this drawing. (7/6) DDI has received base CADD file and is in process of updating<br />

drawing. They commit to resubmitting drawing by 7/21. (7/14) DDI has had issues with the<br />

CADD file, submission bumped to 7/26. (7/20) DDI is reviewing the cost of drawing; anticipate<br />

submittal of drawing by 8/3. (7/27) Submittal delivery has been pushed to 8/12. (8/3)<br />

* WCH return traffic control drawings to DDI, status 2. DDI will be resubmitting soon<br />

incorporating the WCH comments. DDI to submit this week. Drawings are with North Point for<br />

revision and will be resubmitted upon their return. DDI is well beyond the 30-day resubmission<br />

for updated drawings. WCH will be issuing an SDR regarding this issue. DDI has indicated they<br />

are working on a deficiency letter which will be submitted to Watts for this and several other<br />

deficiencies. (5111) No update. (5/18) No update. (5/25) WCH received traffic control submittal<br />

6/3 and is in review of same. (6/8) WCH has returned to DDI status 2. (6/22) No change. (6/29)<br />

They commit to resubmitting drawing by 7/21 (7/14). DDI will install signs to match the traffic<br />

control drawing then resubmit. (7/20)<br />

* WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5/li) SDR provided, no update. (5/18) No update. (5/25) No update. (6/8) DDI submitted redline<br />

copies. WCH will provide a drawing number to DDI. (6/29) DDI has received the reviewed<br />

comments from WCH and is working to get the drawing updated. WCH has provided base<br />

CADD file and DDI is in process of updating drawing. (7/14). DDI is working with their<br />

design group to update the drawings. (7/20)<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

" See attached.<br />

* DDI can expect to see revision soon to Change Notice 025 regarding use of last four digits of<br />

employee social security numbers as identifier. DDI indicates they have not yet received this


Progress Review Meeting<br />

Page 7<br />

revision. WCH to follow-up. (7/14) WCH will be issuing a revision to this CN by the end of the<br />

week. (7/20) WCH has submitted to DDI. (7/27) No costs per DDI. (8/3)<br />

* WCH returned CN 016 to DDI for corrections and changes. (6/1) No update. (6/8) WCH has<br />

received proposal and is making minor adjustments. (6/22) DDI will resubmit proposal by 7/26.<br />

(7/20) WCH waiting on DDI response to hours needed to change out cable. (7/27) No change.<br />

(8/3)<br />

* WCH is returning CN 007 R. 1 and CN 019 for corrections and changes. (6/8) WCH has<br />

received proposal for CN 007 R. 1 and is reviewing. (6/22) WCH commits to completing review<br />

by 7/19. (7/14) WCH is waiting on proposal from DDI for CN 019. (7/27) WCH has submitted<br />

changes on 7/21 to DDI on CN 007. (8/3)<br />

* WCH has issued CN 026 for the Trench I equipment and materials. (6/22) Discussion about start<br />

of fabrication for Trench I equipment from Jewell. WCH requests DDI confirm that fabrication<br />

started on 7/14. DDI to provide WCH with itemized procurement and delivery schedule for<br />

fabricated equipment. (7/14) DDI waiting on revved contract from Jewell to include the laptop<br />

requirements. When received, the proposal will be resubmitted, anticipate by the end of the<br />

week. (8/3)<br />

o<br />

DDI has not received any information on the Trench I camera specs or equipment<br />

specs for the 400 excavator. They will follow up with the vendor. (5111) Some specs<br />

have been received, but more are needed. Confer with D. Teachout for specifics.<br />

(5/18) WCH is in development of change notice for Trench I work. (5/2 5) No update.<br />

(6/1) DDI is to follow-up ASAP to provide the specs. Trench I operations scheduled<br />

to begin late July/early August. (6/8) WCH discussed concerns (6/15) WCH has<br />

transmitted to DDI CN 026 to provide clamnshell and camera excavation equipment.<br />

(6/22) Proposal to be provided to WCH by close of business this week. (6/29) WCH<br />

has requested a delivery schedule for equipment. DDI will provide drawings/details<br />

for equipment (7/6) DDI provided schedule for equipment fabrication from Jewell.<br />

(7/27)<br />

" DDI has submitted proposal today for CN 012, WCH to review. (7/14) WCH is reviewing<br />

proposal, but still needs the signed Change Notice acknowledgement from DDI. (7/20) NO<br />

update. (7/27) WCH is reviewing. (8/3)<br />

* WCH will be issuing CN 027 to DDI today. (7/27) WCH issued 7/28 to DDI. (8/3).<br />

XIV.<br />

XV.<br />

CORRESPONDENCE (since last meeting)<br />

0 Weekly Progress Review Meeting Minutes of 8/3/2010<br />

IN VOICE AND PAYMENT STATUS<br />

*Discussion of completion incentive by trench. Per the contract DDI has the potential for partial<br />

release of retention. For Trenches D, E, P and G one-half of the retainage may be released when<br />

completed. (7/27) A topographical survey will be required upon completion concurrence from<br />

WCH. (8/3)<br />

*DDI to submit invoice this week for July work.<br />

o As energized as-builts have not yet been received, WCH anticipates additional 15%<br />

withholding from July payment. (7/27) WCH will confirm if any change to retainage percent<br />

by the end of the day. (8/3)


Progress Review Meeting<br />

Page 8<br />

XVI.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* WCH requests a full schedule update from DDI.<br />

* DDI requests meeting next week to again discuss anomaly definition - tentatively scheduled for<br />

8/10 immediately following this week.<br />

Attachment(s): As noted above.


6i<br />

C)<br />

00<br />

C<br />

F 0 C<br />

01<br />

0)) C. P0 C') W-<br />

C) 0) (J<br />

N<br />

CD C)C co 00 CC. (a<br />

0)<br />

m I~<br />

0)0 () 0) ) 0)) CD C. z NN<br />

0)V<br />

E~ N<br />

l<br />

0.<br />

cu<br />

0 0 0 0 0 0 6<br />

. 80 -0<br />

-<br />

0 0d 0 .<br />

z z z 0 0 0 z C 0) CC z (<br />

C Cr<br />

6 4<br />

C)<br />

NC.1 -0) 0). N<br />

CIA)<br />

00 C,<br />

03<br />

_2 _-c -<br />

-~~f ,,O .-<br />

.<br />

00 00 0 00<br />

_ v .) -8 -a)


