StartsidaGET • EPA
add
Getlink SE
Föregående stängning
15,59 €
Dygnsintervall
15,44 € - 15,67 €
Årsintervall
14,92 € - 17,35 €
Börsvärde
8,64 md EUR
Genomsnittlig volym
705,96 tn
P/E-tal
24,35
Direktavkastning
3,56 %
Primär börs
EPA
Ekonominyheter
Ekonomi
Resultaträkning
Intäkter
Nettoinkomst
(EUR) | juni 2024info | Förändring Y/Y |
---|---|---|
Intäkter | 404,00 mn | −13,49 % |
Rörliga kostnader | 61,00 mn | 0,00 % |
Nettoinkomst | 86,50 mn | 8,81 % |
Nettovinstmarginal | 21,41 | 25,79 % |
Vinst per aktie | — | — |
EBITDA | 211,50 mn | −14,72 % |
Giltig skattesats | −9,49 % | — |
Balansräkning
Totala tillgångar
Totala ansvarsskyldigheter
(EUR) | juni 2024info | Förändring Y/Y |
---|---|---|
Kontanta och kortsiktiga investeringar | 1,50 md | 15,72 % |
Totala tillgångar | 9,03 md | 2,10 % |
Totala ansvarsskyldigheter | 6,64 md | 1,38 % |
Totala tillgångar | 2,38 md | — |
Utestående aktier | 541,64 mn | — |
P/B | 3,54 | — |
Avkastning på tillgångar | 4,18 % | — |
Avkastning på kapital | 4,64 % | — |
Kassaflöde
Förändring i nettokassa
(EUR) | juni 2024info | Förändring Y/Y |
---|---|---|
Nettoinkomst | 86,50 mn | 8,81 % |
Kontanter från verksamhet | 228,50 mn | −15,21 % |
Kontanter från investering | −33,00 mn | −26,92 % |
Kontanter från finansiering | −208,00 mn | −3,48 % |
Förändring i nettokassa | −8,00 mn | −116,33 % |
Fritt kassaflöde | 88,56 mn | −25,81 % |
Om
Getlink, formerly Groupe Eurotunnel, is a European public company based in Paris that manages and operates the infrastructure of the Channel Tunnel between France and the United Kingdom, operates the LeShuttle railway service, and earns revenue on other trains that operate through the tunnel.
Groupe Eurotunnel was established on 13 August 1986 to finance, build, and operate the Channel Tunnel under a concession granted by the French and British governments. The tunnel was constructed between 1988 and 1994 by TransManche Link under a contract issued by Groupe Eurotunnel; construction costs would overrun considerably, from TML's original estimate of £4.7 billion to the final cost of £9.5 billion. On 6 May 1994, the completed tunnel was officially opened. Its rail infrastructure comprises 50.45 kilometres of double track railway in the main tunnels, plus extensive surface-level terminal facilities at Folkestone in England and Calais in France. The rail network for operation of the Eurotunnel Shuttle train services is entirely self-contained, with connections near the two terminals to the respective national railway networks. Wikipedia
Grundades
13 aug. 1986
Huvudkontor
Hemsida
Anställda
3 375