W4-m<br />

r4<br />

LU =<br />

CL en<br />

E<br />

Ln<br />

0 '<br />

z Ea -<br />

UU,<br />

o o 0 ' n u<br />

ob<br />

T-4<br />

y.4 0..<br />

~E<br />

* E<br />

Co<br />

U.'<br />

w<br />

w<br />

(0U 0 0f<br />

2n UUuUU c "1<br />

EW 000 r C -<br />

C u Cu tn L u w w C<br />

c0 E E E 2C0 1 +1 4_ 4 u 4 u C<br />

00 cO m


Dance Designs Inc.<br />

118-K-1 Burial Ground Remediation Project<br />

PRODUCTION SUMMARY<br />

For Week Ending: Friday, July 30, 2010<br />

TrenI ch<br />

-~ns CaJ per Day, yi~<br />

--- 7/26/2010 7/27/2010 1 7/28/2010 7/29/2010 7/30/2010 -<br />

_____ Monday Tuesday Wednesday Thursday Friday0<br />

E I1 _ _0<br />

F 221 1 _____261<br />

_____ 48<br />

J 171 28, _____ _____ _____ 35<br />

_ _ _ _ _ j 0<br />

K 11 _<br />

L 131 _<br />

_ _32ii_ _ 38<br />

_ _ _ _~~_1j<br />

0_<br />

Trotal Cansi 32 i 31 32 26 _ 0__<br />

121_______


~ 00000 0 00 0) 00<br />

0 0c0l 0<br />

U) LO) C1 N N 04<br />

0C)<br />

G 0 c0 04 0(<br />

04 0'4<br />

I-~ - -4 -<br />

CO<br />

oc<br />

a> C)0 0 00 ) 0 0 0 0 000D C<br />

C, C1 N 04C NCN<br />

N N<br />

( 0 a):4 - - - - !-' Z! ! - C- !Z! Q<br />

0 It0) Oz 0 0 m O(D 0) 0) 0) 0) i C F<br />

4) 040 1 1 4 0 1 N (N Z! Z5Q0<br />

_)<br />

o 04 .<br />

0 Q<br />

cio 0 0 E<br />

W 0 ) VW 0 0 0 .S<br />

a~ LL 00 (00<br />

01 04~ (n: : 0 c c a a<br />

Z- C 0M 000 .(<br />

00 0 C0<br />

C L 0) 01a axC<br />

a) (n0 Z 0 W E0) CD<br />

a) ccC )0z :C<br />

U) ~ a)a U) 0) U) QOZDO C<br />

W) M ~ 4) 0o (D I2U<br />

E n Eoo E 0<br />

Eo a.)~S~<br />

= a D 0 w_ t c<br />

C.) C W<br />

_j (D C ,-C 3:"TY<br />

6 6 w~ co 00 '<br />

z E C%4 C* .c 0 -~g C0 0 0<br />

~~'7~~<br />

o<br />

CN<br />

0<br />

VC 0O q :3 *co om o<br />

5 5o> -700D a C?~ ~ c<br />

co CU~ co~<br />

E ~ ~ ~ ~ C ~ 0 0 e =L~W<br />

- C,*<br />

o o 0:o~ 0:<br />

V 0) co<br />

o 0 cm o 0) 00W :cu2<br />

A0 A -0 ~ , 0<br />

-m<br />

(n ~W W W .C 0<br />

CC<br />

0' ~ 0 ~ C N<br />

=~ .)'3<br />

0 00 0 0 0 0<br />

0 00 0T 0 0 0 00<br />

s 3: inis 3: -, 3:<br />

c) a) (L<br />

4" 0<br />

0)0)0):<br />

a<br />

00 0)00 0 00 : 0 00)0


0 E<br />

E 2E 2<br />

E a-2 0<br />

><br />

Cj C1<br />

a CCCC-<br />

~~~2<br />

C c 2 r o 5<br />

Z~ 2~ Zi C03<br />

Ca CL >l C C- (L Co0N C C<br />

CC2 ~ C - .22 C3<br />

C<br />

as. , 2 ECC<br />

!2 ><br />

C .C~ ~ ~ ' C)'2.<br />

0 . 11 >C C)<br />

zz-<br />

0 0 -<br />

OCO 0 C 0 £0<br />

0 O 2C' O C C<br />

Mz0Of z (nz 0: L ~<br />

U)C C 3C C' C<br />

C0<br />

0<br />

0.~ C) ca<br />

.CC x<br />

CO<br />

0 CC C~ r~ 0 .2 2 < ~ ~ 0 C<br />

C-)) C ZoCC ~ T C<br />

UE l<br />

0 ~ ~ C 3 C 8<br />

- 0C 7,C ~ . -C ~ ><br />

2. U)O C9 CE<br />

C2, 0W.<br />

(CC<br />

C'a'l .U<br />

0 W<br />

CLI X ) EW rR C ' L Co 1 'C Cc C Wj 2 CC-<br />

C<br />

C'<br />

CLZ t±Jgow C - 02 -aW wST .2<br />

0>2o<br />

E-<br />

C<br />

C<br />

'<br />

CC))CC 6 c?0 ) C) c 99<br />

5 Co<br />

t >)' CO 00000 h A 6L 00<br />

U) W 0900 0' ao 0 mm CC<br />

--<br />

0?<br />

1' C<br />

C<br />

z 0 0-


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 152512<br />

EW1--1QJJWEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

August 10, 2010<br />

E. L. Adamson X3-40 D. Bollinger (DDI)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Grist X3-16 R. W. Cross 114-25<br />

T. Dance (DDI) X3-17 R. A. Dodd H4-24<br />

R. Ferguson (DDI) X3-17 C. Flowers (DDI) X3-17<br />

R. T. Hansen H4-17 T. A. Foster N3-30<br />

J. A. Heard H4-17 A. Gagnon X9-08<br />

S. E. Parnell X3-16 R. Ganapathy X3 -40<br />

H. Williams III X3-16 S. J. Huddleston X3-16<br />

W. R. Junkins X3-16<br />

D. G. Saueressig N3 -3 0<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

H. C. Weber (DDD) X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4-1 1<br />

A meeting on the above subject was held on August 10, 2010 at 118-K, MO-755.<br />

1. SAFETY<br />

* Safety topic: School with be starting soon, time to be more aware of related traffic patterns and<br />

activities.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/2010. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 100-K water will be shut-off this weekend. Friday work is pending.<br />

ZAAdministrative Assistant\Project Progress Review Weekly Meetings\2010\August\-1O-O Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/20 10. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 1 9 th' so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 100-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

caics on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/1l) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/25) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pressures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm). (6/1) DDI is<br />

sending a letter to Watts to rework system for increased pressure. (6/8) DDI to submit letter,<br />

request for clarification for intent of water supply. (6/15) No change. (6/22) WCH has not<br />

received letter from DDI about water supply. (6/29) DDI states they send letter on 6/23, but<br />

WCH STR has not received copy. (7/6) WCH received letter 7/12. WCH P'M is following up<br />

with CHPRC before responding to letter. (7/14) WCH PM followed up with the CHPRC Deputy<br />

Fire Marshal about the permit. They hope to have updated information to us by the end of the<br />

week. WCH discussed how using additional percentage of calcium chloride could control dust<br />

and use less water. It was also suggested that DDI look into bringing an additional water tower<br />

on site that could be filled at the start of the day to provide additional water. (7/20) DDI has<br />

submitted WCH suggestions to sub-tier for proposal if there is no increase in water permitted at<br />

the hydrant restrictor. (7/27) DDI has not received a response from WCI on alternative<br />

dust/water suppression chemicals or methods. CHPRC is restricting water on their site. They are<br />

evaluating methods other than the slow fill of the basins (still wells). WCH is concerned that<br />

WCI is allowing projects other than 11 8-K to fill their water trucks from the 118-K tank; it would<br />

appear that there is enough water if more than the 11I8-K project is using the tank. (8/3) WCH to<br />

provide a response to DDI by the end of the week. (8/10)<br />

*DDI and WCH are planning to perform confirmatory sampling on one test pit and two trenches<br />

for 100-K-2 on the day the scale is being replaced - June 18. (6/8) This activity was rescheduled<br />

with new date TBD. (6/22) No change. (6/29) No change. (7/6) This will be tentatively<br />

rescheduled for Friday, July 30 pending support availability. (7/14) DDI expressed beryllium<br />

concerns for this activity. WCH has determined this site to be beryllium free, but this is being re-


Progress Review Meeting<br />

Page 3<br />

evaluated by WCH IH. (7/20) A re-evaluation determined the area to be beryllium free. The,<br />

"Beryllium Free Facility" form has been signed off by WCH III. WCH will evaluate if there is<br />

support available for working on 7/30. (7/27) Work did not occur on 7/30, DDI to request<br />

working Friday, 8/20 when their sampler is available to support this work. (8/3) No update.<br />

* Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This item will remain in these minutes until demobilization as a reminder. (8/10)<br />

* Discussed future start-up plans for Trench N. DDI to present plan for Trench N for WCH<br />

concurrence before the start of intrusive activities. (6/22) No change. (7/6) DDI to schedule a<br />

meeting Monday 7/19 with pertinent DDI and WCH personnel to discuss plan for Trench N.<br />

(7/14) This meeting has been delayed until the week of 7/26 to ensure key DDI personnel are<br />

able to attend. (7/20) Meeting to be scheduled for 7/29 at 1:00. (7/27) DDI is developing work<br />

plan as discussed in meeting. A follow up meeting scheduled for Thursday afternoon at 1:00.<br />

Discussed the status of plans for handling and disposition of known large canisters in Trench K,<br />

DDI to provide details. (6/29) No update. (7/6) This will be included in the discussion to be<br />

scheduled on Monday afternoon, 7/19. (7/14) This meeting has been delayed until the week of<br />

7/26 so key DDI personnel are able to attend. (7/20) This meeting will be rescheduled to the<br />

same time as the Trench N discussion. (7/27) Canisters will be loaded out into single use<br />

containers. This will be included as part of the discussion in Thursday's meeting. (8/3) Meeting<br />

scheduled last week was delayed. Meeting rescheduled to follow delay meeting this afternoon if<br />

the key personnel are available. (8/10)<br />

* DDI is scheduling a 25-ton certification scale test for Kenworth trucks on Tuesday, June 29 at<br />

10:00. A WCH engineer will participate in witnessing the test. (6/22) Test rescheduled to 6/3 0.<br />

DDI working to obtain information from G & H for hoist modifications. (6/29) Test, as<br />

performed, was not successful. DDI is making arrangements for another test, tentatively<br />

scheduled for 7/12/2010. (7/6) A second test was performed without success. DDI is submitting<br />

certifications today for four (4) of the shuttle trucks. (7/14) These include the 22-ton shuttle<br />

trucks. (7/14) DDI has submitted certs, WCH has not received. DDI is planning on bringing an<br />

additional 25-ton truck to the project. (7/20) One Kenworth truck will be removed from the site,<br />

to be replaced by a 25T Peterbilt truck. (7/27) WCH has received submittals and is in review.<br />

Truck will be on-site by the end of this week. (8/3) DDI to submit cert for new Peterbuilt truck<br />

by end of the day. (8/10)<br />

* WCH is still waiting on a procurement schedule for the fabrication items for Trench I. This has<br />

been requested by the FR director. DDI is identifying which type of schedule is needed, is a gantbar<br />

schedule adequate? WCH has requested that DDI include all work to be performed on the 3-<br />

week look-ahead schedule. (7/20) Jewel anticipated to update schedule on a weekly basis.<br />

(7/27) Jewell indicates they are on schedule. DDI will include milestone dates on the schedule<br />

for Trench 1. (8/3) Three-week look ahead scheduled has been updated to include fabrication<br />

milestones as provided by Jewell. (8/10)<br />

o How is DDI tracking the progress of the fabrication of equipment for Trench 1? (7/20) What<br />

are WCH QA plans for reviewing the equipment?<br />

" Whether the equipment is "off-the-shelf 'or "custom" determines the level of<br />

oversight necessary by WCH QA. (7/27) WCH RE is developing a list of tests to be<br />

performed at Jewell's facility prior to delivery. (8/3)<br />

" WCH QA is concerned about the flow down from DDI to sub-tier Jewell. (7/27)<br />

" WCH suggests a visit to sub-tier Jewell next week - tentatively Monday a.m. (7/27)<br />

* On 7/8/20 10 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be


Progress Review Meeting<br />

Page 4<br />

given to DDI today. (8/10)<br />

" WCH asked how DDI is tracking BCL material. No measurement/tracking of BCL material has<br />

been provided to WCH. (7/27) DDI states they are tracking loader buckets and CAT truck loads<br />

on a daily report. They will confirm if it is included in the daily report being provided to WCH.<br />

(8/10)<br />

o<br />

DDI indicated a survey will be completed to measure quantity when the stockpile is<br />

completed. (7/27) DDI indicates this is being tracked. WCH would like to review data; DDI<br />

will include in production report next week. (8/3)<br />

" WCH requests a full schedule update from DDI. (8/3) No update. (8/10)<br />

" DDI requests meeting next week to again discuss anomaly definition - tentatively scheduled for<br />

8/10 immediately following this meeting. (8/3) Meeting to be tentatively scheduled for later<br />

today. (8/10)<br />

I11. PROJECT DESIGN DRAWINGS<br />

*DDI still needs to submit for WCH review as-builts for electrical as well as the energized water<br />

line. (5111) No change. (5/18) No change. (5/25) Electrical drawing modifications have been<br />

discussed between DDI and WCH STR. (6/1) This is a topic of discussion in a meeting on 6/10<br />

between Watts and DDI. (6/8) DDI has additional questions about these as-built requirements.<br />

(6/15) No change. (6/22) WCH has received and is in review. (6/29) DDI has received the<br />

reviewed comments from WCH and is working to get the drawing updated. They commit to<br />

having the drawing resubmitted by 7/21. (7/14) No change. (7/20) The drawing needs to revved<br />

to reflect 15 amp versus 20 amp fuses. (7/27) Fuse has been changed out in accordance with the<br />

drawing. WCH is returning status 1. (8/3)<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

o See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

* No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

* See attached.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

* WCH asks if DDI has any plans to bring on an additional teamster. (8/10)<br />

* Recently WCH observed operators driving water trucks. Per the HSSA contract that is not<br />

allowable. DDI will issue a letter to their sub-tier, WCI concerning this. (8/10)<br />

EQUIPMENT<br />

* See attached.<br />

* Rock truck left the site on 8/2. (8/3) The rock truck is not DOT legal and should not be run on<br />

the road when traveling to and from the site. (8/10)<br />

0 350 excavator will be on site by the end of the week. A bucket that may be utilized on this<br />

machine that is configured for CRATER use is coming from the WCH 100-D project without<br />

required escorting, etc. (8/3) No update, DDI to confirm the ETA of the 350 to the project.<br />

(8/10)<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDT


Progress Review Meeting<br />

Page 5<br />

" None.<br />

* WCH intends to begin working on Trench I silo work packages in early August. Tentative<br />

meeting set for 8/16 to discuss work package for Trench I silos. WCH to confirm with planners<br />

on schedule. (8/3) When the initial work package is developed, craft will be involved in the fine<br />

tuning of the WP. (8/10)<br />

* WCH is testing the use of tungsten silicone mats as shielding/distance barriers for ERDE cans. If<br />

these work as an effective shield, the technical procedure may need to be revised for the use of<br />

them. (8/10)<br />

IX.<br />

MATERIAL<br />

*DDI is planning to begin the process of ordering ecology blocks that will be used in the Trench I<br />

Silo remediation. (7/27) DDI is planning for approximately 150 ecology blocks. (8/3)<br />

0 WCH will be issuing an additional change notice for trench I that will require provision of<br />

means and methods as well as materials such as ecology blocks. (8/10)<br />

X. QUALITY<br />

* The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3. No update (5/4). No update. (5/11)<br />

No update. (5/18) No update. (6/1) No update. (6/8)<br />

o WCH issued SDR (FR-201 0-IF-0092-017) to DDI on 5/24/2010 for shuttle truck<br />

specifications. (5/25) No update. (6/1) No update. (6/8) DDI to provide CAR by 6/24/20 10.<br />

(6/22) WCH received CAR today. (6/29) WCH is in review of the CAR (7/14) WCH QA<br />

would like DDI to update the letter provided in response with current information and dates.<br />

(7/20) DDI to submit letter with updated information on 7/27. (7/27) DDI to provide by 8/4.<br />

(8/3) DDI provided letter to WCH STR with updated information. WCH is in review. (8/10)<br />

* WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCH QA in the near future. (6/29) DDI provided copy of surveillance by WCH QA. This<br />

surveillance will be ongoing this week and next. (7/14) The surveillance will be conducted on<br />

7/22 for this site. (7/20) This surveillance is ongoing to additional sub-tiers, including Jewell.<br />

Results are not anticipated to be positive. There appears to be serious issues with fiowdown of<br />

DDI QA plan to sub tiers. WCH QA is concerned about how the QA plan is being implemented<br />

by sub-tiers, specifically Jewell. These issues are of considerable concern to WCH. (7/27) DDI<br />

and WCH QA to meet to discuss flow downs. (8/3) WCH QA has determined items from Jewell<br />

are "off-the-shelf'.<br />

o WCH QA still has concern about DDI flowdown to WCI. DDI indicated that WCI has<br />

provided letter indicating they intend to work to the DDI QA plan. DDI indicated they have<br />

not assessed WCI to determine that WCI is adhering to the QA plan. (8/10)<br />

XI.<br />

REQUESTS FOR INFORMATION<br />

* DDI will be issuing an RHI for the scheduler position, duties and WCH expectations. No update<br />

(5/4). No update. (5/11) No change. (5/18) Received, WCH in review. (5/25) No update. (6/1)<br />

WCH commits to having a response to DDI no later than 6/15. (6/8) WCH has provided<br />

response letter to DDI outlining expectations. (7/27) DDI is reviewing. (8/3) No update. (8/10)<br />

" DDI to submit REA for 1 00-K-2 confirmatory sampling. (6/22) DDI to submit by 6/30. (6/29)


Progress Review Meeting<br />

Page 6<br />

DDI submitted letter with questions about costs related to analysis of confirmatory sampling<br />

activities. WCH commits to providing a response to DDI by 7/19. (7/14) This will be issued by<br />

WCH will have response to DDI by 7/22. (7/20) WCH sent a letter in response - these costs are<br />

included in Exhibit "D" of the contract. DDI will be submitting a more detailed REA in response<br />

to this letter. (7/27) DDI is reviewing letter with legal counsel. Will follow up to WCH with a<br />

revised request. (8/3)<br />

XII.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

" See attached.<br />

* WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5/il) SDR provided, no update. (5/18) No update. (5/25) No update. (6/8) Water line as-builts<br />

are being marked up for WCH review prior to being submitted. WCH stressed that the as-builts<br />

need to indicate the location of the water lines from hook up at the fence to the high tower. (6/8)<br />

No change. (6/15) No change. (6/22) WCH to provide new drawing number for the as-built<br />

drawing. (6/29) WCH will also provide a CADD base file to DDI for this drawing. (7/6) DDI<br />

has received base CADD file and is in process of updating drawing. They commit to<br />

resubmitting drawing by 7/21. (7/14) DDI is working with their design group to get the drawings<br />

updated, but DDI has had issues with the CADD file, submission bumped to 7/26. (7/20) DDI is<br />

reviewing the cost of drawing; anticipate submittal of drawing by 8/3. (7/2 7) Submittal delivery<br />

has been pushed to 8/12. (8/3) Drawing should be available for DDI review from their sub-tier by<br />

8/18, they will submit to WCH for review no later than 8/23. (8/10)<br />

" WCFI return traffic control drawings to DDI, status 2. DDI will be resubmitting soon<br />

incorporating the WCH comments. DDI to submit this week. Drawings are with North Point for<br />

revision and will be resubmitted upon their return. DDI is well beyond the 30-day resubmission<br />

for updated drawings. WCH will be issuing an SDR regarding this issue. DDI has indicated they<br />

are working on a deficiency letter which will be submitted to Watts for this and several other<br />

deficiencies. (5/11) No update. (5/18) No update. (5/25) WCH received traffic control submittal<br />

6/3 and is in review of same. (6/8) WCH has returned to DDI status 2. (6/22) No change. (6/29)<br />

They commit to resubmitting drawing by 7/21 (7/14). DDI will install signs to match the traffic<br />

control drawing then resubmit. (7/20) Drawing should be available for DDI review from their<br />

sub-tier by 8/18, they will submit to WCH for review no later than 8/23. (8/10)<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

" See attached.<br />

* WCH returned CN 0 16 to DDI for corrections and changes. (6/1) No update. (6/8) WCH has<br />

received proposal and is making minor adjustments. (6/22) DDI will resubmit proposal by 7/26.<br />

(7/20) WCH waiting on DDI response to hours needed to change out cable. (7/27) No change.<br />

(8/3) No change. (8/10)<br />

* WCH is returning CN 007 R. 1 and CN 0 19 for corrections and changes. (6/8) WCH has<br />

received proposal for CN 007 R. 1 and is reviewing. (6/22) WCH commits to completing review<br />

by 7/19. (7/14) WCH is waiting on proposal from DDI for CN 019. (7/27) WCH has submitted<br />

changes on 7/21 to DDI on CN 007. (8/3) No update. (8/10)<br />

* WCH has issued CN 026 for the Trench I equipment and materials. (6/22) Discussion about start<br />

of fabrication for Trench I equipment from Jewell. WCH requests DDI confirm that fabrication<br />

started on 7/14. DDI to provide WCH with itemized procurement and delivery schedule for<br />

fabricated equipment. (7/14) DDI waiting on revved contract from Jewell to include the laptop<br />

requirements. When received, the proposal will be resubmitted, anticipate by the end of the<br />

week. (8/3) No update. (8/10)


Progress Review Meeting<br />

Page 7<br />

o DDI has not received any information on the Trench I camera specs or equipment<br />

specs for the 400 excavator. They will follow up with the vendor. (5/11) Some specs<br />

have been received, but more are needed. Confer with D. Teachout for specifics.<br />

(5/18) WCH is in development of change notice for Trench I work. (5/25) No update.<br />

(6/1) DDI is to follow-up ASAP to provide the specs. Trench I operations scheduled<br />

to begin late July/early August. (6/8) WCH discussed concerns (6/15) WCH has<br />

transmitted to DDI CN 026 to provide clamshell and camera excavation equipment.<br />

(6/22) Proposal to be provided to WCH by close of business this week. (6/29) WCH<br />

has requested a delivery schedule for equipment. DDI will provide drawings/details<br />

for equipment (7/6) DDI provided schedule for equipment fabrication from Jewell.<br />

(7/27)<br />

* DDI has submitted proposal today for CN 012, WCH to review. (7/14) WCH is reviewing<br />

proposal, but still needs the signed Change Notice acknowledgement from DDI. (7/20) No<br />

update. (7/27) WCH is reviewing. (8/3)<br />

" WCH will be issuing CN 027 to DDI today. (7/27) WCH issued to DDI on 7/28. (8/3).<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE (since last meeting)<br />

" Letter from DDI: Response to SDR FR-2010-IF-0382-SDR-015 - UPDATED<br />

" Letter to DDI Response to DDI 2010-089, July 8, 2010 (Delays)<br />

" Weekly Progress Review Meeting Minutes of 8/10/2010<br />

IN VOICE AND PAYMENT STATUS<br />

" DDI requests a copy of Contract Modifications for completed change notices. (8/10)<br />

* DDI inquired about a partial release of retainage from the mobilization pay item. WCH will<br />

evaluate. (8/10)<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* DDI expressed concerns about CRATER operations in the field. CRATER performance is<br />

impacting work in the field. WCH is evaluating CRATER operations and will provide feedback.<br />

" Trench K sampling results were expected back by 8/2. Has WCH received any results yet?<br />

WCH has not received any results but will share with DDI when received.<br />

* DDI will be bringing in lunch tomorrow for the project.<br />

Attachment(s): As noted above.


00<br />

F~ J jCi<br />

00-0 .a o 0 0<br />

I:<br />

- 0 0) 0. C, q C! -0<br />

gi f:s cc; .6<br />

cc o 0<br />

* ~ ~~ C, a~o<br />

*<br />

N N~ ~<br />

00 14<br />

o 1L . 0. -7<br />

CD)<br />

U4!<br />

C). 0 0 0 0 CA 00 , - '-<br />

0 0 0 0 0 00<br />

Co ) n 6) 6-4 L4<br />

oT 7<br />

NdM c', C-4 Cc1 a a<br />

E<br />

L,.<br />

C<br />

I)<br />

0) 0)0 a0)<br />

00 0) 0 0 0 ). 00 1o<br />

g - 0)0<br />

00 00<br />

99 9<br />

oJ 4) w- 4) 8 8u .2u<br />

N 0 N<br />

.6 .4<br />

0 am ml I66<br />

0w<br />

-c - 0 0<br />

0~ ~ 0 ~ 0~<br />

OO(D<br />

E .50)~ LL<br />

~<br />

- - -<br />

,~ 0)<br />

0~~ ~ ro.6oo<br />

Co U) 'O) 0 . C I~<br />

00 N .U<br />

2' 22


00-<br />

4.r<br />

CA<br />

UJ<br />

E<br />

Y<br />

in 0 ><br />

n 4<br />

C 0 - ~ 0<br />

0 W<br />

uo " o~ E-<br />

m - 2 a0 0)<br />

.1 u z 10<br />

o ~~ z mnLQjiu ~ I<br />

L "J<br />

00 w<br />

E 3 't cn-I C"<br />

Ln 01-0 m r-4 w<br />

C<br />

0I 00 N m<br />

E D - nr U . . . 22 :3 :<br />

CL M = -W- F- F- 0 F-F<br />

W n Ln Ln .e - LA<br />

a: F-


Dance Designs Inc.<br />

118-K-i Burial Ground Remediation Project<br />

I ______<br />

PRODUCTION SUMMARY<br />

For Week Ending: Friday, August 6, 2010<br />

T r4 ~ ~ c h _ _ _ _ _<br />

_ _ 8/ /20 0 1 b y T re n c h<br />

_________ 8/2/2010 8/3/20_10 8/4/2010 8/5/2010 8/6/2010 ~______<br />

IMonday<br />

Tuesday Wednesday IThursday Friday _____<br />

F 1 1_ 14 _ _ _ _ _<br />

K L 27146 ___ 24 ___ 97<br />

N i_ _ _ _ _ _1_ _ _ _ _ _0<br />

__ _ 1_ _ __ 30 _<br />

4_ _ _ 35<br />

Total Cans 28 47 1 30 1 42 0 147


Lf 0000 N 0 04<br />

000<br />

00000 0 F~00<br />

Clc<br />

C-0C4''<br />

0<br />

Nc3i. 0 CN<br />

0 0 0 0 0 0o 0 o04<br />

r- Go- --<br />

~<br />

wN (NN (N ( (N cN<br />

U 0 C 0) ) C) C) 0 0 C)<br />

4)( 09 04(N!24!4N (N4 N N .i CN<br />

(3) r- t 00 - 0) co a<br />

- 4)<br />

Z! - 2!<br />

o C U<br />

0 .0 ) )-<br />

(1) (1) (D) a)<br />

C. C: a C -<br />

0. (D (a ) 0 0 Q )<br />

z~ - ~LJ a L( ! ! !<br />

z o~ 04o ~<br />

0 o-~2 0 E~a<br />

CL 00 C 0. (<br />

- m .() U~0 Cl) 0O0) 0 o0 gOv<br />

I> a)00 ~0<br />

0.) E< 0) 2<br />

"<br />

.2<br />

C-<br />

C3<br />

0 0 o 4 -'<br />

05<br />

0 -a02 Z0 L<br />

cc :a A _) zC<br />

n: d:-N( 0 C<br />

)0a<br />

c* O E E ~ g4- .( 0<br />

0 cu<br />

z -<br />

< a) -0<br />

Zo E a: w w: a r- ~ co c<br />

C'4 W-<br />

C? w> C - C:~ 'a z )<br />

c<br />

co ~~ -C'i ~ 8<br />

Cc<br />

2<br />

-E r- 0<br />

!r- 0w I t a) r F aD 0D.)=.<br />

U 5 .0. 3 a : t 0 -<br />

-0 0) 0) Of r- c<br />

0)~~OO)0)00) a) 00)o<br />

;-C<br />

0( 0<br />

0~ ~<br />

U)J A 2<br />

c<br />

-<br />

r-a.u 000n<br />

b (b -aI<br />


0<br />

05 0 E - .<br />

49 a L.<br />

0. E& 3: a ~ 0 00 2<br />

Ox o.0 n> 0 -0 a~<br />

0 C CL C) .0 N T 0 >0<br />

Ca,<br />

03<br />

T0 :<br />

0 Oi rzcc< c iz:<br />

m C<br />

0<br />

~ ~T7<br />

~ o00<br />

8& - )<br />

- 0<br />

10 ZI C4+<br />

Ix-- .<br />

a -<br />

.z<br />

o0 CD 0<br />

0;: 0<br />

0 Vo 0'<br />

0 cc<br />

L0<br />

00<br />

0 0 :7 7- z 0<br />

L<br />

00<br />

oo<br />

CLa<br />

NEz<br />

E.


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 152514<br />

MWIIJI"MWEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach -<br />

August 17, 2010<br />

DISTRIBUTIO<br />

E. L. Adamnson X3-40 D. Bollinger (DDI)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Crist X3-16 R. W. Cross H4-25<br />

T. Dance (DDI) X3-17 C. Flowers (DDI) X3-17<br />

R. A. Dodd H4-24 T. A. Foster N3-30<br />

R. Ferguson (DDI) X3-17 A. Gagnon X9-08<br />

D. G. Saueressig N3-30 R. Ganapathy X3-40<br />

H. Williams III X3-16 R. T. Hansen H14-17<br />

J. A. Heard H14-17<br />

S. J. Huddleston X3-16<br />

W. R. Junkins X3-16<br />

S. E. Parnell X3-16<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

H. C. Weber (DDI) X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4-l11<br />

A meeting on the above subject was held on August 17, 2010 at 118-K, MO-755.<br />

1. SAFETY<br />

* Safety topic: With the end of summer approaching, the weather conditions will potentially<br />

become more volatile. For example, this weekend snow is predicted for Mt. Rainier in the higher<br />

elevations.<br />

IT.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

*PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/2010. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

Z:\Administrative Assistant\Project Progress Review Weekly Meetings\20l0\August\8-17-lO Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 100-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/20 10. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the I 1 9 1h so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 100-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

calcs on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/2 5) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pressures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm.). (6/1) DDI is<br />

sending a letter to Watts to rework system for increased pressure. (6/8) DDI to submit letter,<br />

request for clarification for intent of water supply. (6/15) No change. (6/22) WCH has not<br />

received letter from DDI about water supply. (6/29) DDI states they send letter on 6/23, but<br />

WCH STR has not received copy. (7/6) WCH received letter 7/12. WCH PM is following up<br />

with CHPRC before responding to letter. (7/14) WCH PM followed up with the CHPRC Deputy<br />

Fire Marshal about the permnit. They hope to have updated information to us by the end of the<br />

week. WCH discussed how using additional percentage of calcium chloride could control dust<br />

and use less water. It was also suggested that DDI look into bringing an additional water tower<br />

on site that could be filled at the start of the day to provide additional water. (7/20) DDI has<br />

submitted WCH suggestions to sub-tier for proposal if there is no increase in water permitted at<br />

the hydrant restrictor. (7/27) DDI has not received a response from WCI on alternative<br />

dust/water suppression chemicals or methods. CHPRC is restricting water on their site. They are<br />

evaluating methods other than the slow fill of the basins (still wells). WCH is concerned that<br />

WCI is allowing projects other than 11I8-K to fill their water trucks from the 118-K tank; it would<br />

appear that there is enough water if more than the 11I8-K project is using the tank. (8/3) WCH to<br />

provide a response to DDI by the end of the week. (8/10) WCH pushed issuing a formal<br />

response 8/19. (8/17)<br />

*DDI and WCH are planning to perform confirmatory sampling on one test pit and two trenches<br />

for 100-K-2 on the day the scale is being replaced - June 18. (6/8) This activity was rescheduled


Progress Review Meeting<br />

Page 3<br />

with new date TBD. (6/22) No change. (6/29) No change. (7/6) This will be tentatively<br />

rescheduled for Friday, July 30 pending support availability. (7/14) DDI expressed beryllium<br />

concerns for this activity. WCH has determined this site to be beryllium free, but this is being reevaluated<br />

by WCH 111. (7/20) A re-evaluation determined the area to be beryllium free. The<br />

"Beryllium Free Facility" form has been signed off by WCH 1H. WCH will evaluate if there is<br />

support available for working on 7/30. (7/27) Work did not occur on 7/30, DDI to request<br />

working Friday, 8/20 when their sampler is available to support this work. (8/3) No update.<br />

(8/10) WCH commits to supporting confirmatory sampling and limited CTA maintenance<br />

activities on 8/20. WCH will provide OT approval today. (8/17)<br />

" Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This item will remain in these minutes until demobilization as a reminder. (8/10)<br />

" Discussed future start-up plans for Trench N. DDI to present plan for Trench N for WCH<br />

concurrence before the start of intrusive activities. (6/22) No change. (7/6) DDI to schedule a<br />

meeting Monday 7/19 with pertinent DDI and WCH personnel to discuss plan for Trench N.<br />

(7/14) This meeting has been delayed until the week of 7/26 to ensure key DDI personnel are<br />

able to attend. (7/20) Meeting to be scheduled for 7/29 at 1:00. (7/27) DDI is developing work<br />

plan as discussed in meeting. A follow up meeting scheduled for Thursday afternoon at 1:00.<br />

Discussed the status of plans for handling and disposition of known large canisters in Trench K,<br />

DDI to provide details. (6/29) No update. (7/6) This will be included in the discussion to be<br />

scheduled on Monday afternoon, 7/19. (7/14) This meeting has been delayed until the week of<br />

7/26 so key DDI personnel are able to attend. (7/20) This meeting will be rescheduled to the<br />

same time as the Trench N discussion. (7/27) Canisters will be loaded out into single use<br />

containers. This will be included as part of the discussion in Thursday's meeting. (8/3) Meeting<br />

scheduled last week was delayed. Meeting rescheduled to follow delay meeting this afternoon if<br />

the key personnel are available. (8/10) Meeting to be rescheduled to 1:00 Wednesday 8/18.<br />

(8/17)<br />

" DDI is scheduling a 25-ton certification scale test for Kenworth trucks on Tuesday, June 29 at<br />

10:00. A WCH engineer will participate in witnessing the test. (6/22) Test rescheduled to 6/30.<br />

DDI working to obtain information from G & H for hoist modifications. (6/29) Test, as<br />

performed, was not successful. DDI is making arrangements for another test, tentatively<br />

scheduled for 7/12/2010. (7/6) A second test was performed without success. DDI is submitting<br />

certifications today for four (4) of the shuttle trucks. (7/14) These include the 22-ton shuttle<br />

trucks. (7/14) DDI has submitted certs, WCH has not received. DDI is planning on bringing an<br />

additional 25-ton truck to the project. (7/20) One Kenworth truck will be removed from the site,<br />

to be replaced by a 25T Peterbilt truck. (7/27) WCH has received submittals and is in review.<br />

Truck will be on-site by the end of this week. (8/3) DDI to submit cert for new Peterbuilt truck<br />

by end of the day. (8/10) All certs have been approved by WCH and are being returned status 1.<br />

(8/17)<br />

" On 7/8/2010 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17)<br />

* WCH asked how DDI is tracking BCL material. No measurement/tracking of BCL material has<br />

been provided to WCH. (7/27) DDI states they are tracking loader buckets and CAT truck loads<br />

on a daily report. They will confirm if it is included in the daily report being provided to WCH.<br />

(8/10)<br />

o DDI indicates this is being tracked. WCH would like to review data; DDI will include in


Progress Review Meeting<br />

Page 4<br />

production report next week. (8/3) No update. (8/17)<br />

* WCH requests a full schedule update from DDI. (8/3) No update. (8/10) No update. (8/17)<br />

* DDI requests meeting next week to again discuss anomaly definition - tentatively scheduled for<br />

8/10 immediately following this meeting. (8/3) Meeting to be tentatively scheduled for later<br />

today. (8/10) Meeting scheduled for Wednesday 8/18. (8/17)<br />

* DDI expressed concerns about CRATER operations in the field. CRATER performance is<br />

impacting work in the field. WCH is evaluating CRATER operations and will provide feedback.<br />

(8/10) Additional detailed discussions over CRATER operations after a thorough review by the<br />

WCH CRATER expert. (8/17)<br />

III.<br />

IV.<br />

PROJECT DESIGN DRAWINGS<br />

0 None.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

o See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

" No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

* See attached.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

* WCH asks if DDI has any plans to bring on an additional teamnster. (8/10) DDI indicated there<br />

are no plans to bring on another teamnster. This leaves seven (7) teamsters for 10 trucks. (8/17)<br />

* Recently WCII observed operators driving water trucks. Per the HSSA contract that is not<br />

allowable. DDI will issue a letter to their sub-tier, WCI concerning this. (8/10) DDI has not yet<br />

issued letter. (8/17)<br />

EQUIPMENT<br />

* See attached.<br />

0 350 excavator will be on site by the end of the week. A bucket that may be utilized on this<br />

machine that is configured for CRATER use is coming from the WCH Il00-D project without<br />

required escorting, etc. (8/3) No update, DDI to confirm the ETA of the 350 to the project.<br />

(8/10) The 350 excavator will be on site by the end of the week or first of next week. (8/17)<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

* WCH intends to begin working on Trench I silo work packages in early August. Tentative<br />

meeting set for 8/16 to discuss work package for Trench I silos. WCH to confirm with planners<br />

on schedule. (8/3) When the initial work package is developed, craft will be involved in the fine<br />

tuning of the WP. (8/10) Meeting postponed to Monday, 8/23. (8/17)<br />

" WCH is testing the use of tungsten silicone mats as shielding/distance barriers for ERDF cans. If<br />

these work as an effective shield, the technical procedure may need to be revised for the use of<br />

them. (8/10) WCH will work with planners for any needed revisions relating to the use of<br />

silicone mats. (8/17)


Progress Review Meeting<br />

Page 5<br />

IX.<br />

MATERIAL<br />

*DDI is planning to begin the process of ordering ecology blocks that will be used in the Trench I<br />

Silo remediation. (7/27) DDI is planning for approximately 150 ecology blocks. (8/3)<br />

0 WCH will be issuing an additional change notice for trench I that will require provision of<br />

means and methods as well as materials such as ecology blocks. (8/10)<br />

X. QUALITY<br />

" The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3. No update (5/4). No update. (5/il)<br />

No update. (5/18) No update. (6/1) No update. (6/8)<br />

o<br />

WCH issued SDR (FR-2010-IF-0092-017) to DDI on 5/24/2010 for shuttle truck<br />

specifications. (5/2 5) No update. (6/ 1) No update. (6/8) DDI to provide CAR by 6/24/20 10.<br />

(6/22) WCH received CAR today. (6/29) WCH is in review of the CAR (7/14) WCH QA<br />

would like DDI to update the letter provided in response with current information and dates.<br />

(7/20) DDI to submit letter with updated information on 7/27. (7/27) DDI to provide by 8/4.<br />

(8/3)<br />

o DDI to submit SDR completion response. All items are complete. (8/17)<br />

" WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCH QA in the near future. (6/29) DDI provided copy of surveillance by WCH QA. This<br />

surveillance will be ongoing this week and next. (7/14) The surveillance will be conducted on<br />

7/22 for this site. (7/20) This surveillance is ongoing to additional sub-tiers. Results are not<br />

anticipated to be positive. There appears to be serious issues with flowdown of DDI QA plan to<br />

sub tiers. WCH QA is concerned about how the QA plan is being implemented by sub-tiers.<br />

These issues are of considerable concern to WCH. (7/27) DDI and WCH QA to meet to discuss<br />

flow downs. (8/3) WCH QA will be issuing letter to DDI outlining the details of the<br />

surveillance results.<br />

o WCH QA still has concern about DDI flowdown to WCI. DDI indicated that WCI has<br />

provided letter indicating they intend to work to the DDI QA plan. DDI indicated they have<br />

not assessed WCI to determine that WCI is adhering to the QA plan. (8/10) DDI would like<br />

a response in writing outlining the concerns that WCH QA has that WCI is not working to the<br />

DDI QA program. (8/17)<br />

* WCH is still waiting on a procurement schedule for the fabrication items for Trench I. This has<br />

been requested by the FR director. WCH has requested that DDI include all work to be<br />

performed on the 3-week look-ahead schedule. (7/20) Jewel anticipated updating schedule on a<br />

weekly basis. (7/27) Jewell indicates they are on schedule. DDI will include milestone dates on<br />

the schedule for Trench 1. (8/3) Three-week look ahead scheduled has been updated to include<br />

fabrication milestones as provided by Jewell. (8/10)<br />

o How is DDI tracking the progress of the fabrication of equipment for Trench 1? (7/20)<br />

*WCH RE is developing a list of acceptance criteria to be performed at Jewell's<br />

facility prior to delivery. (8/3)<br />

XI.<br />

REQUESTS FOR INFORMATION<br />

*DDI to submit REA for 1 00-K-2 confirmatory sampling. (6/22) DDI to submit by 6/3 0. (6/29)<br />

DDI submitted letter with questions about costs related to analysis of confirmatory sampling


Progress Review Meeting<br />

Page 6<br />

activities. WCH commits to providing a response to DDI by 7/19. (7/14) This will be issued by<br />

WCH will have response to DDI by 7/22. (7/20) WCH sent a letter in response - these costs are<br />

included in Exhibit "D" of the contract. DDI will be submitting a more detailed REA in response<br />

to this letter. (7/27) DDI is reviewing letter with legal counsel. Will follow up to WCH with a<br />

revised request. (8/3) No change. (8/17)<br />

XII.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

* WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5/11) SDR provided, no update. (5/18) No update. (5/25) No update. (6/8) Water line as-builts<br />

are being marked up for WCH review prior to being submitted. WCH stressed that the as-builts<br />

need to indicate the location of the water lines from hook up at the fence to the high tower. (6/8)<br />

No change. (6/15) No change. (6/22) WCH to provide new drawing number for the as-built<br />

drawing. (6/29) WCH will also provide a CADD base file to DDI for this drawing. (7/6) DDI<br />

has received base CADD file and is in process of updating drawing. They commit to<br />

resubmitting drawing by 7/21. (7/14) DDI is working with their design group to get the drawings<br />

updated, but DDI has had issues with the CADD file, submission bumped to 7/26. (7/20) DDI is<br />

reviewing the cost of drawing; anticipate submittal of drawing by 8/3. (7/27) Submittal delivery<br />

has been pushed to 8/12. (8/3) Drawing should be available for DDI review from their sub-tier by<br />

8/18, they will submit to WCH for review no later than 8/23. (8/10)<br />

* WCH return traffic control drawings to DDI, status 2. DDI will be resubmitting soon<br />

incorporating the WCH comments. DDI to submit this week. Drawings are with North Point for<br />

revision and will be resubmitted upon their return. DDIis well beyond the 30-day resubmission<br />

for updated drawings. WCH will be issuing an SDR regarding this issue. DDI has indicated they<br />

are working on a deficiency letter which will be submitted to Watts for this and several other<br />

deficiencies. (5/11) No update. (5/18) No update. (5/25) WCH received traffic control submittal<br />

6/3 and is in review of same. (6/8) WCH has returned to DDI status 2. (6/22) No change. (6/29)<br />

They commit to resubmitting drawing by 7/21 (7/14). DDI will install signs to match the traffic<br />

control drawing then resubmit. (7/20) Drawing should be available for DDI review from their<br />

sub-tier by 8/18, they will submit to WCH for review no later than 8/23. (8/10)<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

XIV.<br />

XV.<br />

CORRESPONDENCE (since last meeting)<br />

*Weekly Progress Review Meeting Minutes of 8/17/2010<br />

IN VOICE AND PAYMENT STATUS<br />

* DDI requests a copy of Contract Modifications for completed change notices. (8/10) No update.<br />

(8/17)<br />

" DDI inquired about a partial release of retainage from the mobilization pay item. WCH will<br />

evaluate. (8/10) No update. (8/17)


Progress Review Meeting<br />

Page 7<br />

XVI.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

" Discussed provision of recycling reporting. This is a required submittal that in the past was<br />

provided only upon request. WCH EPL now needs to receive this quarterly.<br />

* DDI Quarterly Chemical Inventory submittal due to WCH no later than Tuesday, 9/7.<br />

" DDI requests that as Project Manager, Raymond Ferguson, is leaving the project, WCH please<br />

copy Tamara Dance on all correspondence. DDI does not have any candidates for replacement at<br />

this time.<br />

Attachment(s): As noted above.


co<br />

990<br />

(00<br />

w<br />

CN<br />

. Go 0 CD a) 0) 00<br />

0 ) )0<br />

7E -w<br />

(0(0 (DO 0) ) w<br />

L tLLL L<br />

Of<br />

;e0 -0 0 - 0- 0 0 00 -?12 0 0 0 - 9 ,<br />

0 0<br />

00000<br />

( D<br />

0 0<<br />

0<br />

Aw ZZO O 000<br />

-~ 00 o o 44 z ~ z ,~---.( Z~a<br />

~ (( 0<br />

W ~ ~ C a& c6( A-r-4<br />

.0 a 0<br />

r ) 0..~<br />

0<br />

-o~~L 505. .<br />

C3,~<br />

-o0<br />

a~~~~<br />

5 U ECr<br />

, .~~j<br />

f0 0 ~<br />

V5~0<br />

e 4<br />

0<br />

o50 0.Cc 0 coC<br />

,- ~ . ((<br />

s<br />

E5<br />

0ra<br />

0~~ sc q -<br />

_j r8 8<br />

() 40<br />

c c8~ a c00(<br />

ED-<br />

00000


Dance Designs Inc.<br />

118-K-1 Burial Ground Remediation Project<br />

PRODUCTION SUMMARY<br />

For Week Ending: Friday, August 13, 2010<br />

Trench~<br />

CasprDyyTec<br />

1 8/9/2010 j8/10/2010 8/11/2010 8/12/2010 8/13/2010 ~______<br />

_________ Monday jTuesday Wednesday 1 Thursday Friday ______<br />

D/E/P 1_____ 1 9 10 _ ____ _____ 19<br />

G _ _ _j_ _ _ _ _ _ _ _0<br />

F ______ 16 28 1 19 ______ 63<br />

J/L 40 1_ _<br />

_ _ __ _ __; 19 1 _<br />

_ _ _1 59<br />

N 1_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ j 0<br />

0 0__<br />

Total Can 02 38 45 f 0 148


~0 Q<br />

U)<br />

0 00 00 0)<br />

04i! - - Z!<br />

00 0 0 0<br />

clc~ CD CD1 0 0<br />

(U N !Cj C4 4 0<br />

00 0 0 4<br />

0 0 0 0 0Y 0) 03<br />

4) 04N b<br />

N 04 04 C<br />

oz iz: - iz 00 (C<br />

CM3) 3) 0 3)<br />

CLc<br />

co<br />

0.<br />

U) C!) '3 0~ CD (1) (9 Ci D 09 0) c1<br />

rN-<br />

-E 2L2 :3<br />

.mz0) - x<br />

2 M L c 0 0)<br />

0~~~ c o 0U<br />

0 0 )C.) X z<br />

O ) 0j-<br />

0'3 IL U U) wZ LoM<br />

E E caom t c 0 1. u-<br />

w- VZ (c 3= o 1 cc rr ?;<br />

C - :<br />

C: .0 oEgnc: o o04 00o<br />

LL)<br />

o4id 00.;o 0 -= 2--C<br />

U, :pc~ I' 1= o E<br />

'3)<br />

)<br />

_<br />

U) C 4)- Oi~c<br />

w -- Cc<br />

CL 4) M M ) ca 3)<br />

2<br />

)<br />

(U 0<br />

0 .15 -C 0<br />

-o Lm 0)C O ( C: C4)0<br />

C13 4) ) 0 ) ) ) ) 0 ><br />

0 0 0 0 0c


I<br />

z<br />

0 0~2~0<br />

E~ 0Z'<br />

Uo o, a L o~<br />

0o<br />

o~ Z ~~ ~<br />

a > ~ 0 0 0~~<br />

3: ~ (D0OE . 0~0 OO<br />

0) 0<br />

0<br />

0<br />

0<br />

cc<br />

-<br />

CUZ0 Z<br />

a -<br />

> 0 o o-<br />

r - :c ( -z0 3:<br />

fr 60 z z z z<br />

W M! w fC .<br />

8 ~ 000<br />

00<br />

z<br />

0<br />

Z J_ 0<br />

17, 70<br />

zo 00 P.0 a~~<br />

N ~<br />

0l<br />

FIF


Washington<br />

closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 152515<br />

Mal"Q"MWEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

11111=191"M<br />

Christopher L. Beach<br />

August 24, 20 10<br />

ATEDE<br />

DSTRIBTIO<br />

E. L. Adamson X3-40 D. Bollinger (DDI)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Grist X3-16 R. W. Cross 1-4-25<br />

R. Ferguson (DDI) X3-17 T. Dance (DDI) X3-17<br />

C. Flowers (DDI) X3-17 R. A. Dodd 1H4-24<br />

A. Gagnon X9-08 T. A. Foster N3-30<br />

J. A. Heard H4-17 R. Ganapathy X3-40<br />

S. E.Parnell X3-16 R. T. Hansen 114-17<br />

M. Sherman (DDI) X3-17 S. J. Huddleston X3-16<br />

H. C. Weber (DDI) X3-16 W. R. Junkins X3-16<br />

H. Williams III X3-16 D. G. Saueressig N3-30<br />

D. B. Teachout X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H14-11I<br />

A meeting on the above subject was held on August 24, 2010 at 118-K, MO-755.<br />

1. SAFETY<br />

*Safety topic: As the days are getting shorter, be alert for wildlife crossing the road during<br />

commutes. A deer was hit on the River Road during the Monday morning commute.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

*PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/20 10. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

C:\Docunments and Settings~cbeach\Local Settings\Temporary Internet Files\OLK1O7\8-24-IO Weekly Progressadoc


Progress Review Meeting<br />

Page 2<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 100-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/20 10. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 19 th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 100-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

calcs on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&JD will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/25) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pressures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm). (6/1) DDI is<br />

sending a letter to Watts to rework system for increased pressure. (6/8) DDI to submit letter,<br />

request for clarification for intent of water supply. (6/15) No change. (6/22) WCH has not<br />

received letter from DDI about water supply. (6/29) DDI states they send letter on 6/23, but<br />

WCH STR has not received copy. (7/6) WCH received letter 7/12. WCH PM is following up<br />

with CHPRC before responding to letter. (7/14) WCH PM followed up with the CHPRC Deputy<br />

Fire Marshal about the permit. They hope to have updated information to us by the end of the<br />

week. WCH discussed how using additional percentage of calcium chloride could control dust<br />

and use less water. It was also suggested that DDI look into bringing an additional water tower<br />

on site that could be filled at the start of the day to provide additional water. (7/20) DDI has<br />

submitted WCH suggestions to sub-tier for proposal if there is no increase in water permitted at<br />

the hydrant restrictor. (7/27) DDI has not received a response from WCI on alternative<br />

dust/water suppression chemicals or methods. CHPRC is restricting water on their site. They are<br />

evaluating methods other than the slow fill of the basins (still wells). WCH is concerned that<br />

WCI is allowing projects other than 1 18-K to fill their water trucks from the 11 8-K tank; it would<br />

appear that there is enough water if more than the 118-K project is using the tank. (8/3) WCH to<br />

provide a response to DDI by the end of the week. (8/10) WCH pushed issuing a formal<br />

response 8/19. (8/17) WCH will provide DDI a response letter today. (8/24)<br />

*Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This item will remain in these minutes until demobilization as a reminder. (8/10)


Progress Review Meeting<br />

Page 3<br />

" Discussed future start-up plans for Trench N. DDI to present plan for Trench N for WCH<br />

concurrence before the start of intrusive activities. (6/22) No change. (7/6) DDI to schedule a<br />

meeting Monday 7/19 with pertinent DDI and WCH personnel to discuss plan for Trench N.<br />

(7/14) This meeting has been delayed until the week of 7/26 to ensure key DDI personnel are<br />

able to attend. (7/20) Meeting to be scheduled for 7/29 at 1:00. (7/27) DDI is developing work<br />

plan as discussed in meeting. A follow up meeting scheduled for Thursday afternoon at 1:00.<br />

Discussed the status of plans for handling and disposition of known large canisters in Trench K,<br />

DDI to provide details. (6/29) No update. (7/6) This will be included in the discussion to be<br />

scheduled on Monday afternoon, 7/19. (7/14) This meeting has been delayed until the week of<br />

7/26 so key DDI personnel are able to attend. (7/20) This meeting will be rescheduled to the<br />

same time as the Trench N discussion. (7/27) Canisters will be loaded out into single use<br />

containers. This will be included as part of the discussion in Thursday's meeting. (8/3) Meeting<br />

scheduled last week was delayed. Meeting rescheduled to follow delay meeting this afternoon if<br />

the key personnel are available. (8/10) Meeting to be rescheduled to 1:00 Wednesday 8/18.<br />

(8/17) Meeting rescheduled to Wednesday, 8/25 at 10:00. (8/24)<br />

* On 7/8/2010 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

review. To be scheduled for next week. (8/24)<br />

* WCH asked how DDI is tracking BCL material. No measurement/tracking of BCL material has<br />

been provided to WCH. (7/27) DDI states they are tracking loader buckets and CAT truck loads<br />

on a daily report. They will confirm if it is included in the daily report being provided to WCH.<br />

(8/10) DDI to address adding this to their Daily Report to include project-to-date numbers.<br />

(8/24)<br />

o<br />

DDI indicates this is being tracked. WCH would like to review data; DDI will include in<br />

production report next week. (8/3) No update. (8/17)<br />

* WCH requests a full schedule update from DDI. (8/3) No update. (8/10) No update. (8/17) No<br />

update, but DDI to submit by end of the week. (8/24)<br />

* DDI requests meeting next week to again discuss anomaly definition - tentatively scheduled for<br />

8/10 immediately following this meeting. (8/3) Meeting to be tentatively scheduled for later<br />

today. (8/10) Meeting scheduled for Wednesday 8/18. (8/17) Meeting pushed to another date<br />

TBD. (8/24)<br />

* DDI expressed concerns about CRATER operations in the field. CRATER performance is<br />

impacting work in the field. WCH is evaluating CRATER operations and will provide feedback.<br />

(8/10) Additional detailed discussions over CRATER operations after a thorough review by the<br />

WCH CRATER expert. (8/17) WCH is continuing to evaluate and work through issues. (8/24)<br />

* Discussed provision of recycling reporting. This is a required submittal that in the past was<br />

provided only upon request. WCH EPL now needs to receive this quarterly. (8/17) Discussed<br />

coordinating this submission with the quarterly CID reporting. (8/24)<br />

* DDI Quarterly Chemical Inventory submittal due to WCH no later than Tuesday, 9/7.<br />

" DDI requests that as Project Manager, Raymond Ferguson, is leaving the project, WCH please<br />

copy Tamara Dance on all correspondence. DDI does not have any candidates for replacement at<br />

this time. (8/17) WCH has received and is reviewing resumes for Project Manager and <strong>Site</strong><br />

Safety Officer. (8/24)<br />

Ill.<br />

PROJECT DESIGN DRAWINGS


Progress Review Meeting<br />

Page 4<br />

* Draft in place to be walked down today. (8/24)<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

o See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

* No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

* None provided.<br />

VI.<br />

VII.<br />

VIII.<br />

IX.<br />

MANPOWER<br />

* See attached.<br />

* WCH asks if DDI has any plans to bring on an additional teamster. (8/10) DDI indicated there<br />

are no plans to bring on another teamster. This leaves seven (7) teamsters for 10 trucks. (8/17)<br />

* Recently WCH observed operators driving water trucks. Per the HSSA contract that is not<br />

allowable. DDI will issue a letter to their sub-tier, WCI concerning this. (8/10) DDI has not yet<br />

issued letter. (8/17) No update. (8/24)<br />

EQUIPMENT<br />

* See attached.<br />

* 350 excavator will be on site by the end of the week. A bucket that may be utilized on this<br />

machine that is configured for CRATER use is coming from the WCH 100-D project without<br />

required escorting, etc. (8/3) No update, DDI to confirm the ETA of the 350 to the project.<br />

(8/10) The 350 excavator will be on site by the end of the week or first of next week. (8/17)<br />

* The 225 excavator will be moved to allow for decontamination and will eventually be moved off<br />

site. (8/24)<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

* WCH intends to begin working on Trench I silo work packages in early August. Tentative<br />

meeting set for 8/16 to discuss work package for Trench I silos. WCH to confirm with planners<br />

on schedule. (8/3) When the initial work package is developed, craft will be involved in the fine<br />

tuning of the WP. (8/10) Meeting postponed to Monday, 8/23. (8/17) Meeting moved to<br />

Wednesday 8/25 at 8:00. In the near future a WCH planner will be on site three days a week for<br />

support with work packages and technical procedure needs. (8/24)<br />

MATERIAL<br />

*DDI is planning to begin the process of ordering ecology blocks that will be used in the Trench I<br />

Silo remediation. (7/27) DDI is planning for approximately 150 ecology blocks. (8/3)<br />

0 WCH will be issuing an additional change notice for trench I that will require provision of<br />

means and methods as well as materials such as ecology blocks. (8/10)<br />

X. QUALITY<br />

*The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3. No update (5/4). No update. (5/11)<br />

No update. (5/18) No update. (6/1) No update. (6/8)<br />

o WCH issued SDR (FR-2010-IF-0092-017) to DDI on 5/24/2010 for shuttle truck<br />

specifications. (5/25) No update. (6/1) No update. (6/8) DDI to provide CAR by 6/24/20 10.


Progress Review Meeting<br />

Page 5<br />

(6/22) WCH received CAR today. (6/29) WCH is in review of the CAR (7/14) WCH QA<br />

would like DDI to update the letter provided in response with current information and dates.<br />

(7/20) DDI to submit letter with updated information on 7/27. (7/27) DDI to provide by 8/4.<br />

(8/3)<br />

o DDI to submit SDR completion response. All items are complete. (8/17)<br />

0 WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCH QA in the near future. (6/29) DDI provided copy of surveillance by WCH QA. This<br />

surveillance will be ongoing this week and next. (7/14) The surveillance will be conducted on<br />

7/22 for this site. (7/20) This surveillance is ongoing to additional sub-tiers. Results are not<br />

anticipated to be positive. There appears to be serious issues with flowdown of DDI QA plan to<br />

sub tiers. WCH QA is concerned about how the QA plan is being implemented by sub-tiers.<br />

These issues are of considerable concern to WCH. (7/27) DDI and WCH QA to meet to discuss<br />

flow downs. (8/3) WCH QA will be issuing letter to DDI outlining the details of the<br />

surveillance results.<br />

o WCH QA still has concern about DDI flowdown to WCI. DDI indicated that WCI has<br />

provided letter indicating they intend to work to the DDI QA plan. DDI indicated they have<br />

not assessed WCI to determine that WCI is adhering to the QA plan. (8/10) DDI would like<br />

a Kesponse in writing outlining the concerns that WCH QA has that WCI is not working to the<br />

DDI QA program. (8/17) WCH will be issuing SDR this week to DDI for deficiencies. (FR-<br />

201 0-IF-0664-SDR-023) (8/24)<br />

* WCH is still waiting on a procurement schedule for the fabrication items for Trench I. This has<br />

been requested by the FR director. WCH has requested that DDI include all work to be<br />

performed on the 3-week look-ahead schedule. (7/20) Jewel anticipated updating schedule on a<br />

weekly basis. (7/27) Jewell indicates they are on schedule. DDI will include milestone dates on<br />

the schedule for Trench 1. (8/3) Three-week look ahead scheduled has been updated to include<br />

fabrication milestones as provided by Jewell. (8/10)<br />

o How is DDI tracking the progress of the fabrication of equipment for Trench 1? (7/20)<br />

WCH RE is developing a list of acceptance criteria to be performed at Jewell' s<br />

facility prior to delivery. (8/3) WCH will provide a copy of the acceptance<br />

criteria to DDI. (8/24)<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

*DDI to submit REA for 100-K-2 confirmatory sampling. (6/22) DDI to submit by 6/30. (6/29)<br />

DDI submitted letter with questions about costs related to analysis of confirmatory sampling<br />

activities. WCH commits to providing a response to DDI by 7/19. (7/14) This will be issued by<br />

WCH will have response to DDI by 7/22. (7/20) WCH sent a letter in response - these costs are<br />

included in Exhibit "D" of the contract. DDI will be submitting a more detailed REA in response<br />

to this letter. (7/27) DDI is reviewing letter with legal counsel. Will follow up to WCH with a<br />

revised request. (8/3) No change. (8/17) No change. (8/24)<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

e See attached.<br />

* WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5/11) SDR provided, no update. (5/18) No update. (5/25) No update. (6/8) Water line as-builts


Progress Review Meeting<br />

Page 6<br />

are being marked up for WCH review prior to being submitted. WCH stressed that the as-builts<br />

need to indicate the location of the water lines from hook up at the fence to the high tower. (6/8)<br />

No change. (6/15) No change. (6/22) WCH to provide new drawing number for the as-built<br />

drawing. (6/29) WCH will also provide a CADD base file to DDI for this drawing. (7/6) DDI<br />

has received base CADD file and is in process of updating drawing. They commit to<br />

resubmitting drawing by 7/2 1. (7/14) DDI is working with their design group to get the drawings<br />

updated, but DDI has had issues with the CADD file, submission bumped to 7/26. (7/20) DDI is<br />

reviewing the cost of drawing; anticipate submittal of drawing by 8/3. (7/27) Submittal delivery<br />

has been pushed to 8/12. (8/3) Drawing should be available for DDI review from their sub-tier by<br />

8/18, they will submit to WCH for review no later than 8/23. (8/10) Draft of waterline drawing<br />

will be walked down this afternoon. (8/24)<br />

*WCH return traffic control drawings to DDI, status 2. DDI will be resubmitting soon<br />

incorporating the WCH comments. DDI to submit this week. Drawings are with North.Point for<br />

revision and will be resubmitted upon their return. DDI is well beyond the 30-day resubmission<br />

for updated drawings. WCH will be issuing an SDR regarding this issue. DDI has indicated they<br />

are working on a deficiency letter which will be submitted to Watts for this and several other<br />

deficiencies. (5/11) No update. (5/18) No update. (5/25) WCH received traffic control submittal<br />

6/3 and is in review of same. (6/8) WCH has returned to DDI status 2. (6/22) No change. (6/29)<br />

They commit to resubmitting drawing by 7/21 (7/14). DDI will install signs to match the traffic<br />

control drawing then resubmit. (7/20) Drawing should be available for DDI review from their<br />

sub-tier by 8/18, they will submit to WCH for review no later than 8/23. (8/10)<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

0 See attached.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE (since last meeting)<br />

* Weekly Progress Review Meeting Minutes of 8/17/20 10<br />

IN VOICE AND) PAYMENT STATUS<br />

* DDI requests a copy of Contract Modifications for completed change notices. (8/10) No update.<br />

(8/17) WCH will provide Modification 1 to DDI this week. (8/24)<br />

o DDI inquired about a partial release of retainage from the mobilization pay item. WCH will<br />

evaluate. (8/10) No update. (8/17)<br />

* August accounting month closes Saturday 8/28. (8/24)<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* None.<br />

Attachment(s): As noted above.


CD U)<br />

C')<br />

C50<br />

C4<br />

C/,<br />

U)<br />

0 C<br />

0 - 0q0<br />

rz U) R) ow 4*<br />

-on<br />

u I 6-<br />

00<br />

90 W<br />

u3. ~ -0 0 0 0 0 0 0 0 0 0 - ' o o 0<br />

0 c3 ~ .<br />

co F IF; F9 ~<br />

F F-FFF- ?~<br />

U)I<br />

u. u<br />

w-U) a) F)~ F) F F~ c2 F 2<br />

(U)<br />

Xo 0<br />

;f A<br />

z aa A<br />

C<br />

lb<br />

m<br />

0) c<br />

00 v 00 00 C" C"~ m<br />

w<br />

F- u,)


0~ E<br />

411/<br />

UJ a)<br />

a~ a)<br />

cu 00<br />

oL Lv "0 CLR.. ~<br />

a) 4 a 0 W:<br />

z -<br />

C 0 uu<br />

LUU<br />

E<br />

rn ~~~f rn2 ~<br />

o- o--4 -0 -A-_ Cu -d .d<br />

0 0 u- u - ld cu --Cu<br />

e cd<br />

E En rnu : C<br />

w 0 0 0 o~~


S00 0<br />

0- 04 N N<br />

0<br />

0~ 0) 00<br />

OD<br />

-N00 0 0 0<br />

00<br />

0 0 0 0<br />

CL --- , -t 0<br />

00 _0<br />

zI .0r .2 r Co<br />

0)<br />

0 0 0<br />

0.0 0 Z<br />

E E<br />

0. c _<br />

610 2 N 0<br />

C2 0a - _<br />

LLc% tr I- 2024-<br />

- 00 E 0<br />

C,-F<br />

000<br />

> C) CD<br />

0<br />

00-<br />

CD a) :g: 0 ><br />

0 )<br />

CI~ ) 0 O 0 CO<br />

0 (D ~ 0<br />

cr3 tow cu U<br />

~ 0 C 0 C-<br />

U) :t-0 0<br />

mr<br />

< )L 0 C (D0F t)<br />

E d)9 9 900<br />

00 C 0 0C - Nq<br />

00 0) 01 0<br />

00 oO )c<br />

N


E 0<br />

E . .<br />

flO~ 0<br />

00<br />

~ 0- E ~ 9~ 0. 0 002<br />

0 0 -<br />

00<br />

0I,<br />

0 2<br />

0~a 0000<br />

5'<br />

00 41: 1 L<br />

.k zz KE' = F- - a0<br />

E C ECL<br />

0 c<br />

o. a aE MC<br />

c m 00o<br />

0 8 LT<br />

Z 02 z 0 ~0 0 0 0 0<br />

z<br />

z<br />

0 ch<br />

r


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 152524<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

111120"M Christopher L. Beach ~<br />

August 31, 2010<br />

ATEDE<br />

DISRIBTIO<br />

E. L. Adamson X3-40 D. Bollinger (DDI)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Crist X3-16 R. W. Cross H4-25<br />

T. Dance (DDI) X3-17 R. A. Dodd H4-24<br />

A. Gagnon X9-08 C. Flowers (DDI) X3-17<br />

J. A. Heard 1-4-17 T. A. Foster N3-30<br />

W. R. Junkins, X3-16 R. Ganapathy X3-40<br />

S. E. Parnell X3-16 R. T. Hansen H-4-17<br />

D. G. Saueressig N3-30 S. J. Huddleston X3-16<br />

H. C. Weber (DDI) X3-16 M. Sherman (DDI) X3-17<br />

H. Williams III X3-16 D. B. Teachout X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H-4-1 1<br />

A meeting on the above subject was held on August 31, 2010 at 11 8-K, MO-755.<br />

1. SAFETY<br />

0 Safety topic: When crossing multiple lanes of traffic, proceed cautiously to ensure that the route<br />

is clear across all lanes. There was an accident last night at Steptoe and Gage where someone<br />

crossing two lanes of traffic was "T-boned" by a car that didn't stop.<br />

* If the project completed today without a first aid or injury, they will have completed the latest 90-<br />

day campaign "The Heat is On" successfully.<br />

0 If the project reaches September 7 tlh without an injury, we will have reached the milestone of one<br />

calendar year without an injury. An accomplishment to be celebrated. WCH PSR and PM will be<br />

meeting with Management about celebration options.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

0 PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

Z:\drninistrative Assistant\Project Progress Review Weekly Meetings\2010\August\8-31-lO Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

approvals are with the CHPRC 100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CIIPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permnits scheduled to be complete by 1/14/2010. Still waiting on permits from CI-PRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 100-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/20 10. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 19th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 100-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

calcs on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/25) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pressures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm). (6/1) DDI is<br />

sending a letter to Watts to rework system for increased pressure. (6/8) DDI to submit letter,<br />

request for clarification for intent of water supply. (6/15) No change. (6/22) WCH has not<br />

received letter from DDI about water supply. (6/29) DDI states they send letter on 6/23, but<br />

WCH STR has not received copy. (7/6) WCH received letter 7/12. WCH PM is following up<br />

with CHPRC before responding to letter. (7/14) WCH PM followed up with the CHPRC Deputy<br />

Fire Marshal about the permit. They hope to have updated information to us by the end of the<br />

week. WCH discussed how using additional percentage of calcium chloride could control dust<br />

and use less water. It was also suggested that DDI look into bringing an additional water tower<br />

on site that could be filled at the start of the day to provide additional water. (7/20) DDI has<br />

submitted WCH suggestions to sub-tier for proposal if there is no increase in water permitted at<br />

the hydrant restrictor. (7/27) DDI has not received a response from WCI on alternative<br />

dust/water suppression chemicals or methods. CHPRC is restricting water on their site. They are


Progress Review Meeting<br />

Page 3<br />

evaluating methods other than the slow fill of the basins (still wells). WCH is concerned that<br />

WCI is allowing projects other than 118-K to fill their water trucks from the 118-K tank; it would<br />

appear that there is enough water if more than the 118-K project is using the tank. (8/3) WCH to<br />

provide a response to DDI by the end of the week. (8/10) WCH pushed issuing a formal<br />

response 8/19. (8/17) WCH will provide DDI a response letter today. (8/24) DDI has received<br />

the WCH response letter dated 8/24 and is issuing an SDR to their sub-tier. They are also looking<br />

at alternatives that WCH has previously suggested. (8/3 1)<br />

" Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This item will remain in these minutes until demobilization as a reminder. (8/10)<br />

* Discussed future start-up plans for Trench N. DDI to present plan for Trench N for WCH<br />

concurrence before the start of intrusive activities. (6/22) No change. (7/6) DDI to schedule a<br />

meeting Monday 7/19 with pertinent DDI and WCI- personnel to discuss plan for Trench N.<br />

(7/14) This meeting has been delayed until the week of 7/26 to ensure key DDI personnel are<br />

able to attend. (7/20) Meeting to be scheduled for 7/29 at 1:00. (7/27) DDI is developing work<br />

plan as discussed in meeting. A follow up meeting scheduled for Thursday afternoon at 1:00.<br />

Discussed the status of plans for handling and disposition of known large canisters in Trench K,<br />

DDI to provide details. (6/29) No update. (7/6) This will be included in the discussion to be<br />

scheduled on Monday afternoon, 7/19. (7/14) This meeting has been delayed until the week of<br />

7/26 so key DDI personnel are able to attend. (7/20) This meeting will be rescheduled to the<br />

same time as the Trench N discussion. (7/27) Canisters will be loaded out into single use<br />

containers. This will be included as part of the discussion in Thursday's meeting. (8/3) Meeting<br />

scheduled last week was delayed. Meeting rescheduled to follow delay meeting this afternoon if<br />

the key personnel are available. (8/10) Meeting to be rescheduled to 1:00 Wednesday 8/18.<br />

(8/17) Meeting rescheduled to Wednesday, 8/25 at 10:00. (8/24) At this time, Trench N will be<br />

remediated like all the other trenches to date. WCH has concerns that are related to soil fixative<br />

use while working in Trench N. A meeting will be held later today to discuss particulars. (8/3 1)<br />

* On 7/8/2010 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

review. To be scheduled for next week. (8/24) DDI to provide a letter response. Meeting<br />

rescheduled for Wednesday 9/1. (8/3 1)<br />

* WCH asked how DDI is tracking BCL material. No measurement/tracking of BCL material has<br />

been provided to WCH. (7/27) DDI states they are tracking loader buckets and CAT truck loads<br />

on a daily report. They will confirm if it is included in the daily report being provided to WCH.<br />

(8/10) DDI to address adding this to their Daily Report to include project-to-date numbers.<br />

(8/24) DDI is in the process of getting cumulative numbers and will provide to WCH today.<br />

(8/31)<br />

o<br />

DDI indicates this is being tracked. WCH would like to review data; DDI will include in<br />

production report next week. (8/3) No update. (8/17)<br />

* WCH requests a full schedule update from DDI. (8/3) No update. (8/10) No update. (8/17) No<br />

update, but DDI to submit by end of the week. (8/24) DDI has provided status schedule to WCH<br />

for review. (8/3 1)<br />

" DDI requests meeting next week to again discuss anomaly definition - tentatively scheduled for<br />

8/10 immediately following this meeting. (8/3) Meeting to be tentatively scheduled for later<br />

today. (8/10) Meeting scheduled for Wednesday 8/18. (8/17) Meeting pushed to another date<br />

TBD. (8/24) Meeting rescheduled to Wednesday afternoon. (8/3 1)


Progress Review Meeting<br />

Page 4<br />

" DDI expressed concerns about CRATER operations in the field. CRATER performance is<br />

impacting work in the field. WCH is evaluating CRATER operations and will provide feedback.<br />

(8/10) Additional detailed discussions over CRATER operations after a thorough review by the<br />

WCH CRATER expert. (8/17) WCH is continuing to evaluate and work through issues. (8/24)<br />

* Discussed provision of recycling reporting. This is a required submittal that in the past was<br />

provided only upon request. WCH EPL now needs to receive this quarterly. (8/17) Discussed<br />

coordinating this submission with the quarterly CID reporting. (8/24) WCH EPL commits to<br />

providing a format for the recycling reporting. (8/3 1)<br />

* DDI Quarterly Chemical Inventory submittal due to WCH no later than Tuesday, 9/7. (8/24) On<br />

target for submission. (8/3 1)<br />

" DDI requests that as Project Manager, Raymond Ferguson, is leaving the project, WCH please<br />

copy Tamara Dance on all correspondence. DDL does not have any candidates for replacement at<br />

this time. (8/17) WCH has received and is reviewing resumes for Project Manager and <strong>Site</strong><br />

Safety Officer. (8/24) WCH has relayed to DDI its denial of the candidate provided as PM.<br />

WCH is in receipt of and has responded to the objection raised by DDI as a result of that denial.<br />

DDI indicated they have submitted an additional letter asking for another review of this<br />

candidate, WCH is in review of same. (8/3 1)<br />

o DDI indicated that their HSO will be leaving the project on 9/9. The replacement for that<br />

position will be starting on 9/13.<br />

111. PROJECT DESIGN DRAWINGS<br />

*Waterline drawing draft in place to be walked down today. (8/24) DDI would still like<br />

walkdown prior to final submission. (8/3 1)<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

o See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

* No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

* See attached.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

" WCH asks if DDI has any plans to bring on an additional teamster. (8/10) DDI indicated there<br />

are no plans to bring on another teamster. This leaves seven (7) teamsters for 10 trucks. (8/17)<br />

DDI brought on another teamster this week. (8/3 1)<br />

" Recently WCH observed operators driving water trucks. Per the HSSA contract that is not<br />

allowable. DDI will issue a letter to their sub-tier, WCI concerning this. (8/10) DDI has not yet<br />

issued letter. (8/17) No update. (8/24)<br />

EQUIPMENT<br />

* See attached.<br />

* The 225 excavator will be moved to allow for decontamination and will eventually be moved off<br />

site. (8/24)<br />

" DDI to confirm if shuttle truck #864 left the site last week. (8/3 1)<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI


Progress Review Meeting<br />

Page 5<br />

*WCH intends to begin working on Trench I silo work packages in early August. Tentative<br />

meeting set for 8/16 to discuss work package for Trench I silos. WCH to confirm with planners<br />

on schedule. (8/3) When the initial work package is developed, craft will be involved in the fine<br />

tuning of the WP. (8/10) Meeting postponed to Monday, 8/23. (8/17) Meeting moved to<br />

Wednesday 8/25 at 8:00. In the near future a WCH planner will be on site three days a week for<br />

support with work packages and technical procedure needs. (8/24) Informal review of existing<br />

work packages has begun by WCH Planners. WCH will involve DDI field personnel as the work<br />

draws closer. (8/3 1)<br />

IX.<br />

MATERIAL<br />

*DDI is planning to begin the process of ordering ecology blocks that will be used in the Trench I<br />

Silo remediation. (7/27) DDI is planning for approximately 150 ecology blocks. (8/3)<br />

0 WCH will be issuing an additional change notice for trench I that will require provision of<br />

means and methods as well as materials such as ecology blocks. (8/10) DDI should plan for<br />

draft specification from WCH by the end of the week. (8/3 1)<br />

X. QUALITY<br />

* The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3. No update (5/4). No update. (5/11)<br />

No update. (5/18) No update. (6/ 1) No update. (6/8)<br />

o<br />

WCH issued SDR (FR-2010-IE-0092-017) to DDI on 5/24/2010 for shuttle truck<br />

specifications. (5/25) No update. (6/1) No update. (6/8) DDI to provide CAR by 6/24/2010.<br />

(6/22) WCH received CAR today. (6/29) WCH is in review of the CAR (7/14) WCH QA<br />

would like DDI to update the letter provided in response with current information and dates.<br />

(7/20) DDI to submit letter with updated information on 7/27. (7/27) DDI to provide by 8/4.<br />

(8/3)<br />

" DDI to submit SDR completion response. All items are complete. (8/17) DDI to resubmit<br />

copy of the response letter for final disposition of the SDR. (8/3 1)<br />

* WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCH QA in the near future. (6/29) DDI provided copy of surveillance by WCH QA. This<br />

surveillance will be ongoing this week and next. (7/14) The surveillance will be conducted on<br />

7/22 for this site. (7/20) This surveillance is ongoing to additional sub-tiers. Results are not<br />

anticipated to be positive. There appears to be serious issues with flowdown of DDI QA plan to<br />

sub tiers. WCH QA is concerned about how the QA plan is being implemented by sub-tiers.<br />

These issues are of considerable concern to WCH. (7/27) DDI and WCH QA to meet to discuss<br />

flow downs. (8/3) WCH QA will be issuing letter to DDI outlining the details of the<br />

surveillance results.<br />

o WCH QA still has concemn about DDI flowdown to WCI. DDI indicated that WCI has<br />

provided letter indicating they intend to work to the DDI QA plan. DDI indicated they have<br />

not assessed WCI to determine that WCI is adhering to the QA plan. (8/10) DDI would like<br />

a response in writing outlining the concerns that WCH QA has that WCI is not working to the<br />

DDI QA program. (8/17) WCH will be issuing SDR this week to DDI for deficiencies. (FR-<br />

2010-IF-0664-SDR-023) (8/24) DDI has received the SDR and indicated they will address<br />

issues. (8/3 1)


Progress Review Meeting<br />

Page 6<br />

XI.<br />

XII.<br />

XIII.<br />

XIV.<br />

XV.<br />

REQUESTS FOR INFORMATION<br />

0 None.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

* WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5/11) SDR provided, no update. (5/18) No update. (5/25) No update. (6/8) Water line as-builts<br />

are being marked up for WCH review prior to being submitted. WCH stressed that the as-builts<br />

need to indicate the location of the water lines from hook up at the fence to the high tower. (6/8)<br />

No change. (6/15) No change. (6/22) WCH to provide new drawing number for the as-built<br />

drawing. (6/29) WCH will also provide a CADD base file to DDI for this drawing. (7/6) DDI<br />

has received base CADD file and is in process of updating drawing. They commit to<br />

resubmitting drawing by 7/21. (7/14) DDI is working with their design group to get the drawings<br />

updated, but DDI has had issues with the CADD file, submission bumped to 7/26. (7/20) DDI is<br />

reviewing the cost of drawing; anticipate submittal of drawing by 8/3. (7/27) Submittal delivery<br />

has been pushed to 8/12. (8/3) Drawing should be available for DDI review from their sub-tier by<br />

8/18, they will submit to WCH for review no later than 8/23. (8/10) Draft of waterline drawing<br />

will be walked down this afternoon. (8/24) Continuing. (8/3 1)<br />

* WCH return traffic control drawings to DDI, status 2. DDI will be resubmitting soon<br />

incorporating the WCH comments. DDI to submit this week. Drawings are with North Point for<br />

revision and will be resubmitted upon their return. DDI is well beyond the 30-day resubmission<br />

for updated drawings. WCH will be issuing an SDR regarding this issue. DDI has indicated they<br />

are working on a deficiency letter which will be submitted to Watts for this and several other<br />

deficiencies. (5/11) No update. (5/18) No update. (5/25) WCH received traffic control submittal<br />

6/3 and is in review of same. (6/8) WCH has returned to DDI status 2. (6/22) No change. (6/29)<br />

They commit to resubmitting drawing by 7/21 (7/14). DDI will install signs to match the traffic<br />

control drawing then resubmit. (7/20) Drawing should be available for DDI review from their<br />

sub-tier by 8/18, they will submit to WCH for review no later than 8/23. (8/10) WCH is in<br />

review of submitted drawing. (8/3 1)<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

0 See attached.<br />

CORRESPONDENCE (since last meeting)<br />

* Weekly Progress Review Meeting Minutes of 8/24/2010<br />

* Letter from DDI: Project Manager Replacement<br />

* Letter from DDI: Key Personnel Position - Project Manager<br />

" Letter from DDI: Update of Activities Performed Under the Corrective Action Response as of<br />

August 17, 2010 (SDR FR-20 10-IF-0092-SDR-0 17)<br />

* E-mail to DDI: Acceptance of two HSO; Rejection of PM candidate<br />

* Letter to DDI: Issuance of SDR-023<br />

* Letter to DDI: Response to DDI Letter 20 10-102 re: Project Manager Replacement<br />

INVOICE AND PAYMENT STATUS<br />

*DDI requests a copy of Contract Modifications for completed change notices. (8/10) No update.<br />

(8/17) WCH will provide Modification 1 to DDI this week. (8/24) WCH SA indicates that<br />

Modification is awaiting attachments and should be issued to DDI no later than 9/1. (8/3 1)


Progress Review Meeting<br />

Page 7<br />

* DDI inquired about a partial release of retainage from the mobilization pay item. WCH will<br />

evaluate. (8/10) No update. (8/17)<br />

* DDI to submit billing for August today. (8/3 1)<br />

XVI.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* Discussed need for meeting with WCH and DDI key field personnel regarding start and stopping<br />

times in the field.<br />

* DDI should begin looking at what needs to be done to tighten up the Survey Tent for the<br />

upcoming cold weather. WCH suggests that DDI review their Cold Weather Plan as most of the<br />

items need to be either complete or in place by November 1.<br />

Attachment(s): As noted above.


0 C T 0 zI*<br />

ci<br />

co<br />

C5<br />

-- -- - - -- - - - - -<br />

00<br />

0 020<br />

21<br />

006-<br />

0 0 0<br />

CD~--- -n 0 0<br />

Ai 0<br />

FE 0C0&0 3 &D Nwd W3 a C? .. 0<br />

0 C<br />

< <<br />

U' ,' U 0 0 00C4 2L<br />

00~~~t 0 0 00 0 00 000<br />

- z )KI 02<br />

INI LLw<br />

Ow 000<br />

- . .<br />

fn<br />

03 0 0 0 0a~0 E 02 0<br />

7, 41:.2 O<br />

tu -5 -8m n<br />

~ .5 .5 .5 .it<br />

0 0<br />

~~0 3 8a USf 0<br />

C3 CD (D<br />

IU 0 C" 04 C) -0<br />

C',<br />

~ 4<br />

m<br />

00~~t 808 Z Z~ Z~ Z~'0-<br />

00~ ~ ~~ u2 w~ ~ lw~0<br />

0 '<br />

Lu -z


Dance Designs Inc.<br />

118-K-1 Burial Ground Remediation Project<br />

PRODUCTION SUMMARY<br />

For Week Ending: Friday, August 27, 2010<br />

Trench- - ~ Can Total-<br />

____ _ __ __ ___ ___ ___ __ _ ___ __ ___ by rench-,<br />

______8/23/0210 8/24/2010 8/25/2010 1 8/26/2010 8/27/2010 1______<br />

____ Monday Tusa Wdedy! Thursday Friday-<br />

D/E/P; 6 ____ _____ _ _ __6<br />

G __ _0<br />

F 17 32 _____ 10 ______59<br />

ilL27 __ _ _ _ 35 _ _ _ _ _ _ _ __62<br />

K ______ 13 4 . 11 ______28<br />

M<br />

0e<br />

0 __ __ _ _ __ _0<br />

Total Cans 44 51 39 23 0 157


0 1N E<br />

Lu<br />

E<br />

- U<br />

E<br />

T<br />

'I 04 >i0<br />

-0 C U<br />

L a)<br />

00 0<br />

z m<br />

w-<br />

mmr.<br />

C) it U U L. L<br />

Cr E E Li 4- 4<br />

4-1<br />

a) cu<br />

L


4)<br />

04<br />

C) 0 )<br />

i<br />

a)<br />

000<br />

U) 0 Eo<br />

>- I a-4<br />

o<br />

.2 0<br />

0E<br />

Z o :3<br />

cO<br />

o 00<br />

0: o<br />

CU<br />

~a)-a)<br />

en<br />

00<br />

(a o L0<br />

a)<br />

U) mc'<br />

C> C 0


04. .2<br />

o 2:<br />

~ ~ ~ 0<br />

-* . - - 2- LL-<br />

CL M a aa) .- o- ,<br />

03<br />

0 gn a I<br />

0mn N n<br />

oc<br />

COj* 13 0 c ,- .0<br />

C3 4) 4)<br />

v 00 0<br />

0- 0 80 0 [0<br />

O<br />

zLL co) z z Co<br />

7zzU<br />

0 Q I<br />

0 ID NIt<br />

32<br />

j


WCH closure<br />

Washington<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 152525<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

September 7, 2010<br />

E. L. Adamson X3-40 D. Bollinger (DDI)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Grist X3-16 R. W. Cross H4-25<br />

T. Dance (DDI) X3-17 R. A. Dodd H4-24<br />

A. Gagnon X9-08 C. Flowers (DDI) X3-17<br />

J. A. Heard H4-17 T. A. Foster N3-30<br />

W. R. Junkins X3-16 R. Ganapathy X3-40<br />

H. C. Weber (DDI) X3-16 R. T. Hansen. H4-17<br />

H. Williams III X3-16 S. J. Huddleston X3-16<br />

S. E. Parnell X3-16<br />

D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-1 6<br />

Records and Document Control H441 I<br />

A meeting on the above subject was held on September 7, 2010 at 11 8-K, MQ-755.<br />

I. SAFETY<br />

a Safety topic: It is getting time to begin thinking about fall and winter maintenance items to<br />

prepare for the colder weather.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

0 PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with.the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/2010. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 100-K water will be shut-off this weekend. Friday work is pending.<br />

Z:\Administrative Assistant\Project Progress Review Weekly Meetings\20l0\SeptembeW-07-lO<br />

Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

Further discussed backilow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 19th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 100-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

calcs on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of ptump to increase pressure. (5/25) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pressures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm). (6/1) DDI is<br />

sending a letter to Watts to rework system for increased pressure. (6/8) DDI to submit letter,<br />

request for clarification for intent of water supply. (6/15) No change. (6/22) WCH has not<br />

received letter from DDI about water supply. (6/29) DDI states they send letter on 6/23, but<br />

WCH STR has not received copy. (7/6) WCH received letter 7/12. WCH PM is following up<br />

with CLIPRC before responding to letter. (7/14) WCH PM followed up with the CHPRC Deputy<br />

Fire Marshal about the permit. They hope to have updated information to us by the end of the<br />

week. WCH discussed how using additional percentage of calcium chloride could control dust<br />

and use less water. It was also suggested that DDI look into bringing an additional water tower<br />

on site that could be filled at the start of the day to provide additional water. (7/20) DDI has<br />

submitted WCH suggestions to sub-tier for proposal if there is no increase in water permitted at<br />

the hydrant restrictor. (7/27) DDI has not received a response from WCI on alternative<br />

dust/water suppression chemicals or methods. CITPRC is restricting water on their site. They are<br />

evaluating methods other than the slow fill of the basins (still wells). WCH is concerned that<br />

WCI is allowing projects other than 11I8-K to fill their water trucks from the 11 8-K tank; it would<br />

appear that there is enough water if more than the 11I8-K project is using the tank. (8/3) WCH to<br />

provide a response to DDI by the end of the week. (8/10) WCH pushed issuing a formal<br />

response 8/19. (8/17) WCH will provide DDI a response letter today. (8/24) DDI has received<br />

the WCH response letter dated 8/24 and is issuing an SDR to their sub-tier. They are also looking<br />

at alternatives that WCH has previously suggested. (8/3 1) DDI anticipates submitting the asbuilt<br />

drawings no later than 9/8. (9/7)<br />

.Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.


Progress Review Meeting<br />

Page 3<br />

(8/3) This itemn will remain in these minutes until demobilization as a reminder. (8/10)<br />

"On 7/8/2010 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

review. To be scheduled for next week. (8/24) DDI to provide a letter response. Meeting<br />

rescheduled for Wednesday 9/1. (8/3 1) Meeting held last week, scheduling will continue as<br />

needed. (9/7)<br />

" WCH asked how DDI is tracking BCL material. No measurement/tracking of BCL material has<br />

been provided to WCH. (7/27) DDI states they are tracking loader buckets and CAT truck loads<br />

on a daily report. They will confirm if it is included in the daily report being provided to WCH.<br />

(8/10) DDI to address adding this to their Daily Report to include project-to-date numbers.<br />

(8/24) DDI is in the process of getting cumulative numbers and will provide to WCH today.<br />

(8/3 1)<br />

o<br />

DDI indicates this is being tracked. WCH would like to review data; DDI will include in<br />

production report next week. (8/3) No update. (8/17) DDI is now including this information<br />

in the daily reports provided to WCH. BCL amounts will also be added to the monthly<br />

invoice. (9/7)<br />

" WCH requests a full schedule update from DDI. (8/3) No update. (8/10) No update. (8/17) No<br />

update, but DDI to submit by end of the week. (8/24) DDI has provided status schedule to WCH<br />

for review. (8/31) WCH PC is reviewing and working with DDI scheduler on details. (9/7)<br />

* DDI requests meeting next week to again discuss anomaly definition - tentatively scheduled for<br />

8/10 immediately following this meeting. (8/3) Meeting to be tentatively scheduled for later<br />

today. (8/10) Meeting scheduled for Wednesday 8/18. (8/17) Meeting pushed to another date<br />

TBD. (8/24) Meeting rescheduled to Wednesday afternoon. (8/3 1) Rescheduled to Wednesday<br />

this week. (9/7)<br />

* DDI requests that as Project Manager, Raymond Ferguson, is leaving the project, WCH please<br />

copy Tarnara Dance on all correspondence. DDI does not have any candidates for replacement at<br />

this time. (8/17) WCH has received and is reviewing resumes for Project Manager and <strong>Site</strong><br />

Safety Officer. (8/24) WCH has relayed to DDI its denial of the candidate provided as PM.<br />

WCH is in receipt of and has responded to the objection raised by DDI as a result of that denial.<br />

DDI indicated they have submitted an additional letter asking for another review of this<br />

candidate, WCH is in review of same. (8/31) DDI is contesting the WCH rejection of their PM<br />

candidate. DDI plans to bring on-site a Program Manager to stand in as Project Manager. (9/7)<br />

o<br />

DDI indicated that their HSO will be leaving the project on 9/9. The replacement for that<br />

position will be starting on 9/13.<br />

* Discussed need for meeting with WCH and DDI key field personnel regarding start and stopping<br />

times in the field. (8/3 1) Meeting for this discussion will be held this week. (9/7)<br />

111. PROJECT DESIGN DRAWINGS<br />

*Waterline drawing draft in place to be walked down today. (8/24) DDI would still like<br />

walkdown prior to final submission. (8/3 1) DDI looks to submit by 9/8. (9/7)<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

o See attached.<br />

V. WEEKLY PRODUCTION TABLE


Progress Review Meeting<br />

Page 4<br />

" No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

" See attached.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

" Recently WCH observed operators driving water trucks. Per the HSSA contract that is not<br />

allowable. DDI will issue a letter to their sub-tier, WCI concerning this. (8/10) DDI has not yet<br />

issued letter. (8/17) No update. (8/24)<br />

* A new laborer has been hired as a gate guard. (9/7)<br />

EQUIPMENT<br />

" See attached.<br />

" The 225 excavator will be moved to allow for decontamination and will eventually be moved off<br />

site. (8/24) This is in process. (9/7)<br />

" The 400 excavator will be decontaminated when the 450 excavator arrives on site. (9/7)<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

" None.<br />

* WCH intends to begin working on Trench I silo work packages in early August. Tentative<br />

meeting set for 8/16 to discuss work package for Trench I silos. WCH to confirm with planners<br />

on schedule. (8/3) When the initial work package is developed, craft will be involved in the fine<br />

tuning of the WP. (8/10) Meeting postponed to Monday, 8/23. (8/17) Meeting moved to<br />

Wednesday 8/25 at 8:00. In the near future a WCH planner will be on site three days a week for<br />

support with work packages and technical procedure needs. (8/24) Informal review of existing<br />

work packages has begun by WCH Planners. WCH will involve DDI field personnel as the work<br />

draws closer. (8/3 1) Ongoing. (9/7)<br />

IX.<br />

MATERIAL<br />

*DDI is planning to begin the process of ordering ecology blocks that will be used in the Trench I<br />

Silo remnediation. (7/27) DDI is planning for approximately 150 ecology blocks. (8/3)<br />

0 WCH will be issuing an additional change notice for trench I that will require provision of<br />

means and methods as well as materials such as ecology blocks. (8/10) DDI should plan for<br />

draft specification from WCH by the end of the week. (8/3 1) WCH still waiting on<br />

specifications from Design Engineering group to finalize issuing change notice for remainder<br />

of Trench I changes.<br />

X. QUALITY<br />

*WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determnine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCH QA in the near future. (6/29) DDI provided copy of surveillance by WCH QA. This<br />

surveillance will be ongoing this week and next. (7/14) The surveillance will be conducted on<br />

7/22 for this site. (7/20) This surveillance is ongoing to additional sub-tiers. Results are not<br />

anticipated to be positive. There appears to be serious issues with flowdown of DDI QA plan to<br />

sub tiers. WCH QA is concerned about how the QA plan is being implemented by sub-tiers.


Progress Review Meeting<br />

Page 5<br />

These issues are of considerable concern to WCH. (7/27) DDI and WCH QA to meet to discuss<br />

flow downs. (8/3) WCH QA will be issuing letter to DDI outlining the details of the<br />

surveillance results.<br />

o WCH QA still has concern about DDI flowdown to WCI. DDI indicated that WCI has<br />

provided letter indicating they intend to work to the DDI QA plan. DDI indicated they have<br />

not assessed WCI to determine that WCI is adhering to the QA plan. (8/10) DDI would like<br />

a response in writing outlining the concerns that WCH QA has that WCI is not working to the<br />

DDI QA program. (8/17) WCH will be issuing SDR this week to DDI for deficiencies. (FR-<br />

2010-IF-0664-SDR-023) (8/24) DDI has received the SDR and indicated they will address<br />

issues. (8/31) DDI will be submitting QA Program rewrite this week. (9/7)<br />

XI.<br />

XII.<br />

XIII.<br />

XIV.<br />

REQUESTS FOR INFORMATION<br />

*DDI requests status of response/determination o contested PM proposal. WCH to provide formal<br />

response by COB this week. (9/7)f<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

" See attached.<br />

* WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5/11) SDR provided, no update. (5/18) No update. (5/25) No update. (6/8) Water line as-builts<br />

are being marked up for WCH review prior to being submitted. WCII stressed that the as-builts<br />

need to indicate the location of the water lines from hook up at the fence to the high tower. (6/8)<br />

No change. (6/15) No change. (6/22) WCH to provide new drawing number for the as-built<br />

drawing. (6/29) WCH will also provide a CADD base file to DDI for this drawing. (7/6) DDI<br />

has received base CADD file and is in process of updating drawing. They commit to<br />

resubmitting drawing by 7/21. (7/14) DDI is working with their design group to get the drawings<br />

updated, but DDI has had issues with the CADD file, submission bumped to 7/26. (7/20) DDI is<br />

reviewing the cost of drawing; anticipate submittal of drawing by 8/3. (7/27) Submittal delivery<br />

has been pushed to 8/12. (8/3) Drawing should be available for DDI review from their sub-tier by<br />

8/18, they will submit to WCH for review no later than 8/23. (8/10) Draft of waterline drawing<br />

will be walked down this afternoon. (8/24) Continuing. (8/3 1)<br />

* WCH return traffic control drawings to DDI, status 2. DDI will be resubmitting soon<br />

incorporating the WCH comments. DDI to submit this week. Drawings are with North Point for<br />

revision and will be resubmitted upon their return. DDI is well beyond the 30-day resubmission<br />

for updated drawings. WCH will be issuing an SDR regarding this issue. DDI has indicated they<br />

are working on a deficiency letter which will be submitted to Watts for this and several other<br />

deficiencies. (5/11) No update. (5/18) No update. (5/25) WCH received traffic control submittal<br />

6/3 and is in review of same. (6/8) WCH has returned to DDI status 2. (6/22) No change. (6/29)<br />

They commit to resubmitting drawing by 7/21 (7/14). DDI will install signs to match the traffic<br />

control drawing then resubmit. (7/20) Drawing should be available for DDI review from their<br />

sub-tier by 8/18, they will submit to WCH for review no later than 8/23. (8/10) WCH is in<br />

review of submitted drawing. (8/3 1) WCH anticipates returning this week with no comments.<br />

(9/7)<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

*See attached.<br />

CORRESPONDENCE (since last meeting)<br />

* Weekly Progress Review Meeting Minutes of 9/7/2010


Progress Review Meeting<br />

Page 6<br />

*Letter from DDI: Update of Activities perform-ed under the Corrective Action Response as of<br />

August 17, 2010 (SDR FR-201 0-WF-0092- SDR-0 17)<br />

XV.<br />

XVI.<br />

IN VOICE AND PAYMENT STATUS<br />

" DDI requests a copy of Contract Modifications for completed change notices. (8/10) No update.<br />

(8/17) WCH will provide Modification 1 to DDI this week. (8/24) WCH SA indicates that<br />

Modification is awaiting attachments and should be issued to DDI no later than 9/1. (8/3 1)<br />

* DDI inquired about a partial release of retainage from the mobilization pay item. WCH will<br />

evaluate. (8/10) No update. (8/17)<br />

* DDI to submit billing for August today. (8/3 1) WCH DDI to submit this week. (9/7)<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

*None.<br />

Attachment(s): As noted above.


C! 8 8 8: 8..8 .<br />

C .)0<br />

0)0<br />

LO<br />

38 5<br />

T8 I<br />

a.<br />

0 00 00CD0 00 00a00 000<br />

0o .- - - 0 ~ ~<br />

0 0 0<br />

'<br />

- aZ<br />

. ,LL<br />

0 N q<br />

C~<br />

-b A~ 0.<br />

C4 0<br />

Go W.<br />

03)<br />

'00)<br />

* ~ 8 888 88§8 8~ 88~~8L


Dance Designs Inc.<br />

118-K-1 Burial Ground Remediation Project<br />

PRODUCTION SUMMARY<br />

For Week Ending: Friday, August 27, 2010<br />

G<br />

_<br />

_<br />

F 29 19 ______i 26 ______ 74<br />

0._<br />

J/L _ _ _ 31 13 _ _ _ __44<br />

K _____ ______ 29 1 4 33<br />

N __ _ _ _ _ _ _ _ _ _ _ _0<br />

0 1_ _ _ _ _ _ _ _ _ _ _ _ _0<br />

0<br />

Total Cans 29 50 42 30 0____ 151___


0o %<br />

w E.<br />

CL 0 (<br />

cc Z (A L<br />

.0 W<br />

ME 0 - m a)<br />

u 0<br />

L- I m.<br />

co~<br />

T4<br />

W-<br />

E<br />

C<br />

2mmm<br />

U tuuU-o<br />

E E<br />

C) ~ 000<br />

M u41 1 cu 4 ~CU4ai<br />

00 0 m +1<br />

i 41 M M mi 0i


too<br />

U)<br />

04 N<br />

V 0 0)<br />

C N N<br />

(D C' 4 CC<br />

0 0<br />

0O 0<br />

CL0<br />

0c<br />

o<br />

C0) C<br />

wN :<br />

0<br />

z<br />

Q a)<br />

Zo ( = -0 c<br />

U<br />

a) F= C<br />

c o<br />

0 0C<br />

o<br />

-<br />

(.) C3 C: :<br />

0 0,<br />

cp<br />

U) z<br />

C<br />

-cco<br />

cq CO) I) cmI,<br />

0~ 0 Cl -a


's)<br />

00<br />

a'2<br />

0.(<br />

4--<br />

oc<br />

w~: co r'i-k<br />

0 LL<br />

Im<br />

70<br />

LU 0


DATE: September 7, 2010<br />

WEEKLY PROGRESS MEETING<br />

11 8-K<br />

Attendance Roster<br />

NAME COMPANY PHONE MSIN<br />

j ]A)1 SS Y 3.2 Yo X, -I<br />

_ _ _ _ __ _ _ _ _ _ _ __ __ i( 3-(p,<br />

(&)I~L~ ~-JL~J~tU Wc _ Y7_


Washinton<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 153544<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

0 010 Christopher L. Beach -1<br />

September 28, 2010<br />

DISTR-:u<br />

E. L. Adamson X3-40 D. Bolfiniger (DDI)<br />

C. L. Beach X3 -16 R. D). Cantwell N3-30<br />

A. Gagnon X9-08 Q. L. Grist X3-16<br />

J. A. Heard H14-17 R. W. Cross H4-25<br />

J. R. Soulia (DDI) X3-17 T. Dance (DDI) X3-17<br />

H. C. Weber (DDI) X3-16 R. A. Dodd H4-24<br />

H. Williams rII X3-16 C. Flowers (DDI) X3-17<br />

T. A. Foster N3-30<br />

R. Ganapathy X3 -40<br />

R. T. Hansen H14-17<br />

S. J. Huddleston X3-16<br />

W. R. Junkins X3-16<br />

S. E. Parnell X3-16<br />

D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H14-11I<br />

A meeting on the above subject was held on September 28, 2010 at 11I8-K, MO-755.<br />

g<br />

1. SAFETY<br />

0Safety topic: Discussed not wearing jewelry - rings, ear rings, watches, etc. - while in the HRA.<br />

They can wear through gloves; get caught on equipment, etc. It can also interfere with the proper<br />

wearing of PPE.<br />

ff.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

*PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permnit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/2010. Still waiting on permits from CHPRC.<br />

Z:\Admninistrative Assistant\Proect Progress Review Weekly Mecting\2010\Seprember9-28-1O Weekly Progressdoc


Progress Review Meeting<br />

Page 2<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 100-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/20 10. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 19th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 1 00-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

caics on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/25) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pressures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm). (6/1) DDI is<br />

sending a letter to Watts to rework system for increased pressure. (6/8) DDI to submit letter,<br />

request for clarification for intent of water supply. (6/15) No change. (6/22) WCIJ has not<br />

received letter from DDI about water supply. (6/29) DDI states they send letter on 6/23, but<br />

WCH STR has not received copy. (7/6) WCH received letter 7/12. WCH PM is following up<br />

with CHPRC before responding to letter. (7/14) WCH PM followed up with the CHPRC Deputy<br />

Fire Marshal about the permit. They hope to have updated information to us by the end of the<br />

week. WCH discussed how using additional percentage of calcium chloride could control dust<br />

and use less water. It was also suggested that DDI look into bringing an additional water tower<br />

on site that could be filled at the start of the day to provide additional water. (7/20) DDI has<br />

submitted WCH suggestions to sub-tier for proposal if there is no increase in water permitted at<br />

the hydrant restrictor. (7/27) DDI has not received a response frm WCI on alternative<br />

dust/water suppression chemicals or methods. CHPRC is restricting water on their site. They are<br />

evaluating methods other than the slow fill of the basins (still wells). WCH is concerned that<br />

WCI is allowing projects other than 11I8-K to fill their water trucks from the 11 8-K tank; it would<br />

appear that there is enough water if more than the 118-K project is using the tank. (8/3) WCH to<br />

provide a response to DDI by the end of the week. (8/10) WCH pushed issuing a formal<br />

response 8/19. (8/17) WCH will provide DDI a response letter today. (8/24) DDI has received<br />

the WCH response letter dated 8/24 and is issuing an SDR to their sub-tier. They are also looking


Progress Review Meeting<br />

Page 3<br />

at alternatives that WCH has previously suggested. (8/3 1) DDI anticipates submitting the asbuilt<br />

drawings no later than 9/8. (9/7) WCH in review, should be returned today (9/22) DDI<br />

plans to submit as-built drawings (rev. 0) by the end of the week. (9/28)<br />

* Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This item will remain in these minutes until demobilization as a reminder. (8/10)<br />

* On 7/8/2010 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

review. To be scheduled for next week. (8/24) DDI to provide a letter response. Meeting<br />

rescheduled for Wednesday 9/1. (8/3 1) Meeting held last week, scheduling will continue as<br />

needed. (9/7) DDI would like to schedule this to follow the 9/27 1:00 meeting. (9/22) Meeting<br />

rescheduled for Monday at 1:00 p.m. (9/2 8)<br />

11I. PROJECT DESIGN DRAWINGS<br />

* Waterline drawing draft in place to be walked down today. (8/24) DDI would still like<br />

walkdown prior to final submission. (8/3 1) DDI looks to submit by 9/8. (9/7)<br />

" WCH asked DDI if excavation is still within pre-ex. survey points. DDI to confirm. (9/2 8)<br />

" WCH requests R.O.M. drawing of electrical drawings which will be red-lined to placement of<br />

CHPRC air monitor changes. (9/28)<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

o See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

" No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

" See attached.<br />

VI.<br />

Vii.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

* See attached.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

" WCH intends to begin working on Trench I silo work packages in early August. Tentative<br />

meeting set for 8/16 to discuss work package for Trench I silos. WCH to confirm with planners<br />

on schedule. (8/3) When the initial work package is developed, craft will be involved in the fine<br />

tuning of the WP. (8/10) Meeting postponed to Monday, 8/23. (8/17) Meeting moved to<br />

Wednesday 8/25 at 8:00. In the near future a WCH planner will be on site three days a week for<br />

support with work packages and technical procedure needs. (8/24) Informal review of existing<br />

work packages has begun by WCH Planners. WCH will involve DDI field personnel as the work<br />

draws closer. (8/3 1) Ongoing. (9/7). WCH would like to begin including DDI SS in the work<br />

package planning process. (9/28)


Progress Review Meeting<br />

Page 4<br />

* The Anomaly Work Package is being superseded by new technical procedures.<br />

IX.<br />

MATERIAL<br />

*DDI is planning to begin the process of ordering ecology blocks that will be used in the Trench I<br />

Silo remediation. (7/27) DDI is planning for approximately 150 ecology blocks. (8/3)<br />

0 WCH will be issuing an additional change notice for trench I that will require provision of<br />

means and methods as well as materials such as ecology blocks. (8/10) DDI should plan for<br />

draft specification from WCH by the end of the week. (8/3 1) WCH still waiting on<br />

specifications from Design Engineering group to finalize issuing change notice for remainder<br />

of Trench I changes.<br />

X. QUALITY<br />

*WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCI- QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCH QA in the near future. (6/29) DDI provided copy of surveillance by WCH QA. This<br />

surveillance will be ongoing this week and next. (7/14) The surveillance will be conducted on<br />

7/22 for this site. (7/20) This surveillance is ongoing to additional sub-tiers. Results are not<br />

anticipated to be positive. There appears to be serious issues with flowdown of DDI QA plan to<br />

sub tiers. WCH QA is concerned about how the QA plan is being implemented by sub-tiers.<br />

These issues are of considerable concern to WCH. (7/27) DDI and WCH QA to meet to discuss<br />

flow downs. (8/3) WCH QA will be issuing letter to DDI outlining the details of the<br />

surveillance results.<br />

o WCH QA still has concern about DDI flowdown to WCI. DDI indicated that WCI has<br />

provided letter indicating they intend to work to the DDI QA plan. DDI indicated they have<br />

not assessed WCI to determine that WCI is adhering to the QA plan. (8/10) DDI would like<br />

a response in writing outlining the concerns that WCH QA has that WCI is not working to the<br />

DDI QA program. (8/17) WCH will be issuing SDR this week to DDI for deficiencies. (FR-<br />

201 O-IF-0664-SDR-023) (8/24) DDI has received the SDR and indicated they will address<br />

issues. (8/3 1) DDI will be submitting QA Program rewrite this week. (9/7) This has been<br />

pushed out. (9/22) WCH QA and DDI PM to meet to discuss SDR and response. (9/28)<br />

o DDI developing NCR #2, CAP to be provided to WCH for acceptance prior to resumption of<br />

use of breathing air equipment. (9/22) WCR to provide SDR today to DDI. (9/28)<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

a None.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

" WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5/11) SDR provided, no update. (5/18) No update. (5/25) No update. (6/8) Water line as-builts<br />

are being marked up for WCH review prior to being submitted. WCH stressed that the as-builts<br />

need to indicate the location of the water lines from hook up at the fence to the high tower. (6/8)<br />

No change. (6/15) No change. (6/22) WCH to provide new drawing number for the as-built<br />

drawing. (6/29) WCH will also provide a CADD base file to DDI for this drawing. (7/6) DDI<br />

has received base CADD file and is in process of updating drawing. They commit to


Progress Review Meeting<br />

Page 5<br />

resubmitting drawing by 7/21. (7/14) DDI is working with their design group to get the drawings<br />

updated, but DDI has had issues with the CADD file, submission bumped to 7/26. (7/20) DDI is<br />

reviewing the cost of drawing; anticipate submittal of drawing by 8/3. (7/27) Submittal delivery<br />

has been pushed to 8/12. (8/3) Drawing should be available for DDI review from their sub-tier by<br />

8/18, they will submit to WCH for review no later than 8/23. (8/10) Draft of waterline drawing<br />

will be walked down this afternoon. (8/24) Continuing. (8/3 1) Drawings returned status 2 to<br />

DDI. DDI to rev drawing and it will be approved as status 1. (9/22)<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

0 See attached.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE (since last meeting)<br />

* Transmittal from DDI: Acknowledgement of CN 027<br />

" Letter from DDI: NCR 002-10<br />

" Transmittal from DDI: Proposal for CN 028<br />

IN VOICE AND PAYMENT STATUS<br />

o Thursday is the last day of billing cycle for this month.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

" Heaters for the tent have been delivered this week. DDI should have light plant at turn off soon.<br />

WCH urged DDI to review their Cold Weather Protection Plan.<br />

" DDI to look at antifreeze used in containers to keep from sticking to the ERDF cans during<br />

fr-eezing weather. DDI should contact WCH EPL for recommendations.<br />

* DD to provide authorization letter for Mr. Soulia to sign on behalf as DDI authorized<br />

representative.<br />

Attachment(s): As noted above.


a d a<br />

6,<br />

4<br />

z 0 u<br />

I<br />

II<br />

8. 8 4L r 0 a U<br />

10 r<br />

j -J<br />

-,<br />

I.(on)<br />

0


C<br />

a8<br />

08<br />

i<br />

-<br />

bbb&b<br />

N<br />

0<br />

N<br />

0- zz ~<br />

4116 .6<br />

!<br />

I I Ijil I:<br />

I<br />

j H<br />

iii I -<br />

Ii I 11111<br />

ii<br />

ii ii


Dance Designs Inc.<br />

118-K-i Burial Ground Remediation Project<br />

PRODUCTION SUMMARY<br />

For Week Ending: Friday, September 24, 2010<br />

Trench<br />

Cans per Day~<br />

~b Trench<br />

- 9/20/2010 9/21/2010 9/22/2010 9/23/2010 9/24/2010 ______<br />

_________ Monday Tuesday Wednesday Thursday Friday ______<br />

C _ _ _ _ _ _ _ _ _ _0<br />

O/E/P _____ ______ _____ ____ __0<br />

G _ _ _ _ _ _ _ _ _ _0<br />

F 37 ______ 31 __ ___ ____ 68<br />

1______ ______ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 0<br />

i/L _ _ _ _ _ _ _ _ _ __ _ _ _ _0<br />

K 20 28 48<br />

M __ _0<br />

N _ _ __ _ _ _0<br />

0 _ _ _ _ _ _ _ _ _ _0<br />

___________________<br />

_________0<br />

_________________ ________ ________ _________0<br />

LTotal Cans 1 57 28 31 0 0 116


6 o en<br />

Z u -i r- ~-i rN<br />

a) -0<br />

D


Co~<br />

0 0<br />

w0 -<br />

oL<br />

oo<br />

0 2 -<br />

0 -<br />

0 c)<br />

C .<br />

Eo<br />

oC<br />

c (D<br />

0 -<br />

C<br />

cn 9 0


0 -6 m 0 00<br />

?1 s 5. 13 0 L) 0<br />

0)0<br />

00)<br />

x~ x X-<br />

z --<br />

-0 4<br />

-13<br />

~ U)<br />

.) IN<br />

L.)I) ~U<br />

0 ''~-


Washlinn<br />

Closure<br />

WC H <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 153545<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L.Bec<br />

October 5, 2010<br />

DISTRBUTIO<br />

C. L. Beach X3-16 E. L. Adamson X3-40<br />

A. Gagnon X9-08 D. Bollinger (DDI)<br />

W. R. Junkins X3-16 R. D. Cantwell N3-30<br />

S. E. Parnell X3-16 Q. L. Crist X3 -16<br />

M. Sherman (DDI) X3-17 R. W. Cross H4-25<br />

J. R. Soulia (DDI) X3-17 T. Dance (DDI) X3-17<br />

H. C. Weber (DDI) X3-16 R. A. Dodd H14-24<br />

H. Williams HI1 X3-16 C. Flowers (DDI) X3-17<br />

T. A. Foster N3-30<br />

R. Ganapathy X3-40<br />

R. T. Hansen H4-17<br />

J. A. Heard H14-17<br />

S. J. Huddleston X3-16<br />

D. G. Saueressig N3 -3 0<br />

D. B. Teachout X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H14-11<br />

A meeting on the above subject was held on October 5, 2010 at 11 8-K, MO-755.<br />

I. SAFETY<br />

0 Safety topic: Discussed getting back to basics with safety. Need to remember safety values and<br />

lessons learned. Need more focus to mitigate complacency; housekeeping and organization are<br />

key elements of safety.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

*PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the pernits to be issued by CHI'RC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/20 10. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

Z \Adminiitrahve Assistant1rjerA Prugress Rcview Weekly Meelinga\20l0\c~olber\lM-5-lO<br />

Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 1 00-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the I 9th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 100-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

cales on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/2 5) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pressures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm). (6/1) DDI is<br />

sending a letter to Watts to rework system for increased pressure. (6/8) DDI to submit letter,<br />

request for clarification for intent of water supply. (6/15) No change. (6/22) WCH has not<br />

received letter from DDI about water supply. (6/2 9) DDI states they send letter on 6/23, but<br />

WCH STR has not received copy. (7/6) WCH received letter 7/12. WCH PM is following up<br />

with CHPRC before responding to letter. (7/14) WCH PM followed up with the CHPRC Deputy<br />

Fire Marshal about the permit. They hope to have updated information to us by the end of the<br />

week. WCH discussed how using additional percentage of calcium chloride could control dust<br />

and use less water. It was also suggested that DDI look into bringing an additional water tower<br />

on site that could be filled at the start of the day to provide additional water. (7/20) DDI has<br />

submitted WCH suggestions to sub-tier for proposal if there is no increase in water permitted at<br />

the hydrant restrictor. (7/27) DDI has not received a response from WCI on alternative<br />

dust/water suppression chemicals or methods. CHPRC is restricting water on their site. They are<br />

evaluating methods other than the slow fill of the basins (still wells). WCH is concerned that<br />

WCI is allowing projects other than 11 8-K to fill their water trucks from the 11 8-K tank; it would<br />

appear that there is enough water if more than the 11I8-K project is using the tank. (8/3) WCH to<br />

provide a response to DDI by the end of the week. (8/10) WCH pushed issuing a formal<br />

response 8/19. (8/17) WCH will provide DDI a response letter today. (8/24) DDI has received<br />

the WCH response letter dated 8/24 and is issuing an SDR to their sub-tier. They are also looking<br />

at alternatives that WCH has previously suggested. (8/3 1) DDI anticipates submitting the as-


Progress Review Meeting<br />

Page 3<br />

built drawings no later than 9/8. (9/7) WCH in review, should be returned today (9/22) DDI<br />

plans to submit as-built drawings (rev. 0) by the end of the week. (9/2 8) DDI still waiting on<br />

drawings from their subcontractor. Anticipate they will be received by the end of the week.<br />

(10/5)<br />

" Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(813) This item will remain in these minutes until demobilization as a reminder. (8/10)<br />

* On 7/8/2010 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

review. To be scheduled for next week. (8/24) DDI to provide a letter response. Meeting<br />

rescheduled for Wednesday 9/1. (8/3 1) Meeting held last week, scheduling will continue as<br />

needed. (9/7) DDI would like to schedule this to follow the 9/27 1:00 meeting. (9/22) Meeting<br />

rescheduled for Monday at 1: 00 p.m. (9/28) Delay impacts meeting scheduled for 10/6/10 at<br />

1:00. (1015)<br />

" Heaters for the tent have been delivered this week. DDI should have light plant at turn off soon.<br />

WCH urged DDI to review their Cold Weather Protection Plan. (9/28)<br />

* DDI to look at antifreeze used in containers to keep from sticking to the ERDF cans during<br />

freezing weather. DDI should contact WCH EPL for recommendations. (9/28)<br />

* DD to provide authorization letter for Mr. Soulia to sign on behalf as DDI authorized<br />

representative. (9/2 8)<br />

III.<br />

IV.<br />

PROJECT DESIGN DRAWINGS<br />

* WCH asked DDI if excavation is still within pre-ex survey points. DDI to confirm. (9/28)<br />

* WCH requests R.O.M. drawing of electrical drawings which will be red-lined to placement of<br />

CHPRC air monitor changes. (9/28)<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

o See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

" No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

" See attached.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

* See attached.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

*WCH intends to begin working on Trench I silo work packages in early August. Tentative<br />

meeting set for 8/16 to discuss work package for Trench I silos. WCH to confirm with planners<br />

on schedule. (8/3) When the initial work package is developed, craft will be involved in the fine<br />

tuning of the WP. (8/10) Meeting postponed to Monday, 8/23. (8/17) Meeting moved to<br />

Wednesday 8/25 at 8:00. In the near future a WCH planner will be on site three days a week for


Progress Review Meeting<br />

Page 4<br />

support with work packages and technical procedure needs. (8/24) Informal review of existing<br />

work packages has begun by WCH Planners. WCH will involve DDI field personnel as the work<br />

draws closer. (8/3 1) Ongoing. (9/7). WCH would like to begin including DDI SS in the work<br />

package planning process. (9/28)<br />

" The Anomaly Work Package is being superseded by new technical procedures. (9/28)<br />

" Meeting to discuss Trench I Sort and Loadout JHA Rev. 1 scheduled for 10/6/10 at 8:00. (10/5)<br />

IX.<br />

MATERIAL<br />

*DDI is planning to begin the process of ordering ecology blocks that will be used in the Trench I<br />

Silo remnediation. (7/27) DDI is planning for approximately 150 ecology blocks. (8/3)<br />

X. QUALITY<br />

*WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determnine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCII QA in the near future. (6/29) DDI provided copy of surveillance by WCH QA. This<br />

surveillance will be ongoing this week and next. (7/14) The surveillance will be conducted on<br />

7/22 for this site. (7/20) This surveillance is ongoing to additional sub-tiers. Results are not<br />

anticipated to be positive. There appears to be serious issues with flowdown of DDI QA plan to<br />

sub tiers. WCH QA is concerned about how the QA plan is being implemented by sub-tiers.<br />

These issues are of considerable concern to WCH. (7/27) DDI and WCH QA to meet to discuss<br />

flow downs. (8/3) WCH QA will be issuing letter to DDI outlining the details of the<br />

surveillance results. (9/28) DDI is revising their QA plan, will be Rev. 1. (10/5)<br />

o WCH QA still has concern about DDI flowdown to WCI. DDI indicated that WCI has<br />

provided letter indicating they intend to work to the DDI QA plan. DDI indicated they have<br />

not assessed WCI to determine that WCI is adhering to the QA plan. (8/10) DDI would like<br />

a response in writing outlining the concerns that WCH QA has that WCI is not working to the<br />

DDI QA program. (8/17) WCH will be issuing SDR this week to DDI for deficiencies. (FR-<br />

2010-IF-0664-SDR-023) (8/24) DDI has received the SDR and indicated they will address<br />

issues. (8/3 1) DDI will be submitting QA Program rewrite this week. (9/7) This has been<br />

pushed out. (9/22) WCH QA and DDI PM to meet to discuss SDR and response. (9/28)<br />

o<br />

DDI developing NCR #2, CAP to be provided to WCH for acceptance prior to resumption of<br />

use of breathing air equipment. (9/22) WCH to provide SDR today to DDI. (9/28)<br />

*Discussed QA audit (DOE) from last week. DOE cited DDI's failure to implement QA plan.<br />

(10/5)<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

e None.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

" See attached.<br />

* WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5111) SDR provided, no update. (5/18) No update. (5/25) No update. (6/8) Water line as-builts<br />

are being marked up for WCH review prior to being submitted. WCH stressed that the as-builts<br />

need to indicate the location of the water lines from hook up at the fence to the high tower. (6/8)<br />

No change. (6/15) No change. (6/22) WCH to provide new drawing number for the as-built


Progress Review Meeting<br />

Page 5<br />

drawing. (6/29) WCH will also provide a CADO base file to DDI for this drawing. (7/6) DDI<br />

has received base CADD file and is in process of updating drawing. They commit to<br />

resubmitting drawing by 7/21. (7/14) DDI is working with their design group to get the drawings<br />

updated, but DDI has had issues with the CADD file, submission bumped to 7/26. (7/20) DDI is<br />

reviewing the cost of drawing; anticipate submittal of drawing by 8/3. (7/2 7) Submittal delivery<br />

has been pushed to 8/12. (8/3) Drawing should be available for DDI review from their sub-tier by<br />

8/18, they will submit to WCH for review no later than 8/23. (8/10) Draft of waterline drawing<br />

will be walked down this afternoon. (8/24) Continuing. (8/3 1) Drawings returned status 2 to<br />

DDI. DDI to rev drawing and it will be approved as status 1. (9/22) DDI anticipates Rev B.<br />

statused to Rev. 0 by COB this week. (1015)<br />

* WCH in review of site absence coverage plan. (10/5)<br />

" Discussed MAQSDR requirements. (1015)<br />

" DDI to submit manpower report to WCH on a monthly basis. (10/5)<br />

XIII.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

" WCH will be issuing an additional change notice for trench I that will require provision of means<br />

and methods as well as materials such as ecology blocks. (8/10) DDI should plan for draft<br />

specification from WCH by the end of the week. (8/3 1) WCH still waiting on specifications from<br />

Design Engineering group to finalize issuing change notice for remainder of Trench I changes.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE (since last meeting)<br />

" Weekly Progress Review Meeting Minutes 9/28/2010<br />

" Transmittal from DDI: CN Exhibit "K" Proposal (no cost)<br />

* Transmittal from DDI: Acknowledgement of CN 032<br />

" Transmittal from DDI: Acknowledgement of CN 031 (no cost)<br />

IN VOICE AND PAYMENT STATUS<br />

* DDI submitted September invoice today.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* Discussed shower facilities, PPE, towels, and janitorial DOR's.<br />

" Discussed plans for Jewell site visit (Portland). Discussion included schedule, logistics, etc.<br />

Schedule to be completed by 10/18/2010. <strong>Site</strong> visit to Portland will be scheduled.<br />

" DDI has not yet mobilized light plants per authorization in CN 019. Light plant is required to be<br />

on site no later than 10/01/2010.<br />

Attachment(s): As noted above.


-of.<br />

Ir<br />

d<br />

MIE<br />

j<br />

cc 00a 0000 a000 0000 00 0 ~ 00<br />

~~0<br />

0 02 90 zo0 000<br />

U7~ La<br />

U! 61<br />

CL<br />

iI<br />

lid fa 51 0<br />

top<br />

Lo<br />

I


C030


Dance Designs Inc.<br />

118-K-i Burial Ground Remediation Project<br />

PRODUCTION SUMMARY<br />

For Week Ending: Friday, October 1, 2010<br />

9/25201 9/821 492/0 9/010 102/01<br />

F40 10 102<br />

1_ _ _ _ _ 0<br />

Toa Can 63 37517 0179


ci<br />

C3<br />

CEE<br />

~ E<br />

CC<br />

w<br />

0 0 ><br />

VA CL 0C-Q<br />

I IA (1 oJ -C<br />

O44j~<br />

0 iz<br />

a) -0 m -@<br />

0 0 i 4<br />

C<br />

V-1w<br />

Vq ~<br />

ell<br />

0<br />

(U)<br />

U<br />

0. o<br />

00 w0r Nff nmr<br />

Y-Iu<br />

u<br />

U)* t n (<br />

E )qc N Y<br />

E<br />

CDQ)Oo<br />

rn :5 Cn<br />

o m<br />

C<br />

U " " & --<br />

(A l ) .- F-<br />

4- 4U = j ) T (<br />

wL<br />

m-E MC U (U 41 -- ni (U O n 0<br />

M U 4-+<br />

~


00 5 ;8~0<br />

-0-<br />

z 0<br />

00<br />

.4CL<br />

r ?1<br />

z<br />

E~ E<br />

IL Lj 0<br />

ul 5rn M<br />

E d i .<br />

0 i


511f 0- 4<br />

I's~L


CCN: 153545<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

October 12, 2010Ag<br />

ATENE<br />

ISTIUTO<br />

E. L. Adamson X3.40 D. Bollinger (DD1)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

A. Gagnon X9-08 Q. L. Grist X3-16<br />

S. E. Parnell X3-16 R. W. Cross H4-25<br />

M. Sherman (DDI) X3-17 T. Dance (DDI) X3-17<br />

J. R. Soulia (DDI) X3-17 R. A. Dodd H4-24<br />

H. C. Weber (DDI) X3-16 C. Flowers (DDI) X3-17<br />

H. Williams IIH X3-16 T. A. Foster N3-30<br />

R. Ganapathy X3-40<br />

W. R. Junkins X3-16<br />

R. T. Hansen H4- 17<br />

J. A. Heard H4-17<br />

S. J. Huddleston X3-16<br />

D. G. Saueressig N3-30<br />

D. B. Teachout X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4- 11<br />

A meeting on the above subject was held on October 12, 2010 at I118-K, M0-755.<br />

1. SAFETY<br />

*Safety topic: Discussed driving in the fog and low visibility conditions. Wildlife will be on the<br />

roadways and drivers need to be extra alert.<br />

11. ACTION ITEMS FROM LAST MEETING/STATUS<br />

*PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPTRC 100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CI-PRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/20 10. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/20 10. Excavation permit is<br />

CA~ocumnents and Sentings\clbeach\Local Seltings\Ternporary I nternet FiLesOLK1O7\I0- 12-10 Weekly Progremn dc


Progress Review Meeting<br />

Page 2<br />

complete. Discussed that 1 00-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 1 9 th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 1 00-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

calcs on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/25) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pre ssures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm). (6/1) DDI is<br />

sending a letter to Watts to rework system for increased pressure. (6/8) DDI to submit letter,<br />

request for clarification for intent of water supply. (6/15) No change. (6/22) WCH has not<br />

received letter from DDI about water supply. (6/29) DDI states they send letter on 6/23, but<br />

WCH STR has not received copy. (7/6) WCH received letter 7/12. WCH PM is following up<br />

with CHPRC before responding to letter. (7/14) WCH PM followed up with the CHPRC Deputy<br />

Fire Marshal about the permit. They hope to have updated informnation to us by the end of the<br />

week. WCH discussed how using additional percentage of calcium chloride could control dust<br />

and use less water. It was also suggested that DDI look into bringing an additional water tower<br />

on site that could be filled at the start of the day to provide additional water. (7/20) DDI has<br />

submitted WCH suggestions to sub-tier for proposal if there is no increase in water permitted at<br />

the hydrant restrictor. (7/27) DDI has not received a response from WCI on alternative<br />

dust/water suppression chemicals or methods. CHPRC is restricting water on their site. They are<br />

evaluating methods other than the slow fill of the basins (still wells). WCH is concerned that<br />

WCI is allowing projects other than 11I8-K to fill their water trucks from the 11 8-K tank; it would<br />

appear that there is enough water if more than the 118-K project is using the tank. (8/3) WCH to<br />

provide a response to DDI by the end of the week. (8/10) WCH pushed issuing a formal<br />

response 8/19. (8/17) WCH will provide DDI a response letter today. (8/24) DDI has received<br />

the WCH response letter dated 8/24 and is issuing an SDR to their sub-tier. They are also looking<br />

at alternatives that WCH has previously suggested. (8/3 1) DDI anticipates submitting the asbuilt<br />

drawings no later than 9/8. (9/7) WCII in review, should be returned today (9/22) DDI


Progress Review Meeting<br />

Page 3<br />

plans to submit as-built drawings (rev. 0) by the end of the week. (9/28) DDI still waiting on<br />

drawings from their subcontractor. Anticipate they will be received by the end of the week.<br />

(10/5) As-built is status 2 (will be revved to Status I upon receipt of Rev 0) and is with ARES<br />

for completion. (10/12)<br />

* Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This item will remain in these minutes until demobilization as a reminder. (8/10)<br />

" On 7/8/2010 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

review. To be scheduled for next week. (8/24) DDI to provide a letter response. Meeting<br />

rescheduled for Wednesday 9/1. (8/3 1) Meeting held last week, scheduling will continue as<br />

needed. (9/7) DDI would like to schedule this to follow the 9/27 1:00 meeting. (9/22) Meeting<br />

rescheduled for Monday at 1:00 p.m. (9/2 8) Delay impacts meeting scheduled for 10/6/10 at<br />

1:00. (10/5) Delay impacts meeting to be rescheduled, time TBD. (10/12)<br />

" Heaters for the tent have been delivered this week. DDI should have light plant at turn off soon.<br />

WCH urged DDI to review their Cold Weather Protection Plan. (9/28)<br />

" DDI to look at antifreeze used in containers to keep from sticking to the ERDF cans during<br />

freezing weather. DDI should contact WCH EPL for recommendations. (9/28)<br />

* DDI to provide authorization letter for Mr. Soulia to sign on behalf as DDI authorized<br />

representative. (9/2 8)<br />

" Discussed shower facilities, PPE, towels, and janitorial DOR's. (10/5)<br />

* Discussed plans for Jewell site visit (Portland). Discussion included schedule, logistics, etc.<br />

Schedule to be completed by 10/18/2010. <strong>Site</strong> visit to Portland will be scheduled. (10/5)<br />

" DDI has not yet mobilized light plants per authorization in CN 019. Light plant is required to be<br />

on site no later than 10/01/20 10. (10/5)<br />

111. PROJECT DESIGN DRAWINGS<br />

" WCH asked DDI if excavation is still within pre-ex survey points. DDI to confirm. (9/28)<br />

* WCH requests R.O.M. drawing of electrical drawings which will be red-lined to placement of<br />

CHPRC air monitor changes. (9/28) DDI to provide, (no changes at this time). (10/12)<br />

" Discussed topo requirements for pre and post excavation drawings. (10/12)<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

o See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

" No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

" See attached.<br />

VI.<br />

VII.<br />

MANPOWER<br />

& See attached.<br />

EQUIPMENT<br />

" See attached.<br />

" Need to check on return status of Kenworth truck that was sent to 100-F for Watts' work. This


Progress Review Meeting<br />

Page 4<br />

truck is under lease agreement with DDI not Watts for use at 118-K. (10/12)<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

"WCH intends to begin working on Trench I silo work packages in early August. Tentative<br />

meeting set for 8/16 to discuss work package for Trench I silos. WCH to confirm with planners<br />

on schedule. (8/3) When the initial work package is developed, craft will be involved in the fine<br />

tuning of the WP. (8/10) Meeting postponed to Monday, 8/23. (8/17) Meeting moved to<br />

Wednesday 8/25 at 8:00. In the near future a WCH planner will be on site three days a week for<br />

support with work packages and technical procedure needs. (8/24) Informal review of existing<br />

work packages has begun by WCH Planners. WCH will involve DDI field personnel as the work<br />

draws closer. (8/3 1) Ongoing. (9/7). WCH would like to begin including DDI SS in the work<br />

package planning process. (9/2 8)<br />

* Meeting to discuss the Sort and Loadout JHA Rev. I scheduled for 10/6/10 at 8:00. (10/5)<br />

Continuing. (10/12)<br />

IX.<br />

MATERIAL<br />

* Dust Bond and propylene glycol now on site. (10/12)<br />

X. QUALITY<br />

*WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCI- QA in the near future. (6/29) DDI provided copy of surveillance by WCH QA. This<br />

surveillance will be ongoing this week and next. (7/14) The surveillance will be conducted on<br />

7/22 for this site. (7/20) This surveillance is ongoing to additional sub-tiers. Results are not<br />

anticipated to be positive. There appears to be serious issues with flowdown of DDI QA plan to<br />

sub tiers. WCH QA is concerned about how the QA plan is being implemented by sub-tiers.<br />

These issues are of considerable concern to WCH. (7/27) DDI and WCH QA to meet to discuss<br />

flow downs. (8/3) WCH QA will be issuing letter to DDI outlining the details of the<br />

surveillance results. (9/28) DDI is revising their QA plan, will be Rev. 1. (10/5)<br />

o WCH QA still has concern about DDI fiowdown to WCI. DDI indicated that WCI has<br />

provided letter indicating they intend to work to the DDI QA plan. DDI indicated they have<br />

not assessed WCI to determine that WCI is adhering to the QA plan. (8/10) DDI would like<br />

a response in writing outlining the concerns that WCH QA has that WCI is not working to the<br />

DDI QA program. (8/17) WCH will be issuing SDR this week to DDI for deficiencies. (FR-<br />

2010-IF-0664-SDR-023) (8/24) DDI has received the SDR and indicated they will address<br />

issues. (8/3 1) DDI will be submitting QA Program rewrite this week. (9/7) This has been<br />

pushed out. (9/22) WCH QA and DDI PM to meet to discuss SDR and response. (9/28)<br />

Discussed SDR response for QA flowdown. (10/12)<br />

o<br />

DDI developing NCR #2, CAP to be provided to WCH for acceptance prior to resumption of<br />

use of breathing air equipment. (9/22) WCH to provide SDR today to DDI. (9/28)<br />

" Discussed QA audit (DOE) from last week. DOE cited DDI's failure to implement QA plan.<br />

(10/5)<br />

" WCH to issue SDR to DDI for IH issues. (10/12)


Progress Review Meeting<br />

Page 5<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

0 None.<br />

TECHNICAL DATA SUBMITTALS/STATIJS<br />

" See attached.<br />

" WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5/11) SDR provided, no update. (5/18) No update. (5/25) No update. (6/8) Water line as-builts<br />

are being marked up for WCH review prior to being submitted. WCH stressed that the as-builts<br />

need to indicate the location of the water lines from hook up at the fence to the high tower. (6/8)<br />

No change. (6/15) No change. (6/22) WCH to provide new drawing number for the as-built<br />

drawing. (6/29) WCH will also provide a CADD base file to DDI for this drawing. (7/6) DDI<br />

has received base CADD file and is in process of updating drawing. They commit to<br />

resubmitting drawing by 7/21. (7/14) DDI is working with their design group to get the drawings<br />

updated, but DDI has had issues with the CADD file, submission bumped to 7/26. (7/20) DDI is<br />

reviewing the cost of drawing; anticipate submittal of drawing by 8/3. (7/27) Submittal delivery<br />

has been pushed to 8/12. (8/3) Drawing should be available for DDI review from their sub-tier by<br />

8/18, they will submit to WCH for review no later than 8/23. (8/10) Draft of waterline drawing<br />

will be walked down this afternoon. (8/24) Continuing. (8/3 1) Drawings returned status 2 to<br />

DDI. DDI to rev drawing and it will be approved as status 1. (9/22) DDI anticipates Rev B. to be<br />

submitted Rev. 0 by COB this week. (10/5)<br />

" WCH in review of site absence coverage plan. (10/5)<br />

* Discussed MAQSDR requirements. (10/5)<br />

" DDI to submit manpower report to WCH on a monthly basis. (10/5)<br />

" DDI to provide WCH with MSDS sheets for Dust Bond and Propylene glycol. (10/12)<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

" WCH will be issuing an additional change notice for trench I that will require provision of means<br />

and methods as well as materials such as ecology blocks. (8/10) DDI should plan for draft<br />

specification from WCH by the end of the week. (8/3 1) WCI- still waiting on specifications from<br />

Design Engineering group to finalize issuing change notice for remainder of Trench I changes.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE (since last meeting)<br />

0 Weekly Progress Review Meeting Minutes 10/5/2010<br />

INVOICE AND PAYMENT STATUS<br />

0 September invoice approved.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* Discussed use of change trailer for coats, PPE, etc.<br />

* Acid overpack decon needs to be completed.<br />

Attachment(s): As noted above.


00<br />

1; 1<br />

r A a 44 1RA$ A tR1<br />

00 0 o06 .<br />

w 8 z z A ge g ~ ~ ~ 8<br />

~~~ I<br />

A t0<br />

*a-- at- ~ - ~ - ~ ~ - f ,g M 1<br />

~ 5~g ~5~ ~ 5 g g g~0<br />

02 bbAm<br />

0 O~ 000 o 0 0 f60 0 0 00<br />

el 11 ~<br />

0000 000 00


Dance Designs Inc.<br />

118-K-i Burial Ground Remediation Project<br />

PRODUCTION SUMMARY<br />

For Week Ending: Friday, October 8, 2010<br />

Can Total.<br />

Trnc Cans per Da<br />

F~~~ 29<br />

Trench_ 2<br />

10/4/2010_ 10/5/2010_ 10/6/2010_ 1072100821<br />

F/ 26 292 5<br />

K 5 16 _____ ___ ___21<br />

M __ _0<br />

N ______ ______0<br />

0 12 ___________ _____12<br />

_________<br />

_________0<br />

__________<br />

_________0<br />

Total Cans 43 50 25 0 0 118


6 N<br />

0 N E<br />

-W E<br />

43 4<br />

D<br />

(U~ 0<br />

0 4' CU U.<br />

Z<br />

m<br />

a<br />

(Oa-aL~<br />

CL<br />

8 E<br />

CLj<br />

(V 4<br />

F- 0<br />

-. Z<br />

FA<br />

~<br />

a


cu 0<br />

E<br />

mu<br />

0 E 0 - 09<br />

z<br />

2 25 - - - M C<br />

U<br />

rL<br />

(L<br />

C C ui<br />

-50. i k 'i k -i .s K a a a E 0<br />

0 i5<br />

cc<br />

aw 5 m m E<br />

a o a o 1 1<br />

cc U) z Z cc () 03r o u 0 C, 0<br />

jr z ICE 0 z z Azo :2 0 c z a<br />

z<br />

0 co<br />

1011.<br />

I<br />

0io Oic,<br />

9)c<br />

z<br />

0 ch<br />

Z<br />

CD<br />

C4<br />

C, 0<br />

LL<br />

?<br />

Of<br />

C-4<br />

c) m<br />

aa<br />

c,<br />

Lu<br />

IL<br />

&<br />

LU<br />

w<br />

w<br />

D<br />

0<br />

b8 2 Ff<br />

g<br />

s 9<br />

Lu 0 8<br />

'0 tW<br />

- (-)I L (r LL, (.) WILP I- t 0- 1<br />

LLI Ir<br />

Ra: 0 'Cc w e<br />

L<br />

LU<br />

U<br />

Lu<br />

c<br />

L4E<br />

Ld<br />

ji<br />

0 , O C) 0<br />

7'7 17<br />

r 0 F) z 8<br />

z<br />

cl m


lk S'"-1 Zv/DrZ X3 /7<br />

1111C<br />

/3'~j/(>.*I<br />

I/A7


Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

WashigtonCCN:<br />

154576<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

X<br />

Ely-AN=October26, 2010<br />

DISTRBUTIO<br />

E. L. Adamson X3-40 D. Bollinger (DDI)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Crist X3-16 R. W. Cross H-4-25<br />

A. Gagnon X9-08 T. Dance (DDI) X3-17<br />

J. A. Heard H4-17 R. A. Dodd H4-24<br />

S. E. Parnell X3-16 C. Flowers (DDI) X3-17<br />

J. R. Soulia (DDI) X3-17 T. A. Foster N3-30<br />

H. C. Weber (DDI) X3-17 R. Ganapathy X3-40<br />

H. Williams III X3-16 W. R. Junkins X3-16<br />

R. T. Hansen H4-17<br />

S. J. Huddleston X3-16<br />

D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H-4-l11<br />

A meeting on the above subject was held on October 26, 2010 at 11I8-K, MO-755.<br />

I. SAFETY<br />

* Safety topic: Discussed the importance of wearing the proper eye protection for the job. It is<br />

especially important in changing weather conditions. Need to recognize that weather is not the<br />

same in town as it is on site and vice versa and that conditions can change rapidly and<br />

unexpectedly. Another topic: drivers needed to realize that bridges can be icy even if the<br />

temperature isn't below 320<br />

IT.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC I100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/20 10. Still waiting on permits from CHPRC.<br />

Z:\Administrative Assistant\Project Progress Review Weekly Meelings\2010\Oetober\lO-26-lO Weekly Pmgress.doc


Progress Review Meeting<br />

Page 2<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 1 00-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backfiow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the I 9th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 100-K area. DDL<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

cales on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/25) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pressures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm). (6/1) DDI is<br />

sending a letter to Watts to rework system for increased pressure. (6/8) DDI to submit letter,<br />

request for clarification for intent of water supply. (6/15) No change. (6/22) WCH has not<br />

received letter from DDI about water supply. (6/29) DDI states they send letter on 6/23, but<br />

WCH STR has not received copy. (7/6) WCH received letter 7/12. WCH PM is following up<br />

with CHPRC before responding to letter. (7/14) WCH PM followed up with the CHPRC Deputy<br />

Fire Marshal about the permit. They hope to have updated information to us by the end of the<br />

week. WCH discussed how using additional percentage of calcium chloride could control dust<br />

and use less water. It was also suggested that DDI look into bringing an additional water tower<br />

on site that could be filled at the start of the day to provide additional water. (7/20) DDI has<br />

submitted WCH suggestions to sub-tier for proposal if there is no increase in water permitted at<br />

the hydrant restrictor. (7/27) DDI has not received a response from WCI on alternative<br />

dust/water suppression chemicals or methods. CHPRC is restricting water on their site. They are<br />

evaluating methods other than the slow fill of the basins (still wells). WCH is concerned that<br />

WCI is allowing projects other than 11 8-K to fill their water trucks from the 11 8-K tank; it would<br />

appear that there is enough water if more than the 11I8-K project is using the tank. (8/3) WCH to<br />

provide a response to DDI by the end of the week. (8/10) WCH pushed issuing a formal<br />

response 8/19. (8/17) WCH will provide DDI a response letter today. (8/24) DDI has received<br />

the WCH response letter dated 8/24 and is issuing an SDR to their sub-tier. They are also looking


Progress Review Meeting<br />

Page 3<br />

at alternatives that WCH has previously suggested. (8/3 1) DDI anticipates submitting the asbuilt<br />

drawings no later than 9/8. (9/7) WC- in review, should be returned today (9/22) DDI<br />

plans to submit as-built drawings (rev. 0) by the end of the week. (9/28) DDI still waiting on<br />

drawings from their subcontractor. Anticipate they will be received by the end of the week.<br />

(10/5) As-built is status 2 (will be revved to Status 1 upon receipt of Rev 0) and is with ARES<br />

for completion. (10/12) Per DDI PM, drawings can be issued with a PB stamp is there is a way<br />

to certify that the work was completed per the plans. WCH PM indicated there is non-emergency<br />

hydrant permit which should work for this. (10/26)<br />

* Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This item will remain in these minutes until demobilization as a reminder. (8/10)<br />

" On 7/8/2010 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

review. To be scheduled for next week. (8/24) DDI to provide a letter response. Meeting<br />

rescheduled for Wednesday 9/1. (8/31) Meeting held last week, scheduling will continue as<br />

needed. (9/7) DDI would like to schedule this to follow the 9/27 1:00 meeting. (9/22) Meeting<br />

rescheduled for Monday at 1:00 p.m. (9/28) Delay impacts meeting scheduled for 10/6/10 at<br />

1:00. (10/5) Delay impacts meeting to be rescheduled, time TBD. (10/12) DDI has completed<br />

review and would like to meet again to put this issue to rest. Meeting will be scheduled as soon<br />

as possible. (10/26)<br />

" Discussed plans for Jewell site visit (Portland). Discussion included schedule, logistics, etc.<br />

Schedule to be completed by 10/18/2010. <strong>Site</strong> visit to Portland will be scheduled. (10/5) <strong>Site</strong><br />

visit went well. A surveillance based on the visit to Jewell has been completed by WCH QA.<br />

The few minor issues noted will be resolved in the receipt surveys. The surveillance number is<br />

QA&S-2010-S053. DDI waiting on invoice from vendor for final bill, which will be submitted to<br />

WCH as soon as it is received. (10/26)<br />

" Stainless steel acid overpack decontamination needs to be completed. (10/12) This has not yet<br />

been done. Drums are currently contained in the anomaly staging area. (10/26)<br />

III.<br />

IV.<br />

PROJECT DESIGN DRAWINGS<br />

*WCH requests R.O.M. drawing of electrical drawings which will be red-lined to placement of<br />

CHPRC air monitor changes. (9/28) DDI to provide, (no changes at this time). (10/12) No<br />

change. (10/26)<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

o See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

* No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

* See attached.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT


Progress Review Meeting<br />

Page 4<br />

" See attached.<br />

" WCII asked when the third water truck is expected to arrive on site. (10/26)<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* WCH intends to begin working on Trench I silo work packages in early August. Tentative<br />

meeting set for 8/16 to discuss work package for Trench I silos. WCH to confirm with planners<br />

on schedule. (8/3) When the initial work package is developed, craft will be involved in the fine<br />

tuning of the WP. (8/10) Meeting postponed to Monday, 8/23. (8/17) Meeting moved to<br />

Wednesday 8/25 at 8:00. In the near future a WCH planner will be on site three days a week for<br />

support with work packages and technical procedure needs. (8/24) Informal review of existing<br />

work packages has begun by WCH Planners. WCH will involve DDJ field personnel as the work<br />

draws closer. (8/3 1) Ongoing. (9/7). WCH would like to begin including DDI SS in the work<br />

package planning process. (9/28) Meeting scheduled for Thursday, 10/28 to discuss work<br />

package needs relating to overburden removal to locate the tops of the silos in Trench 1. (10/26)<br />

* Meeting to discuss the Sort and Loadout JHA Rev. 1 scheduled for 10/6/10 at 8:00. (10/5)<br />

Continuing. (10/ 12) The JHA is complete and ready for signatures. (10/26)<br />

IX.<br />

MATERIAL<br />

* Dust Bond and propylene glycol now on site. (10/12) Discussed Dust Bond use requirements per<br />

Change Notice 032. Should be used at a 7:1 ratio. (10/26)<br />

* Ecology blocks will begin to arrive next week from vendor. (10/26)<br />

" Material in trenches J and L will be used to construct ramp to trench I. Discussed use of his<br />

material and minimizing any additional pad-in material for the trench I sorting operations.<br />

(10/26)<br />

X. QUALITY<br />

" WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCII QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCH QA in the near future. (6/29) DDI provided copy of surveillance by WCH QA. The<br />

surveillance will be ongoing this week and next. (7/14) Surveillance will be conducted on 7/22<br />

for this site. (7/20) Surveillance is ongoing to include additional sub-tiers. Results are not<br />

anticipated to be positive. WCH QA is concerned about how the QA plan is being implemented<br />

by sub-tiers. It appears that there are serious issues with flowdown of DDI QA plan to sub-tiers.<br />

These issues are of considerable concern to WCH. (7/27) DDI and WCH QA to meet to discuss<br />

flow downs. (8/3) WCH QA will issue letter to DDI outlining the details of the surveillance<br />

results. WCH QA still has concern about flowdown from DDI to WCL. DDI indicated that WCI<br />

(Watts) has provided letter to them indicating the intent to work to the DDI QA plan. DDI<br />

indicated they have not assessed WCI to determine that WCI is adhering to the QA plan. (8/10)<br />

DDI would like a response in writing outlining the concerns that WCH QA has that WCI is not<br />

working to the DDI QA program. (8/17) (8/3 1) DDI will be submitting QA Program rewrite this<br />

week. (9/7) The timeframe for the re-write has been pushed out. (9/22) DDI is revising their<br />

QA plan, will be Rev. 1. (10/5)<br />

* Discussed QA audit (DOE) from last week. DOE cited DDI's failure to implement QA plan.<br />

(10/5)


Progress Review Meeting<br />

Page 5<br />

* WCH QA requests copy of letter of authorization for DDI PM.<br />

XI.<br />

XII.<br />

FUTURE ASSESSMENTS<br />

* WCH will be issuing SDR this week to DDI for deficiencies for DDI Procurement<br />

Controls/Control or Purchased Items and Services. (FR-201 0-IF-0664-SDR-023) (8/24) DDI has<br />

received the SDR and indicated they will address issues. WCH QA and DDI PM to meet to<br />

discuss SDR and response. (9/28) Discussed SDR response for QA flowdown. (10/12)<br />

* WCH to issue SDR (FR.-201 0-IF-0749-SDR-024) to DDI for IH breathing air calibration issues.<br />

(10/12)<br />

0 DDI developing NCR #2, CAP to be provided to WCH for acceptance prior to<br />

resumption of use of breathing air equipment. (9/22)<br />

* WCH to provide SDR (FR-2010-IF-0826-SDR-025) today to DD I for IH equipment past the<br />

calibration date. (9/28)<br />

REQUESTS FOR INFORMATION<br />

a None.<br />

XIII. TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

" WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5/11) SDR issued to DDI. (5/18) Water line as-builts are being marked up for WCH review<br />

prior to being submitted. Drawings returned status 2 to DDI. DDI to rev drawing and it will be<br />

approved as status 1. (9/22) DDI anticipates Rev B. to be submitted Rev. 0 by COB this week.<br />

(10/5)<br />

* WCH in review of site absence coverage plan. (10/5)<br />

" DDI to provide WCH with MSDS sheets for Dust Bond and Propylene glycol. (10/12) These are<br />

with WCH for review. (10/26)<br />

XIV.<br />

XV.<br />

XVI.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

CORRESPONDENCE (since last meeting)<br />

" Weekly Progress Review Meeting Minutes 10/12/20 10<br />

* CN 012 - Letter to DDI to revise Proposal<br />

* SDR Letter to DDI: FR-2010-0826-SDR-025<br />

* Letter from DDI: Response to SDR FR-201 0-IF-2010-0826-025<br />

INVOICE AND PAYMENT STATUS<br />

* October month end was 10/24. DDI to submit invoice by the end of the week.<br />

* WCH has received invoice for final mobilization percentage, to be approved. There is a delay for<br />

potential overpayment on the design pay item, this is being researched.


Progress Review Meeting<br />

Page 6<br />

XVII. OTHER COMMENTS/NEW ACTION ITEMS<br />

* 1 00-K-78 pothole excavation for confirmatory sampling will be done on Friday, November 5.<br />

* A meeting will be held on Wednesday 10/27 at 2:00 with engineering to discuss the trench K<br />

odors and potential methods for additional engineering controls.<br />

* WCH asks if there is an "all-call" option available on the radios which, when triggered, makes an<br />

announcement over all of the radio channels. The option is not the scan function that<br />

automatically changes channels, but one that issues announcements simultaneously over all<br />

channels. WCH requests that DDI look into this and if available check into the costs of<br />

purchasing several for the project.<br />

0 WCH asks if it is feasible to set up a PID in the tent. DDI will evaluate. DDI has purchased a 36'<br />

extension wand for use with the 5-gas instrument, which is expected to be here this week.<br />

Attachment(s): As noted above.


.0 . 4.<br />

0<br />

I<br />

.0<br />

0 0<br />

*0<br />

8 ~ .0<br />

~ ro<br />

0 I I<br />

9 A Io<br />

LIIZZZ 111' ff1111<br />

~.I ~ 8 8 8~<br />

2 * a 8 8<br />

E ffff~<br />

8 ~,0A<br />

4C 4<br />

~ ~8 ~<br />

8 1 12'84<br />

8"4<br />

5 4 -4 A<br />

8 8 8 8 - 1<br />

8 0 - .~ 4<br />

220 0220 ~00 02 20 00.0<br />

A~r<br />

8 0<br />

00 10 I:<br />


Dance Designs Inc.<br />

118-K-i Burial Ground Remnediation Project<br />

Trench<br />

PRODUCTION SUMMARY<br />

For Week Ending: Friday, October 15, 2010<br />

Cans per DaybyTec<br />

Can Total<br />

_________10/11/2010 10/12/2010 10/13/2010 10/14/2010 10/15/2010<br />

Monday Tuesday Wednesday Thursday Friday _______<br />

C 0<br />

D/E/P __________ __0<br />

G _ ___ _0<br />

F 28 18 46<br />

J/ 4 __ _ 4<br />

K ______ 13 13<br />

M 0<br />

N 0<br />

0 22 3 _____ 25<br />

Total Cans 32 40 16 0 0 88<br />

PRODUCTION SUMMARY<br />

For Week Ending: Friday, October 22, 2010<br />

Trench .Cans<br />

per DayCaTol<br />

Iby Trench<br />

10/18/2010 10/19/2010 10/20/2010 10/21/2010 10/22/2010<br />

______ Monday Tuesday Wednesday Thursday Friday<br />

C 0<br />

D/E/P ______ _____0<br />

G 0<br />

F 0<br />

1______ 0<br />

J /L 24 11 35<br />

K 0<br />

M 0<br />

N 0<br />

0 0<br />

LTotal Cans 0 0 24 11 0 j 35


4-<br />

u<br />

E5 ~o t *<br />

0) 0<br />

(<br />

2<br />

uLA <<br />

CU ;;z-3<br />

030<br />

Z 2 E<br />

r ~ ~ (Uu<br />

m -Fa o iz<br />

Cl<br />

zU<br />

ui<br />

Y-Io<br />

9:<br />

D-<br />

c(U<br />

ul2<br />

E<br />

C Lnl- -<br />

0E m~t m urv<br />

Lt(<br />

M U U +1- 0icu<br />

E c m 222 4 -<br />

0 0 0 ..- 0-CCCC<br />

1<br />

~


0 00<br />

CV,<br />

00C<br />

00C<br />

a*L CD C)<br />

C<br />

0) 00<br />

Lu<br />

U)U<br />

_<br />

0 .0<br />

CL (D<br />

z c 0<br />

>- 0<br />

~Jo -<br />

ZC<br />

ze3.<br />

-o 0<br />

E Z<br />

C<br />

0<br />

.0.- 0<br />

Cl)' 0<br />

c:) E<br />

U)<br />

C.4)<br />

Nr_<br />

) C))~<br />

E 9c999 C<br />

C0 0 a CD (<br />

U) "I<br />

l<br />

I A6<br />

x- CDI C0 40


a~ 0 N<br />

0 2<br />

-<br />

E r: m~ AnF<br />

L)<br />

0<br />

v 0 0 e 0<br />

~ V<br />

-@ 75-O<br />

a Z 0<br />

O<br />

0<br />

t ' Ea<br />

2) 2S 0ow<br />

D>Oa o0 02 Q C<br />

jA3<br />

m a~ 00<br />

a 3: 00 00<br />

oo2<br />

r<br />

ZzO z Rz 0r j U E~-<br />

LD M 2 .~<br />

ZD Z Z ZZ (L<br />

0 0<br />

01<br />

0 0<br />

00<br />

0<br />

Z 0 0a 01<br />

CoO<br />

00)<br />

C-


Washington<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

MO = Christopher L. Beach §' ' J<br />

September 22, 2010 6<br />

CN<br />

AC:!M'<br />

E. L. Adamson X3-40 D. Bollinger (DDI)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

T. Dance (DDI) X3-17 Q. L. Grist X3-16<br />

A. Gagnon X9-08 R. W. Cross 114-25<br />

J. A. Heard H4-17 R. A. Dodd H4-24<br />

J. R. Soulia (DDI) X3-17 C. Flowers (DDI) X3-17<br />

H. C. Weber (DDI) X3-16 T. A. Foster N3-30<br />

H. Williams III X3-16 R. Ganapathy X3-40<br />

R. T.Hansen H4-17<br />

S. J. Huddleston X3-16<br />

W. R. Junkins X3-16<br />

S. E. Parnell X3-16<br />

D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control 114-11<br />

A meeting on the above subject was held on September 22, 2010 at 118-K, MO-755.<br />

I. SAFETY<br />

*Safety topic: Discussed insect stings, allergic reactions and safety precautions. Part of this<br />

discussion centered on emergencies and incident reporting and invoking <strong>Hanford</strong> Emergency<br />

Services.<br />

1I. ACTION ITEMS FROM LAST MEETING/STATUS<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/2010. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permnit is in hand, waiting for excavation permit. Plan to perform<br />

Z:\dmainistrative Assistant\Project Progress Review Weekly Meetings\2010\September\9.22-lO Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 100-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 1 9 th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 100-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

calcs on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/25) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pressures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm). (6/1) DDI is<br />

sending a letter to Watts to rework system for increased pressure. (6/8) DDI to submit letter,<br />

request for clarification for intent of water supply. (6/15) No change. (6/22) WCH has not<br />

received letter from DDI about water supply. (6/29) DDI states they send letter on 6/23, but<br />

WCH STR has not received copy. (7/6) WCH received letter 7/12. WCH PM is following up<br />

with CHPRC before responding to letter. (7/14) WCH PM followed up with the CHPRC Deputy<br />

Fire Marshal about the permit. They hope to have updated information to us by the end of the<br />

week. WCH discussed how using additional percentage of calcium chloride could control dust<br />

and use less water. It was also suggested that DDI look into bringing an additional water tower<br />

on site that could be filled at the start of the day to provide additional water. (7/20) DDI has<br />

submitted WCH suggestions to sub-tier for proposal if there is no increase in water permitted at<br />

the hydrant restrictor. (7/27) DDI has not received a response from WCI on alternative<br />

dust/water suppression chemicals or methods. CHPRC is restricting water on their site. They are<br />

evaluating methods other than the slow fill of the basins (still wells). WCH is concerned that<br />

WCI is allowing projects other than 11I8-K to fill their water trucks from the 11 8-K tank; it would<br />

appear that there is enough water if more than the 11 8-K project is using the tank. (8/3) WCH to<br />

provide a response to DDI by the end of the week. (8/10) WCH pushed issuing a formal<br />

response 8/19. (8/17) WCH will provide DDI a response letter today. (8/24) DDI has received<br />

the WCH response letter dated 8/24 and is issuing an SDR to their sub-tier. They are also looking<br />

at alternatives that WCH has previously suggested. (8/3 1) DDI anticipates submitting the as-


Progress Review Meeting<br />

Page 3<br />

built drawings no later than 9/8. (9/7) WCH in review, should be returned today (9/22)<br />

* Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This itemn will remain in these minutes until demobilization as a reminder. (8/10)<br />

* On 7/8/2010 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

review. To be scheduled for next week. (8/24) DDI to provide a letter response. Meeting<br />

rescheduled for Wednesday 9/1. (8/3 1) Meeting held last week, scheduling will continue as<br />

needed. (9/7) DDI would like to schedule this to follow the 9/27 1:00 meeting. (9/22)<br />

* WCH requests a full schedule update from DDI. (8/3) No update. (8/10) No update. (8/17) No<br />

update, but DDI to submit by end of the week. (8/24) DDI has provided status schedule to WCfl<br />

for review. (8/3 1) WCH PC is reviewing and working with DDI scheduler on details. (9/7) DDI<br />

needs to provide a full schedule on a monthly basis. (9/22)<br />

" DDI requests meeting next week to again discuss anomaly definition - tentatively scheduled for<br />

8/10 immediately following this meeting. (8/3) Meeting to be tentatively scheduled for later<br />

today. (8/10) Meeting scheduled for Wednesday 8/18. (8/17) Meeting pushed to another date<br />

TB3D. (8/24) Meeting rescheduled to Wednesday afternoon. (8/3 1) Rescheduled to Wednesday<br />

this week. (9/7) Meeting rescheduled for 9/28. (9/22)<br />

1I1. PROJECT DESIGN DRAWINGS<br />

*Waterline drawing draft in place to be walked down today. (8/24) DDI would still like<br />

walkdown prior to final submission. (8/3 1) DDI looks to submit by 9/8. (9/7)<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

o See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

* No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

" See attached.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

* See attached.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

" None.<br />

* WCH intends to begin working on Trench I silo work packages in early August. Tentative<br />

meeting set for 8/16 to discuss work package for Trench I silos. WCH to confirm with planners<br />

on schedule. (8/3) When the initial work package is developed, craft will be involved in the fine<br />

tuning of the WP. (8/10) Meeting postponed to Monday, 8/23. (8/17) Meeting moved to<br />

Wednesday 8/25 at 8:00. In the near future a WCH planner will be on site three days a week for<br />

support with work packages and technical procedure needs. (8/24) Informal review of existing


Progress Review Meeting<br />

Page 4<br />

work packages has begun by WCH Planners. WCH will involve DDI field personnel as the work<br />

draws closer. (8/3 1) Ongoing. (917)<br />

IX.<br />

MATERIAL<br />

*DDI is planning to begin the process of ordering ecology blocks that will be used in the Trench I<br />

Silo remediation. (7/27) DDI is planning for approximately 150 ecology blocks. (8/3)<br />

0 WCH will be issuing an additional change notice for trench I that will require provision of<br />

means and methods as well as materials such as ecology blocks. (8/10) DDI should plan for<br />

draft specification from WCH by the end of the week. (8/3 1) WCH still waiting on<br />

specifications from Design Engineering group to finalize issuing change notice for remainder<br />

of Trench I changes.<br />

X. QUALITY<br />

*WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/2 5) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCH QA in the near future. (6/2 9) DDI provided copy of surveillance by WCH QA. This<br />

surveillance will be ongoing this week and next. (7/14) The surveillance will be conducted on<br />

7/22 for this site. (7/20) This surveillance is ongoing to additional sub-tiers. Results are not<br />

anticipated to be positive. There appears to be serious issues with flowdown of DDI QA plan to<br />

sub tiers. WCH QA is concerned about how the QA plan is being implemented by sub-tiers.<br />

These issues are of considerable concern to WCH. (7/27) DDI and WCH QA to meet to discuss<br />

flow downs. (8/3) WCH QA will be issuing letter to DDI outlining the details of the<br />

surveillance results.<br />

o WCH QA still has concern about DDI flowdown to WCI. DDI indicated that WCI has<br />

provided letter indicating they intend to work to the DDI QA plan. DDI indicated they have<br />

not assessed WCI to determine that WCI is adhering to the QA plan. (8/10) DDI would like<br />

a response in writing outlining the concerns that WCII QA has that WCI is not working to the<br />

DDI QA program. (8/17) WCH will be issuing SDR this week to DDI for deficiencies. (FR-<br />

201 0-IF-0664-SDR-023) (8/24) DDI has received the SDR and indicated they will address<br />

issues. (8/3 1) DDI will be submitting QA Program rew-rite this week. (9/7) This has been<br />

pushed out. (9/22)<br />

o DDI developing NCR #2, CAP to be provided to WCH for acceptance prior to resumption of<br />

use of breathing air equipment. (9/22)<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

* None.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

* WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5111) SDR provided, no update. (5/18) No update. (5/25) No update. (6/8) Water line as-builts<br />

are being marked up for WCH review prior to being submitted. WCH stressed that the as-builts<br />

need to indicate the location of the water lines from hook up at the fence to the high tower. (6/8)<br />

No change. (6/15) No change. (6/22) WCH to provide new drawing number for the as-built<br />

drawing. (6/29) WCH will also provide a CADD base file to DDI for this drawing. (7/6) DDI


Progress Review Meeting<br />

Page 5<br />

has received base CADD file and is in process of updating drawing. They commit to<br />

resubmitting drawing by 7/21. (7/14) DDI is working with their design group to get the drawings<br />

updated, but DDI has had issues with the CADD file, submission bumped to 7/26. (7/20) DDI is<br />

reviewing the cost of drawing; anticipate submittal of drawing by 8/3. (7/27) Submittal delivery<br />

has been pushed to 8/12. (8/3) Drawing should be available for DDI review from their sub-tier by<br />

8/18, they will submit to WCH for review no later than 8/23. (8/10) Draft of waterline drawing<br />

will be walked down this afternoon. (8/24) Continuing. (8/3 1) Drawings returned status 2 to<br />

DDI. DDI to rev drawing and it will be approved as status 1. (9/22)<br />

WCH return traffic control drawings to DDI, status 2. DDI will be resubmitting soon<br />

incorporating the WCH commnents. DDI to submit this week. Drawings are with North Point for<br />

revision and will be resubmitted upon their return. DDI is well beyond the 30-day resubmission<br />

for updated drawings. WCH will be issuing an SDR regarding this issue. DDI has indicated they<br />

are working on a deficiency letter which will be submitted to Watts for this and several other<br />

deficiencies. (5/11) No update. (5/18) No update. (5/25) WCH received traffic control submittal<br />

6/3 and is in review of same. (6/8) WCH has returned to DDI status 2. (6/22) No change. (6/29)<br />

They commit to resubmitting drawing by 7/21 (7/14). DDI will install signs to match the traffic<br />

control drawing then resubmit. (7/20) Drawing should be available for DDI review from their<br />

sub-tier by 8/18, they will submit to WCH for review no later than 8/23. (8/10) WCH is in<br />

review of submitted drawing. (8/3 1) WCH anticipates returning this week with no comments.<br />

(9/7) Returned to DDI as status 1. (9/22)<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

0 See attached.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE (since last meeting)<br />

" Transmittal from DDI: Updated proposal for CN 007 R I<br />

" Transmittal from DDI: Response to CN 009 (Exhibit G)<br />

" Transmittal from DDI: Proposal for CN 019<br />

" Transmittal from DDI: Acknowledgement of CN 027<br />

* Letter from DDI: NCR 002-10<br />

* Weekly Progress Review Meeting Minutes 9/7/2010<br />

" Modification I to Contract C008753A00<br />

" CN029 Exhibit J, Greenhouse Gas Emissions<br />

IN VOICE AND PAYMENT STATUS<br />

* WCH to release partial release of 15% retention for deficiency for May and July. (9/22)<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

*None.<br />

Attachment(s): As noted above.


66<br />

CD -6<br />

0<br />

L<br />

0) Z<br />

3:'<br />

0- - j - - - - ---- -- -<br />

- L0q<br />

0 D<br />

0<br />

w00 00<br />

E<br />

0<br />

0<br />

C)-<br />

-s o 01 -j 0<br />

C)<br />

) 0 0<br />

ca~5<br />

co<br />

oD 0 *00 ~<br />

(A 0) me- m- m, ~<br />

0~ 00 ~<br />

C) 0~ c<br />

00 0444<br />

5- a - 0-~ cc- c - cc cc m<br />

0 - - 0. 0 0 - 0 -<br />

tu z zz 00 E! 4)4 Ai)0<br />

0 IN I- 000<br />

c CIA . C),.<br />

00~~~N 4 , 0 ~0 c<br />

m"4 N,,<br />

2 d -<br />

u. so ~z ro 5 o 0-<br />

0t 0 t0 0<br />

0S-<br />

In; , - s< 0 0 m<br />

0 C0<br />

a a ~ 0 C, Z 1 It<br />

La C)<br />

. > >q4 0 00 0 0 0 0.2 c 0 .<br />

uj N__ __,<br />

i7, 1,7<br />

LLI<br />

___ ------<br />

M/d


Dance Designs Inc.<br />

118-K-i Burial Ground Remediation Project<br />

PRODUCTION SUMMARY<br />

For Week Ending: Friday, September 10, 2010<br />

SCan Total<br />

Trench Cans per Day b~~~<br />

9/6/2010 9/7/2010 9/8/2010 9/9/2010 9 14/2010<br />

Monday Tuesday Wednesday -Thursday i Friday<br />

Trench C 0<br />

TrenchiJ 13 28 41<br />

Trench L 4 21 25<br />

Trench F 27 19 46<br />

Trench G,H __________ 0<br />

Trench K 29 4 7 41 81<br />

Trench D,E,P _____ ______ _____ ______ 0<br />

Trenchl _ _ _ _ _ _ _ _ _ _ _0<br />

Trench N______ ______ ____ __ 0<br />

TrenchO 0_ _ _ _ _ _ _ _ 0<br />

0<br />

......<br />

. .. ........<br />

...-....--<br />

..... ...... . .... ....... .......<br />

Tota Cans~ 46 31 40 35 41 1 193<br />

.- . . ~ --.-...-...........- . ......<br />

. . . . .......-.. ~<br />

PRODUCTION SUMMARY<br />

For Week Ending: Friday, September 17, 2010<br />

TrnhCans per Day 1 a oa<br />

Trenh A ' jby Trench<br />

9/6/2010 9/7/2010 9//009/9/2010 VI/10<br />

Monday Tuesday Wednesday Thursday ' Frrday<br />

Trench C __ ____0<br />

Trench i/L _____ ______ 42 ______42<br />

Trench F 42 48 26 116<br />

Trench G,H<br />

_____<br />

Trench K 10 12 22<br />

Trench D,EP_____<br />

_____0<br />

Trenchl__ _ _ _0<br />

Trench N __ ____ 0<br />

TrenchO 10 __ 2<br />

ToaCans 42 48 53 39 j 0 182<br />

0


Z Ln r -4 r4<br />

w >w<br />

a. (U io5<br />

ui0<br />

uu<br />

m<br />

CLi<br />

CL<br />

"a r 0, W~3 =<br />

0 in W) -<br />

U<br />

ZOI<br />

* o<br />

2 a<br />

00 wU<br />

(A<br />

00 r' r m<br />

C Lo LA rm<br />

u u Q U U-'.d-Ne<br />

= w mm cn H-- -<br />

oE~ E um m0N 0 00


N<br />

N<br />

(000<br />

C4<br />

NC'<br />

U* 0-) 0<br />

G))<br />

0 c~iO7<br />

0 U .2 . . -<br />

C0 7v -a<br />

U, ~) cc 0)<br />

o<br />

wD<br />

- w x<br />

M .)-<br />

-<br />

w C: (9 C* (<br />

0 0<br />

o o cc<br />

C =<br />

ZO) (D -o -c Oc<br />

0 0<br />

< - v.<br />

(IL<br />

Ec<br />

U)<br />

wl LL C3 F-<br />

U) 9<br />

CE C0>O


-Z 2 Q N 0 ,<br />

E o 2! Cm 3<br />

o0 2 2 28<br />

'0 0 - 0 ~<br />

i2 U 2~ o 0 75i- 2 Z<br />

f 0 0 z Z aUwzC . W zU~ xO0 3: M ; : z zz 0.<br />

0<br />

0<br />

L) 0<br />

0<br />

C) b 00<br />

0<br />

00 gh<br />

0 m .<br />

u (9 o<br />

"U<br />

o ;z<br />

M g f, cl<br />

-0<br />

?:-' 16 00I U


WCH Closure<br />

Washington<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 154578<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

November 2, 2010<br />

OWE 431SMDSRBTO a<br />

E. L. Adam'son X3-40 D. Bollinger (DDI)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Crist X3-16 R. W. Cross 114-25<br />

T. Dance (DDI) X3-17 R. A. Dodd H14-24<br />

A. Gagnon X9-08 C. Flowers (DDI) X3-17<br />

J. A. Heard H4-17 T. A. Foster N3-30<br />

S. E. Parnell X3-16 R. Ganapathy X3-40<br />

J. R. Soulia (DDI) X3-17 W. R. Junkins X3-16<br />

H. C. Weber (DDI) X3-17 R. T. Hansen H14-17<br />

H. Williams III X3-16 S. J. Huddleston X3-16<br />

D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control 114-11<br />

A meeting on the above subject was held on November 2, 2010 at 11 8-K, MO-755.<br />

1. SAIFETY<br />

*Safety topic: Discussed parental monitoring of children and their use of cell phones and internet,<br />

particularly-social networking sites.<br />

11. ACTION ITEMS FROM LAST MEETING/STATUS<br />

0 PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/2010. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

Z:'Administrative Assistant~roject Progress Review Weekly Meetings\2010\Novemberl 1-2-10 Weekly Progessdoc


Progress Review Meeting<br />

Page 2<br />

complete. Discussed that 1 00-K water will be shut-off this weekend. Friday work is pending.<br />

Further discussed backflow preventer versus air-gap installation requirements. DDI is pursuing<br />

additional changes to the water system tie-in. WCH met with CHPRC again on 2/22/2010. DDI<br />

to complete system construction while new permits are pending. Decision has been made to<br />

utilize the existing permits in place. DDI will begin to get materials on site to support installation<br />

of water tie-in to support installation date of Friday, 3/19/2010. Work inside the fence next door<br />

needs to be complete by the end of the weekend of the 1 9 th so not to disrupt their work. DDI<br />

indicated system should be operational the week of March 22. DDI waiting on materials, flow<br />

restrictors, tanks, calcium chloride. Underground installations completed in the 1 00-K area. DDI<br />

does not yet have parts on-site to complete the above ground installations to complete the tie-ins.<br />

DDI to provide information/details for additional flow requests. DDI to prepare as-built<br />

information prior to energizing system. High tank is in place and operational. DDI is having<br />

some issues with float valve that they are continuing to work through. Getting this system<br />

operational inside the burial ground needs to be a priority. DDI is working through a request by<br />

Watts for additional GPM. DDI is considering bringing in another sub to complete the water<br />

system project (4/20). DDI is evaluating a recalculation of water system requirements from Watts<br />

and will forward to WCH after review. Watts has been instructed by DDI to continue installation<br />

of the stabilization injection system related to the water system. WCH requests a P&ID of the<br />

water system (4/27). DDI is finalizing the P&ID and will submit this week (5/4). DDI has run<br />

calcs on the injection system pump production and recognizes that the pump proposed by Watts is<br />

significantly undersized. Therefore, the P&ID will not be submitted until this issue is resolved.<br />

WCH does not have a defined injection rate for the use of calcium chloride. (5/11) The use of<br />

calcium chloride or other soil bonding agents are a performance specification, not a specific<br />

requirement of WCH. No change. (5/18) Injection system to be complete by Wednesday May<br />

26, plan to demonstrate on Tuesday June 1. DDI has no plans to utilize a tank (as shown on<br />

previous sketch) or any type of pump to increase pressure. (5/25) System equipment<br />

configuration is complete, still need to test the remote water cannons with the current pressures.<br />

Discussed pressure needs for operating the system, additional pumps, tanks, etc. On 5/27, system<br />

was tested and it took 14 minutes for a water truck to fill (approximately 285 gpm). (6/1) DDI is<br />

sending a letter to Watts to rework system for increased pressure. (6/8) DDI to submit letter,<br />

request for clarification for intent of water supply. (6/15) No change. (6/22) WCH has not<br />

received letter from DDI about water supply. (6/29) DDI states they send letter on 6/23, but<br />

WCH STR has not received copy. (7/6) WCH received letter 7/12. WCH PM is following up<br />

with CHPRC before responding to letter. (7/14) WCH PM followed up with the CHPRC Deputy<br />

Fire Marshal about the permit. They hope to have updated information to us by the end of the<br />

week. WCH discussed how using additional percentage of calcium chloride could control dust<br />

and use less water. It was also suggested that DDI look into bringing an additional water tower<br />

on site that could be filled at the start of the day to provide additional water. (7/20) DDI has<br />

submitted WCH suggestions to sub-tier for proposal if there is no increase in water permitted at<br />

the hydrant restrictor. (7/27) DDI has not received a response from WCI on alternative<br />

dust/water suppression chemicals or methods. CHPRC is restricting water on their site. They are<br />

evaluating methods other than the slow fill of the basins (still wells). WCH is concerned that<br />

WCI is allowing projects other than 11 8-K to fill their water trucks from the 11 8-K tank; it would<br />

appear that there is enough water if more than the 11I8-K project is using the tank. (8/3) WCH to<br />

provide a response to DDI by the end of the week. (8/10) WCH pushed issuing a formal<br />

response 8/19. (8/17) WCH will provide DDI a response letter today. (8/24) DDI has received<br />

the WCH response letter dated 8/24 and is issuing an SDR to their sub-tier. They are also looking<br />

at alternatives that WCH has previously suggested. (8/3 1) DDI anticipates submitting the asbuilt<br />

drawings no later than 9/8. (9/7) WCH in review, should be returned today (9/22) DDI


Progress Review Meeting<br />

Page 3<br />

plans to submit as-built drawings (rev. 0) by the end of the week. (9/2 8) DDI still waiting on<br />

drawings from their subcontractor. Anticipate they will be received by the end of the week.<br />

(10/5) As-built is status 2 (will be revved to Status 1 upon receipt of Rev 0) and is with ARES<br />

for completion. (10/12) Per DDI PM, drawings can be issued with a PE stamp is there is a way<br />

to certify that the work was completed per the plans. WCH PM indicated there is non-emergency<br />

hydrant permit which should work for this. (10/26) DDI will be submitting final Rev 0 drawing<br />

today. (11/2)<br />

" Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This item will remain in these minutes until demobilization as a reminder. (8/10)<br />

* On 7/8/2010 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

review. To be scheduled for next week. (8/24) DDI to provide a letter response. Meeting<br />

rescheduled for Wednesday 9/1. (8/3 1) Meeting held last week, scheduling will continue as<br />

needed. (9/7) DDI would like to schedule this to follow the 9/27 1:00 meeting. (9/22) Meeting<br />

rescheduled for Monday at 1:00 p.m. (9/28) Delay impacts meeting scheduled for 10/6/10 at<br />

1:00. (10/5) Delay impacts meeting to be rescheduled, time T13D. (10/12) DDI has completed<br />

review and would like to meet again to put this issue to rest. Meeting will be scheduled as soon<br />

as possible. (10/26) Meeting rescheduled for today at 1:00 to discuss the last couple weeks. A<br />

meeting to discuss impacts TB3D. (11/2)<br />

" Stainless steel acid overpack decontamination needs to be completed. (10/12) This has not yet<br />

been done. Drums are currently contained in the anomaly staging area. (10/26) Characterization<br />

plan development is in process. The drums are in an exclusion zone due to the contamination on<br />

the outside of the drums. (11/2)<br />

* 100-K-78 pothole excavation for confirmatory sampling will be done on Friday, November 5.<br />

" A meeting will be held on Wednesday 10/27 at 2:00 with engineering to discuss the trench K<br />

odors and potential methods for additional engineering controls. (10/26) WCH is working with<br />

waste services for recommendations. Intent is to obtain a product to apply on soil which will help<br />

control the odors. (11/2)<br />

" WCH asks if there is an "all-call" option available on the radios which, when triggered, makes an<br />

announcement over all of the radio channels. The option is not the scan function that<br />

automatically changes channels, but one that issues announcements simultaneously over all<br />

channels. WCH requests that DDI look into this and if available check into the costs of<br />

purchasing several for the project. (10/26) DDI is still researching options. (11/2)<br />

" WCH asks if it is feasible to set up a PID in the tent. DDI will evaluate. DDI has purchased a 36'<br />

extension wand for use with the 5-gas instrument, which is expected to be here this week. (10/26)<br />

currently DDI is doing periodic PID monitoring in the tent. DDI does not plan to dedicate a PID<br />

to the tent at this time. (11/2)<br />

III.<br />

IV.<br />

PROJECT DESIGN DRAWINGS<br />

* None.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE


Progress Review Meeting<br />

Page 4<br />

* No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

* See attached.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

* See attached.<br />

* WCH asked when the third water truck is expected to arrive on site. (10/26) Per DDI this is the<br />

plan, but no definite date has been determined. (11/2)<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* WCH intends to begin working on Trench I silo work packages in early August. Tentative<br />

meeting set for 8/16 to discuss work package for Trench I silos. WCH to confirm with planners<br />

on schedule. (8/3) When the initial work package is developed, craft will be involved in the fine<br />

tuning of the WP. (8/10) Meeting postponed to Monday, 8/23. (8/17) Meeting moved to<br />

Wednesday 8/25 at 8:00. In the near future a WCH planner will be on site three days a week for<br />

support with work packages and technical procedure needs. (8/24) Informal review of existing<br />

work packages has begun by WCH Planners. WCH will involve DDI field personnel as the work<br />

draws closer. (8/3 1) Ongoing. (9/7). WCH would like to begin including DDI SS in the work<br />

package planning process. (9/28) Meeting scheduled for Thursday, 10/28 to discuss work<br />

package needs relating to overburden removal to locate the tops of the silos in Trench 1. (10/26)<br />

" Meeting to discuss the Sort and Loadout JHA Rev. I scheduled for 10/6/10 at 8:00. (10/5)<br />

Continuing. (10/12) The JHA is complete and ready for signatures. (10/26)<br />

IX.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

*WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an itemn of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCH QA in the near future. (6/29) DDI provided copy of surveillance by WCH QA. The<br />

surveillance will be ongoing this week and next. (7/14) Surveillance will be conducted on 7/22<br />

for this site. (7/20) Surveillance is ongoing to include additional sub-tiers. Results are not<br />

anticipated to be positive. WCH QA is concerned about how the QA plan is being implemented<br />

by sub-tiers. It appears that there are serious issues with flowdown of DDI QA plan to sub-tiers.<br />

These issues are of considerable concern to WCH. (7/2 7) DDI and WCH QA to meet to discuss<br />

flow downs. (8/3) WCH QA will issue letter to DDI outlining the details of the surveillance<br />

results. WCH QA still has concern about flowdown from DDI to WCI. DDI indicated that WCI<br />

(Watts) has provided letter to them indicating the intent to work to the DDI QA plan. DDI<br />

indicated they have not assessed WCI to determine that WCI is adhering to the QA plan. (8/10)<br />

DDI would like a response in writing outlining the concerns that WCH QA has that WCI is not<br />

working to the DDI QA programn. (8/17) (8/3 1) DDI will be submitting QA Program rewrite this<br />

week. (9/7) The timeframe for the re-write has been pushed out. (9/22) DDI is revising their


Progress Review Meeting<br />

Page 5<br />

QA plan, will be Rev. 1. (10/5)<br />

*Discussed QA audit (DOE) from last week. DOE cited DDI's failure to implement QA plan.<br />

(10/5) No change, this issue (IF-201 0-0531) remains open pending DDI corrective actions.<br />

(11/2)<br />

FUTURE ASSESSMENTS<br />

" WCH will be issuing SDR this week to DDI for deficiencies for DDI Procurement<br />

Controls/Control or Purchased Items and Services. (FR-201 0-IF-0664-SDR-023) (8/24) DDI has<br />

received the SDR and indicated they will address issues. WCH QA and DDI PM to meet to<br />

discuss SDR and response. (9/28) Discussed SDR response for QA flowdown. (10/ 12)<br />

" WCH to issue SDR (FR-20 1 -IF-0749-SDR-024) to DDI for IH breathing air calibration issues.<br />

(10/12)<br />

o<br />

DDI developing NCR #2, CAP to be provided to WCH for acceptance prior to<br />

resumption of use of breathing air equipment. (9/22)<br />

" WCH to provide SDR (FR-2010-IF-0826-SDR-025) today to DDI for IIH equipment past the<br />

calibration date. (9/28)<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

*None.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

" WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5/11) SDR issued to DDI. (5/18) Water line as-builts are being marked up for WCH review<br />

prior to being submitted. Drawings returned status 2 to DDI. DDI to rev drawing and it will be<br />

approved as status 1. (9/22) DDI anticipates Rev B. to be submitted Rev. 0 by COB this week.<br />

(10/5) This will be submitted today. (11/2)<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

0 See attached.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE (since last meeting)<br />

0 Weekly Progress Review Meeting Minutes 10/26/2010<br />

INVOICE AND PAYMENT STATUS<br />

* WCH has received invoice for final mobilization percentage, to be approved. There is a delay for<br />

potential overpayment on the design pay item, this is being researched.<br />

" DDI to submit October billing today.<br />

" RE payment for CN 026 to be submitted separately.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* None.<br />

Attachment(s): As noted above.


Vq<br />

'S<br />

2 F-<br />

-~~<br />

~ 198 -


Dance Designs Inc.<br />

118-K-i Burial Ground Remediation Project<br />

PRODUCTION SUMMARY<br />

For Week Ending: Friday, October 15, 2010<br />

C_____ 0<br />

i/L 6 2 8<br />

K _<br />

0_<br />

M<br />

_<br />

_<br />

N _ _ _ _ _8 8<br />

0 ______ 13 7 20<br />

0__<br />

_________<br />

_________0<br />

________<br />

_________ _________0 ________<br />

Total Cans 6 15 43 22 0 86


-<br />

0 E<br />

Ln E<br />

3: 0 wU<br />

o t~<br />

0- -~ 0U LU 4.<br />

- Z<br />

Z. 0<br />

Ln<br />

u<br />

Z 4- 2<br />

LUo<br />

mm<br />

r-4m ~<br />

rn<br />

q


C)<br />

"0 000<br />

tui<br />

00 00<br />

0>00<br />

E o<br />

M 4)<br />

m<br />

w - 2<br />

C. C<br />

M<br />

M<br />

0<br />

z0<br />

C<br />

E_ 0<br />

0<br />

a.0 0 .<br />

aaCD<br />

M CO<br />

CD 0


E<br />

0E<br />

E W - 0<br />

~<br />

Z~ 15 CLO0<br />

V 0 E E<br />

a ot00 0<br />

m L<br />

t2~. 2 000<br />

00<br />

oC<br />

:0<br />

CD 0<br />

U 0<br />

~0<br />

zo<br />

'Cp 0<br />

00 0<br />

*(6<br />

0 C0<br />

00 00<br />

2iEU


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 154583<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach 9" 2<br />

November 9, 2010 (<br />

DISRB<br />

UTIO<br />

E. L. Adamson X3-40 C. J. Adamson X3-16<br />

C. L. Beach X3-16 D. Bollinger (DDI)<br />

Q. L. Grist X3-16 R. D. Cantwell N3-30<br />

A. Gagnon X9-08 R. W. Cross H14-25<br />

J. A. Heard H14-17 T. Dance (DDI) X3-17<br />

S. E. Parnell X3-16 R. A. Dodd H4-24<br />

M. Sherman (DDI) X3-17 C. Flowers (DDI) X3-17<br />

J. R. Soulia (DDI) X3-17 T. A. Foster N3-30<br />

H. C. Weber (DDI) X3-17 R. Ganapathy X3-40<br />

H. Williams III X3-16 W. R. Junkins X3-16<br />

R. T. Hansen 114-17<br />

S. J. Huddleston X3-16<br />

D. G. Saueressig N3-30<br />

D. B. Teachout X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control 114-11<br />

A meeting on the above subject was held on November 9, 2010 at 118-K, MO-755.<br />

1. SAIFETY<br />

0 Safety topic: Displayed a chunk of concrete that had come off of an ecology block that was just<br />

delivered. Discussed hazards that the chunk might have caused had it come loose during transit.<br />

Cautioned DDI to discuss with delivery driver about checking their loads.<br />

IT.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

0 Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This item will remain in these minutes until demobilization as a reminder. (8/10)<br />

* On 7/8/2010 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

review. To be scheduled for next week. (8/24) DDI to provide a letter response. Meeting<br />

Z:\Administrative Assistant\Project Progress Review Weekly Meetings\20l0\November\l 1-9-10 Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

rescheduled for Wednesday 9/1. (8/3 1) Meeting held last week, scheduling will continue as<br />

needed. (9/7) DDI would like to schedule this to follow the 9/27 1:00 meeting. (9/22) Meeting<br />

rescheduled for Monday at 1:00 p.m. (9/28) Delay impacts meeting scheduled for 10/6/10 at<br />

1:00. (10/5) Delay impacts meeting to be rescheduled, time T13D. (10/12) DDI has completed<br />

review and would like to meet again to put this issue to rest. Meeting will be scheduled as soon<br />

as possible. (10/26) Meeting rescheduled for today at 1:00 to discuss the last couple weeks. A<br />

meeting to discuss impacts TB3D. (11/2) Delay status meeting today at 1:00. (11/9)<br />

* Stainless steel acid overpack decontamination needs to be completed. (10/12) This has not yet<br />

been done. Drums are currently contained in the anomaly staging area. (10/26) Characterization<br />

plan development is in process. The drums are in an exclusion zone due to the contamination on<br />

the outside of the drums. (11/2) No change. (11/9)<br />

" WCH asks if there is an "all-call" option available on the radios which, when triggered, makes an<br />

announcement over all of the radio channels. The option is not the scan function that<br />

automatically changes channels, but one that issues announcements simultaneously over all<br />

channels. WCH requests that DDI look into this and if available check into the costs of<br />

purchasing several for the project. (10/26) DDI is still researching options. (11/2) DDI has<br />

received a quote for this function and will look into scheduling to have the radios programmed<br />

over the Thanksgiving holiday. WCH to provide change notice for DDI to proceed with this.<br />

(11/9)<br />

I11. PROJECT DESIGN DRAWINGS<br />

*None.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

" No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

" See attached.<br />

VI.<br />

VII.<br />

VIII.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

* See attached.<br />

* WCH asked when the third water truck is expected to arrive on site. (10/26) Per DDI this is the<br />

plan, but no definite date has been determined. (11/2)<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

*WCH intends to begin working on Trench I silo work packages in early August. Tentative<br />

meeting set for 8/16 to discuss work package for Trench I silos. WCH to confirm with planners<br />

on schedule. (8/3) When the initial work package is developed, craft will be involved in the fine<br />

tuning of the WP. (8/10) Meeting postponed to Monday, 8/23. (8/17) Meeting moved to<br />

Wednesday 8/25 at 8:00. In the near future a WCH planner will be on site three days a week for<br />

support with work packages and technical procedure needs. (8/24) Informal review of existing<br />

work packages has begun by WCH Planners. WCH will involve DDI field personnel as the work<br />

draws closer. (8/3 1) Ongoing. (9/7). WCH would like to begin including DDI SS in the work


Progress Review Meeting<br />

Page 3<br />

package planning process. (9/2 8) Meeting scheduled for Thursday, 10/28 to discuss work<br />

package needs relating to overburden removal to locate the tops of the silos in Trench 1. (10/26)<br />

*Meeting to discuss the Sort and Loadout JHA Rev. 1 scheduled for 10/6/10 at 8:00. (10/5)<br />

Continuing. (10/ 12) The JHA is complete and ready for signatures. (10/26) Task instruction and<br />

JHA walkdown to be completed by end of the week. (11/9)<br />

IX.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

* WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an itemn of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCH QA in the near future. (6/29) DDI provided copy of surveillance by WCH QA. The<br />

surveillance will be ongoing this week and next. (7/14) Surveillance will be conducted on 7/22<br />

for this site. (7/20) Surveillance is ongoing to include additional sub-tiers. Results are not<br />

anticipated to be positive. WCH QA is concerned about how the QA plan is being implemented<br />

by sub-tiers. It appears that there are serious issues with flowdown of DDI QA plan to sub-tiers.<br />

These issues are of considerable concern to WCH. (7/27) DDI and WCH QA to meet to discuss<br />

flow downs. (8/3) WCH QA will issue letter to DDI outlining the details of the surveillance<br />

results. WCH QA still has concern about flowdown from DDI to WCI. DDI indicated that WCI<br />

(Watts) has provided letter to them indicating the intent to work to the DDI QA plan. DDI<br />

indicated they have not assessed WCI to determine that WCI is adhering to the QA plan. (8/10)<br />

DDI would like a response in writing outlining the concerns that WCH QA has that WCI is not<br />

working to the DDI QA program. (8/17) (8/3 1) DDI will be submitting QA Program rewrite this<br />

week. (9/7) The timeframne for the re-write has been pushed out. (9/22) DDI is revising their<br />

QA plan, will be Rev. 1. (10/5)<br />

" Discussed QA audit (DOE) from last week. DOE cited DDI's failure to implement QA plan.<br />

(10/5) No change, this issue (IF-20 10-053 1) remains open pending DDI corrective actions.<br />

(11/2)<br />

FUTURE ASSESSMENTS<br />

* WCH will be issuing SDR this week to DDI for deficiencies for DDI Procurement<br />

Controls/Control or Purchased Items and Services. (FR-201 0-IF-0664-SDR-023) (8/24) DDI has<br />

received the SDR and indicated they will address issues. WCH QA and DDI PM to meet to<br />

discuss SDR and response. (9/2 8) Discussed SDR response for QA flowdown. (10/12) WCH<br />

has received and accepted the CAP from DDI for SDR-023. Corrective action timeline has been<br />

extended to January. (11/9)<br />

* WCH to issue SDR (FR-20 10-IF-0749-SDR-024) to DDI for IH breathing air calibration issues.<br />

(10/12) WCH has received CAP from DDI. (11/9)<br />

* WCH to provide SDR (FR-201 0-IF-0826-SDR-025) today to DDI for IH equipment past the<br />

calibration date. (9/28) WCH has received CAP from DDI. (11/9)<br />

XI.<br />

REQUESTS FOR INFORMATION<br />

* None.


Progress Review Meeting<br />

Page 4<br />

XII.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE (since last meeting)<br />

* Weekly Progress Review Meeting Minutes 11/9/2010<br />

* CN 033 Provide one temporary building to be used at container transfer area<br />

IN VOICE AND PAYMENT STATUS<br />

*WCH will be releasing the 15% retainage related to the as-built drawings as they have been<br />

submitted and accepted status 1.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* Discussion of the results from 1 00-H cable break fact finding. Appears that uneven surfaces in<br />

the CTA may potentially create situations that could shock load the cable tension as the can is<br />

released to the ground.<br />

* Thursday, November 11I is the WCH All-Hands Meeting in town. All afternoon work will be<br />

pulled forward three hours. This will be the safety meeting for the week.<br />

* There will be an Emergency Preparedness Drill on Thursday morning.<br />

* A beryllium awareness packet needs to be given to any employee leaving the site to work<br />

elsewhere.<br />

Attachment(s): As noted above.


LU 0 :00<br />

C: d 1 Z Z<br />

00 L0l<br />

0 0<br />

) CD0 8<br />

o<br />

0o<br />

10 m0 w b00 0 05<br />

'-N<br />

~0-7<br />

0 0<br />

0-0<br />

a<br />

Ws0U<br />

a, 0a 0 m ~ 0VV r- 0 -<br />

0<br />

co 15.5 ><br />

0- . -00<br />

0.)<br />

0 0<br />

00 00<br />

0o<br />

4<br />

00w a,<br />

))<br />

a0<br />

40.00<br />

.<br />

0 0<br />

0<br />

0 .*0. ,0<br />

r. 2 E;<br />

z z zf3 C3c -Z z 0<br />

:1 0<br />

uS<br />

0 !0 C -<br />

Z 5. 0~ >0 C.o~ 0<br />

0 0 2<br />

1.11 m 0 zz 0<br />

z<br />

M ~ P 10<br />

Q 00 0 0 8 u 8. o) 00 0<br />

- O 0 0<br />

u ~ . 0<br />

to)<br />

(D M u


Dance Designs Inc.<br />

118-K-i Burial Ground Remediation Project<br />

PRODUCTION SUMMARY<br />

For Week Ending: Friday, November 5, 2010<br />

rr~rid~i~7ACan Cane<br />

vt<br />

11/1/2010 11/2/2010 11/3/2010 11/4/2010 11/5/2010<br />

Monday Tuesday Wednesday Thursday Friday<br />

C 0<br />

D/E/P ____ __0<br />

G 0<br />

F _____ ______ 11 25 36<br />

1______ ______ 0<br />

J /L _ _ _ _ _ _ _ _ _ _0<br />

K _ _ _ _ _ __ _ _0<br />

M _ _ _ _ _ __ _ _0<br />

N 33 27 27 87<br />

0 18 9<br />

__________<br />

________________<br />

________ _________ _________0<br />

_________________<br />

________<br />

_________0<br />

Total Cans 1 34 35 38 25 0 132


0<br />

E > ~ & .<br />

) 0 0 0 u<br />

In~~ z<br />

.<<br />

CL CuL -<br />

o E -atn<br />

a u<br />

cu m.4<br />

Cu<br />

C-C<br />

rn-<br />

r<br />

0 -E E0 UU CuE r* :<br />

i


0555<br />

(0<br />

U)<br />

0 C)C 0C<br />

Oc CD<br />

CN0404CI<br />

040<br />

0 (0 (<br />

V)<br />

0 00"<br />

4) CD CD<br />

C. 4)C4 -<br />

00<br />

zo -<br />

0<br />

Z C<br />

C<br />

0 ><br />

ca<br />

-C<br />

0<br />

)' 0<br />

- Cco<br />

N a)<br />

04<br />

9) 10('a<br />

0 C)<br />

I) 9999<br />

a) i e)<br />

. 0 De) 0D


c 0- 0 0<br />

z<br />

t2 2 * o000,W,<br />

m<br />

E E IL<br />

252<br />

o 0 coo<br />

cc<br />

0 .C.<br />

C ) Cl<br />

m<br />

cim<br />

-00<br />

'Ui<br />

Nc<br />

0 a,<br />

2O 0 Co I C 0<br />

4) **'U.C.<br />

-T'<br />

0 CC<br />

4))<br />

Z 8. 7 ~O<br />

4) -2<br />

cID<br />

co<br />

00 0<br />

CDz


DATE: November 9,2010<br />

WEEKLY PROGRESS MEETING<br />

11 8-K<br />

Attendance Roster<br />

NAME COMPANY PHONE MSIN<br />

-Il$4Ca ____v<br />

~-~3-/7o<br />

VJC<br />

3-cJ<br />

X3-(<br />

/4/J i &v '//c 32u ir<br />

'~~F<br />

R~rvx1 _ ____ __ __x<br />

-_7F____1V_3<br />

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ~3 _ /


WCH Closure<br />

WCH <strong>Hanford</strong><br />

Washington<br />

Meeting Minutes<br />

CCN: 154586<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

November 16, 2010<br />

IISTIUTO<br />

E. L. Adamson X3-40 C. J. Adamson X3-16<br />

C. L. Beach X3-16 D. Bollinger (DDI)<br />

Q. L. Grist X3-16 R. D. Cantwell N3-30<br />

A. Gagnon X9-08 R. W. Cross H4-25<br />

J. A. Heard H4-17 T. Dance (DDI) X3-17<br />

S. E. Parnell X3-16 R. A. Dodd H-4-24<br />

M. Sherman (DDI) X3-17 C. Flowers (DDI) X3-17<br />

J. R. Soulia (DDI) X3-17 T. A. Foster N3-30<br />

H. C. Weber (DDI) X3-17 R. Ganapathy X3-40<br />

H. Williams III X3-16 W. R. Junkins X3-16<br />

R. T. Hansen H4-17<br />

S. J. Huddleston X3-16<br />

D. G. Saueressig N3-30<br />

D. B. Teachout X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control 1-4-l11<br />

D<br />

A meeting on the above subject was held on November 16, 2010 at 11 8-K, MO-755.<br />

1. SAFETY<br />

*Safety topic: Snow and winter weather conditions are forecasted for Friday. Are you prepared?<br />

Also discussed keeping focused on work and not the upcoming holiday.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This item will remain in these minutes until demobilization as a reminder. (8/10)<br />

* On 7/8/2010 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

review. To be scheduled for next week. (8/24) DDI to provide a letter response. Meeting<br />

rescheduled for Wednesday 9/1. (8/3 1) Meeting held last week, scheduling will continue as<br />

Z:\Administrative Assistant\Pmject Progress Review Weekly Meetirigs\2010\November\l 1-16-10 Weekly Proges.doc


Progress Review Meeting<br />

Page 2<br />

needed. (9/7) DDI would like to schedule this to follow the 9/27 1:00 meeting. (9/22) Meeting<br />

rescheduled for Monday at 1:00 p.m. (9/28) Delay impacts meeting scheduled for 10/6/10 at<br />

1:00. (10/5) Delay impacts meeting to be rescheduled, time TBD. (10/12) DDI has completed<br />

review and would like to meet again to put this issue to rest. Meeting will be scheduled as soon<br />

as possible. (10/26) Meeting rescheduled for today at 1:00 to discuss the last couple weeks. A<br />

meeting to discuss impacts TBD. (11/2) Delay status meeting today at 1:00. (11/9) WCH and<br />

DDI met on 11/15/2010 and will continue these discussions. (11/16)<br />

* Stainless steel acid overpack decontamination needs to be completed. (10/12) This has not yet<br />

been done. Drums are currently contained in the anomaly staging area. (10/26) Characterization<br />

plan development is in process. The drums are in an exclusion zone due to the contamination on<br />

the outside of the drums. (11/2) No change. (11/9) WCH is developing a characterization plan.<br />

(11/16)<br />

* WCI{ asks if there is an "all-call" option available on the radios which, when triggered, makes an<br />

announcement over all of the radio channels. The option is not the scan function that<br />

automatically changes channels, but one that issues announcements simultaneously over all<br />

channels. WCH requests that DDI look into this and if available check into the costs of<br />

purchasing several for the project. (10/26) DDI is still researching options. (11/2) DDI has<br />

received a quote for this function and will look into scheduling to have the radios programmed<br />

over the Thanksgiving holiday. WCH to provide change notice for DDI to proceed with this.<br />

(11/9) DDI has plans to take all the radios off site on 11/23 for reprogramming; over the holiday<br />

period. (11/16)<br />

* WCH will follow-up on procurement of odor control materials for potential use in Trench K.<br />

" RCTs working on survey of trenches D, E, P and G.<br />

111. PROJECT DESIGN DRAWINGS<br />

0 None.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

" DDI to add Trench I silo work to the schedule.<br />

V. WEEKLY PRODUCTION TABLE<br />

" No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

* See attached.<br />

VI.<br />

VII.<br />

VIII.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

* See attached.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDT<br />

*WCH intends to begin working on Trench I silo work packages in early August. Tentative<br />

meeting set for 8/16 to discuss work package for Trench I silos. WCH to confirm with planners<br />

on schedule. (8/3) When the initial work package is developed, craft will be involved in the fine<br />

tuning of the WP. (8/10) Meeting postponed to Monday, 8/23. (8/17) Meeting moved to<br />

Wednesday 8/25 at 8:00. In the near future a WCH planner will be on site three days a week for


Progress Review Meeting<br />

Page 3<br />

support with work packages and technical procedure needs. (8/24) Informal review of existing<br />

work packages has begun by WCH Planners. WCH will involve DDI field personnel as the work<br />

draws closer. (8/3 1) Ongoing. (9/7). WCH would like to begin including DDI S S in the work<br />

package planning process. (9/28) Meeting scheduled for Thursday, 10/28 to discuss work<br />

package needs relating to overburden removal to locate the tops of the silos in Trench 1. (10/26)<br />

The plan is to have the JHA complete by 11/18/2010. There may be additional changes or tweaks<br />

after the dry runs are completed. (11/16)<br />

*Meeting to discuss the Sort and Loadout JHA Rev. 1 scheduled for 10/6/10 at 8:00. (10/5)<br />

Continuing. (10/ 12) The IHA is complete and ready for signatures. (10/26) Task instruction and<br />

JHA walkdown to be completed by end of the week. (11/9) Work package is expected to be<br />

completed soon, hopefully this week. (11/16)<br />

IX<br />

MATERIAL<br />

e None.<br />

X. QUALITY<br />

" WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCLT. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCH QA in the near future. (6/29) DDI provided copy of surveillance by WCH QA. The<br />

surveillance will be ongoing this week and next. (7/14) Surveillance will be conducted on 7/22<br />

for this site. (7/20) Surveillance is ongoing to include additional sub-tiers. Results are not<br />

anticipated to be positive. WCH QA is concerned about how the QA plan is being implemented<br />

by sub-tiers. It appears that there are serious issues with flowdown of DDI QA plan to sub-tiers.<br />

These issues are of considerable concern to WCH. (7/27) DDI and WCH QA to meet to discuss<br />

flow downs. (8/3) WCH QA will issue letter to DDI outlining the details of the surveillance<br />

results. WCH QA still has concern about flowdown from DDI to WCI. DDI indicated that WCI<br />

(Watts) has provided letter to them indicating the intent to work to the DDI QA plan. DDI<br />

indicated they have not assessed WCI to determine that WCI is adhering to the QA plan. (8/10)<br />

DDI would like a response in writing outlining the concerns that WCH QA has that WCI is not<br />

working to the DDI QA program. (8/17) (8/3 1) DDI will be submitting QA Program rewrite this<br />

week. (9/7) The timeframe for the re-write has been pushed out. (9/22) DDI is revising their<br />

QA plan, will be Rev. 1. (10/5) SDR-023 CAP has been accepted by WCH. (11/16)<br />

" Discussed QA audit (DOE) from last week. DOE cited DDI's failure to implement QA plan.<br />

(10/5) No change, this issue (IF-20 10-053 1) remains open pending DDI corrective actions.<br />

(11/2)<br />

FUTURE ASSESSMENTS<br />

" WCH will be issuing SDR this week to DDI for deficiencies for DDI Procurement<br />

Controls/Control or Purchased Items and Services. (FR-2010-IF-0664-SDR-023) (8/24) DDI has<br />

received the SDR and indicated they will address issues. WCH QA and DDI PM to meet to<br />

discuss SDR and response. (9/28) Discussed SDR response for QA flowdown. (10/12) WCH<br />

has received and accepted the CAP from DDI for SDR-023. Corrective action timeline has been<br />

extended to January. (11/9)<br />

" WCH to issue SDR (FR-201 0-IF-0749-SDR-024) to DDI for Ill breathing air calibration issues.<br />

(10/12) WCH has received CAP from DDI. (11/9)


Progress Review Meeting<br />

Page 4<br />

*WCH to provide SDR (FR-2010-IF-0826-SDR-025) today to DDI for Iii equipment past the<br />

calibration date. (9/28) WCH has received CAP from DDI. (11/9)<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

* None.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

* DDI to contact WCH EPL for clarification of greenhouse gases requirements.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE (since last meeting)<br />

" Letter from DDI: Project Manager Key Personnel Position (approved)<br />

" Transmittal from DDI: Acknowledgement of CN 033<br />

INVOICE AND PAYMENT STATUS<br />

* None.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* Beryllium training for on-site craft supervision has been scheduled.<br />

" Planned dry run for Trench Ito being 11/29.<br />

* WCH will observe the Thanksgiving holiday on November 24 and 25.<br />

* A meeting will be held 11/17 to discuss change notices 015, 016, 030, and 032.<br />

Attachment(s): As noted above.


C) 0<br />

0<br />

o~~ -CI Wn<br />

------<br />

o<br />

m<br />

o zD z<br />

0 00<br />

:; -.<br />

0<br />

CDa -~<br />

C z zaZ 6 a0 t ~ -6 z < 4 ~ ~


Z un -4w kD'- ) 1<br />

0 ><br />

I- I-o<br />

E w<br />

E<br />

bA 0 ><br />

0 -Z<br />

M "<br />

u00<br />

UJO m~<br />

mr-<br />

0 -0<br />

C<br />

0U Q<br />

U U u<br />

-<br />

E cu m E- 4 ~ -<br />

QJJ !:e .* , t VH tn<br />

H<br />

SCU<br />

C-<br />

Cn


U)<br />

0<br />

0o 0<br />

U) 2<br />

z<br />

3<br />

cc)<br />

'4)<br />

CO)<br />

m<br />

~ E3<br />

zv<br />

m I~cu<br />

co0<br />

C6c.<br />

0a<br />

CM<br />

.0 94 ~


a 0- 00 002<br />

E U)~ -<br />

-0 o0<br />

z z 5 m 5 m<br />

CL<br />

E<br />

2L<br />

L) 2L<br />

><br />

____ __ ___, : EE EE<br />

N<br />

0<br />

o<br />

*<br />

o<br />

0<br />

c<br />

z<br />

m<br />

I<br />

z<br />

N; I t- N<br />

i2<br />

:!W0<br />

0,D<br />

cu0<br />

U<br />

0o<br />

N 00<br />

U<br />

E<br />

E<br />

z 22 w<br />

0~C re .5<br />

I<br />

S o ~ o<br />

al C? 0e<br />

~ ~ WR<br />

C<br />

o<br />

9U a<br />

z<br />

z<br />

No<br />

c:4 cb e6 u %<br />

c4<br />

ND 0)<br />

c)<br />

-o -- L<br />

PI


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 154589<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

November 16, 2010<br />

ATEDE<br />

DISTRBUTIO<br />

C. L. Beach X3-16 C. J. Adamson X3-16<br />

Q. L. Grist X3-16 E. L. Adamson X3-40<br />

A. Gagnon X9-08 D. Bollinger (DDI)<br />

S. E. Parnell X3-16 R. D. Cantwell N3-30<br />

D. G. Saueressig N3-30 R. W. Cross H4-25<br />

J. R. Soulia (DDI) X3-17 T. Dance (DDI) X3-17<br />

R. A. Dodd H4-24<br />

C. Flowers (DDI) X3-17<br />

T. A. Foster N3-30<br />

R. Ganapathy X3-40<br />

J. A. Heard 114-17<br />

W. R. Junkins X3-16<br />

R. T. Hansen 114-17<br />

S. J. Huddleston X3-16<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

H. C. Weber (DDI) X3-17<br />

H. Williams III X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control 1-4-l11<br />

A meeting on the above subject was held on November 30, 2010 at 118-K, MO-755.<br />

I. SAFETY<br />

* Safety topic: Watch for changing road conditions in this winter weather. Winter driving required<br />

your full attention.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

" Prior to moving the truck scale with the non-conforming lifing eye, a lift plan will be developed.<br />

(8/3) This item will remain in these minutes until demobilization as a reminder. (8/10)<br />

* On 7/8/2010 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Z:\Administrative Assistant\Project Progress Review Weekly Meetings\2010\November\1 1-16-113 Weekly Progressedoc


Progress Review Meeting<br />

Page 2<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

review. To be scheduled for next week. (8/24) DDI to provide a letter response. Meeting<br />

rescheduled for Wednesday 9/1. (8/3 1) Meeting held last week, scheduling will continue as<br />

needed. (9/7) DDI would like to schedule this to follow the 9/27 1:00 meeting. (9/22) Meeting<br />

rescheduled for Monday at 1:00 p.m. (9/28) Delay impacts meeting scheduled for 10/6/10 at<br />

1:00. (10/5) Delay impacts meeting to be rescheduled, time TBD. (10/12) DDI has completed<br />

review and would like to meet again to put this issue to rest. Meeting will be scheduled as soon<br />

as possible. (10/26) Meeting rescheduled for today at 1:00 to discuss the last couple weeks. A<br />

meeting to discuss impacts TBD. (11/2) Delay status meeting today at 1:00. (11/9) WCH and<br />

DDI met on 11/15/2010 and will continue these discussions. (11/16) WCH would like to have<br />

complete agreement on delays so DDI is in a position to submit request for delays past 45 days.<br />

The weekly meetings will resume beginning Thursday, 12/2. (11/30)<br />

* Stainless steel acid overpack decontamination needs to be completed. (10/12) This has not yet<br />

been done. Drums are currently contained in the anomaly staging area. (10/26) Characterization<br />

plan development is in process. The drums are in an exclusion zone due to the contamination on<br />

the outside of the drums. (11/2) No change. (11/9) WCH is developing a characterization plan.<br />

(11/16) No update. (11/30)<br />

* WCH asks if there is an "all-call" option available on the radios which, when triggered, makes an<br />

announcement over all of the radio channels. The option is not the scan function that<br />

automatically changes channels, but one that issues announcements simultaneously over all<br />

channels. WCH requests that DDI look into this and if available check into the costs of<br />

purchasing several for the project. (10/26) DDI is still researching options. (11/2) DDI has<br />

received a quote for this function and will look into scheduling to have the radios programmed<br />

over the Thanksgiving holiday. WCH to provide change notice for DDI to proceed with this.<br />

(11/9) DDI has plans to take all the radios off site on 11/23 for reprogramming over the holiday<br />

period. (11/16) Reprogramming of the radios has been delayed until mid-December due to the<br />

unavailability of the vendor. (11/30)<br />

" WCH will follow-up on procurement of odor control materials for potential use in Trench K.<br />

(11/16) WCH 1HI suggested using a charcoal substance to mix with the soil rather than using the<br />

proposed odor control chemical. No update past this recommendation from ll. WCH to followup<br />

onthis. (11/30)<br />

* RCTs working on survey of trenches D, E, P and G to prepare for GPERS survey. (11/16)<br />

Surveys on hold due to weather conditions. (11/30)<br />

* Beryllium training for on-site craft supervision has been scheduled. (11/16) Discussed REA,<br />

CN, etc. (11/30)<br />

" Planned dry run for Trench I to begin 11/29. (11/16) Start pushed out due to weather. (11/30)<br />

" A meeting will be held 11/17 to discuss change notices 015, 016, 030, and 032. (11/16)<br />

III.<br />

IV.<br />

PROJECT DESIGN DRAWINGS<br />

* None.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

" None.<br />

* DDI to add Trench I silo work to the schedule.<br />

V. WEEKLY PRODUCTION TABLE<br />

*No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.


Progress Review Meeting<br />

Page 3<br />

* None.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* None.<br />

EQUIPMENT<br />

o None.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

*WCH intends to begin working on Trench I silo work packages in early August. Tentative<br />

meeting set for 8/16 to discuss work package for Trench I silos. WCH to confirm with planners<br />

on schedule. (8/3) When the initial work package is developed, craft will be involved in the fine<br />

tuning of the WP. (8/10) Meeting postponed to Monday, 8/23. (8/17) Meeting moved to<br />

Wednesday 8/25 at 8:00. In the near future a WCH planner will be on site three days a week for<br />

support with work packages and technical procedure needs. (8/24) Informal review of existing<br />

work packages has begun by WCH Planners. WCH will involve DDI field personnel as the work<br />

draws closer. (8/3 1) Ongoing. (9/7). WCH would like to begin including DDI SS in the work<br />

package planning process. (9/28) Meeting scheduled for Thursday, 10/28 to discuss work<br />

package needs relating to overburden removal to locate the tops of the silos in Trench 1. (10/26)<br />

The plan is to have the JHA complete by 11/18/2010. There may be additional changes or tweaks<br />

after the dry runs are completed. (11/16) WCH SMRT review scheduled, final work package<br />

should be available for approval next week. (11/30)<br />

IX.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

" WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) DDI is revising their QA plan, will be Rev. 1. (10/5) SDR-023 CAP has<br />

been accepted by WCH. (11/16)<br />

" Discussed QA audit (DOE) from last week. DOE cited DDI's failure to implement QA plan.<br />

(10/5) No change, this issue (IF-2010-053 1) remains open pending DDI corrective actions.<br />

(11/2)<br />

FUTURE ASSESSMENTS<br />

" WCH will be issuing SDR this week to DDI for deficiencies for DDI Procurement<br />

Controls/Control or Purchased Items and Services. (FR-2010-IF-0664-SDR-023) (8/24) WCH<br />

has received and accepted the CAP from DDI for SDR-023. Corrective action timeline has been<br />

extended to January. (11/9)<br />

* WCII to issue SDR (FR-201 0-IF-0749-SDR-024) to DDI for IH breathing air calibration issues.<br />

(10/12) WCH has received CAP from DDI. (11/9) WCH to perform follow-up surveillance for<br />

implementation of CAP. (11/30)<br />

" WCI{ to provide SDR (FR-201 0-IF-0826-SDR-025) today to DDI for IIH equipment past the<br />

calibration date. (9/28) WCH has received CAP from DDI. (11/9) WCH to perform follow-up<br />

surveillance for implementation of CAP. (11/30)<br />

XI.<br />

REQUESTS FOR INFORMATION<br />

*None.


Progress Review Meeting<br />

Page 4<br />

XII.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

0 None.<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

" DDI to contact WCH EPL for clarification of greenhouse gases requirements.<br />

* WCH to prepare change notice for radio reprogramming costs. (11/30)<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE (since last meeting)<br />

* Transmittal from DDI: Acknowledgement of CN 033<br />

" Letter from DDI: Response to CN 015 Two Days Standby<br />

* Letter from DDI: Response to CN 012 Modification to requirement for issued for construction<br />

drawings<br />

" Weekly Progress Review Meeting Minutes 11I/ 16/2010<br />

INVOICE AND PAYMENT STATUS<br />

* DDI should be submitting November invoice this week.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

0<br />

Attachment(s): As noted above.


E<br />

a~ ZO 0,2 070<br />

2 0 >,C<br />

z 2o.2 2 0<br />

z: 0<br />

0 12 C<br />

'S ; : .02.0<br />

C3<br />

0 In ~<br />

C3<br />

z<br />

c<br />

N<br />

0 5 0<br />

a z<br />

r. -<br />

00<br />

A0 0 m<br />

E<br />

.0<br />

z<br />

0<br />

E<br />

w<br />

z .9 2 m c<br />

0 (D<br />

Q '2<br />

(A 2<br />

ao ~0.<br />

991 2<br />

LU<br />

C<br />

0<br />

Iz


wcHClosure<br />

CCN: 155878<br />

Washington<br />

WC H <strong>Hanford</strong><br />

Meeting Minutes<br />

J1Z2=WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

M ~lkl Christopher L. Beach ~<br />

Kly-AIMDecember 28, 2010<br />

* IS R BUMN<br />

C. J. Adamson X3-16 E. L. Adamson X3-40<br />

C. L. Beach X3-16 D. Bollinger (DDI)<br />

A. Gagnon X9-08 R. D. Cantwell N3-30<br />

J. A. Heard H4-17 Q. L. Grist X3-16<br />

S. E. Parnell X3-16 T. Dance (DDI) X3-17<br />

J. R. Soulia (DDI) X3-17 J. L. Dennis N3-30<br />

H. C. Weber (DDI) X3-17 R. A. Dodd 114-24<br />

C. Flowers (DDI) X3-17<br />

T. A. Foster N3-30<br />

R. Ganapathy X3-40<br />

W. R. Junkins X3-16<br />

R. T. Hansen 114-17<br />

S. J. Huddleston X3-16<br />

D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

H. Williams III X3-16<br />

J. E. Vermaas N3-30<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control 114-11<br />

A meeting on the above subject was held on December 28, 2010 at 11I8-K, MO-755.<br />

1. SAFETY<br />

0 Safety topic: Discussed hand and finger injuries, hazards of pinch points.<br />

Ii.<br />

ACTION ITEMS FROM LAST MEETING/STATUS,<br />

" Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This item will remain in these minutes until demobilization as a reminder. (8/10)<br />

" On 7/8/20 10 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

Z:\Adnministrative Assistant\Project Progress Review Weekly Meetings\2010\December\12-28-1O Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

review. To be scheduled for next week. (8/24) DDI to provide a letter response. Meeting<br />

rescheduled for Wednesday 9/1. (8/3 1) Meeting held last week, scheduling will continue as<br />

needed. (9/7) DDI would like to schedule this to follow the 9/27 1:00 meeting. (9/22) Meeting<br />

rescheduled for Monday at 1:00 p.m. (9/28) Delay impacts meeting scheduled for 10/6/10 at<br />

1:00. (10/5) Delay impacts meeting to be rescheduled, time TBD. (10/12) DDI has completed<br />

review and would like to meet again to put this issue to rest. Meeting will be scheduled as soon<br />

as possible. (10/26) Meeting rescheduled for today at 1:00 to discuss the last couple weeks. A<br />

meeting to discuss impacts TBD. (11/2) Delay status meeting today at 1:00. (11/9) WCH and<br />

DDI met on 11/15/2010 and will continue these discussions. (11/16) WCH would like to have<br />

complete agreement on delays so DDI is in a position to submit request for delays past 45 days.<br />

The weekly meetings will resume beginning Thursday, 12/2. (11/30) Currently, delays have been<br />

discussed through the end of November. DDI to respond to WCH letter regarding delays.<br />

Moving forward, DDI will follow the equipment and manpower process as lined out in Exhibit B<br />

from this date forward. (12/7) WCH is requesting that DDI provide a letter of agreement on the<br />

45-day of scheduled delays. In return, WCH will provide to DDI a letter agreeing to a calculated<br />

method versus TIA for delays. November 30th was the last day of the 45-day of delays. (12/14)<br />

WCH to respond to 12/15/10 DDI delays letter, concurrent to meeting 45 days of Exhibit B<br />

delays as of 11/30/10. This letter will include explanation of how the delay days were<br />

determined/calculated. (12/28)<br />

" Stainless steel acid overpack decontamination needs to be completed. (10/12) This has not yet<br />

been done. Drums are currently contained in the anomaly staging area. (10/26) Characterization<br />

plan development is in process. The drums are in an exclusion zone due to the contamination on<br />

the outside of the drums. (11/2) No change. (11/9) WCH is developing a characterization plan.<br />

(11/16) No update. (11/30) Characterization plan is with WCH Engineering for review. (12/7)<br />

No update. (12/14) Characterization plan is at the planning for evaluation. (12/28)<br />

" WCH asks if there is an "all-call" option available on the radios which, when triggered, makes an<br />

announcement over all of the radio channels. The option is not the scan function that<br />

automatically changes channels, but one that issues announcements simultaneously over all<br />

channels. WCH requests that DDI look into this and if available check into the costs of<br />

purchasing several for the project. (10/26) DDI is still researching options. (11/2) DDI has<br />

received a quote for this function and will look into scheduling to have the radios programmed<br />

over the Thanksgiving holiday. WCH to provide change notice for DDI to proceed with this.<br />

(11/9) DDI has plans to take all the radios off site on 11/23 for reprogramming over the holiday<br />

period. (11/16) Reprogramming of the radios has been delayed until mid-December due to the<br />

unavailability of the vendor. (11/30) WCH has 30 radios. (12/7) Plan to reprogram radios has<br />

been pushed to either the Christmas or New Year break in work. All radios will be<br />

reprogrammed to receive the announcement, and three radios will have the broadcast function. A<br />

total of sixty radios in all. DDI requests a change notice for the cost of the reprogramming.<br />

(12/14) DDI has had all radios reprogrammed and redistributed. DDI to provide CN proposal by<br />

COB this week. (12/28)<br />

" WCH will follow-up on procurement of odor control materials for potential use in Trench K.<br />

(11/16) WCH 11- suggested using a charcoal substance to mix with the soil rather than using the<br />

proposed odor control chemical. No update past this recommendation from I1H. WCH to followup<br />

on this. (11/30) No viable engineering controls are available. On the next available Friday,<br />

the crew will do a thorough resort and mix of Trench K. (12/7) Re-sort successfully performed on<br />

12/10. WCH has some work package and management requirements that need to be satisfied<br />

before work can begin again in Trench K. (12/14) Secondary Sort of odorous materials to begin<br />

Monday, 1/3. (12/28)


Progress Review Meeting<br />

Page 3<br />

" RCTs working on survey of trenches D, E, P and G to prepare for GPERS survey. (11/16)<br />

Surveys on hold due to weather conditions. (11/30) Surveys to begin, weather and personnel<br />

permitting. (12/14) Not completed yet. (12/28)<br />

* Beryllium training for on-site craft supervision has been scheduled. (11/16) Discussed REA,<br />

CN, etc. (11/30) WCH to finalize scheduling for remaining DDI supervisory personnel for<br />

beryllium supervisor training. The next scheduled class to be 1/19. (12/14) Flowers and<br />

Holbrook are scheduled to complete the training on 1/19. (12/28)<br />

* Planned dry run for Trench Ito begin 11/29. (11/16) Start pushed out due to weather. (11/30)<br />

Need to pinpoint starting dates for dry runs now that equipment is located in the HRA. WCH to<br />

review the PSR to determine what will be evaluated for readiness from the dry run. (12/7) A dry<br />

run checklist will be developed after the holidays for the 400 excavator. (12/14) Dry run in<br />

Trench A to begin 1/3/11 as planned. (12/2 8)<br />

" DDI requests trenches D, E, P, and G retainage release. WCH is evaluating this. (12/14) RCTs<br />

scheduled to begin surveys of trenches D and P on 1/3/11. (12/28)<br />

111. PROJECT DESIGN DRAWINGS<br />

o None.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

" No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

" Trench I Work Package training scheduled for 1/4/11.<br />

* TWP/BWP training scheduled for 1/4/11 and 1/5/11.<br />

* None.<br />

VI.<br />

VII.<br />

MANPOWER<br />

0 See attached.<br />

EQUIPMENT<br />

* See attached.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

*WCH intends to begin working on Trench I silo work packages in early August. Tentative<br />

meeting set for 8/16 to discuss work package for Trench I silos. WCH to confirm with planners<br />

on schedule. (8/3) When the initial work package is developed, craft will be involved in the fine<br />

tuning of the WP. (8/10) Meeting postponed to Monday, 8/23. (8/17) Meeting moved to<br />

Wednesday 8/25 at 8:00. In the near future a WCH planner will be on site three days a week for<br />

support with work packages and technical procedure needs. (8/24) Informal review of existing<br />

work packages has begun by WCH Planners. WCH will involve DDI field personnel as the work<br />

draws closer. (8/3 1) Ongoing. (9/7). WCH would like to begin including DDI SS in the work<br />

package planning process. (9/28) Meeting scheduled for Thursday, 10/28 to discuss work<br />

package needs relating to overburden removal to locate the tops of the silos in Trench 1. (10/26)<br />

The plan is to have the JHA complete by 11/18/2010. There may be additional changes or tweaks<br />

after the dry runs are completed. (11/16) WCH SMRT review scheduled, final work package<br />

should be available for approval next week. (11/30) No change, plan to have review by the end


Progress Review Meeting<br />

Page 4<br />

of the week. (12/7) Work Package is with the planners and should be signed off by the end of<br />

this week. (12/14) Trench I work package is complete. (12/28)<br />

IX.<br />

MATERIAL<br />

0 None.<br />

X. QUALITY<br />

o None.<br />

FUTURE ASSESSMENTS<br />

" WCH will be issuing SDR this week to DDI for deficiencies for DDI Procurement<br />

Controls/Control or Purchased Items and Services. (FR-201 0-IF-0664-SDR-023) (8/24) WCH<br />

has received and accepted the CAP from DDI for SDR-023. Corrective action timeline has been<br />

extended to January. (11/9) WCH to perform surveillance for CAP implementation.<br />

" WCH to issue SDR (FR-2010-IF-0749-SDR-024) to DDI for IH breathing air calibration issues.<br />

(10/ 12) WCH has received CAP from DDI. (11/9) WCH to perform follow-up surveillance for<br />

implementation of CAP. (11/30)<br />

* WCH to provide SDR (FR-2010-IF-0826-SDR-025) today to DDI for IIH equipment past the<br />

calibration date. (9/28) WCH has received CAP from DDI. (11/9) WCH to perform follow-up<br />

surveillance for implementation of CAP. (11/30)<br />

XI.<br />

XII.<br />

XIII.<br />

XIV.<br />

XV.<br />

XVI.<br />

REQUESTS FOR INFORMATION<br />

* None.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* None.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

CORRESPONDENCE (since last meeting)<br />

* Letter from DDI: Delays<br />

" Transmittal to DDI: CN 035 - Radios<br />

" Weekly Progress Review Meeting Minutes, December 28, 2010<br />

IN VOICE AND PAYMENT STATUS<br />

* None.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

" Trench I work package training to begin Tuesday 1/4/11.<br />

* Trench I RWP and BWP training to begin Wednesday 1/5/11.<br />

" BWP finalization meeting to be held Monday 1/3.<br />

" John heard will be leaving the project and WCH. Good luck John. Doug Ordal will be taking<br />

over as Subcontract Specialist for the project. (12/28)<br />

" Discussed requirement for discussing work to be performed prior to performance (tailgates, work<br />

authorization, necessary oversight, etc.)<br />

Attachment(s): As noted above.


0) iiO<br />

0 L<br />

m- 0<br />

is~~ 0<br />

-N i-N N<br />

I<br />

600-<br />

C44<br />

~( 00 C~ N !'bo '&o-~ gz ,i 4 -O 0<br />

m 00<br />

co 3. ~ I ?o<br />

~ - ~ ~<br />

CD 8C0 00 00 0 0 2 ~ 8 8<br />


F4'.<br />

ai (U<br />

4A EN (U<br />

u0 0<br />

3: 0<br />

CL - (<br />

o<br />

'44<br />

c0<br />

o E<br />

4r.rr 4.9<br />

~<br />

U,<br />

-(<br />

0 -<br />

MU IAr ~~-H U<br />

(U U.cH - CE<br />

00 LuU<br />

V4f rU E~~u (


0 0<br />

0 " 0 0 -0<br />

a Q'0<br />

. a 10<br />

0q 2 2 a2<br />

2<br />

L) 4 ) -W55 0<br />

EE<br />

0 0<br />

zo '0<br />

0 C-<br />

o<br />

z<br />

(j<br />

co<br />

C<br />

O<br />

w~ a<br />

0<br />

NN<br />

2 2<br />

.N<br />

*00<br />

zE<br />

0 0 ~ 00 0 29<br />

0 0


WCH Closure<br />

WCH <strong>Hanford</strong><br />

Washington<br />

Meeting Minutes<br />

CCN: 155881<br />

EM1-P~inWEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Clinton J. Adamson<br />

January 4, <strong>2011</strong><br />

DISTRBUTIO<br />

C. J. Adamson X3-16 D. Bollinger (DDI)<br />

E. L. Adamson X3-40 R. D. Cantwell N3-30<br />

C. L. Beach X3-16 T. Dance (DDI) X3-17<br />

Q. L. Grist X3-16 J. L. Dennis N3-30<br />

A. Gagnon X9-08 R. A. Dodd 114-24<br />

J. A. Heard 114-17 C. Flowers (DDI) X3-17<br />

W. R. Junkins X3-16 T. A. Foster N3-30<br />

D. C. Ordal 1-4-17 R. Ganapathy X3-40<br />

S. E. Parnell X3-16 R. T. Hansen H4-17<br />

J. R. Soulia (DDI) X3-17 S. J. Huddleston X3-16<br />

D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

H. C. Weber (DDI) X3-17<br />

H. Williams III X3-16<br />

J. E. Vermaas N3-30<br />

J. Zeisloft A3-04<br />

Project File, X3-1 6<br />

Records and Document Control 114-11<br />

A meeting on the above subject was held on January 4, <strong>2011</strong> at 11 8-K, MO-755.<br />

1. SAFETY<br />

0 Safety topic: Discussed the need to clean side and back vehicle windows of frost as well as the<br />

front.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

" Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This item will remain in these minutes until demobilization as a reminder. (8/10)<br />

* On 7/8/20 10 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH' s letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

review. To be scheduled for next week. (8/24) DDI to provide a letter response. Meeting<br />

Z:\Administrative Assistant\Project Progress Review Weekly Meetings\201 1\January\I -4-11 Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

rescheduled for Wednesday 9/1. (8/3 1) Meeting held last week, scheduling will continue as<br />

needed. (9/7) DDI would like to schedule this to follow the 9/27 1:00 meeting. (9/22) Meeting<br />

rescheduled for Monday at 1:00 p.m. (9/28) Delay impacts meeting scheduled for 10/6/10 at<br />

1:00. (10/5) Delay impacts meeting to be rescheduled, time TBD. (10/12) DDI has completed<br />

review and would like to meet again to put this issue to rest. Meeting will be scheduled as soon<br />

as possible. (10/26) Meeting rescheduled for today at 1:00 to discuss the last couple weeks. A<br />

meeting to discuss impacts TBD. (11/2) Delay status meeting today at 1:00. (11/9) WCH and<br />

DDI met on 11/15/2010 and will continue these discussions. (11/16) WCH would like to have<br />

complete agreement on delays so DDI is in a position to submit request for delays past 45 days.<br />

The weekly meetings will resume beginning Thursday, 12/2. (11/30) Currently, delays have been<br />

discussed through the end of November. DDI to respond to WCH letter regarding delays.<br />

Moving forward, DDI will follow the equipment and manpower process as lined out in Exhibit B<br />

from this date forward. (12/7) WCH is requesting that DDI provide a letter of agreement on the<br />

45-day of scheduled delays. In return, WCH will provide to DDI a letter agreeing to a calculated<br />

method versus TIA for delays. November 30ff was the last day of the 45-day of delays. (12/14)<br />

WCH to respond to 12/15/10 DDI delays letter, concurrent to meeting 45 days of Exhibit B<br />

delays as of 11/30/10. This letter will include explanation of how the delay days were<br />

determined/calculated. (12/28) WCH will have letter to DDI completed by COB today. (1/4)<br />

* Stainless steel acid overpack decontamination needs to be completed. (10/12) This has not yet<br />

been done. Drums are currently contained in the anomaly staging area. (10/26) Characterization<br />

plan development is in process. The drums are in an exclusion zone due to the contamination on<br />

the outside of the drums. (11/2) No change. (11/9) WCH is developing a characterization plan.<br />

(11/16) No update. (11/30) Characterization plan is with WCH Engineering for review. (12/7)<br />

No update. (12/14) Characterization plan is at the planning for evaluation. (12/28) No change.<br />

(1/4)<br />

" WCH asks if there is an "all-call" option available on the radios which, when triggered, makes an<br />

announcement over all of the radio channels. The option is not the scan function that_<br />

automatically changes channels, but one that issues announcements simultaneously over all<br />

channels. WCH requests that DDI look into this and if available check into the costs of<br />

purchasing several for the project. (10/26) DDI is still researching options. (11/2) DDI has<br />

received a quote for this function and will look into scheduling to have the radios programmed<br />

over the Thanksgiving holiday. WCH to provide change notice for DDI to proceed with this.<br />

(11/9) DDI has plans to take all the radios off site on 11/23 for reprogramming over the holiday<br />

period. (11/ 16) Reprogramming of the radios has been delayed until mid-December due to the<br />

unavailability of the vendor. (11/30) WCH has 30 radios. (12/7) Plan to reprogram radios has<br />

been pushed to either the Christmas or New Year break in work. All radios will be<br />

reprogrammed to receive the announcement, and three radios will have the broadcast function. A<br />

total of sixty radios in all. DDI requests a change notice for the cost of the reprogramming.<br />

(12/14) DDI has had all radios reprogrammed and redistributed. DDI to provide CN proposal by<br />

COB this week. (12/28) DDI still needs to provide proposal to complete this change notice.<br />

(1/4)<br />

*WCH will follow-up on procurement of odor control materials for potential use in Trench K.<br />

(11/16) WCH IH suggested using a charcoal substance to mix with the soil rather than using the<br />

proposed odor control chemical. No update past this recommendation from lI. WCH to followup<br />

on this. (11/30) No viable engineering controls are available. On the next available Friday,<br />

the crew will do a thorough resort and mix of Trench K. (12/7) Re-sort successfully performed on<br />

12/10. WCH has some work package and management requirements that need to be satisfied<br />

before work can begin again in Trench K. (12/14) Secondary Sort of odorous materials to begin


*Progress Review Meeting<br />

Page 3<br />

Monday, 1/3. (12/28) On 1/3/11 work resumed in Trench K. Load out of previously sorted<br />

odorous material has begun. No issues encountered so far. (1/4)<br />

* RCTs working on survey of trenches D, E, P and G to prepare for GPERS survey. (11/16)<br />

Surveys on hold due to weather conditions. (11/30) DDI requests trenches D, E, P, and G<br />

retainage release. WCH is evaluating this. Surveys to begin, weather and personnel permitting.<br />

(12/14) RCTs scheduled to begin surveys of trenches D and P on 1/3/11. (12/28) WCH<br />

suggested that Trenches 0, J, L and H be down posted.<br />

* Beryllium training for on-site craft supervision has been scheduled. (11/16) Discussed REA,<br />

CN, etc. (11/30) WCH to finalize scheduling for remaining DDI supervisory personnel for<br />

beryllium supervisor training. The next scheduled class to be 1/19. (12/14) Flowers and<br />

Holbrook are scheduled to complete the training on 1/19. (12/28) Discussion of what beryllium<br />

training is necessary for the new DDI craft employees. WCH to get clarification at the BWPT<br />

finalization meeting this afternoon. (1/4)<br />

* Planned dry run for Trench I to begin 11/29. (11/16) Start pushed out due to weather. (11/30)<br />

Need to pinpoint starting dates for dry runs now that equipment is located in the HRA. WCH to<br />

review the PSR to determine what will be evaluated for readiness from the dry run. (12/7) A dry<br />

run checklist will be developed after the holidays for the 400 excavator. (12/14) Dry run in<br />

Trench A to begin 1/3/11 as planned. (12/28) Dry runs have been moved to 1/6. (1/4)<br />

* Trench I work package training to begin Tuesday 1/4/11 after the POD.<br />

" Trench I RWP and BWP training to begin Wednesday 1/5/11 after the POD.<br />

* John Heard will be leaving the project and WCH. Doug Ordal will be taking over as Subcontract<br />

Specialist for the project. (12/28) Doug Ordal introduced to key project personnel. (1/4)<br />

* Discussed requirement for discussing work to be performed prior to performance (tailgates, work<br />

authorization, necessary oversight, etc.) (12/28) DDI suggested that the Plan-of-Tomorrow<br />

meeting be more formalized. POT will become a scheduled daily meeting at 1530 hours each<br />

day. (1/4)<br />

I11. PROJECT DESIGN DRAWINGS<br />

0 None.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

* Trench I work package training scheduled for 1/5/11 after the POD. (1/4)<br />

* Trench I RWP and BWP training scheduled for Thursday 1/6/11 after the POD. (1/4)<br />

* PSR in final review and plans are for WCH to have it available to be signed off Monday or<br />

Tuesday of next week. (1/4)<br />

o After PSR is signed off, cone penetrometers and lids will be pulled.<br />

o Block wall will be completed.<br />

V. WEEKLY PRODUCTION TABLE<br />

* No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

* None.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT


Progress Review Meeting<br />

Page 4<br />

*See attached.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

*WCH intends to begin working on Trench I silo work packages in early August. Tentative<br />

meeting set for 8/16 to discuss work package for Trench I silos. WCH to confirm with planners<br />

on schedule. (8/3) When the initial work package is developed, craft will be involved in the fine<br />

tuning of the WP. (8/10) Meeting postponed to Monday, 8/23. (8/17) Meeting moved to<br />

Wednesday 8/25 at 8:00. In the near future a WCH planner will be on site three days a week for<br />

support with work packages and technical procedure needs. (8/24) Informal review of existing<br />

work packages has begun by WCH Planners. WCH will involve DDI field personnel as the work<br />

draws closer. (8/3 1) Ongoing. (9/7). WCH would like to begin including DDI SS in the work<br />

package planning process. (9/28) Meeting scheduled for Thursday, 10/28 to discuss work<br />

package needs relating to overburden removal to locate the tops of the silos in Trench 1. (10/26)<br />

The plan is to have the THA complete by 11/18/2010. There may be additional changes or tweaks<br />

after the dry runs are completed. (11/16) WCH SMRT review scheduled, final work package<br />

should be available for approval next week. (11/30) No change, plan to have review by the end<br />

of the week. (12/7) Work Package is with the planners and should be signed off by the end of<br />

this week. (12/14) Trench I work package is complete. (12/28) Crew briefing on Trench I work<br />

package is scheduled for 1/5-6/11. (1/4)<br />

IX.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

* WCH QA informed DDI that SCI training is available free of charge and recommended they send<br />

some people through the training. Bob Carter will be administering the training. (1/4)<br />

* WCH QA will be participating in a factual accuracy meeting with DOE tomorrow about the DDI<br />

QA plan. (1/4)<br />

* WCH QA provided DDI with copy of assessments coming up in the near future. (1/4)<br />

FUTURE ASSESSMENTS<br />

* WCH will be issuing SDR this week to DDI for deficiencies for DDI Procurement<br />

Controls/Control or Purchased Items and Services. (FR-2010-IF-0664-SDR-023) (8/24) WCH<br />

has received and accepted the CAP from DDI for SDR-023. Corrective action timeline has been<br />

extended to January. (11/9) WCH to perform surveillance for CAP implementation.<br />

* WCH to issue SDR (FR-2010-IF-0749-SDR-024) to DDI for III breathing air calibration issues.<br />

(10/12) WCI- has received CAP from DDI. (11/9) WCH to perform follow-up surveillance for<br />

implementation of CAP. (11/30)<br />

" WCH to provide SDR (FR-2010-IF-0826-SDR-025) today to DDI for IH equipment past the<br />

calibration date. (9/28) WCH has received CAP from DDI. (11/9) WCH to perform follow-up<br />

surveillance for implementation of CAP. (11/30)<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

0 None.<br />

TECHNICAL DATA SUBMIITTALS/STATUS<br />

* None.


Progress Review Meeting<br />

Page 5<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE (since last meeting)<br />

" Transmittal from DDI: CN 033 Proposed (revised)<br />

" Transmittal from DDI: CN 036 Acknowledgement<br />

* Weekly Progress Review Meeting Minutes, January 4, <strong>2011</strong><br />

INVOICE AND PAYMENT STATUS<br />

0 None.<br />

OTHER COMMIENTS/NEW ACTION ITEMS<br />

0 None.<br />

Attachment(s): As noted above.


w z z<br />

N-<br />

0 C2<br />

I I3<br />

-0 0<br />

v<br />

Io<br />

(N~ 0 N ~~ o . C<br />

000<br />

(00 T T T ND to<br />

LOo o ~ 0<br />

m.NV)N-<br />

wco<br />

C)0)<br />

4 C~m I- C)w -A.<br />

s2 cc m q 00 m ~ to 0 (<br />

m 9<br />

0i 0 0 0a 00 00 0> 0mO<br />

0 0<br />

><br />

z(N z JO aON JON 12O<br />

C 000 55<br />

C4 I<br />

co- CIA 0 t Z 1<br />

.E<br />

0 0 ~ o o ~<br />

I


aai<br />

L "0E<br />

0. c 0<br />

r (D oT o E.a-<br />

0 0J<br />

q-4 a:<br />

CO<br />

LU<br />

E<br />

E<br />

00r- rom r<br />

a) L.<br />

a) :M U) u) u) a) LH<br />

0 0 - d -, -be _:c<br />

0 .E Ec Eu u u


0 0<br />

0 3<br />

c00 0 0<br />

a.<br />

0 -0 0. c<br />

V , E E<br />

T- a s a_<br />

a._<br />

oe0 0 a 0<br />

I -lr<br />

o<br />

0z<br />

VJ<br />

V<br />

IX4


Washington<br />

Closure.<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 155885<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Clinton J. Adamson<br />

January 12, <strong>2011</strong><br />

DISTRBUTIO<br />

C. J. Adamson X3-16 D. Bollinger (DDI)<br />

E. L. Adamson X3-40 R. D. Cantwell N3-30<br />

Q. L. Grist X3-16 T. Dance (DDD) X3-17<br />

A. Gagnon X9-08 J. L. Dennis N3-30<br />

D. C. Ordal H14-17 R. A. Dodd 114-24<br />

S. E. Parnell X3-16 C. Flowers (DDI) X3-17<br />

J. R. Soulia (DDI) X3-17 T. A. Foster N3-30<br />

H. Williams III X3-16 R. Ganapathy X3-40<br />

R. T. Hansen H4-17<br />

S. J. Huddleston X3-16<br />

W. R. Junkins X3-16<br />

D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

H. C. Weber (DDI) X3-17<br />

J. Zeisloft A3-04<br />

Project File, X3-1 6<br />

Records and Document Control H44-il<br />

A meeting on the above subject was held on January 12, <strong>2011</strong> at 118-K, MO-755.<br />

I. SAFETY<br />

* Safety topic: Discussed icy conditions as a result of last night's snow and to stay alert as freezing<br />

rain is in the forecast.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This item will remain in these minutes until demobilization as a reminder. (8/10)<br />

" On 7/8/2010 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

review. To be scheduled for next week. (8/24) DDI to provide a letter response. Meeting<br />

rescheduled for Wednesday 9/1. (8/3 1) Meeting held last week, scheduling will continue as<br />

Z:'Adnministrativc Assistant\Pmject Progress Review Weekly Meetings\20l1\January\I-l2-1 I Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

needed. (9/7) DDI would like to schedule this to follow the 9/27 1:00 meeting. (9/22) Meeting<br />

rescheduled for Monday at 1:00 p.m. (9/28) Delay impacts meeting scheduled for 10/6/10 at<br />

1:00. (10/5) Delay impacts meeting to be rescheduled, time TBD. (10/12) DDI has completed<br />

review and would like to meet again to put this issue to rest. Meeting will be scheduled as soon<br />

as possible. (10/26) Meeting rescheduled for today at 1:00 to discuss the last couple weeks. A<br />

meeting to discuss impacts TBD. (11/2) Delay status meeting today at 1:00. (11/9) WCH and<br />

DDI met on 11/15/2010 and will continue these discussions. (11/16) WCH would like to have<br />

complete agreement on delays so DDI is in a position to submit request for delays past 45 days.<br />

The weekly meetings will resume beginning Thursday, 12/2. (11/30) Currently, delays have been<br />

discussed through the end of November. DDI to respond to WCH letter regarding delays.<br />

Moving forward, DDI will follow the equipment and manpower process as lined out in Exhibit B<br />

from this date forward. (12/7) WCH is requesting that DDI provide a letter of agreement on the<br />

45-day of scheduled delays. In return, WCH will provide to DDI a letter agreeing to a calculated<br />

method versus TIA for delays. November 3 0 th was the last day of the 45-day of delays. (12/14)<br />

WCH to respond to 12/15/10 DDI delays letter, concurrent to meeting 45 days of Exhibit B<br />

delays as of 11/30/10. This letter will include explanation of how the delay days were<br />

determined/calculated. (12/28) WCH will have letter to DDI completed by COB today. (1/4)<br />

WCH Procurement has letter and is working on distribution of letter to DDI. (1/12)<br />

* Stainless steel acid overpack decontamination needs to be completed. (10/12) This has not yet<br />

been done. Drumis are currently contained in the anomaly staging area. (10/26) Characterization<br />

plan development is in process. The drums are in an exclusion zone due to the contamination on<br />

the outside of the drums. (11/2) No change. (11/9) WCH is developing a characterization plan.<br />

(11/16) No update. (11/30) Characterization plan is with WCH Engineering for review. (12/7)<br />

No update. (12/14) Characterization plan is at the planning for evaluation. (12/28) No change.<br />

(1/4) Plan has been returned from the planning department and is in review by project<br />

management. WCH would like to have review complete and returned to planning with changes<br />

this week. (1/12)<br />

" RCTs working on survey of trenches D, E, P and G to prepare for GPERS survey. (11/16)<br />

Surveys on hold due to weather conditions. (11/30) DDI requests trenches D, E, P, and G<br />

retainage release. WCH is evaluating this. Surveys to begin, weather and personnel permitting.<br />

(12/14) RCTs scheduled to begin surveys of trenches D and P on 1/3/11. (12/28) WCH<br />

suggested that Trenches 0, J, L and H be down posted. (1/4) Down posting of trenches not yet<br />

complete. Some additional debris in the bottom of the trenches will need to be excavated and<br />

disposed of prior to down posting. (1/12)<br />

" Beryllium training for on-site craft supervision has been scheduled. (11/16) Discussed REA,<br />

CN, etc. (11/30) WCH to finalize scheduling for remaining DDI supervisory personnel for<br />

beryllium supervisor training. The next scheduled class to be 1/19. (12/14) Flowers and<br />

Holbrook are scheduled to complete the training on 1/19. (12/28) Discussion of what beryllium<br />

training is necessary for the new DDI craft employees. WCH to get clarification at the BWP<br />

finalization meeting this afternoon. (1/4) BWP has been approved and is in the process of being<br />

signed off. It is expected that this will be completed this week. Once signatures are obtained, the<br />

craft will be briefed on the BWP. (1/12)


Progress Review Meeting<br />

Page 3<br />

" Planned dry run for Trench I to begin 11/29. (11/16) Start pushed out due to weather. (11/30)<br />

Need to pinpoint starting dates for dry runs now that equipment is located in the HRA. WCH to<br />

review the PSR to determine what will be evaluated for readiness from the dry run. (12/7) A dry<br />

run checklist will be developed after the holidays for the 400 excavator. (12/14) Dry run in<br />

Trench A to begin 1/3/11 as planned. (12/28) Dry runs have been moved to 1/6. (1/4) Dry runs<br />

utilizing Trench A were performed on 1/6-11, WCH RE currently working on video connection<br />

troubleshooting. (1/12)<br />

" Trench I work package training to begin Tuesday 1/4/11 after the POD. (1/4) Completed 1/5/11.<br />

(1/12)<br />

" Trench I RWP and BWP training to begin Wednesday 1/5/11 after the POD. (1/4) The RWP was<br />

briefed with the crew on 1/6/11. (1/12)<br />

" John Heard will be leaving the project and WCH. Doug Ordal will be taking over as Subcontract<br />

Specialist for the project. (12/28) Doug Ordal introduced to key project personnel. (1/4) WCH<br />

will provide a letter to DDI announcing the appointment of Doug to the project. (1/12)<br />

* Discussed requirement for discussing work to be performed prior to performance (tailgates, work<br />

authorization, necessary oversight, etc.) (12/28) DDI suggested that the Plan-of-Tomorrow<br />

meeting be more formalized. POT will become a scheduled daily meeting at 1530 hours each<br />

day. (1/4) The more formalized POT appears to be working well. (1/12)<br />

Ill.<br />

IV.<br />

PROJECT DESIGN DRAWINGS<br />

* None.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* No change from last week.<br />

* Trench I work package training scheduled for 1/5/11 after the POD. (1/4) Crew briefing<br />

performed 1/5/11. (1/12)<br />

* Trench I RWP and BWP training scheduled for Thursday 1/6/11 after the POD. (1/4) Crew<br />

received briefing on the Trench I RWP on 1/6/11. (1/12)<br />

* PSR in final review and plans are for WCH to have it available to be signed off Monday or<br />

Tuesday of next week. (1/4) PSR sign off has been rescheduled for Monday, 1/17/11. (1/12)<br />

o<br />

o<br />

After PSR is signed off, cone penetrometers and lids will be pulled.<br />

Block wall will be completed. (1/4) The first layer of the block wall has been completed.<br />

Once the cone penetrometers and lids are removed, the remainder of the wall will be<br />

constructed. (1/12)<br />

V. WEEKLY PRODUCTION TABLE<br />

" No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

" None.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* None provided. Verbal confirmation of new and resigned subcontractor employees mentioned.<br />

(1/12)<br />

EQUIPMENT<br />

0 No change from last week.<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI


Progress Review Meeting<br />

Page 4<br />

*WCH intends to begin working on Trench I silo work packages in early August. Tentative<br />

meeting set for 8/16 to discuss work package for Trench I silos. WCH to confirm with planners<br />

on schedule. (8/3) When the initial work package is developed, craft will be involved in the fine<br />

tuning of the WP. (8/10) Meeting postponed to Monday, 8/23. (8/17) Meeting moved to<br />

Wednesday 8/25 at 8:00. In the near future a WCH planner will be on site three days a week for<br />

support with work packages and technical procedure needs. (8/24) Informal review of existing<br />

work packages has begun by WCH Planners. WCH will involve DDI field personnel as the work<br />

draws closer. (8/3 1) Ongoing. (9/7). WCH would like to begin including DDI SS in the work<br />

package planning process. (9/28) Meeting scheduled for Thursday, 10/28 to discuss work<br />

package needs relating to overburden removal to locate the tops of the silos in Trench 1. (10/26)<br />

The plan is to have the JHA complete by 11/18/2010. There may be additional changes or tweaks<br />

after the dry runs are completed. (11/16) WCH SMRT review scheduled, final work package<br />

should be available for approval next week. (11/30) No change, plan to have review by the end<br />

of the week. (12/7) Work Package is with the planners and should be signed off by the end of<br />

this week. (12/14) Trench I work package is complete. (12/28) Crew briefing on Trench I work<br />

package is scheduled for 1/5-6/11. (1/4) Work package briefing with the crew was held on<br />

IX.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

" WCH QA informed DDI that SCI training is available free of charge and recommended they send<br />

some people through the training. Bob Carter will be administering the training. (1/4) Jim<br />

Soulia is planning to attend. (1/12)<br />

" WCH QA will be participating in a factual accuracy meeting with DOE tomorrow about the DDI<br />

QA plan. (1/4) WCH did not receive any take away input from the meeting. (1/12)<br />

" WCH QA provided DDI with copy of assessments coming up in the near future. (1/4)<br />

FUTURE ASSESSMENTS<br />

* WCH will be issuing SDR this week to DDI for deficiencies for DDI Procurement<br />

Controls/Control or Purchased Itemns and Services. (FR-2010-IF-0664-SDR-023) (8/24) WCH<br />

has received and accepted the CAP from DDI for SDR-023. Corrective action timeline has been<br />

extended to January. (11/9) WCI- to perform surveillance for CAP implementation due 2/1/1 1.<br />

(1/12)<br />

" WCH to issue SDR (FR-201 0-IF-0749-SDR-024) to DDI for IH breathing air calibration issues.<br />

(10/12) WCH has received CAP from DDI. (11/9) WCH to perform follow-up surveillance for<br />

implementation of CAP. (11/30) WCH has accepted the CAP for this SDR. WCH will perform<br />

final surveillance in the near future to close this item. Surveillance will be completed by 2/24/Il.<br />

(1/12)<br />

* WCH to provide SDR (FR-201 0-IF-0826-SDR-02 5) today to DDI for IH equipment past the<br />

calibration date. (9/28) WCH has received CAP from DDI. (11/9) WCH to perform follow-up<br />

surveillance for implementation of CAP. (11/30)<br />

" WCH QA shared with DDI a checklist outlining subcontractor responsibilities at related to subtier<br />

contractors. (1/12)<br />

XI.<br />

REQUESTS FOR INFORMATION<br />

*None.


Progress Review Meeting<br />

Page 5<br />

XII.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* None.<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

*See attached.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE (since last meeting)<br />

* Transmittal from DDI: CN 033 Proposed (revised)<br />

* Transmittal from DDI: CN 03 5 Proposal<br />

" Weekly Progress Review Meeting Minutes, January 12, <strong>2011</strong><br />

* E-mail to DDI: Rejection of revised proposal for CN 033 received 1/4/11<br />

* 10M: Appointment of Clinton J. Adamson as subcontractor Technical Representative (STR) in<br />

support of C008753A00, Work Activities at 118-K-i Burial Grounds<br />

IN VOICE AND PAYMENT STATUS<br />

0 DDI is working on completion of the December invoice.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

o None.<br />

Attachment(s): As noted above.


o~ U-<br />

uS<br />

z<br />

w 0<br />

IL<br />

I<br />

(1i Cc<br />

ot C5 U-<br />

U6<br />

C)<br />

09<br />

C) g2<br />

a<br />

0a<br />

LO<br />

CD 0u U' - m<br />

00000<br />

00~0 -M o o o i 000 0<br />

Nl! oA


0<br />

L(U<br />

00<br />

(U*<br />

00<br />

0CL<br />

0)O.<br />

ic<br />

00<br />

00<br />

0<br />

C<br />

C.)


0<br />

CX a 0 0<br />

0 0 O o 0<br />

0. 2 0<br />

0) rd<br />

8 : 0 D<br />

0 __ 9<br />

-110 0a_<br />

1%~ t2<br />

0)<br />

3~0 C)<br />

0~ Ch<br />

c z 0 (0 (<br />

In w CV, N<br />

m 2 CD w<br />

ED .( 0<br />

ID<br />

V<br />

p Q,<br />

m<br />

0 E 0<br />

cc<br />

CLu~<br />

10<br />

_r<br />

00<br />

T cc 0<br />

CD (0i<br />

N A<br />

1000


wCHClosure<br />

CCN: 155894<br />

Washington<br />

WC H <strong>Hanford</strong><br />

Meeting Minutes<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Clinton J. Adamson<br />

January 18, <strong>2011</strong><br />

DISRIBTIO<br />

C. J. Adamson X3-16 E. L. Adamson X3-40<br />

Q. L. Grist X3-16 D. Bollinger (DDI)<br />

A. Gagnon X9-08 R. D. Cantwell N3-30<br />

D. C. Ordal H4-17 T. Dance (DDI) X3-17<br />

S. E. Parnell X3-16 J. L. Dennis N3-30<br />

J. R. Soulia (DDI) X3-17 R. A. Dodd H4-24<br />

H. C. Weber (DDI) X3-17 C. Flowers (DDI) X3-17<br />

H. Williams III X3-16 T. A. Foster N3-30<br />

R. Ganapathy X3-40<br />

R. T. Hansen H4-17<br />

S. J. Huddleston X3-16<br />

W. R. Junkins X3-16<br />

D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3- 16<br />

Records and Document Control H4- 11<br />

A meeting on the above subject was held on January 18, <strong>2011</strong> at 118-K, MO-755.<br />

I. SAFETY<br />

* Safety topic: Discussed environmental impacts of single place dumping of water. Also discussed<br />

the housekeeping to minimize drips, drops, globs, etc. from both a safety and environmental<br />

perspective.<br />

1I. ACTION ITEMS FROM LAST MEETING/STATUS<br />

* Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This item will remain in these minutes until demobilization as a reminder. (8/10)<br />

* On 7/8/20 10 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

review. To be scheduled for next week. (8/24) DDI to provide a letter response. Meeting<br />

CDocuments a nd Settings'kjadanso\Loca I SettingsfTemporary Internet Files\0LK74\I -18-11 Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

rescheduled for Wednesday 9/1. (8/3 1) Meeting held last week, scheduling will continue as<br />

needed. (9/7) DDI would like to schedule this to follow the 9/27 1:00 meeting. (9/22) Meeting<br />

rescheduled for Monday at 1:00 p.m. (9/28) Delay impacts meeting scheduled for 10/6/10 at<br />

1:00. (10/5) Delay impacts meeting to be rescheduled, time TBD. (10/12) DDI has completed<br />

review and would like to meet again to put this issue to rest. Meeting will be scheduled as soon<br />

as possible. (10/26) Meeting rescheduled for today at 1:00 to discuss the last couple weeks. A<br />

meeting to discuss impacts TBD. (11/2) Delay status meeting today at 1:00. (11/9) WCH and<br />

DDI met on 11/15/2010 and will continue these discussions. (11/16) WCLI would like to have<br />

complete agreement on delays so DDI is in a position to submit request for delays past 45 days.<br />

The weekly meetings will resume beginning Thursday, 12/2. (11/30) Currently, delays have been<br />

discussed through the end of November. DDI to respond to WCH letter regarding delays.<br />

Moving forward, DDI will follow the equipment and manpower process as lined out in Exhibit B<br />

from this date forward. (12/7) WCH is requesting that DDI provide a letter of agreement on the<br />

45-day of scheduled delays. In return, WCH will provide to DDI a letter agreeing to a calculated<br />

method versus TIA for delays. November 30'h was the last day of the 45-day of delays. (12/14)<br />

WCH to respond to 12/15/10 DDI delays letter, concurrent to meeting 45 days of Exhibit B<br />

delays as of 11/30/10. This letter will include explanation of how the delay days were<br />

determined/calculated. (12/28) WCH will have letter to DDI completed by COB today. (1/4)<br />

WCH Procurement has letter and is working on distribution of letter to DDI. (1/12) Procurement<br />

will issue the letter by COB today. (1/18)<br />

* Stainless steel acid overpack decontamination needs to be completed. (10/12) This has not yet<br />

been done. Drums are currently contained in the anomaly staging area. (10/26) Characterization<br />

plan development is in process. The drums are in an exclusion zone due to the contamination on<br />

the outside of the drums. (11/2) No change. (11/9) WCH is developing a characterization plan.<br />

(11/16) No update. (11/30) Characterization plan is with WCH Engineering for review. (12/7)<br />

No update. (12/14) Characterization plan is at the planning for evaluation. (12/28) No change.<br />

(1/4) Plan has been returned from the planning department and is in review by project<br />

management. WCH would like to have review complete and returned to planning with changes<br />

this week. (1/12) Hans Carmen, RE who will be helping Doug Teachout, will be taking the lead<br />

in finalizing this plan. (1/18)<br />

* RCTs working on survey of trenches D, E, P and G to prepare for GPERS survey. (11/16)<br />

Surveys on hold due to weather conditions. (11/30) DDI requests trenches D, E, P, and G<br />

retainage release. WCH is evaluating this. Surveys to begin, weather and personnel permitting.<br />

(12/14) RCTs scheduled to begin surveys of trenches D and P on 1/3/11. (12/28) WCH<br />

suggested that Trenches 0, J, L and H be down posted. (1/4) Down posting of trenches not yet<br />

complete. Some additional debris in the bottom of the trenches will need to be excavated and<br />

disposed of prior to down posting. (1/12) There are twelve (12) small spots that will be dug (no<br />

more than 6" by shovel) and bagged by a laborer in full PPE with RCT support before area will<br />

be downposted. (1/18)<br />

" Beryllium training for on-site craft supervision has been scheduled. (11/16) Discussed REA,<br />

CN, etc. (11/30) WCH to finalize scheduling for remaining DDI supervisory personnel for<br />

beryllium supervisor training. The next scheduled class to be 1/19. (12/14) Flowers and<br />

Holbrook are scheduled to complete the training on 1/19. (12/28) Discussion of what beryllium<br />

training is necessary for the new DDI craft employees. WCH to get clarification at the BWP<br />

finalization meeting this afternoon. (1/4) BWP has been approved and is in the process of being<br />

signed off. It is expected that this will be completed this week. Once signatures are obtained, the<br />

craft will be briefed on the BWPT. (1/12) BWPT was briefed with the crew on 1/13. (1/18)


Progress Review Meeting<br />

Page 3<br />

" Planned dry run for Trench I to begin 11/29. (11/16) Start pushed out due to weather. (11/30)<br />

Need to pinpoint starting dates for dry runs now that equipment is located in the [IRA. WCH to<br />

review the PSR to determine what will be evaluated for readiness from the dry run. (12/7) A dry<br />

run checklist will be developed after the holidays for the 400 excavator. (12/14) Dry run in<br />

Trench A to begin 1/3/11 as planned. (12/28) Dry runs have been moved to 1/6. (1/4) Dry runs<br />

utilizing Trench A were performed on 1/6-11, WCH RE currently working on video connection<br />

troubleshooting. (1/12) All cameras are now working, continuing mock-ups. Some work<br />

package and RWP issues relating to the cone penetrometers are being resolved. (1/18)<br />

" Trench I work package training to begin Tuesday 1/4/11 after the POD. (1/4) Completed 1/5/11.<br />

(1/12) Before work can begin, a detailed briefing of the work packing will be given to the Trench<br />

I Silo work crew. (1/18)<br />

" Trench I RWP and BWP training to begin Wednesday 1/5/11 after the POD. (1/4) The RWP was<br />

briefed with the crew on 1/6/11. (1/12)<br />

" John Heard will be leaving the project and WCH. Doug Ordal will be taking over as Subcontract<br />

Specialist for the project. (12/28) Doug Ordal introduced to key project personnel. (1/4) WCH<br />

will provide a letter to DDI announcing the appointment of Doug to the project. (1/12) A formal<br />

letter to DDI is coming from WCH announcing that contract duties are being assumed by Doug<br />

Ordal.<br />

" Discussed requirement for discussing work to be performed prior to performance (tailgates, work<br />

authorization, necessary oversight, etc.) (12/28) DDI suggested that the Plan-of-Tomorrow<br />

meeting be more formalized. POT will become a scheduled daily meeting at 1530 hours each<br />

day. (1/4) The more formalized POT appears to be working well. (1/12)<br />

I11. PROJECT DESIGN DRAWINGS<br />

* None.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

" No change from last week.<br />

" Trench I work package training scheduled for 1/5/11 after the POD. (1/4) Crew briefing<br />

performed 1/5/11. (1/12)<br />

" Trench I RWP and BWP training scheduled for Thursday 1/6/11 after the POD. (1/4) Crew<br />

received briefing on the Trench I RWP on 1/6/11. (1/12)<br />

" PSR in final review and plans are for WCFI to have it available to be signed off Monday or<br />

Tuesday of next week. (1/4) PSR sign off has been rescheduled for Monday, 1/17/11. (1/12)<br />

o After PSR is signed off, cone penetrometers and lids will be pulled.<br />

o Block wall will be completed. (1/4) The first layer of the block wall has been completed.<br />

Once the cone penetrometers and lids are removed, the remainder of the wall will be<br />

constructed. (1/12)<br />

* Once RWP is revised and approved, cone penetrometers can be removed and mock-ups will<br />

commence.<br />

V. MANPOWER<br />

* See attached.<br />

VI.<br />

EQUIPMENT<br />

*See attached.


Progress Review Meeting<br />

Page 4<br />

VII.<br />

VIII.<br />

IX.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

MATERIAL<br />

*Until weather warms up, Dust Bond needs to be shipped in heated truck. These additional costs<br />

will be communicated to WCH as an REA. (1/18)<br />

QUALITY<br />

* WCH QA informed DDI that SCI training is available free of charge and recommended they send<br />

some people through the training. Bob Carter will be administering the training. (1/4) Jim<br />

Soulia is planning to attend. (1/12)<br />

* WCH QA will be participating in a factual accuracy meeting with DOE tomorrow about the DDI<br />

QA plan. (1/4) WCH did not receive any take away input from the meeting. (1/12)<br />

* WCH QA provided DDI with copy of assessments coming up in the near future. (1/4) Scheduled<br />

date is Wednesday 1/26/11. (1/18)<br />

FUTURE ASSESSMENTS<br />

* WCH will be issuing SDR this week to DDI for deficiencies for DDI Procurement<br />

Controls/Control or Purchased Items and Services. (FR-2010-IF-0664-SDR-023) (8/24) WCH<br />

has received and accepted the CAP from DDI for SDR-023. Corrective action timeline has been<br />

extended to January. (11/9) WCH to perform surveillance for CAP implementation due 2/1/1 1.<br />

(1/12)<br />

* WCH to issue SDR (FR-2010-]]F-0749-SDR-024) to DDI for IH breathing air calibration issues.<br />

(10/12) WCH has received CAP from DDI. (11/9) WCH to perform follow-up surveillance for<br />

implementation of CAP. (11/30) WCH has accepted the CAP for this SDR. WCH will performn<br />

final surveillance in the near future to close this item. Surveillance will be completed by 2/24/11.<br />

(1/12)<br />

" WCH to provide SDR (FR-2010-IF-0826-SDR-025) today to DDI for IH equipment past the<br />

calibration date. (9/2 8) WCH has received CAP from DDI. (11/9) WCH to perform follow-up<br />

surveillance for implementation of CAP. (11/30)<br />

* WCH QA shared with DDI a checklist outlining subcontractor responsibilities at related to subtier<br />

contractors. (1/12)<br />

* WCH will be issuing a new SDR to DDI relating to the OMP walkdown performed by WCH<br />

EPL.<br />

X. REQUESTS FOR INFORMATION<br />

* None.<br />

XI.<br />

XII.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

*See attached.


Progress Review Meeting<br />

Page 5<br />

XIII. CORRESPONDENCE (since last meeting)<br />

" Transmittal from DDI: CN 034 Proposal<br />

" Transmittal from DDI: CN 036 Proposal<br />

" Weekly Progress Review Meeting Minutes, January 18, <strong>2011</strong><br />

* SDR letter to DDI: FR-<strong>2011</strong>-TF-0015-SDR-0O1<br />

" Letter to DDI: Project Delays<br />

XIV.<br />

XV.<br />

IN VOICE AND PAYMENT STATUS<br />

" DDI has submitted invoice to WCH.<br />

* DDI needs to acknowledge Modification No. 2 to WCH.<br />

* WCH will be issuing Modification No. 3 which will be ad administrative modification relating to<br />

the procurement turn-over from John Heard to Doug Ordal.<br />

OTHER COM[MENTS/NEW ACTION ITEMS<br />

* None.<br />

Attachment(s): As noted above.


0 I I<br />

z 0<br />

CD(<br />

03<br />

LO<br />

o o Cao3<br />

4mO ;0 i<br />

j<br />

0 0 0<br />

- IF<br />

-Z4<br />

26E<br />

tooO<br />

C O<br />

03C Lb 3 C f-: ~ '<br />

E9 a 0 .0<br />

0,400<br />

w~: 1 L<br />

C-<br />

x * 0 X,0 ? 0 , 0 00" , 0<br />

w ui w w W wx j j


4-(<br />

U(<br />

w J m<br />

rn 0<br />

n <<br />

(A -L u o cu 3<br />

o EZo<br />

0. CL<br />

0<br />

00 0<br />

E<br />

E<br />

't 0<br />

00 -, -on00r<br />

-- U U U -m~<br />

,t 0 u-<br />

0E OO)u E~


U<br />

(U<br />

Coj<br />

0 ~<br />

o -m<br />

co<br />

Coo<br />

C-)-<br />

Lu-L<br />

0<br />

o<br />

0<br />

Cu<br />

0<br />

Coo<br />

E<br />

C<br />

U)<br />

c


SC<br />

* 2) 0<br />

E 2 , U<br />

0 -00 o<br />

10<br />

z<br />

0 E__<br />

a.o<br />

LDa<br />

u 0<br />

z _ _ _ _


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 155896<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Clinton J. Adamson ><br />

January 25, <strong>2011</strong><br />

DISRIBTIO<br />

C. J. Adamuson X3-16 E. L. Adamson X3-40<br />

Q. L. Crist X3-16 D. Bollinger (DDI)<br />

A. Gagnon X9-08 R. D. Cantwell N3-30<br />

D. C. Ordal H4-17 T. Dance (DDI) X3-17<br />

S. E. Parnell X3-16 J. L. Dennis N3-30<br />

J. R. Soulia (DDI) X3-17 R. A. Dodd H4-24<br />

H. Williams III X3-16 C. Flowers (DDI) X3-17<br />

T. A. Foster N3-30<br />

R. Ganapathy X3-40<br />

R. T. Hansen H14-17<br />

S. J. Huddleston X3-16<br />

W. R. Junkins X3-16<br />

D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

H. C. Weber (DDI) X3-17<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H14-11<br />

A meeting on the above subject was held on January 25, <strong>2011</strong> at 118-K, MO-755.<br />

1. SAFETY<br />

* Safety topic: Discussed communications in the field, especially when approaching/leaving<br />

equipment. Communication needs to be both visual and verbal for clarity.<br />

11. ACTION ITEMS FROM LAST MEETING/STATUS<br />

" Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This item will remain in these minutes until demobilization as a reminder. (8/10)<br />

" On 7/8/20 10 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

review. To be scheduled for next week. (8/24) DDI to provide a letter response. Meeting<br />

C:\Documnents and Settings\cjadamso\Locai Settings\Temporary Internet Files\0LK74\l -25-I I Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

rescheduled for Wednesday 9/1. (8/3 1) Meeting held last week, scheduling will continue as<br />

needed. (9/7) DDI would like to schedule this to follow the 9/27 1:00 meeting. (9/22) Meeting<br />

rescheduled for Monday at 1:00 p.m. (9/28) Delay impacts meeting scheduled for 10/6/10 at<br />

1:00. (10/5) Delay impacts meeting to be rescheduled, time TBD. (10/12) DDI has completed<br />

review and would like to meet again to put this issue to rest. Meeting will be scheduled as soon<br />

as possible. (10/26) Meeting rescheduled for today at 1:00 to discuss the last couple weeks. A<br />

meeting to discuss impacts TBD. (11/2) Delay status meeting today at 1:00. (11/9) WCH and<br />

DDI met on 11/15/2010 and will continue these discussions. (11/16) WCH would like to have<br />

complete agreement on delays so DDI is in a position to submit request for delays past 45 days.<br />

The weekly meetings will resume beginning Thursday, 12/2. (11/30) Currently, delays have been<br />

discussed through the end of November. DDI to respond to WCH letter regarding delays.<br />

Moving forward, DDI will follow the equipment and manpower process as lined out in Exhibit B<br />

from this date forward. (12/7) WCH is requesting that DDI provide a letter of agreement on the<br />

45-day of scheduled delays. In return, WCH will provide to DDT a letter agreeing to a calculated<br />

method versus TIA for delays. November 3Off was the last day of the 45-day of delays. (12/14)<br />

WCH to respond to 12/15/10 DDI delays letter, concurrent to meeting 45 days of Exhibit B<br />

delays as of 11/30/10. This letter will include explanation of how the delay days were<br />

determined/calculated. (12/28) WCH will have letter to DDI completed by COB today. (1/4)<br />

WCH Procurement has letter and is working on distribution of letter to DDI. (1/12) Procurement<br />

will issue the letter by COB today. (1/18) Delays for December are recorded and up-to-date and<br />

WCHIDDI are working through the delays for January. The delays in fuirther discussion are<br />

related to equipment delays versus personnel delays. DDI has submitted an updated equipment<br />

list with rates for WCH to review. (1/25)<br />

" Stainless steel acid overpack decontamination needs to be completed. (10/12) This has not yet<br />

been done. Drums are currently contained in the anomaly staging area. (10/26) Characterization<br />

plan development is in process. The drums are in an exclusion zone due to the contamination on<br />

the outside of the drums. (11/2) No change. (11/9) WCH is developing a characterization plan.<br />

(11/16) No update. (11/30) Characterization plan is with WCH Engineering for review. (12/7)<br />

No update. (12/14) Characterization plan is at the planning for evaluation. (12/28) No change.<br />

(1/4) Plan has been returned from the planning department and is in review by project<br />

management. WCH would like to have review complete and returned to planning with changes<br />

this week. (1/12) Hans Carmen, RE who will be helping Doug Teachout, will be taking the lead<br />

in finalizing this plan. (1/18) A JHA walkdown is scheduled for tomorrow. Once final tweaks<br />

are completed, plan will be reviewed with the crew and implemented. (1/25)<br />

* RCTs working on survey of trenches D, E, P and G to prepare for GPERS survey. (11/16)<br />

Surveys on hold due to weather conditions. (11/30) DDI requests trenches D, E, P, and G<br />

retainage release. WCH is evaluating this. Surveys to begin, weather and personnel permitting.<br />

(12/14) RCTs scheduled to begin surveys of trenches D and P on 1/3/11. (12/28) WCH<br />

suggested that Trenches 0, J, L and H be down posted. (1/4) Down posting of trenches not yet<br />

complete. Some additional debris in the bottom of the trenches will need to be excavated and<br />

disposed of prior to down posting. (1/12) There are twelve (12) small spots that will be dug (no<br />

more than 6" by shovel) and bagged by a laborer in full PPE with RCT support before area will<br />

be downposted. (1/18) Approximately half of the spots have been cleaned up to date. (1/25)<br />

" Beryllium training for on-site craft supervision has been scheduled. (11/16) Discussed REA,<br />

CN, etc. (11/30) WCH to finalize scheduling for remaining DDI supervisory personnel for<br />

beryllium supervisor training. The next scheduled class to be 1/19. (12/14) Flowers and<br />

Holbrook are scheduled to complete the training on 1/19. (12/28) Discussion of what beryllium<br />

training is necessary for the new DDI craft employees. WCH to get clarification at the BWVP


Progress Review Meeting<br />

Page 3<br />

finalization meeting this afternoon. (1/4) BWP has been approved and is in the process of being<br />

signed off. It is expected that this will be completed this week. Once signatures are obtained, the<br />

craft will be briefed on the BWPT. (1/12) BWPT was briefed with the crew on 1/13. (1/18) A<br />

checklist for bringing equipment in/out of the BCA has been developed; the crew briefed, and is<br />

being implemented for use. (1/25)<br />

* Planned dry run for Trench I to begin 11/29. (11/16) Start pushed out due to weather. (11/30)<br />

Need to pinpoint starting dates for dry runs now that equipment is located in the HIRA. WCH to<br />

review the PSR to determine what will be evaluated for readiness from the dry run. (12/7) A dry<br />

run checklist will be developed after the holidays for the 400 excavator. (12/14) Dry run in<br />

Trench A to begin 1/3/11 as planned. (12/28) Dry runs have been moved to 1/6. (1/4) Dry runs<br />

utilizing Trench A were performed on 1/6-11, WCH RE currently working on video connection<br />

troubleshooting. (1/12) All cameras are now working, continuing mock-ups. Some work<br />

package and RWP issues relating to the cone penetrometers are being resolved. (1/ 18)<br />

* Trench I work package training to begin Tuesday 1/4/11 after the POD. (1/4) Completed 1/5/11.<br />

(1/12) Before work can begin, a detailed briefing of the work packing will be given to the Trench<br />

I Silo work crew. (1/18)<br />

" Trench I RWP and BWP training to begin Wednesday 1/5/11 after the POD. (1/4) The RWP was<br />

briefed with the crew on 1/6/11. (1/12) The RWP has been rev'd removing issues relating to the<br />

cone penetrometers and lids. The crew has been briefed on the changes. It is anticipated that the<br />

RWP might be rev'd again as a result of comments from the DNFSB. (1/25)<br />

1I1. PROJECT DESIGN DRAWINGS<br />

0 None.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

" Trench I work package training scheduled for 1/5/11 after the POD. (1/4) Crew briefing<br />

performed 1/5/11. (1/12) A work package revision is being completed and will be briefed by the<br />

crew before work begins. (1/25)<br />

* PSR in final review and plans are for WCH to have it available to be signed off Monday or<br />

Tuesday of next week. (1/4) PSR sign off has been rescheduled for Monday, 1/17/11. (1/12)<br />

o<br />

o<br />

After PSR is signed off, cone penetrometers and lids will be pulled.<br />

Block wall will be completed. (1/4) The first layer of the block wall has been completed.<br />

Once the cone penetrometers and lids are removed, the remainder of the wall will be<br />

constructed. (1/12) Final construction of the block wall will be complete by the end of this<br />

week. (1/25)<br />

V. MANPOWER<br />

* No changes from last week.<br />

VI.<br />

VII.<br />

EQUIPMENT<br />

" No changes from last week.<br />

* A cable change on shuttle truck #74 was completed over the weekend. (1/25)<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.


Progress Review Meeting<br />

Page 4<br />

VIII.<br />

IX.<br />

MATERIAL<br />

*Until weather warms up, Dust Bond needs to be shipped in heated truck. These additional costs<br />

will be communicated to WCH as an REA. (1/18)<br />

QUALITY<br />

* WCH QA will be participating in a factual accuracy meeting with DOE tomorrow about the DDI<br />

QA plan. (1/4) WCH did not receive any take away input from the meeting. (1/12) This item<br />

will remain in the minutes until DOE has submitted their findings to WCH. (1/25)<br />

* WCH QA provided DDI with copy of assessments coming up in the near future. (1/4) Scheduled<br />

date is Wednesday 1/26/11. (1/18) DOE will be on site to perforn an assessment of WCH on<br />

1/26/<strong>2011</strong>. (1/25)<br />

FUTURE ASSESSMENTS<br />

" WCH will be issuing SDR this week to DDI for deficiencies for DDI Procurement<br />

Controls/Control or Purchased Items and Services. (FR-2010-IF-0664-SDR-023) (8/24) WCH<br />

has received and accepted the CAP from DDI for SDR-023. Corrective action timeline has been<br />

extended to January. (11/9) WCH to perform surveillance for CAP implementation due 2/1/1 1.<br />

(1/12)<br />

* WCH to issue SDR (FR-20 1 0-IF-0749-SDR-024) to DDI for IH breathing air calibration issues.<br />

(10/12) WCH has received CAP from DDI. (11/9) WCH to perform follow-up surveillance for<br />

implementation of CAP. (11/30) WCH has accepted the CAP for this SDR. WCH will perform<br />

final surveillance in the near future to close this item. Surveillance will be completed by 2/24/11.<br />

(1/12)<br />

" WCH to provide SDR (FR-201 0-IF-0826-SDR-025) today to DDI for IH equipment past the<br />

calibration date. (9/28) WCH has received CAP from DDI. (11/9) WCH to perform follow-up<br />

surveillance for implementation of CAP. (11/30)<br />

* WCH will be issuing a new SDR to DDI relating to the OMP walkdown performed by WCH<br />

EPL. (1/18) FR-201 1-IF-<strong>2011</strong>-0015-SDR-001 was submitted to DDI on 1/18/<strong>2011</strong>. WCH has<br />

received CAP from DDI on 1/20/11. (1/25)<br />

X. REQUESTS FOR INFORMATION<br />

* DDI has requested a definition of an anomaly from WCH. (1/25)<br />

XI.<br />

XII.<br />

XIH.<br />

XIV.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

0 See attached.<br />

CORRESPONDENCE (since last meeting)<br />

* Transmittal from DDI: Acknowledgement of MOD 3<br />

* Transmittal from DDI: Response to SDR FR-201 Il-IF-201 l-00l5-SDR-001<br />

* Letter from DDI: Addition of Equipment to Exhibit C, Contract C008753A00<br />

* Transmittal from DDI CN 030 Proposal (Partial)<br />

* Letter from DDI: Request for Clarification on Anomalies<br />

" Weekly Progress Review Meeting Minutes, January 25, <strong>2011</strong><br />

INVOICE AND PAYMENT STATUS


Progress Review Meeting<br />

Page 5<br />

* DDI is submitting invoice to WCH which will include CN invoices.<br />

* DDI needs to acknowledge Modification No. 2 to WCH. (1/18) DDI had questions on certain<br />

amounts. WCH SAE answered the questions to the agreement of DDI. (1/25)<br />

" WCH will be issuing Modification No. 3 which will be ad administrative modification relating to<br />

the procurement turn-over from John Heard to Doug Ordal. (1/18) DDI has submitted their<br />

acceptance of this modification. (1/25)<br />

XV.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

0 None.<br />

Attachment(s): As noted above.


clii<br />

z ~<br />

0 H<br />

0<br />

CC<br />

aa 0) CS~-<br />

- ~0** T<br />

)<br />

C0<br />

'-g0<br />

0 0 0<br />

N 0 LL L-U<br />

6 0 6 !. 0<br />

W, LE<br />

a~> 0<br />

co 0 m


LU,<br />

0a<br />

I.-o<br />

U))<br />

E<br />

*<br />

m) 4)<br />

ca~<br />

C.))<br />

a-a<br />

CC.4<br />

m<br />

L<br />

.0<br />

N


I<br />

E -<br />

o<br />

a<br />

CL)<br />

* 0<br />

mz<br />

c<br />

CDC


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 155899<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Clinton J. Adamson<br />

February 2, <strong>2011</strong><br />

DITRBUIO<br />

C. J. Adarnson X3-16 R. D. Cantwell N3-30<br />

E. L. Adamnson X3-40 Q. L. Grist X3-16<br />

D. Bollinger (DDI) J. L. Dennis N3-30<br />

T. Dance (DDI) X3-17 R. A. Dodd H4-24<br />

A. Gagnon X9-08 C. Flowers (DDI) X3-17<br />

D. C. Ordal H4-17 T. A. Foster N3-30<br />

J. R. Soulia (DDI) X3-17 R. Ganapathy X3-40<br />

H. Williams III X3-16 R. T. Hansen H4-17<br />

S. J. Huddleston X3-16<br />

W. R. Junkins X3-16<br />

S. E. Parnell X3-16<br />

D. G. Saueressig N3 -3 0<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

H. C. Weber (1313) X3-17<br />

J. Zeisloft A3-04<br />

Project File, X3-1 6<br />

Records and Document Control H4-1 1<br />

A meeting on the above subject was held on February 2, <strong>2011</strong> at 11 8-K, MO-755.<br />

I. SAFETY<br />

0 Safety topic: Discussed lack of safety topics. Watch out when driving for trucks on the highway,<br />

they can throw up rocks, have loose loads, etc.<br />

Ii.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

" Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This itemn will remain in these minutes until demobilization as a reminder. (8/10)<br />

* On 7/8/2010 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

review. To be scheduled for next week. (8/24) DDI to provide a letter response. Meeting<br />

rescheduled for Wednesday 9/1. (8/3 1) Meeting held last week, scheduling will continue as<br />

ZAdministrative Assistant\Project Progress Review Weekly Meetings\201 1\Febniary\2-2-1 I Weekly Progressedoc


Progress Review Meeting<br />

Page 2<br />

needed. (9/7) DDI would like to schedule this to follow the 9/27 1:00 meeting. (9/22) Meeting<br />

rescheduled for Monday at 1:00 p.m. (9/28) Delay impacts meeting scheduled for 10/6/10 at<br />

1:00. (10/5) Delay impacts meeting to be rescheduled, time TBD. (10/12) DDI has completed<br />

review and would like to meet again to put this issue to rest. Meeting will be scheduled as soon<br />

as possible. (10/26) Meeting rescheduled for today at 1:00 to discuss the last couple weeks. A<br />

meeting to discuss impacts TBD. (11/2) Delay status meeting today at 1:00. (11/9) WCH and<br />

DDI met on 11/15/2010 and will continue these discussions. (11/16) WCH would like to have<br />

complete agreement on delays so DDI is in a position to submit request for delays past 45 days.<br />

The weekly meetings will resume beginning Thursday, 12/2. (11/30) Currently, delays have been<br />

discussed through the end of November. DDI to respond to WCH letter regarding delays.<br />

Moving forward, DDI will follow the equipment and manpower process as lined out in Exhibit B<br />

from this date forward. (12/7) WCH is requesting that DDI provide a letter of agreement on the<br />

45-day of scheduled delays. In return, WCH will provide to DDI a letter agreeing to a calculated<br />

method versus TIA for delays. November 30' was the last day of the 45-day of delays. (12/14)<br />

WCH to respond to 12/15/10 DDI delays letter, concurrent to meeting 45 days of Exhibit B<br />

delays as of 11/30/10. This letter will include explanation of how the delay days were<br />

determined/calculated. (12/28) WCH will have letter to DDI completed by COB today. (1/4)<br />

WCH Procurement has letter and is working on distribution of letter to DDI. (1/12) Procurement<br />

will issue the letter by COB today. (1/18) Delays for December are recorded and up-to-date and<br />

WCH/DDI are working through the delays for January. The delays in further discussion are<br />

related to equipment delays versus personnel delays. DDI has submitted an updated equipment<br />

list with rates for WCH to review. (1/25) Procurement is reviewing equipment standby rates.<br />

They are also evaluating standby versus delays and effect each has on the contract. (2/2)<br />

" Stainless steel acid overpack decontamination needs to be completed. (10/12) This has not yet<br />

been done. Drums are currently contained in the anomaly staging area. (10/26) Characterization<br />

plan development is in process. The drums are in an exclusion zone due to the contamination on<br />

the outside of the drums. (11/2) No change. (11/9) WCH is developing a characterization plan.<br />

(11/16) No update. (11/30) Characterization plan is with WCH Engineering for review. (12/7)<br />

No update. (12/14) Characterization plan is at the planning for evaluation. (12/28) No change.<br />

(1/4) Plan has been returned from the planning department and is in review by project<br />

management. WCH would like to have review complete and returned to planning with changes<br />

this week. (1/12) Hans Carmen, RE who will be helping Doug Teachout, will be taking the lead<br />

in finalizing this plan. (1/18) A JHA walkdown is scheduled for tomorrow. Once final tweaks<br />

are completed, plan will be reviewed with the crew and implemented. (1/25)<br />

* RCTs working on survey of trenches D, E, P and G to prepare for GPERS survey. (11/16)<br />

Surveys on hold due to weather conditions. (11/30) DDI requests trenches D, E, P, and G<br />

retainage release. WCH is evaluating this. Surveys to begin, weather and personnel permitting.<br />

(12/14) RCTs scheduled to begin surveys of trenches D and P on 1/3/11. (12/28) WCH<br />

suggested that Trenches 0, J, L and H be down posted. (1/4) Down posting of trenches not yet<br />

complete. Some additional debris in the bottom of the trenches will need to be excavated and<br />

disposed of prior to down posting. (1/12) There are twelve (12) small spots that will be dug (no<br />

more than 6" by shovel) and bagged by a laborer in full PPE with RCT support before area will<br />

be downposted. (1/18) Approximately half of the spots have been cleaned up to date. (1/25)


Progress Review Meeting<br />

Page 3<br />

* Trench I work package training to begin Tuesday 1/4/11 after the POD. (1 /4) Completed 1/5/11.<br />

(1/12) Before work can begin, a detailed briefing of the work packing will be given to the Trench<br />

I Silo work crew. (1/18) PSR complete on 1/27 and work has begun. (2/2)<br />

" Trench I RWP and BWP training to begin Wednesday 1/5/11 after the POD. (1 /4) The RWP was<br />

briefed with the crew on 1/6/11. (1/12) The RWP has been rev'd removing issues relating to the<br />

cone penetrometers and lids. The crew has been briefed on the changes. It is anticipated that the<br />

RWP might be rev'd again as a result of comments from the DNFSB. (1/25) Complete. (2/2)<br />

11I. PROJECT DESIGN DRAWINGS<br />

* None.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

" See attached.<br />

" Trench I work package training scheduled for 1/5/11 after the POD. (1 /4) Crew briefing<br />

performed 1/5/11. (1/12) A work package revision is being completed and will be briefed by the<br />

crew before work begins. (1/25)<br />

" PSR in final review and plans are for WCH to have it available to be signed off Monday or<br />

Tuesday of next week. (1/4) PSR sign off has been rescheduled for Monday, 1/17/11. (1/12)<br />

PSR has been signed off and work has begun. (2/2)<br />

" After PSR is signed off, cone penetrometers and lids will be pulled.<br />

" Block wall will be completed. (1/4) The first layer of the block wall has been completed.<br />

Once the cone penetrometers and lids are removed, the remainder of the wall will be<br />

constructed. (1/12) Final construction of the block wall will be complete by the end of this<br />

week. (1/25)<br />

V. MANPOWER<br />

" See attached.<br />

* WCH to look into why HRA Gate Guard was asked to sign "exit" paperwork at AMH.<br />

VI.<br />

VII.<br />

EQUIPMENT<br />

" No changes from last week.<br />

* Water truck repairs.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

e None.<br />

VIII. MATERIAL<br />

*Until weather warms up, Dust Bond needs to be shipped in heated truck. These additional costs<br />

will be communicated to WCH as an REA. (1/18)<br />

IX.<br />

QUALITY<br />

" WCH QA will be participating in a factual accuracy meeting with DOE tomorrow about the DDI<br />

QA plan. (1/4) WCH did not receive any take away input from the meeting. (1/12) This item<br />

will remain in the minutes until DOE has submitted their findings to WCH. (1/25)<br />

" WCH QA provided DDI with copy of assessments coming up in the near future. (1/4) Scheduled<br />

date is Wednesday 1/26/11. (1/18) DOE will be on site to perform an assessment of WCH on<br />

1/26/<strong>2011</strong>. (1/25) No new information. (2/2)<br />

* QA has two new people; Amanda Toll and Jack Weaver. (2/2)


Progress Review Meeting<br />

Page 4<br />

FUTURE ASSESSMENTS<br />

* WCH will be issuing SDR this week to DDI for deficiencies for DDI Procurement<br />

Controls/Control or Purchased Items and Services. (FR-20 1 -IF-0664-SDR-023) (8/24) WCH<br />

has received and accepted the CAP from DDI for SDR-023. Corrective action timeline has been<br />

extended to January. (11/9) WCH to perform surveillance for CAP implementation due 2/1/1 1.<br />

(1/12)<br />

" WCH to issue SDR (FR-201 O-IF-0749-SDR-024) to DDI for IH breathing air calibration issues.<br />

(10/12) WCH has received CAP from DDI. (11/9) WCH to perform follow-up surveillance for<br />

implementation of CAP. (11/30) WCH has accepted the CAP for this SDR. WCH will perform<br />

final surveillance in the near future to close this item. Surveillance will be completed by 2/24/11.<br />

(1/12)<br />

* WCH to provide SDR (FR-201 0-IF-0826-SDR-025) today to DDI for Ill equipment past the<br />

calibration date. (9/28) WCH has received CAP from DDI. (11/9) WCH to perform follow-up<br />

surveillance for implementation of CAP. (11/30)<br />

* WCH will be issuing a new SDR to DDI relating to the OMP walkdown performed by WCH<br />

EPL. (1/18) FR-201 1-IF-201 l-0015-SDR-0O1 was submitted to DDI on 1/18/<strong>2011</strong>. WCH has<br />

received CAP from DDI on 1/20/11. (1/25) WCH EPL audit of OMP procedures last week.<br />

DDI is documenting when fuel is received, but not as it is being used. (2/2)<br />

X. REQUESTS FOR INFORMATION<br />

*DDI has requested a definition of an anomaly from WCH. (1/25)<br />

XI.<br />

XII.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

XIII. CORRESPONDENCE (since last meeting)<br />

" Letter from DDI: Formal Request for Operations and Overhead extension<br />

* Letter to DDI: Response to Request for 0 & 0 extension<br />

* Weekly Progress Review Meeting Minutes, February 2, <strong>2011</strong><br />

XIV.<br />

XV.<br />

IN VOICE AND PAYMENT STATUS<br />

* DDI is submitting invoice to WCH which will include CN invoices.<br />

* DDI needs to acknowledge Modification No. 2 to WCH. (1/18) DDI had questions on certain<br />

amounts. WCH SAE answered the questions to the agreement of DDI. (1/25)<br />

* WCH will be issuing Modification No. 3 which will be ad administrative modification relating to<br />

the procurement turn-over from John Heard to Doug Ordal. (1/18) DDI has submitted their<br />

acceptance of this modification. (1/25)<br />

" RFP for January is in the system for payment next week. (2/2)<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

*DDI is requesting a full scope of work for Trench 1. They believed this was supposed to have<br />

been provided as part of CN 010. WCH will look into this. (2/2)<br />

Attachment(s): As noted above.


I-x<br />

CI 0 W<br />

2 ir<br />

ID<br />

C,<br />

0 0) c) - 0 -<br />

00<br />

N1 00.<br />

~~~~ A<br />

0'n<br />

V~ V<br />

C) R "<br />

LO4) 04) 0 40<br />

4 ID caW t<br />

~ 0<br />

I- 1 ;?-<br />

L U LL m: : mS I U cL 3U<br />

0 1 0 L M LLLL 00<br />

'z L)<br />

N<br />

_2<br />

NV


U U f 3 CU<br />

0 .0<br />

1~0<br />

0~ ~ o .<br />

c_<br />

cio<br />

0w<br />

zu.<br />

w ~ ~ Quu<br />

u<br />

o ~ L.<br />

~ 2 E<br />

~E<br />

w 00 r n l-<br />

'-Ir<br />

U<br />

'n<br />

CL t , ( F-4~ -- F-<br />

U le vu'.-.- CA Zn 0)<br />

04


Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 156752<br />

JW<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

11111101M Clinton J. Adamson 2 /<br />

February 8, <strong>2011</strong><br />

ATEDE<br />

DISRIBTIO<br />

C. J. Adamson X3-16 D. Bollinger (DDI)<br />

E. L. Adamson X3-40 R. D. Cantwell N3-30<br />

A. Gagnon X9-08 Q. L. Grist X3-16<br />

W. R. Junkins X3-16 T. Dance (DDI) X3-17<br />

D. C. Ordal H4-17 J. L. Dennis N3-30<br />

S. E. Parnell X3-16 R. A. Dodd H14-24<br />

J. R. Soulia (DDI) X3-1 7 C. Flowers (DDI) X3-17<br />

B. E. Stubbs X3-16 T. A. Foster N3-30<br />

H. Williams III X3-16 R. Ganapathy X3-40<br />

R. T. Hansen H4-17<br />

S. J. Huddleston X3-16<br />

D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

H. C. Weber (DDI) X3-17<br />

J. Zeisloft A3-04<br />

Project File, X3-1 6<br />

Records and Document Control H4-1 1<br />

A meeting on the above subject was held on February 8, <strong>2011</strong> at 11 8-K, MO-755.<br />

1. SAFETY<br />

* Safety topic: Discussed incident at the railroad project where a truck tried to move forward but<br />

still had the landing gear down. The action bent the landing gear and damaged the trailer.<br />

Discussed the need for paying attention to details.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

" Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This item will remain in these minutes until demobilization as a reminder. (8/10)<br />

* On 7/8/2010 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

review. To be scheduled for next week. (8/24) DDI to provide a letter response. Meeting<br />

Z:\Administrative Assistant\Project Progress Review Weekly Meetings\201 l\February\2-8-l I Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

rescheduled for Wednesday 9/1. (8/3 1) Meeting held last week, scheduling will continue as<br />

needed. (9/7) DDI would like to schedule this to follow the 9/27 1:00 meeting. (9/22) Meeting<br />

rescheduled for Monday at 1:00 p.m. (9/28) Delay impacts meeting scheduled for 10/6/10 at<br />

1:00. (10/5) Delay impacts meeting to be rescheduled, time TBD. (10/12) DDI has completed<br />

review and would like to meet again to put this issue to rest. Meeting will be scheduled as soon<br />

as possible. (10/26) Meeting rescheduled for today at 1:00 to discuss the last couple weeks. A<br />

meeting to discuss impacts TBD. (11/2) Delay status meeting today at 1:00. (11/9) WCH and<br />

DDI met on 11/15/2010 and will continue these discussions. (11/16) WCH would like to have<br />

complete agreement on delays so DDI is in a position to submit request for delays past 45 days.<br />

The weekly meetings will resume beginning Thursday, 12/2. (11/30) Currently, delays have been<br />

discussed through the end of November. DDI to respond to WCH letter regarding delays.<br />

Moving forward, DDI will follow the equipment and manpower process as lined out in Exhibit B<br />

from this date forward. (12/7) WCH is requesting that DDI provide a letter of agreement on the<br />

45-day of scheduled delays. In return, WCH will provide to DDI a letter agreeing to a calculated<br />

method versus TIA for delays. November 3 0 Oth was the last day of the 45-day of delays. (12/14)<br />

WCH to respond to 12/15/10 DDI delays letter, concurrent to meeting 45 days of Exhibit B<br />

delays as of 11/30/10. This letter will include explanation of how the delay days were<br />

determined/calculated. (12/28) WCH will have letter to DDI completed by COB today. (1/4)<br />

WCH Procurement has letter and is working on distribution of letter to DDI. (1/12) Procurement<br />

will issue the letter by COB today. (1/18) Delays for December are recorded and up-to-date and<br />

WCH/DDI are working through the delays for January. The delays in further discussion are<br />

related to equipment delays versus personnel delays. DDI has submitted an updated equipment<br />

list with rates for WCH to review. (1/25) Procurement is reviewing equipment standby rates.<br />

They are also evaluating standby versus delays and effect each has on the contract. (2/2) No<br />

change. (2/8)<br />

* Stainless steel acid overpack decontamnination needs to be completed. (10/12) This has not yet<br />

been done. Drums are currently contained in the anomaly staging area. (10/26) Characterization<br />

plan development is in process. The drums are in an exclusion zone due to the contamination on<br />

the outside of the drums. (11/2) No change. (11/9) WCH is developing a characterization plan.<br />

(11/16) No update. (11/30) Characterization plan is with WCH Engineering for review. (12/7)<br />

No update. (12/14) Characterization plan is at the planning for evaluation. (12/28) No change.<br />

(1/4) Plan has been returned from the planning department and is in review by project<br />

management. WCH would like to have review complete and returned to planning with changes<br />

this week. (1/12) Hans Carmen, RE who will be helping Doug Teachout, will be taking the lead<br />

in finalizing this plan. (1/18) A JHA walkdown is scheduled for tomorrow. Once final tweaks<br />

are completed, plan will be reviewed with the crew and implemented. (1/25) No update. (2/8)<br />

" RCTs working on survey of trenches D, E, P and G to prepare for GPERS survey. (11/16)<br />

Surveys on hold due to weather conditions. (11/30) DDI requests trenches D, E, P, and G<br />

retainage release. WCH is evaluating this. Surveys to begin, weather and personnel permitting.<br />

(12/14) RCTs scheduled to begin surveys of trenches D and P on 1/3/11. (12/28) WCH<br />

suggested that Trenches 0, J, L and H be down posted. (1/4) Down posting of trenches not yet<br />

complete. Some additional debris in the bottom of the trenches will need to be excavated and<br />

disposed of prior to down posting. (1/12) There are twelve (12) small spots that will be dug (no<br />

more than 6" by shovel) and bagged by a laborer in full PPE with RCT support before area will<br />

be downposted. (1/18) Approximately half of the spots have been cleaned up to date. (1/25)<br />

Most of the trenches have been down posted to SCA. The south slope is still up posted near<br />

Trench H/I. There will be RBA areas where the debris has been identified. (2/8)


Progress Review Meeting<br />

Page 3<br />

*DDI is requesting a full scope of work for Trench 1. They believed this was supposed to have<br />

been provided as part of CN 010. WCH will look into this. (2/2) No update. (2/8)<br />

I11. PROJECT DESIGN DRAWINGS<br />

* None.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

* Trench I silos 3, 4, 5 and 2 have been excavated to the 10' level with no issues so far. (2/8)<br />

* Trench N has been down posted from a BCA.<br />

" No work this Friday.<br />

V. MANPOWER<br />

" None.<br />

" WCH to look into why HRA Gate Guard was asked to sign "exit" paperwork at AMH. (2/2) No<br />

update (2/8)<br />

VI.<br />

VII.<br />

EQUIPMENT<br />

0 No changes from last week.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

VIII. MATERIAL<br />

*Until weather warms up, Dust Bond needs to be shipped in heated truck. These additional costs<br />

will be communicated to WCH as an REA. (1/18) To date one load has been delivered using the<br />

heated transport. (2/8)<br />

IX.<br />

QUALITY<br />

*WCH QA will be participating in a factual accuracy meeting with DOE tomorrow about the DDI<br />

QA plan. (1 /4) WCH did not receive any take away input from the meeting. (1 /12) This item<br />

will remain in the minutes until DOE has submitted their findings to WCH. (1/25)<br />

FUTURE ASSESSMENTS<br />

* WCH will be issuing SDR this week to DDI for deficiencies for DDI Procurement<br />

Controls/Control or Purchased Items and Services. (FR-2010-IF-0664-SDR-023) (8/24) WCH<br />

has received and accepted the CAP from DDI for SDR-023. Corrective action timeline has been<br />

extended to January. (11/9) WCH to perform surveillance for CAP implementation due 2/1/11.<br />

(1/12) WCH and DDI will meet to discuss. (2/8)<br />

" WCH will be performing a follow-up surveillance (to be completed by March) to verify the<br />

implementation of the corrective action plans for FR-201 0-IF-0749-SDR-024 and 025. This<br />

surveillance, when acceptable, will close out these two SDRs. (2/8)<br />

* WCH issued a new SDR to DDI relating to the OMP walkdown performed by WCH EPL. (1/18)<br />

FR-201 1-IF-201 1-0015-SDR-001 was submitted to DDI on 1/18/<strong>2011</strong>. WCH has received CAP<br />

from DDI on 1/20/11. (1/25) WCH EPL audit of OMP procedures last week. DDI is<br />

documenting when fuel is received, but not as it is being used. (2/2)


Progress Review Meeting<br />

Page 4<br />

X. REQUESTS FOR INFORMATION<br />

*DDI has requested a definition of an anomaly from WCH. (1/25)<br />

XI.<br />

XII.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* None.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

0 See attached.<br />

XIII. CORRESPONDENCE (since last meeting)<br />

" Letter from DDI: Response to SDR-FR-201 I1-IF-201 1-0015-SDR-000 1 - UPDATED<br />

* Letter to DDI: Declination of SDR-201 1 -0001<br />

" Weekly Progress Review Meeting Minutes, February 8, <strong>2011</strong><br />

XIV.<br />

XV.<br />

INVOICE AND PAYMENT STATUS<br />

" DDI is submitting invoice to WCH which will include CN invoices.<br />

* DDI to submit January invoice this week.<br />

" CN 34 and 36 will be put into a requisition this week for payment.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* DDI notified of signage improvements needed in excavation areas. Some areas do not have signs,<br />

some need to be revised. DDI will look into this. (2/8)<br />

" A corrective action (IF) has been written for extension cords. The hydrant at the CHPRC line is<br />

heat taped and powered by an extension cord. Inspections, per procedure, should be done daily<br />

on the whole cord. This cord is covered by a board and it is not apparent that the inspections are<br />

being completed.<br />

* Introduction of Brian Stubbs who will be taking over for Scott. Scott will be transitioning; to<br />

interim Deputy Director.<br />

" Need to do a run through of the anomaly checklist. It has been a while since it has been used.<br />

Attachment(s): As noted above.


a- lC<br />

.0<br />

z<br />

I-.- C-<br />

0<br />

0-01<br />

0. (0J~j' ~ , '- ~<br />

mn C -<br />

o ) w (D 0c<br />

LO IDCO (0 41 ( '<br />

- - 0 4<br />

OD z : I<br />

I<br />

3<br />

'5C65<br />

}:<br />

1- -J '<br />

m<br />

L4I- Z 0<br />

i 2 3 t<br />

m- TI om c0(, ' s 0<br />

Ifl9 .3 U - 3 D 0JWo~<br />

fL<br />

~. (D<br />

CW "0 '2<br />

w4<br />

e, z U<br />

3~ 00 ~ ,000 o0 0<br />

or0~<br />

(01')<br />

"0 > S<br />

>'<br />

E' 0 '~ 0 j<br />

>_ 0 U_0 CA<br />

N.N0,<br />

:0, A AIX(


E ~<br />

C.)<br />

z 2'<br />

E<br />

0 0><br />

z<br />

00<br />

.)<br />

C.<br />

05<br />

0<br />

0<br />

2<br />

9<br />

0<br />

a~W)<br />

Oz<br />

c


WEEClosure<br />

11JCHWashington<br />

W1<br />

<strong>Hanford</strong><br />

Meeting Minutes<br />

I- WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

llffill<br />

Distribution<br />

CCN: 156756<br />

JLG<br />

Clinton J. Adamson<br />

February 15, <strong>2011</strong><br />

ATNES<br />

DSTRBUIO<br />

C. J. Adamson X3-16 D. Bollinger (DDI)<br />

E. L. Adamson X3-40 R. D. Cantwell N3-30<br />

Q. L. Grist X3-16 J. L. Dennis N3-30<br />

T. Dance (DDI) X3-17 C. Flowers (DDI) X3-17<br />

R. A. Dodd H4-24 T. A. Foster N3-30<br />

A. Gagnon X9-08 R. Ganapathy X3-40<br />

D. C. Ordal H4-17 R. T. Hansen H4-17<br />

J. R. Soulia (DDI) X3-17 S. J. Huddleston X3-16<br />

B. E. Stubbs X3-16 W. R. Junkins X3-16<br />

H. Williams I11 X3-16 S. E. Parnell X3-16<br />

D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

H. C. Weber (DDI) X3-17<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4-1 1<br />

A meeting on the above subject was held on February 15, <strong>2011</strong> at 11I8-K, MO-755.<br />

1. SAFETY<br />

*Safety topic: Discussed putting detailed personal information on social network sites, particularly<br />

be cautious about telling when your home will be empty. There has been a rash of burglaries<br />

resulting from these types of postings.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

" Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This item will remain in these minutes until demobilization as a reminder. (8/10)<br />

" On 7/8/20 10 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

review. To be scheduled for next week. (8/24) DDI to provide a letter response. Meeting<br />

Z:\Administrative Assistant\Project Progress Review Weekly Meetings\201 I 'Februarv'2-15-Il Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

rescheduled for Wednesday 9/1. (8/3 1) Meeting held last week, scheduling will continue as<br />

needed. (9/7) DDI would like to schedule this to follow the 9/27 1:00 meeting. (9/22) Meeting<br />

rescheduled for Monday at 1:00 p.m. (9/28) Delay impacts meeting scheduled for 10/6/10 at<br />

1:00. (10/5) Delay impacts meeting to be rescheduled, time TBD. (10/12) DDI has completed<br />

review and would like to meet again to put this issue to rest. Meeting will be scheduled as soon<br />

as possible. (10/26) Meeting rescheduled for today at 1:00 to discuss the last couple weeks. A<br />

meeting to discuss impacts TBD. (11/2) Delay status meeting today at 1:00. (11/9) WCH and<br />

DDI met on 1/ 15/20 10 and will continue these discussions. ( 1/ 16) WCH would like to have<br />

complete agreement on delays so DDI is in a position to submit request for delays past 45 days.<br />

The weekly meetings will resume beginning Thursday, 12/2. (11/30) Currently, delays have been<br />

discussed through the end of November. DDI to respond to WCH letter regarding delays.<br />

Moving forward, DDI will follow the equipment and manpower process as lined out in Exhibit B<br />

from this date forward. (12/7) WCH is requesting that DDI provide a letter of agreement on the<br />

45-day of scheduled delays. In return, WCH will provide to DDI a letter agreeing to a calculated<br />

method versus TIA for delays. November 3 0 'h was the last day of the 45-day of delays. (12/14)<br />

WCH to respond to 12/15/10 DDI delays letter, concurrent to meeting 45 days of Exhibit B<br />

delays as of 11/30/10. This letter will include explanation of how the delay days were<br />

determined/calculated. (12/28) WCH will have letter to DDI completed by COB today. (1/4)<br />

WCH Procurement has letter and is working on distribution of letter to DDI. (1/ 12) Procurement<br />

will issue the letter by COB today. (1/18) Delays for December are recorded and up-to-date and<br />

WCH/DDI are working through the delays for January. The delays in further discussion are<br />

related to equipment delays versus personnel delays. DDI has submitted an updated equipment<br />

list with rates for WCH to review. (1/25) Procurement is reviewing equipment standby rates.<br />

They are also evaluating standby versus delays and effect each has on the contract. (2/2) No<br />

change. (2/8) Procurement is still evaluating and will make this a priority. (2/15)<br />

* Stainless steel acid overpack decontamination needs to be completed. (10/ 12) This has not yet<br />

been done. Drums are currently contained in the anomaly staging area. (10/26) Characterization<br />

plan development is in process. The drums are in an exclusion zone due to the contamination on<br />

the outside of the drums. (11/2) No change. (11/9) WCH is developing a characterization plan.<br />

( 1/ 16) No update. (11/30) Characterization plan is with WCH Engineering for review. (12/7)<br />

No update. (12/14) Characterization plan is at the planning for evaluation. (12/28) No change.<br />

(1/4) Plan has been returned from the planning department and is in review by project<br />

management. WCH would like to have review complete and returned to planning with changes<br />

this week. (1/12) Hans Carmen, RE who will be helping Doug Teachout, will be taking the lead<br />

in finalizing this plan. (1/18) A JHA walkdown is scheduled for tomorrow. Once final tweaks<br />

are completed, plan will be reviewed with the crew and implemented. (1/25) No update. (2/8)<br />

JHA walkdown scheduled for 2/16 and will include post-planning and a walkdown with the<br />

associated crew. In preparation for this activity, DDI is inspecting and updating the certs on the<br />

bottle carts. (2/15)<br />

" RCTs working on survey of trenches D, E, P and G to prepare for GPERS survey. (11/16)<br />

Surveys on hold due to weather conditions. (11/30) DDI requests trenches D, E, P, and G<br />

retainage release. WCH is evaluating this. Surveys to begin, weather and personnel permitting.<br />

(12/14) RCTs scheduled to begin surveys of trenches D and P on 1/3/11. (12/28) WCH<br />

suggested that Trenches 0, J, L and H be down posted. (1/4) Down posting of trenches not yet<br />

complete. Some additional debris in the bottom of the trenches will need to be excavated and<br />

disposed of prior to down posting. (1/12) There are twelve (12) small spots that will be dug (no<br />

more than 6" by shovel) and bagged by a laborer in full PPE with RCT support before area will<br />

be downposted. (1/18) Approximately half of the spots have been cleaned up to date. (1/25)


Progress Review Meeting<br />

Page 3<br />

M~ost of the trenches have been down posted to SCA. The south slope is still up posted near<br />

Trench H/I. There will be RBA areas where the debris has been identified. (2/8) LORAD will<br />

be finished next week. Based on information already received, there will be several spots that<br />

will require clean up and will then be re-surveyed. (2/15)<br />

* DDL is requesting a full scope of work for Trench 1. They believed this was supposed to have<br />

been provided as part of CN 030. WCH will look into this. (2/2) No update. (2/8) WCH will<br />

letter or other documentation to DDI soon. One consideration is to rev CN 030 to include<br />

reference to Trench I work package which is specific in scope. (2/15)<br />

* DDI notified of signage improvements needed in excavation areas. Some areas do not have signs,<br />

some need to be revised. DDI will look into this. (2/8) DDI indicated postings are in process of<br />

being updated. (2/15)<br />

" A corrective action (IF) has been written for extension cords. The hydrant at the CHPRC line is<br />

heat taped and powered by an extension cord. Inspections, per procedure, should be done daily<br />

on the whole cord. This cord is covered by a board and it is not apparent that the inspections are<br />

being completed. (2/8) DDI is working on a resolution. (2/15)<br />

" Need to do a run through of the anomaly checklist. It has been a while since it has been used.<br />

(2/8) DDI is reviewing the bottle cart checklist and will have it updated and ready for use when<br />

needed. (2/15)<br />

111. PROJECT DESIGN DRAWINGS<br />

* None.<br />

* DDI given notice that when LARADS and close out sampling is completed it will be time to<br />

schedule final civil survey drawings.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

" See attached.<br />

" All Trench I silos have been excavated to the 10' level. As anticipated, around the 9 to 10 foot<br />

level the excavator encounters a lid like plate. There has been no dose associated with the plate at<br />

this time. The plan is to go back and continue remediation past the 10' level, beginning with silo<br />

3. A question was raised whether the lid should be considered an anomaly. (2/15)<br />

" Trench N has now been posted as an HPA (High Particle Area.)<br />

V. MANPOWER<br />

* None.<br />

" DDI has reduced the crew by two laborers. Announced that Heather Weber is leaving the project,<br />

the search for her replacement is underway.<br />

VI.<br />

VII.<br />

EQUIPMENT<br />

* No changes from last week.<br />

* Watts will be removing Haul Truck #303 from service. DDI will be requesting release from the<br />

contract for that truck.<br />

" Watts also anticipates reducing the number of excavators on site, with the John Deere 450<br />

machine being the one to leave site first as it is a rental.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.


Progress Review Meeting<br />

Page 4<br />

VIII. MATERIAL<br />

*Until weather wars up, Dust Bond needs to be shipped in heated truck. These additional costs<br />

will be communicated to WCH as an REA. (1/18) To date one load has been delivered using the<br />

heated transport. (2/8) There should not be any more need for heated truck as the weather is<br />

warming up above the freezing point. (2/15)<br />

IX.<br />

QUALITY<br />

*WCH QA will be participating in a factual accuracy meeting with DOE tomorrow about the DDI<br />

QA plan. (1/4) WCH did not receive any take away input from the meeting. (1/12) This item<br />

will remain in the minutes until DOE has submitted their findings to WCH. (1/25)<br />

FUTURE ASSESSMENTS<br />

* WCH will be issuing SDR this week to DDI for deficiencies for DDI Procurement<br />

Controls/Control or Purchased Items and Services. (FR-2010-IF-0664-SDR-023) (8/24) WCH<br />

has received and accepted the CAP from DDI for SDR-023. Corrective action timeline has been<br />

extended to January. (11/9) WCH to perform surveillance for CAP implementation due 2/1 /11.<br />

(1/12) WCH and DDI will meet to discuss. (2/8) WCH QA is working on a compensatory plan<br />

for DDI. (2/15)<br />

* WCH will be performing a follow-up surveillance (to be completed by March) to verify the<br />

implementation of the corrective action plans for FR-201 0-IF-0749-SDR-024 and 025. This<br />

surveillance, when acceptable, will close out these two SDRs. (2/8)<br />

* WCH issued a new SDR to DDI relating to the OMP walkdown performed by WCH EPL. (1/18)<br />

FR-201 1-IF-<strong>2011</strong>-0015-SDR-001 was submitted to DDI on 1/18/<strong>2011</strong>. WCH has received CAP<br />

from DDI on 1/20/11. (1/25) WCH EPL audit of OMP procedures last week. DDI is<br />

documenting when fuel is received, but not as it is being used. (2/2) WCH rejected the initial<br />

CAP from DDI. A second response was submitted by DDI and WCH has approved. (2/15)<br />

X. REQUESTS FOR INFORMATION<br />

*DDI has requested a definition of an anomaly from WCH. (1/25) WCH is working through<br />

contract terminology discrepancies and conflicts, but will attempt to make this response a priority.<br />

(2/15)<br />

X1. TECHNICAL DATA SUBMITTALS/STATUS<br />

* None.<br />

XII.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

" See attached.<br />

* Procurement anticipates issuing Modification No. 4 next week.<br />

" An option to rev CN 030 to include the work scope contained in the Trench I work package is<br />

being considered. (2/15)<br />

XIII. CORRESPONDENCE (since last meeting)<br />

* Letter from DDI: REA - Transportation Costs for Dust Bond<br />

" Weekly Progress Review Meeting Minutes, February 15, <strong>2011</strong>


Progress Review Meeting<br />

Page 5<br />

XIV.<br />

XV.<br />

INVOICE AND PAYMENT STATUS<br />

*DDL to submit January invoice this week. (2/8) WCH received the invoice on 2/16 from DDI.<br />

WCH stressed that DDI needs to be more timely in their submission of invoices. Reminder that<br />

February end of month is February 2 0 1h.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

" There is an All Hands Meeting next week, 2/24. The project will shutdown in time to leave<br />

around 1:30 for the Three Rivers Convention Center. (2/15)<br />

* Heat stress management Is upcoming.<br />

* DDI indicated that they anticipate working next Friday, February 2 5 th<br />

Attachment(s): As noted above.


I6 z<br />

IU.<br />

LI<br />

z<br />

C<br />

z~ . II I I<br />

ILL uiu L<br />

0 Wz<br />

f - 42- j,<br />

M 744<br />

44C:) S) '.<br />

a0<br />

4 44 0<br />

oJ 00 0<br />

44,m<br />

01 ~44<br />

73 F- f3<br />

A5<br />

a)5 0(<br />

a' 0~0 0 0~<br />

w Liuu -,J w 14


00<br />

0~<br />

0<br />

ui 2<br />

0 ~ 0<br />

a 0 o A<br />

= UU<br />

'-Ioe<br />

E0<br />

E<br />

o


E<br />

z<br />

o<br />

r<br />

I K-<br />

Cl -:<br />

2L<br />

o) 0<br />

0


Washington<br />

WCH Closure<br />

Meeting Minutes<br />

CCN: 156757<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Clinton J. Adanmson<br />

February 22, <strong>2011</strong><br />

* IE~E ISTRIUTIO<br />

C. J. Adamson X3-16 D. Bollinger (DDI)<br />

E. L. Adamson N3-23 R. D. Cantwell N3-30<br />

Q. L. Crist X3-16 T. Dance (DDI) X3-17<br />

A. Gagnon X9-08 J. L. Dennis N3-30<br />

W. R. Junkins X3-16 R. A. Dodd H4-24<br />

D. C. Ordal H4-17 C. Flowers (DDI) X3-17<br />

M. Sherman (DDI) X3-17 T. A. Foster N3-30<br />

J. R. Soulia (DDI) X3-17 R. Ganapathy X3-40<br />

B. E. Stubbs X3-16 R. T. Hansen H4-17<br />

H. Williams III X3-16 S. J. Huddleston X3-16<br />

S. E. Parnell X3-16<br />

D. G. Saueressig N3-30<br />

D. B. Teachout X3-16<br />

H. C. Weber (DDI) X3-1 7<br />

J. Zeisloft A3-04<br />

Project File, X3 -16<br />

Records and Document Control H4-11I<br />

A meeting on the above subject was held on February 22, <strong>2011</strong> at 11 8-K, MO-755.<br />

I. SAFETY<br />

* Safety topic: Discussed changing conditions, especially when driving to the All-Hands meeting<br />

this week. Watch for people passing. Be aware of your surroundings.<br />

ti.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

" Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This item will remain in these minutes until demobilization as a reminder. (8/10)<br />

" DDI has submitted an updated equipment list with rates for WCH to review. (1/25) Procurement<br />

is reviewing equipment standby rates. They are also evaluating standby versus delays and effect<br />

each has on the contract. (2/2) No change. (2/8) Procurement is still evaluating and will make<br />

this a priority. (2/15) Procurement has completed their review and observations will be given to<br />

DDI this week. (2/22)<br />

" Stainless steel acid overpack decontamination needs to be completed. (10/12) This has not yet<br />

been done. Drums are currently contained in the anomaly staging area. (10/26) Characterization<br />

Z:\Administrative Assistantfroject Progress Review Weekly Meetings\201 lk~ebniary2-22-11 Weekly Pmogress.doc


Progress Review Meeting<br />

Page 2<br />

plan development is in process. The drums are in an exclusion zone due to the contamination on<br />

the outside of the drums. (11/2) No change. (11/9) WCH is developing a characterization plan.<br />

(11/16) No update. (11/30) Characterization plan is with WCH Engineering for review. (12/7)<br />

No update. (12/14) Characterization plan is at the planning for evaluation. (12/28) No change.<br />

(1/4) Plan has been returned from the planning department and is in review by project<br />

management. WCH would like to have review complete and returned to planning with changes<br />

this week. (1/12) Hans Carmen, RE who will be helping Doug Teachout, will be taking the lead<br />

in finalizing this plan. (1/18) A JHA walkdown is scheduled for tomorrow. Once final tweaks<br />

are completed, plan will be reviewed with the crew and implemented. (1/25) No update. (2/8)<br />

JHA walkdown scheduled for 2/16 and will include post-planning and a walk down with the<br />

associated crew. (2/15) JHA walk down has been completed, revisions will be made based on<br />

questions asked. Another JHA will be scheduled when revisions are complete. (2/22)<br />

* In Trenchs D, E, P, and G, there are twelve (12) small spots that will be dug up (no more than 6"<br />

by shovel) and bagged by a laborer in full PPE with RCT support before area will be downposted.<br />

(1/18) Approximately half of the spots have been cleaned up to date. (1/25) Most of the<br />

trenches have been down posted to SCA. The south slope is still up up-posted near Trench H/I.<br />

There will be RBA areas where the debris has been identified. (2/8) LARADS will be finished<br />

next week. Based on information already received, there will be several spots that will require<br />

clean up and will then be re-surveyed. DDI is reviewing the bottle cart checklist and will have it<br />

updated and ready for use when needed. (2/15) LARADS will be back tomorrow to develop<br />

plan. DDI is checking the certs on bottles that were delivered this week. (2/22)<br />

* DDI is requesting a full scope of work for Trench I. They believed this was supposed to have<br />

been provided as part of CN 030. WCH will look into this. (2/2) No update. (2/8) WCH will<br />

provide letter or other documentation to DDI soon. One consideration is to rev CN 030 to include<br />

reference to Trench I work package which is specific in scope. (2/15) Rev. I of CN 030 is being<br />

developed and will be issued this week. (2/22)<br />

* Need to do a run through of the anomaly checklist. It has been a while since it has been used.<br />

(2/8)<br />

" DDI notified of signage improvements needed in excavation areas. Some areas do not have signs,<br />

some need to be revised. DDI will look into this. (2/8) DDI indicated postings are in process of<br />

being updated. (2/15) DDI and WCH PSR will conduct a walk down of signage tomorrow.<br />

(2/22)<br />

" A corrective action (IF) has been written for extension cords. The hydrant at the CHPRC line is<br />

heat taped and powered by an extension cord. Inspections, per procedure, should be done daily<br />

on the whole cord. This cord is covered by a board and it is not apparent that the inspections are<br />

being completed. (2/8) DDI is working on a resolution. (2/15) DDI to install the cover<br />

tomorrow morning. (2/22)<br />

* DDI indicated that they anticipate working next Friday, February 2 5 'h, weather permitting.<br />

I11. PROJECT DESIGN DRAWINGS<br />

* None.<br />

* DDI given notice that when LARADS and close out sampling is completed it will be time to<br />

schedule final civil survey drawings. (2/15) DDI would like to schedule LARADS for trenches<br />

D, P, F, C and 0. WCH indicated that the "hot spot" in trench 0 needs to be taken care of before<br />

LARADS can be scheduled to survey that trench. (2/22)<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.


Progress Review Meeting<br />

Page 3<br />

* All Trench I silos have been excavated to the 10' level. As anticipated, around the 9 to 10 foot<br />

level the excavator encounters a lid like plate in Silo 6. There has been no dose associated with<br />

the plate at this time. The plan is to go back and continue remediation past the 10' level,<br />

beginning with silo 3. A question was raised whether the lid should be considered an anomaly.<br />

(2/15)<br />

" Trench N has now been posted as an HPA (High Particle Area.)<br />

V. MANPOWER<br />

* DDI announced that they will not be replacing their admin position at this time.<br />

VI.<br />

VII.<br />

EQUIPMENT<br />

" Watts will be removing Haul Truck #303 from service. DDI will be requesting release from the<br />

contract for that truck. (2/15)<br />

" Watts also anticipates reducing the number of excavators on site, with the John Deere 450<br />

machine being the one to leave site first as it is a rental. (2/15)<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

0 None.<br />

VIII. MATERIAL<br />

* None.<br />

IX.<br />

QUALITY<br />

*WCH QA will be participating in a factual accuracy meeting with DOE tomorrow about the DDI<br />

QA plan. (1/4) WCH did not receive any take away input from the meeting. (1/12) This item<br />

will remain in the minutes until DOE has submitted their findings to WCH. (1/25)<br />

FUTURE ASSESSMENTS<br />

* WCH will be issuing SDR this week to DDI for deficiencies for DDI Procurement<br />

Controls/Control or Purchased Items and Services. (FR-2010-LF-0664-SDR-023) (8/24) WCH<br />

has received and accepted the CAP from DDI for SDR-023. Corrective action timeline has been<br />

extended to January. (11/9) WCH to perform surveillance for CAP implementation due 2/1 /11.<br />

(1/12) WCH and DDI will meet to discuss. (2/8) WCH QA is working on a compensatory plan<br />

for DDI. (2/15)<br />

* WCH will be performing a follow-up surveillance (to be completed by March) to verify the<br />

implementation of the corrective action plans for FR-2010-WF-0749-SDR-024 and 025. This<br />

surveillance, when acceptable, will close out these two SDRs. (2/8) WCH project management<br />

will be meeting today to review completion of SDR actions. (2/22)<br />

" WCH issued a new SDR to DDI relating to the OMP walkdown performed by WCH EPL. (1/18)<br />

FR-201 I -IF-201 l-0015-SDR-O01 was submitted to DDI on 1/18/<strong>2011</strong>. WCH has received CAP<br />

from DDI on 1/20/11. (1/25) WCH EPL audit of OMP procedures last week. DDI is<br />

documenting when fuel is received, but not as it is being used. (2/2) WCH rejected the initial<br />

CAP from DDI. A second response was submitted by DDI and WCH has approved. (2/15)<br />

WCI- project management will be meeting today to review completion of SDR actions. (2/22)


Progress Review Meeting<br />

Page 4<br />

X. REQUESTS FOR INFORMATION<br />

DDI has requested a definition of an anomaly from WCH. (1/25) WCH is working through<br />

contract terminology discrepancies and conflicts, but will attempt to make this response a priority.<br />

(2/15) WCH issued letter regarding anomalies today. (2/22)<br />

XI.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* None.<br />

X11. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

" See attached.<br />

* Procurement anticipates issuing Modification No. 4 this week. REA is in process, finalizing<br />

answers to questions from WCH management. (2/22)<br />

" An option to rev CN 030 to include the work scope contained in the Trench I work package is<br />

being considered. (2/15) Rev. I of CN 030 should be issued by the end of the week. (2/22)<br />

XIII. CORRESPONDENCE (since last meeting)<br />

* Letter to DDI: Definition of an Anomaly<br />

* Weekly Progress Review Meeting Minutes 2/15/<strong>2011</strong><br />

XIV.<br />

XV.<br />

INVOICE AND PAYMENT STATUS<br />

*DDI to submit January invoice this week. (2/8) WCH received the invoice on 2/16 from DDI.<br />

WCH stressed that DDI needs to be more timely in their submission of invoices. Reminder that<br />

February end of month is February 20'.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

*DDI asked about the requested extension for 0 & 0, they anticipate submitting requested<br />

information today. (2/22)<br />

Attachment(s): As noted above.


o C )I '<br />

d<br />

>rol 0<br />

U-U<br />

CU'<br />

(NJ3<br />

* Eo<br />

E ln U. U<br />

TV ;<br />

- 11 1<br />

0N<br />

C"~ 6 Al<br />

c2


CZ<br />

z<br />

00<br />

S -


WCHClosure<br />

Washington .C-- -- 47<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

111169101 WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

W=1911=Christopher L. Beach<br />

11111"A'IM July 28,2009<br />

411<br />

ATEDE<br />

DSTRBTO<br />

C. L. Beach X3-16 E. L. Adamson X3-40<br />

D. Bollinger (DDI) S. C. Bentti X3-16<br />

R. D. Belden (DDI) R. D. Cantwell N3-30<br />

S. D. Bigham N3-30 R. A. Dodd H4-24<br />

Q. L. Crist X3-16 T. A. Foster N3-30<br />

T. M. Greager X3-40 R. Ganapathy X3-40<br />

L. N. Grossarth X9-08 D. L. Schilperoort T2- 10<br />

R. M. Harrison N3-30 J. A. Ware N3-30<br />

J. A. Heard H4-17 Project File, X3-16<br />

S. J. Henneman X9-08 Records and Document Control H4-1 I<br />

L. R. Miller (DDI)<br />

S. W. Parnell X3-16<br />

S. A. Strope (DDI)<br />

D. B. Teachout X9- 10<br />

R. C. Voeks L6-06<br />

H. Williams N3-30<br />

A. E. Zacharias X9-08<br />

A meeting on the above subject was held on July 28, 2009 at I118-K, MO-755.<br />

1. SAFETY<br />

*Safety topic: Be prepared when commuting. Be prepared by carrying cell phone, emergency kit,<br />

etc.<br />

1I. ACTION ITEMS FROM LAST TMEETING/STATUS<br />

* Received two submittals from DDI for review: Security Plan (Submittal 08-001-001), Baseline<br />

Schedule.<br />

[I1.<br />

PROJECT DESIGN DRAWINGS<br />

1),me uItn nr i d Se rnos qicrw~fkD kt p 07 - W ck Iv ige 10


Progress Review Meeting<br />

Page 2<br />

11I. PROJECT DESIGN DRAWINGS<br />

* Received a sketch showing the potential layout of the RCT and POD trail er/offices.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

" See attached mobilization schedule draft. DDI to include legend or key for color coding.<br />

" DDI provided preliminary sketc hes of trailer floor plans for the contractor and RCT trailers.<br />

V. WEEKLY PRODUCTION TABLE<br />

* See attached table.<br />

* Discussion about sorting processes. There will be two (2) craters to begin excavation secondary<br />

sorting.<br />

VI.<br />

VII.<br />

VIII.<br />

MANPOWER<br />

* None.<br />

EQUIPM[ENT<br />

" DDI raised the question about the possibility of holding the equipment inspections at the Watts'<br />

yard in Kennewick prior to bringing equipment on site in order to expedite any necessary changes<br />

for the initial mobilization effort.<br />

" DDI asked about using the WCH excavator (located at 618- 1) equipment attachments that are<br />

controlled as rad equipment.<br />

* WCH to get an inventory of buckets, shear and hammer breakers that might be available for<br />

use.<br />

" Discussion held about the number of excavators that will be on site.<br />

*Will be six (6) excavators on site, two(2) for the initial sort, two (2) for the secondary sort and<br />

two (2) for loadout.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

" Chris/Shane to check on GPR scans and Excavation Permit for site.<br />

" DDI to prepare anomaly handing and tracking processes for review.<br />

* WCH to provide a drum handling plan "straw-man" example to DDI.<br />

" Mobilization work package is to be developed.<br />

IX.<br />

MATERIAL<br />

*There will be a meeting on 7/29 to discuss 1H<br />

included in this meeting.<br />

equipment preparation. Chris Beach is to be<br />

X. QUALITY<br />

* None.<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

*Project phone list including c-mails will be published by WCH shortly.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* 08-001-001 Security Program for 188-K- I Burial 7/23/09 WCH in Review<br />

Ground Remediation Project<br />

* DDI provided copy of their Submittal Log and planned submittal schedule.


Progress Review Meeting<br />

Page3<br />

XIII.<br />

XIV.<br />

XV.<br />

XVI.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

0 None.<br />

CORRESPONDENCE<br />

* None.<br />

IN VOICE AND PAYMENT STATUS<br />

0 None.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

*Discussion with DDI of potential change notice to replace the skin on the tent. Fall protection<br />

plan required before bringing trailers on-site.<br />

*Fall protection plan will be similar to the one in use at 6 18-10 mobilization by Pac Mobile. Fall<br />

Protection Plan required before bringing trailers on-site.<br />

- Copy of Standing Order will be provided to DDI when received.<br />

*Need to have Letter of Credit rather than Performance Bond. DDI instructed to submit original<br />

Letter of Credit to WCH.<br />

* DDI submitted copies of the proposed "Chemical Inventory Log", "Employee Training Log", and<br />

"Daily Report" forms.<br />

* A reminder to DDI that all stand by and delays need to be approved by the Project Manager and<br />

STR and documented daily on form as per Exhibit C of the subcontracts.<br />

" WCH to check on getting an inventory of drums, boxes, pallets, etc from 618-1 and 100-D for<br />

site.<br />

" DDI is working with Dade Moeller for IH plan.<br />

Attachment(s): As noted above.


00U<br />

" --- ---<br />

C 3-<br />

-- -- - ..<br />

4<br />

C<br />

- -. -- , - - -<br />

--- --- ... ...<br />

... ... ----<br />

04 0 0<br />

zz<br />

cby<br />

E<br />

00 90 0<br />

-


9 - -- - - - - --- - - - - - - - - -- - - - -<br />

o<br />

Co<br />

o ---------- C J--<br />

N------<br />

----<br />

C<br />

I -----<br />

- - -- - 7~<br />

C,- ---- - -----<br />

c~~ ------- ~~ §-- --- ---<br />

CY ----<br />

d<br />

d<br />

(fl<br />

0 LL0<br />

L<br />

usC<br />

UIl<br />

I<br />

U


005 -- cr---<br />

Z- ad o<br />

0 -<br />

T-<br />

Z= 6<br />

0<br />

0 --- -- -0,<br />

-------- .... ......<br />

v 0<br />

C -<br />

- --- - - - -<br />

La<br />

-- - -------<br />

0 EL<br />

> ><br />

0<br />

0 0 , > ><br />

C) -<br />

wd ctW~ < w<br />

0(


0<br />

CY<br />

o --<br />

0<br />

0 0 o<br />

z-. z<br />

C<br />

- 00<br />

>~~ C C c<br />

.3 E<br />

L I Lij<br />

'I<br />

0<br />

<<br />

4-C


1-i<br />

toK<br />

CL~--<br />

*<br />

-<br />

E1 tT-7 T-<br />

"i 117<br />

E<br />

-~ 7 -<br />

71 r<br />

A1 U~ 1<br />

- 4-- -<br />

123<br />

V~t V<br />

-~ 77<br />

I ±-<br />

~ ~ FIT<br />

~ - z~i~il


- - ~- -~ - -~ -~ -~ - - - - - -<br />

- - - i-i I- 7 :4<br />

- 1t'r,-I,-i.; -- ti<br />

o - -~-~ - - i<br />

-~ *i-tTh 1-4 LH K<br />

- - - 1t 't -1---1- -] - +- 712-I -<br />

-~ - - - ~r -~ - -<br />

* '~' 1- -~ -42~. -- 4<br />

I- - - -1 -I * '-~ -<br />

1 I -l - -<br />

~ I -' ~ ~ 1 -i ~ I -<br />

I> r--~ 2 TVT~T7 -. -~ 12<br />

~- ~- - -- ~- - -<br />

- t-- -~ -~ -: -12 ~-] -, -<br />

-- r---I I-<br />

_ -~ -~<br />

- 1 T ~ I<br />

-~ TTT~T~<br />

V<br />

K -- '-'--' -, ---~ - - ti -r-,<br />

* fl - -<br />

~~(0<br />

- ~<br />

- 421272-72 1 -- -<br />

(.-.q, F H -I--- ~- ~'~~~~1~~<br />

1~~~~ -" -- H ---- -- -i<br />

-- T -- 1 1------, -1<br />

-i-LI<br />

~ -~ -<br />

2<br />

2<br />

- -t -~<br />

-+ -~<br />

N 7 2 I -, ~T772 7277<br />

~Id ~H2<br />

---- ' -<br />

- i-i 2- -~<br />

- -~ -<br />

- - -<br />

--1 -~ --- ~ - 2- -,<br />

-I---,-<br />

z-<br />

'1 -1---- 1<br />

'~ H '2 124<br />

712 1-1<br />

-~<br />

-~<br />

-~ -~ ---A---! -f-- -<br />

- 14<br />

- I -i---- t- -I--- --~---<br />

(N~ - -A A--I - - - ~1~:4 -~ -- t-- .-<br />

tFmN<br />

(N.-<br />

-. - H j--l j-.<br />

i-H .- ~ -<br />

- -~ -- p-i-I - -<br />

*7 12 14 -A--H -F- -f----<br />

-i--I<br />

AZ<br />

~~2<br />

-7-<br />

-- I---- a 4 -----~<br />

u-I---<br />

L. - I 2<br />

* ---~--AZ---2-4-~fl~


- - -~ - - - -<br />

'--~<br />

'I ~1 '-1<br />

V<br />

- H- '' ~ 1<br />

- -<br />

p '--i -, 1<br />

-~ ~-<br />

'N ~1<br />

-1-'1<br />

'~1 -<br />

-. -<br />

~1<br />

- - -<br />

t~ -i--i<br />

___ t t" --F----]<br />

I - ~ -<br />

~oc 1 '-I<br />

i-- 71 H<br />

- ' ~-<br />

0'~- --<br />

1-<br />

1~~<br />

2: 1<br />

~ -- I'- 2<br />

- - - 22 t H T t~ -"<br />

_ - 1~f-I---'<br />

-H<br />

-- CD 1 I -1--"<br />

* -~ F.- ~ .- -i---- 222 7<br />

1 -'-1 r- 4 -I - ~<br />

F: -1 ----' ~J 7122<br />

1 -~ F<br />

- - - - ~1 -'-i Al<br />

H ~ -t<br />

i --- I --A<br />

~~-tH +1142<br />

--2 -4-I<br />

~1<br />

F1 -I-I ' --4<br />

"Co 4- 77 III<br />

C44 ~ -- 27 T<br />

I, YW<br />

- 4---<br />

4--i ~-'1 -<br />

- - ~- -~--<br />

- r1 -p-' 4 ~~1<br />

-4--' H -<br />

-4---' 1 -~<br />

1 '---1 - -<br />

-Hft<br />

-v<br />

--- -- '<br />

--<br />

-4-- 4-<br />

22 - .--- -- I ~7 22t11<br />

--- I-A'<br />

t<br />

I<br />

-' 12 ~-iJ -~<br />

-~ --12<br />

-- I- -


4)<br />

- 0'<br />

000 CD 1CD-00:0D 00;<br />

0D -<br />

OfO ) ) 01c 00 I<br />

Im C.,)<br />

NII<br />

D<br />

0) 6-0


I<br />

I<br />

I<br />

0 >C<br />

.- o0<br />

AR -


110 ' H<br />

1110 I<br />

'F<br />

I<br />

F' I ''<br />

- I H<br />

F ' F I 'F<br />

II~<br />

F<br />

I. F<br />

F , I F<br />

F<br />

F<br />

''F I 'I F<br />

- p<br />

F' F F<br />

K FF F F F ' F'' 'I.<br />

F 'F K~F 'F'<br />

F I I F<br />

JI- K '<br />

'1 KK. KF F<br />

'<br />

F<br />

' I, ' F'<br />

IF *1 'I ,I, ' ii<br />

~J~'' ':.I '~FI [J~ F, 'f~<br />

1 K I'I< F<br />

~ 'p'' ''F K<br />

~1- '<br />

F I '<br />

&<br />

F'<br />

~ 'I,'<br />

-~ F F ,F' 'F F,<br />

~IF~<br />

'<br />

F<br />

I;<br />

K',<br />

'FF I F' ' '<br />

' F F<br />

''F''''<br />

K<br />

C -<br />

I-'<br />

44<br />

,i~ ~


Dance Designs Inc.<br />

118-K-i Burial Ground Remediatlon Project<br />

Daily Report<br />

Date: Wednesday,July 08, 2009<br />

Prepared By: Ron Belden Start Time: 6:00 AM<br />

Finish Time: 4:30 PM<br />

Weather: Partly cloudy, winds 15-25 in the afternoon, high: 880 F, low: 520 F.<br />

Production Summary<br />

Manpower Summary<br />

Straight<br />

Estimated BCMV Sorted: BCM Time Overtime<br />

Estimated Tons Loaded: Tons Classification Hrs Hirs<br />

No. of Containers Loaded: Cans Operators<br />

No. of Containers Shipped: Cans Laborers<br />

No. of Anomalies Handled: 0 Each Teamsters<br />

Anomaly Characterization: 0 Crew Hrs. Mechanic<br />

Total 0.00 0.00<br />

Equipment Summary<br />

Hitachi 450 #1 hrs. Rock Truck hrs.<br />

Hitachi 450 #2 h rs. Water Truck #1 h rs.<br />

Hitachi 330 #1 h rs. Water Truck #2 h rs.<br />

Hitachi 330 #2 hrs. Road Grader h rs.<br />

Hitachi 225 #1 h rs. Front End Loader hrs.<br />

Hitachi 225 #2 hrs. Fork Lift h rs.<br />

Shuttle Truck #1 h rs. Shear h rs.<br />

Shuttle Truck #2 h rs. hrs.<br />

Shuffle Truck #3 hrs. hrs.<br />

Shuttle Truck #4 h rs. h rs.<br />

POD Summary<br />

Meeting @ 0600 hrs. Safety topic discussed heat stress and how to prevent it. Work scope was discussed. Some concern<br />

expressed over congestion and personnel working in close proximity to equipment. Excavator operators were reminded that they<br />

control their work area and will make sure everyone is following their direction when in that area.<br />

Work Activity Summary<br />

Gross and secondary sorting in Trenches J, L, C and K. Loading EROF containers from Trenches C, J and D. 15 Boxes of liners<br />

were delivered @ 1415 hrs. Handled 5 anomalies, Characterized 4 anomalies in the morning (3.5 crew hours.)<br />

All soils disturbed today were treated with a soil fixative at the end of the shift.<br />

SafetyfrraininaJAccident/lncident Activities<br />

Monthly GFCI Inspections performed. All were functioning properly.<br />

Excavation Inspections<br />

Performed by Ron Belden @ 0645 hrs immediately after the POD. All excavations were approved for personnel entry. This was<br />

communicated to the workforce via radio.<br />

Air Monitor Inspections<br />

Performed by Ron Belden (0 0545 hrs prior to the POD. All monitors were running.<br />

Delays (Concurrence y WCH:<br />

Rad~on Equip: No. 2 sorting crew down for 2.5 hours (0845-1115 hrs) while the CRATER system was not functioning.<br />

Wind: Shutdown at 1500 hrs due to excessive winds (1 hour).<br />

Other<br />

NorthPoint Electrical was onsite to troubleshoot the Frisking Tent lighting.


Dance Designs Inc.<br />

118-K-1 Burial Ground Remediation Project<br />

Production Log<br />

Date:<br />

7/28/09 6:30 AM<br />

_ERDIF Connr __aokTP<br />

Cu<br />

~2 Day of<br />

Tona*<br />

m It tn Cn Lo4d(D<br />

=0 the Week Date D1 vr ' hp)~ hp.~ Lbidsct .scaes), Lojpj<br />

Thu 10/1/09<br />

Fri 10/2/09 __<br />

Sat 1-0/3/09 _<br />

Sun 10-/4/09 -<br />

Mo-n- 10/5/09 ____<br />

_<br />

Tue 10/6/0-9<br />

-__ _ ____<br />

Wed 10/7/09<br />

__<br />

Thu 10/8/09 __<br />

#4r - 10/9/09- -- - - - - -- -- - -<br />

Sat 10/10Q/094- ___<br />

Sun -10/111/09 _____<br />

Mon 10/12d/09 ___<br />

Tu 10/13/09<br />

Wed 10/14/09<br />

- __ _<br />

____<br />

Thuf 10/157/09 __<br />

_<br />

Sun 10/18/09 ___<br />

Mon 10/19/09 ___<br />

Tue 10/20/09 ____<br />

Wed 10/21/09<br />

Thu 10-TO/22/09 ____<br />

__<br />

_<br />

__<br />

Fri 10/23/09<br />

_ _<br />

Sat 10/24/09 -___ __ ___ _____<br />

Sun -10/25/09 ____<br />

-M-on -- 10/26/09<br />

_-_________<br />

___<br />

Tue- 10/27/09-___<br />

___ _ _ _____<br />

-Wed -10/28/Y09 _____<br />

Th -u -10/29/0 - __ __ -___<br />

Fri - 10/3(0/09<br />

Sat ----- :10/31/09 __<br />

Sun 1//9__<br />

Mon 11/20<br />

Tue 11/3/09 __<br />

Wed 11/4/09 ___<br />

Th-u 11/5-/09<br />

Fri<br />

11/6/09__<br />

_<br />

_<br />

Sat 11/7/09<br />

- __<br />

Sun 11/8/09<br />

_<br />

Mon -1-1/9/09<br />

-<br />

Tue 11/10/09<br />

Wed 11/711/09<br />

- __


Dance Designs Inc.<br />

11 8-K-i Burial Ground Remnediation Project<br />

Delay Log<br />

Lack of ERDF<br />

______Wind<br />

Other Weather Containers<br />

0 ayo Overall<br />

zthe Week Date cum. Hours Hours Cum. Hours Hours Cum. Hours Hours Cum. Hours<br />

- Thu 10/1/09<br />

Fri 10/2/09<br />

__<br />

Sat 10/3/09 ___<br />

__<br />

__ Sun 10/4/09<br />

Mo-n 1_0_/5/09<br />

___ ___ __ __<br />

_ ue 1-/6/09<br />

Fri 10/9/09 - ___<br />

_ Sat 10/10/09 _<br />

_<br />

__ Sun 10/11/09 _ ______<br />

Mon 10/12/09 ___<br />

Tue 1f0/ 13/0-9<br />

-___<br />

Wed 10/14/09 ___ ___ ___<br />

__ Thu 10/15/09,__<br />

Fri 10/16/09 _<br />

__ Sat 10/17/09<br />

- __<br />

_ Sun 10/18/09 _______<br />

Mon 10/19/09 _<br />

Tue 10/20/09<br />

____<br />

__ W -ed -10/2_1/09 _<br />

__<br />

- -----<br />

Thu - 10/22/09 ___<br />

Fri 10/23/09 -__________<br />

Sat 10/24/09 _______<br />

Sun 1 0/25/09 -_______ ___ ___<br />

-_Mon 10/26/09 --<br />

Tue 10/27/09<br />

___________<br />

_ __Thu 10/29/09 __<br />

Fri- 10/30/09<br />

--<br />

Sat 1/10<br />

S n _1- 1 / 9____<br />

-<br />

Mon 11/2/09<br />

--<br />

_<br />

Tue 11/3/09 __ __ _-<br />

Wed 11 /4/09<br />

Thu 11/5/09- I-<br />

_<br />

Fri -- 11/6/09<br />

-<br />

Sun 11/8/09<br />

- _<br />

Mon 11/9/09<br />

Sat 11/7/09<br />

Tue 11/10/09 -_ - -_____<br />

-- _


Dance Designs Inc.<br />

118-K-i Burial Ground Remedlation Project<br />

Production Log<br />

-Manpower-<br />

F- H- F- - ~ - ~<br />

Cl) 0 H H - a) 0 H H- *<br />

U)'<br />

UC) 0 Cn l<br />

~ o) o o L<br />

o)<br />

0 LO LO<br />

(n<br />

m~ m '<br />

.o -- m- O R F1<br />

X Day of<br />

Q) (n C<br />

I_-Eo<br />

C) Ca a 0 (D 9<br />

.mthe Week, Date 0 01 - XJ m<br />

Thu 10/1/09<br />

Fri 10/2/09 _<br />

Sat 10/3/09<br />

_ _<br />

Sun 10/4/09<br />

___ _<br />

Mon 10/5/09<br />

_<br />

Tue 10/6/09<br />

___<br />

Wed 10/7/09 ___<br />

Thu 10/8/09 ___<br />

Fri 10/9/09 _ _ _<br />

_<br />

Sat 10/10/09<br />

_<br />

Sun 10/11/09 _ _<br />

Mon 10/12/09 _<br />

Tue 10/13/09 __ __-<br />

_<br />

Wed 10/14/09 _ ____<br />

Thu 10/15/09 _ ____<br />

Fri 10/16/09<br />

Sat 10/17/09__<br />

- _<br />

Sun 10/18/09 _<br />

Mon 10/19/09 ___<br />

Tue 10/20/09 __ _<br />

Wed 10/21/09 _<br />

Thu 10/22/09<br />

Fri 10/23/09__<br />

_<br />

_<br />

____<br />

____<br />

Sat 10/24/09<br />

Sun 10/25/09<br />

_<br />

Mon 10/26/09<br />

Tue 10/27/09<br />

Wed 10/28/09<br />

Thu 10/29/09<br />

Fri 10/30/09__<br />

Sat 10/31/09<br />

___<br />

_<br />

Sun 11/1/09<br />

_ __<br />

Mon 11/2/09__<br />

Tue 11/3/09<br />

Wed 11/4/09<br />

Thu 11/5/09<br />

Fri 11/6/09<br />

Sat 11/7/09<br />

_<br />

Sun 11/8/09<br />

______


Dance Designs Inc.<br />

118-K-i Burial Ground Remediation Project<br />

Production Log<br />

Average Tare Wt.=<br />

22000 lbs.<br />

________ Load Number (Gross Wt from Scales) _____ ____<br />

Cs<br />

Daily Total<br />

SDay of<br />

Tons Loaded<br />

0 zthe Week Date (DDI Scales) 1 2 3 4 5 6<br />

Thu 10/1/09<br />

Fri 10/2/09<br />

-- _ _ ___<br />

Sat 10/3/09 - -____<br />

Sun 10/4/09 _ _<br />

__ Mon 10/5/09 ___ ______<br />

Tue 10/6/09<br />

Wed -160-1-C9__ __ _ _<br />

_<br />

_ Thu 10/8/09 - _ _ _ _ _ _ __ ___ _ _ _<br />

__ Fri 10/9/09- _ _ _ _ _ _ _ _ _ _ _ _ _ _<br />

__ Sat 10/10/09<br />

_ Sun 10/11/09 _ __<br />

Mon 10/12109-_<br />

_ __ _ ___<br />

__ Tue 10/1 3/09 ____<br />

Wed 10/14/09<br />

____ __ _____<br />

__ Thu 10/15/09 -- _ _ __ __<br />

ri~7 10/16/09 _ _<br />

_ Sat -l1/1/9<br />

Sun 10/18/09 ___<br />

Mon 1/90 __<br />

__ Tue 10/20/09 -_ ____<br />

__ Wed 10/21/09<br />

__<br />

__ Thu 10/22/09<br />

___<br />

_ Fri 10/23/09<br />

_<br />

Sat 10/24/09 ___ ____<br />

__ Sun 10/25/09 ____<br />

__ Mon 10/26/09-<br />

_ ______<br />

Tue _ 10/27/09 __<br />

_<br />

Wed 10/28/09<br />

- _____ __ _ ___<br />

Thu - 10/90 -d-__<br />

__ Fri 10/30/09-<br />

Sat 10/31/09<br />

_ __ _<br />

_ Sun 11/1/09 - _-________<br />

_ Mon 11/2/09<br />

__<br />

_<br />

Tue 11/3/09- ___<br />

Wed 11i1419 -_<br />

_____ ____<br />

_<br />

Shu 11/8/09--<br />

_ -_<br />

_<br />

_<br />

Mon 11/8/09 - _ __<br />

Tue 11/10/0 9 ___


co<br />

cc<br />

-r H-b<br />

-r<br />

- J- e - -<br />

Ir<br />

u *w --<br />

- -<br />

0<br />

-- 40M o<br />

*) Ob .0 ci) (b c) U<br />

0<br />

>) 0 0< t<br />

CD3 E2J, a<br />

cc a <<br />

<<br />

U) mi<br />

~<br />

(00<br />

00 CLU<br />

0C 01 - 4) 0<br />

CN m 1- 00 0<br />

Cc. cc' ) 4<br />

o : 00 0 0 'N


-o<br />

*<br />

0. U)<br />

(D<br />

0D C: 0<br />

o<br />

0*Z 0 l<br />

CDC.<br />

CL.<br />

ci<br />

F<br />

4) 0<br />

0 0 0-j 1<br />

U)(UU 00 c J)0 (<br />

13. (1) 704 () 0a - 7 -<br />


1 )<br />

00 (D<br />

(A E<br />

40 00N<br />

cc<br />

c 3<br />

-a<br />

(D a) a (<br />

Cn3<br />

Z - -<br />

-: -<br />

(D<br />

C<br />

C.D -)<br />

CD.-C:<br />

rl- a)_ cu<br />

Va ) )a)C<br />

C<br />

C


(0<br />

CL<br />

C0<br />

0<br />

E 0<br />

-) --<br />

o) 0<br />

(.))<br />

Ic<br />

I<br />

C. I<br />

co 00<br />

ix<br />

0 C0 .0M0<br />

00 .). -o ><br />

I(a) -0 m<br />

T 0<br />

4) m4 .0 C:c<br />

0<br />

a) () l<br />

lb (D ) ) a<br />

E~ Co 0) 00<br />

- F5<br />

.0 0 3L<br />

0.<br />

Xx<br />

0D<br />

M<br />

.j .t x 0<br />

Cu -<br />

E .4 o C<br />

I s C


0<br />

co<br />

E<br />

Ic - c - _ _ __T-c<br />

0.<br />

0~0<br />

(Jr.<br />

-ED-<br />

IV-<br />

-00 ts<br />

70 c<br />

0U .w;<br />

0 m00<br />

CDr-L<br />

m (<br />

U)u)-0c<br />

c .2<br />

U<br />

0< E lit5 m<br />

0 4) 4)<br />

Ea<br />

M cL L a (<br />

ll. IL I<br />

(D 4)LU c<br />

w~~~ ~ num<br />

~ 450 ,<br />

2o<br />

CN ~cn r- c


- -<br />

co<br />

00<br />

00<br />

E0<br />

0):<br />

Ca1<br />

00<br />

-r wu CD(D I 0<br />

I- I<br />

co < <


C~4<br />

4w<br />

COD -J<br />

C--4<br />

I 0<br />

a -a 'a 'a* 'a l) 7 b-<br />

U)w U))) 0<br />

1.- < < < < M<br />

4) . ~ 0 U ) U ) U ) U ) U<<br />

Tw~E-<br />

~c w<br />

I ~ I<br />

= 0<br />

cc<br />

EE<br />

(0E 0 (00a<br />

0 r- a.-<br />

- .2<br />

-6 >1<br />

C/) < 'a a<br />

0 - ca 0 cc0<br />

U<br />

5 z ~ 4<br />

z<br />

0D 0) 0r w2 m 2-'<br />

c E ,c( 0 0c J IT o C<br />

El 00 2U n L) 0) C ><br />

< 0 C L na<br />

0o<br />

_o 0l co 0) a- 0__ m-<br />

n<br />

9 0 0: 09<br />

I C'IT<br />

I I


w -0 2 -Dwc lw -<br />

(.0<br />

E 0<br />

0 M<br />

0 00-<br />

< < < ce:1)0 Ce)Jo


C4'<br />

0) 0)<br />

0 "*D<br />

tD b-Cocr (<br />

C) .-<br />

40- C040 o<br />

co4 D ) a<br />

(U1<br />

a4)<br />

m<br />

c<br />

co .<br />

00<br />

(n C i l 0-<br />

N) C14V<br />

j ~CD C ~ 0<br />

'Po<br />

99


C4<br />

E0<br />

a 0<br />

I.-r<br />

0o<br />

o<br />

<br />

0.0~~c<br />

~ ~.<br />

a.-<br />

-0 -2 0 0- z- ,<br />

0 -:3 0 0<br />

Cu-~ 0 CA-5CT ~<br />

-<br />

tv 0<br />

4)<br />

a)<br />

00<br />

c . .<br />

CDC


Washington<br />

Closure<br />

WC H <strong>Hanford</strong><br />

Meeting Minutes<br />

lag= WEEKLY PROGRESS REVIEW MEETING C008753AO0<br />

Distribution<br />

CCN: 148834<br />

11111=01AM<br />

Christopher L. Beach<br />

W _IA I B January 19, 2010<br />

ATNDE<br />

DITRBUIO<br />

E. L. Adamson X3-40 S. C. Bentti X3-16<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Grist X3-16 M. D. Clancy X3-.16<br />

L. W. Grossartli X9-08 R. A. Dodd H14-24<br />

J. A. Heard H4-17 C. Flowers (DDI)<br />

W. R. Junkins X3-16 T. A. Foster N3-30<br />

P. Kennedy (DD I) R. Ganapathy X3-40<br />

S. E. Parnell X3-16 T. M. Greager X3-16<br />

M. Sherman (DDI) S. J. Henneman X3-16<br />

D. B. Teachout X3-16 R. A. Nunamaker X3-16<br />

A. S. White (DDI) J. Price (DDI)<br />

G. D. Barberi H4-18 D. G. Saueressig N3-30<br />

J. A. Ware N3-30<br />

H. Williams III X3-16<br />

A. E. Zacharias X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4-1 1<br />

A meeting on the above subject was held on January 19, 2010 at 1 I18-K, MO-755.<br />

1. SAFETY<br />

0 Safety topic:. Compliance with speed limits on gravel roads entering the site and parking lot<br />

areas. Discussed the LSIT process and encourage use of LSIT programs.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* DDI and WCH to discuss tank ladder fall protection requirements. DDI to propose providing<br />

JLG, manlift, etc. in process. WCH has this proposal for review. DDI is revising Fall Protection<br />

Plan. When this is complete, they will draft response and proposal to CNOO5. Whitney Sexmith<br />

is competent person for harness inspections. DDI resubmitted CN 005 proposal last week WCH<br />

in review. This is to be completed by 1/28/20 10. Discussed diesel tank ladder use. DDI Fall<br />

Protection plan has been returned status 2. DDI is evaluating comments.<br />

" Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/25/2010.<br />

Z:\Administrative Assistant~roject Progress Review Weekly Meetings\201 0\January\1 -19-10 Weekly Progress.doc


Progress Review Meeting<br />

Page 2<br />

" PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currentlyjust waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/2010. Still waiting on permits from CHPRC.<br />

WCH following up.<br />

* Discussion of waste oil uses and testing of same if oil is taken off site. Will discuss further with<br />

environmental regarding Watts' re-use of waste oil. WCH is investigating from an environmental<br />

perspective. DDI to supersede the SPCC with an OMP. WCH has evaluated waste oil for<br />

heaters. DDI to provide a designation of non-regulated and/or specification on used oil that<br />

qualifies to burn prior to removal of any waste oil from the site. When DDI has submitted OMP,<br />

Environmental will get WCH concurrence. DDI plans to submit by 1/25/2010.<br />

* WCH requests a site absences coverage plan. WCI- to give DDI comments. DDI plans to submit<br />

this by 1/21/2010.<br />

* WCH requests G-02 hours for December. DDI needs to have these submitted by the 3 rd day of<br />

each month. Transmittal back to DDI with status 2 due to mathematical errors in hours<br />

calculation. Discussed attention to detail in completion of G-02 form submnittals. DDI is going<br />

back and auditing all the records so that the next submittal will show corrected figures.<br />

* Discussed the potential upgrade from 2-watt to 4-watt radios. DDI indicated there should be a<br />

trade-in value from existing radios which will help off-set the cost. DDI evaluating quotes<br />

received and licensing potential issues. Also looking into alternatives such as installation of a<br />

repeater versus purchase of new radios. Possible change out this weekend. DDI to have two (2)<br />

5-watt radios on-site for testing approximately 1/20/2010.<br />

" Discussed DDI working to mobilize two haul trucks from ERDF. There is a total of four (4)<br />

needed for site operations. Negotiations about contracts, costs and ownership are in progress.<br />

DDI to work on a proposal and WCH Procurement will follow up on request. Discussed details<br />

regarding WCH provision of two 22-ton capable haul truck and contract changes that would need<br />

to be made for the 25-ton minimum requirement. DDI to provide their own trucks rather than this<br />

proposal. DDI plans to have the fourth haul truck onsite, no firm date for arrival. DDI requested<br />

to provide firm date.<br />

* Discussed badging requests recovery of badge and TLD upon termination of employees.<br />

Currently there are two individuals that need to return their badge from DDI/Watts. Discussed<br />

Boyd and Hanson TLD retrieval.<br />

* Discussed positive continuous improvement in POD work pre-evs. Continue to have feedback<br />

from DOE that there needs to be more employee interaction during the work package pre-ev<br />

briefing.<br />

* Shuttle truck cable directions have been requested (CNOI 6). WCH to share video tutorial with<br />

DDI. Training using the video will be scheduled by the end of January. Training to be held<br />

1/27/2010 at 1530 hours.<br />

" Discussed 1/27/20 10 Safety luncheon for meeting safety goals and VPP flag raising.<br />

* Discussed weekly site safety walkdowns to be conducted Wednesdays with craft and supervision<br />

support.


Progress Review Meeting<br />

Page 3<br />

111. PROJECT DESIGN DRAWINGS<br />

*Electrical drawings are in process. Diesel storage tank electrical designs and trailer site electrical<br />

as well as as-built drawings. DDI will be re-submitting drawings which will incorporate WCH<br />

comments. DDI to make sure that drawings reflect changes that have occurred recently.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

* Discussed trench scheduled. DDI plans daily to have two primary sorts, two secondary sorts, and<br />

one load-out for now. DDI has begun work in trench DEP. Will perform two (2) loadouts in the<br />

beginning. After DEP trenches are complete, work will be moved to trench G before starting<br />

trench F.<br />

V. WEEKLY PRODUCTION TABLE<br />

* None.<br />

VI.<br />

VII.<br />

VIII.<br />

IX.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

0 See attached.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

" WCH QA in process of scheduled assessments.<br />

* Discussed the importance of proper completion of inspection forms.<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

* None.<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* DDI plans to revise equipment maintenance plan (9/25).<br />

* DDI plans to resubmit fall protection plan<br />

* DDI working on OMP (9/25) and will submit to WCH.<br />

* DDI to resubmit corrected G-02 after reconciliation.<br />

* WCH is reviewing submittal 3-011-001 (Notification of/or Quarterly Inventory Updates of<br />

Chemical Materials/Products Inventory 1/4/2010<br />

" WCH is reviewing submittal 09-005-018 (Equipment Inspection of: Peterbuilt Shuttle Truck 84,<br />

Water Truck 774)<br />

* WCH is reviewing submittals 05-08-001, 002, 003, 004 (Electrical Drawings)<br />

* WCH is reviewing submittal 09-013-OOIA (Traffic Control Plan)


Progress Review Meeting<br />

Page 4<br />

XIII.<br />

XIV.<br />

XV.<br />

XVI.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

CORRESPONDENCE<br />

" Letter from DDI: Safety Award Hours.<br />

* Transmittal from DDI: Proposal for CN 013 Rev. 1.<br />

INVOICE AND PAYMENT STATUS<br />

* None.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* Discussed Trench I solo remediation planning and subcontractor involvement. DDI will be<br />

requested for feedback during the development process.<br />

" Discussed USQ evaluation of work guiding documents and the 118-K safety basis.<br />

Attachment(s): As noted above.


0<br />

x<br />

cu<br />

m w.<br />

0A 0 .2<br />

Cao a L.-<br />

0.<br />

><br />

Qw<br />

004<br />

0L<br />

L(U<br />

0 C r4<br />

a O0 CD 0 0 UC)<br />

3J<br />

W ~<br />

E E~~ m m 4u 4ru - 0<br />

2 u Cu Cu un* E ( uL<br />

SE


.-<br />

c o<br />

L~0<br />

.2 0<br />

U a) a) a)<br />

~ a a ) a ) a<br />

a)<br />

4..<br />

tg C) C r- 0 w a ~ r 0<br />

Ci * - 0 ( -q E<br />

LU 0'~.~ (U<br />

U


C<br />

E<br />

(A)< a<br />

E<br />

C (A<br />

(V) X< x X x x<br />

0_<br />

(D C)<br />

CoQ<br />

r0 o-<br />

cuu -<br />

E<br />

C)a)..<br />

00 a)<br />

U~-<br />

f'f<br />

a- L<br />

0 toE<br />

F- -0cU<br />

0 0- I<br />

(19<br />

.X 0~ -00<br />

m f EU<br />

m - m 0-= 00 c<br />

u o a)s- ( u Q<br />

- x xox 0- 0 -<br />

I- -LJW -- +0-- T:Z


X x x x<br />

Ul)<br />

a)<br />

C (U<br />

E<br />

UC<br />

Ln X a)<br />

0)<br />

d<br />

E<br />

~ Ni<br />

aL a) a)<br />

--<br />

0<br />

CDU<br />

)< a<br />

Otto<br />

w0 00.<br />

-C C &-O<br />

-E z<br />

ra- c: - 0<br />

0U0*<br />

O-Ou Ei z<br />

a) C 7, . ) LJ<br />

4 4<br />

0J<br />

>0 > 0 m a) - _<br />

m -a a<br />

u<br />

=~<br />

cu<br />

c c a)<br />

(U m<br />

x<br />

wI....<br />

0 &<br />

a) m a<br />

2<br />

W, -J,4 -J O<br />

TZ_ _ _ _ _


0 V<br />

x) xx x x x V<br />

5.<br />

a. 0<br />

0 m<br />

0) (U<br />

ILE<br />

.0 0-'<br />

X )<<br />

00<br />

- a<br />

Co<br />

U-<br />

CL<br />

03 C 0 o.z<br />

~ - C -0 a. 0<br />

U~ U - 0..<br />

0~<br />

C) Lu C LL L/)<br />

< C"n 0 0a_<br />

=O44C 4- C<br />

LU<br />

>3 0) JU U 0- 4- W UC<br />

> > u -0 _0<br />

5- x x 0.<br />

0X<br />

M L,2 LU.u, Lu a- .~- TZ __ _


0 0 aa 0<br />

Fi<br />

E<br />

2<br />

a 2 12<br />

22U<br />

55<br />

CS<br />

0:0<br />

j<br />

'Mae<br />

L<br />

U) 0 tJ 8 .2<br />

oa